Loading...
HomeMy WebLinkAboutZ-9345 Map 31. Builder must ensure that proposed structure and r learstb ilding lines, setback requirements, semenbefore including those stated in the Bill of Assurance, construction begins. Will be available. Z. No other coPies of this survey considered as a final survey. 3 This plot plan should not be cons \4 The se not n "tend benefit anytother properis NyOtransferrable and . T doe SURVEYOR'S CERTIFICAF£ I hereby certify that this survey was made under my supervision on October 27, 2015 and is my opinion of the property lines of land Indicated hereon. This survey was done to the standards set forth by the State -address NMS of Atkansas lane saroty l fwStt acid does not Tepresent a s revea more easements and/or right ctN MT survey was done without the benefit of a full title search which may of ways. The survey makes no statement concerning floodparties shown It and are non-transferrable.and the liability of this survey are for and limited to the pa t;tttp1111N►q►// GtSTFq;;�.,, \\\ tttt\/ttININIry�I/''�//O /III \� STATE OF ARKANSAS 9 ± S(= r►rtnrti�itwtj'e}�ij_tleYtl� o l / LEGAL Lots 2 to the Arkar