HomeMy WebLinkAboutZ-9345 Map 31. Builder must ensure that proposed structure
and r learstb ilding
lines, setback requirements, semenbefore
including those stated in the Bill of Assurance,
construction begins. Will be available.
Z. No other coPies of this survey
considered as a final survey.
3 This plot plan should not be cons
\4 The se not n "tend benefit
anytother properis NyOtransferrable and
. T
doe
SURVEYOR'S CERTIFICAF£
I hereby certify that this survey was made under my supervision on October 27, 2015 and is my opinion of
the property lines of land Indicated hereon. This survey was done to the standards set forth by the State
-address NMS
of Atkansas lane saroty l fwStt acid does not Tepresent a s revea more easements and/or right
ctN MT
survey was done without the benefit of a full title search which may
of ways. The survey makes no statement concerning floodparties shown It
and are non-transferrable.and
the liability of this survey are for and limited to the pa
t;tttp1111N►q►//
GtSTFq;;�.,,
\\\ tttt\/ttININIry�I/''�//O /III
\� STATE OF
ARKANSAS 9
± S(=
r►rtnrti�itwtj'e}�ij_tleYtl� o l /
LEGAL
Lots 2
to the
Arkar