HomeMy WebLinkAboutZ-9305 Staff AnalysisFILE NO.: Z-9305
NAME: Meyer Long -form PD-C
LOCATION: Located at 10 Rusty Tractor Lane
DEVELOPER:
Doug Meyer
1 Sunset Lake Drive
Little Rock, AR 72210
OWNER/AUTHORIZED AGENT:
Doug and Sheree Meyer — Owner/Agent
SURVEYOR/ENGINEER:
West Land Surveying, Inc.
7 Roberts Street
Greenbrier, AR 72058
AREA: 7.69-acres NUMBER OF LOTS: 1
WARD: N/A PLANNING DISTRICT: 17 — Crystal Valley
CURRENT ZONING: R-2, Single-family
ALLOWED USES:
PROPOSED ZONING:
PROPOSED USE
VARIANCE/WAIVERS
Single-family residential
PD-C
Events center
None requested.
A. PROPOSAL/REQUEST/APPLICANT'S STATEMENT:
FT. NEW STREET: 0 LF
CENSUS TRACT: 42.21
The applicant is proposing to rezone the site from R-2, Single-family to PD-C,
Planned Development Commercial, to allow the use of the property as an events
center. Rusty Tractor Vineyards is the site of the historic Kinsel Dairy. The
property has been listed as a dairy farm for over 50-years. The property is still
FILE NO.: Z-9305
listed with Pulaski County and the USDA as a working farm. Six (6) years ago the
applicant decided to convert the pasture land into a vineyard and plant grapes.
Working in conjunction with the Pulaski County Department of the USDA a plan
was implemented to drill a well for irrigation of the grapes. Then the owners
planted 5,000 grape vines on 10-acres of their ownership and installed a trellis
system and a drip irrigation watering system. The USDA funded part of the system.
It has been so successful the State USDA department has hosted one (1) of their
State wide meetings at the farm.
Rusty Tractor Vineyards has been approved for a federal permit as a bonded
winery through the Alcohol, Tabaco, Tax and Trade Bureau (TTB) and has also
been approved by the state of Arkansas Alcohol Beverage Control Commission
(ABC) as a Small Farm Winery. Now that the grapes are maturing the vineyard is
producing grapes and Rusty Tractor Vineyards harvested their first crop in the fall
of 2017.
Rusty Tractor Vineyards rezoning request is proposed to allow the use of the
existing barns on the site for wine education classes, wine tastings and vineyard
tours, wine and dinner pairings, outdoor activities including family functions,
musical entertainment and hay rides. The event center will also be available for
weddings, receptions and mid -week business meetings. Local brewed beer will
be offered along with small farm wines from across the State and beyond.
Rusty Tractor Vineyards will not apply for a license from the State to allow liquor
sales in conjunction with their events and activities. The applicant indicates some
caterers which are licensed by the State to provide food and liquor may potentially
provide liquor at a private function or event.
B. EXISTING CONDITIONS:
The property being requested for rezoning is located outside the city limits of Little
Rock but abuts the city limits on the north and west sides. The site is a portion of
a larger tract owned by the developer. The remaining portions of the property
contains three (3) single-family homes (rental property), a vineyard and the
residence of the developer. Rusty Tractor Lane is a private unimproved street
extending from David O Dodd Road to the west. There is a single-family
subdivision located across David O Dodd Road to the east. There is a
single-family subdivision located to the north and northwest accessed from Lawson
Road.
C. NEIGHBORHOOD COMMENTS:
All property owners located within 200-feet of the site along with Southwest Little
Rock United for Progress were notified of the public hearing.
2
FILE NO.: Z-9305 (Cont.)
D. ENGINEERING COMME
PUBLIC WORKS CONDITIONS:
1. The driveway and access easement widths do not meet the traffic access and
circulation requirements of Sections 30-43 and 31-210. The driveway within
the access easement should be constructed to at least 20-feet in width with
concrete or asphalt.
2. All driveways, easements, and private streets shall be constructed with
concrete aprons per City Ordinance.
3. Stormwater detention ordinance applies to this property if additional impervious
surfaces including roof tops and parking areas are constructed. If additional
impervious surfaces are to be constructed, show the proposed location for
stormwater detention facilities on the plan. Maintenance of the detention pond
and all private drainage improvements is the responsibility of the developer
and/or property owner.
4. Any future construction within the floodplain must conform to Pulaski County
floodplain requirements.
5. In accordance with Section 31-176, floodway areas must be shown as floodway
easements or be dedicated to the public. In addition, a 25-foot wide drainage
and access easement is required adjacent to the floodway boundary.
6. Per Section 36-341, floodways shall be kept free of structure involvement
including fences, open storage of materials and equipment, vehicle parking,
and other impediments to the free flow of floodwaters.
E. Utilities/Fire Department/Parks/Coup Planning:
Little Rock Water Reclamation Authority: Outside the service boundary.
No comment.T
Entergy: Entergy does not object to this proposal. There do not appear to be any
conflicts with existing electrical utilities at this location. A single phase overhead
electrical power line runs along the north and west sides of this property. Contact
Entergy in advance to discuss electrical service requirements, or adjustments to
existing facilities (if any) as this project proceeds.
Centerpoint Energy: No comment received.
AT & T: No comment received.
Central Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for
water service must be met.
3
FILE NO.: Z-9305 (Cont.
2. The Little Rock Fire Department needs to evaluate this site to determine
whether additional public and/or private fire hydrant(s) will be required. If
additional fire hydrant(s) are required, they will be installed at the Developer's
expense.
3. Please submit plans for water facilities and/or fire protection system to Central
Arkansas Water for review. Plan revisions may be required after additional
review. Contact Central Arkansas Water regarding procedures for installation
of water facilities and/or fire service. Approval of plans by the Arkansas
Department of Health Engineering Division and the Little Rock Fire Department
is required.
4. A Capital Investment Charge based on the size of meter connection(s) will
apply to this project in addition to normal charges. This fee will apply to all
connections including metered connections off the private fire system.
5. Contact Central Arkansas Water regarding the size and location of the water
meter.
6. Due to the nature of this facility, installation of an approved reduced pressure
zone backflow preventer assembly (RPZA) is required on the domestic water
service. This assembly must be installed prior to the first point of use. Central
Arkansas Water requires that upon installation of the RPZA, successful tests
of the assembly must be completed by a Certified Assembly Tester licensed by
the State of Arkansas and approved by Central Arkansas Water. The test
results must be sent to Central Arkansas Water's Cross Connection Section
within ten days of installation and annually thereafter. Contact the Cross
Connection Section at 501.377.1226 if you would like to discuss backflow
prevention requirements for this project.
7. Fire sprinkler systems which do not contain additives such as antifreeze shall
be isolated with a double detector check valve assembly. If additives are used,
a reduced pressure zone back flow preventer shall be required.
Fire Department:
1. Full Plan Review — Maintain Access
2. Fire Hydrants. Maintain fire apparatus access roads at fire hydrant locations
as per Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section
D103.1 Access road width with a hydrant. Where a fire hydrant is located on a
fire apparatus access road, the minimum road width shall be 26 feet, exclusive
of shoulders.
3. Grade. Maintain fire apparatus access roads as per Appendix D of the 2012
Arkansas Fire Prevention Code Vol. 1 Section D103.2 Grade. Fire apparatus
access roads shall not exceed 10 percent in grade except as approved by the
fire chief.
4
FILE NO.: Z-9305 (Cont.
4. Loading. Maintain fire apparatus access road design as per Appendix D of the
2012 Arkansas Fire Prevention Code Vol. 1 Section D102.1 Access and
loading. Facilities, buildings or portions of buildings hereafter constructed shall
be accessible to fire department apparatus by way of an approved fire
apparatus access road with an asphalt, concrete or other approved driving
surface capable of supporting the imposed load of fire apparatus weighing at
least 75,000 pounds.
5. Commercial and Industrial Developments — 2 means of access. - Maintain fire
apparatus access roads as per Appendix D of the 2012 Arkansas Fire
Prevention Code Vol. 1
a. Section D104.1 Buildings exceeding three stories or 30 feet in height.
Building or facilities exceeding 30 feet or three stories in height shall
have at least two means of fire apparatus access for each structure.
b. Section D104.2 Building exceeding 62,000 square feet in area.
Buildings or facilities having a gross building area of more than
62,000 square feet shall be provide with two separate and approved
fire apparatus access roads.
c. Exception: Projects having a gross building area of up to
124,000 square feet that have a single approved fire apparatus
access road when all building are equipped throughout with
approved automatic sprinkler systems.
d. D104.3 Remoteness. Where two fire apparatus access roads are
required, they shall be placed a distance apart equal to not less than
one half of the length of the maximum overall diagonal dimension of
the lot or area to be served, measured in a straight line between
accesses.
6. 30' Tall Buildi nq s -Maintain aerial fire ao aratus access roads as per Appendix
D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D105.1 — D105.4
a. D105.1 Where Required. Where the vertical distance between the
grade plane and the highest roof surface exceed 30', approved aerial
fire apparatus access roads shall be provided. For the purposes of
this section the highest roof surfaces shall be determined by
measurement to the eave of a pitched roof, the intersection of a roof
to the exterior wall, or the top of the parapet walls, whichever is
greater.
b. D105.2 Width. Aerial fire apparatus access roads shall have a
minimum unobstructed with of 26', exclusive of shoulders, in the
immediate vicinity of the building or portion thereof.
5
FILE NO.: Z-9305 (Cont.
c. D105.3 Proximity to building. At least one of the required access
routes meeting this condition shall be located within a minimum of 15
feet and a maximum of 30 feet from the building, and shall be
positioned parallel to one entire side of the building. The side of the
building on which the aerial fire apparatus access road is positioned
shall be approved by the fire code official.
d. D105.4 Obstructions. Overhead utility and power lines shall not be
located over the aerial fire apparatus access road or between the
aerial fire apparatus road and the building. Other obstructions shall
be permitted to be places with the approval of the fire code official.
7. Dead Ends. Maintain fire apparatus access roads at dead end locations as per
Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.4
Dead Ends. Dead-end fire apparatus access roads in excess of
150 feet shall be provided with width and turnaround provisions in accordance
with Table D103.4. Requirements for Dead-end fire apparatus access roads.
8. Gates. Maintain fire apparatus access road gates as per Appendix D of the
2012 Arkansas Fire Prevention Code Vol. 1 Section D103.5 Fire apparatus
access road gates. Gates securing the fire apparatus access roads shall
comply with all of the following criteria:
1. Minimum gate width shall be 20 feet.
2. Gates shall be of swinging or sliding type.
3. Construction of gates shall be of material that allow manual operation by
one person.
4. Gate components shall be maintained in an operable condition at all
times and replaces or repaired when defective.
5. Electric gates shall be equipped with a means of opening the gate by
fire department personnel for emergency access. Emergency opening
devices shall be approved by the fire code official.
6. Manual opening gates shall not be locked with a padlock or chain and
padlock unless they are capable of being opened by means of forcible
entry tools or when a key box containing the keys to the lock is installed
at the gate location.
7. Locking device specifications shall be submitted for approval \by the fire
code official
8. Electric gate operators, where provided, shall be listed in accordance
with UL 325.
9. Gates, intended for automatic operation shall be designed, constructed
and installed to comply with requirements of ASTM F 2200.
0
FILE NO.: Z-9305 (Cont.
9. Fire Hydrants. Locate Fire Hydrants as per Appendix C of the
2012 Arkansas Fire Prevention Code. Section C101 — C105, in conjunction with
Central Arkansas Water (Jason Lowder 501.377.1245) and the
Little Rock Fire Marshal's Office (Capt. Tony Rhodes 501.918.3757 or
Capt. John Hogue 501.918.3754). Number and Distribution of Fire Hydrants as
per Table C105.1.
Parks and Recreation: No comment received.
County Planning:
1. Applicant must submit a completed floodplain development permit
application.
2. A floodplain development permit fee of $25.00 plus one cent per cubic yard
of fill to the placed in the SFHA. Check should be made out to "Pulaski
County".
3. An Elevation Certificate with proposed elevations for all new construction
located outside of the existing structure and inside of the SFHA. Finish floor
for the Dining Hall must be two (2) feet or higher above the Base Flood
Elevation. All utilities must be two (2) feet or higher above the Base Flood
Elevation. All enclosed areas, used for parking assess, and storage only, can
be located at any elevations but will need flood openings if finish -floor is
located below the Base Flood Elevation. See flood opening requirements
below.
4. A second Elevation Certificate is required after finish -floor forms are
completed and before floor is constructed. This applies to all new finish -floors
located within an enclosure.
5. A third as -built Elevation Certificate is needed after all construction is
complete to verify elevations and close out permit.
6. Existing structures located within the SFHA must meet the current Pulaski
County Floodplain Code requirements if improvements, including
remodeling, rehabilitation, additions, and repairs, in total value, exceed 50%
of the value of the structure before start of construction. Exceeding this 50%
value is classified as "Substantial Improvements". Improvements to correct
identified violations of local health, sanitary or safety codes are not substantial
improvements, regardless of the cost, as long as they are the minimum
improvement necessary to bring the structure up to code. In the attached
PDF, there is a list of items that should be included in the project cost as well
as a list of items that can be excluded. Also in the attached pdf, acceptable
methods for obtaining the building's value are listed.
7. Flood opening requirements - New construction and substantial
improvements, with fully enclosed areas (such as garages and crawlspaces)
below the lowest floor that are usable solely for parking of vehicles, building
access or storage in an area other than a basement and which are below the
base flood elevation shall be designed to automatically equalize hydrostatic
7
FILE NO.: Z-9305 (Cont.
flood forces on exterior walls by allowing for the entry and exit of floodwaters.
Designs for meeting this requirement must either be certified by a registered
professional engineer or architect or meet or exceed the following minimum
criteria:
a. A minimum of two openings on separate walls having a total net area
of not less than 1 square inch for every square foot of enclosed area
subject to flooding shall be provided.
b. The bottom of all openings shall be no higher than 1 foot above grade
or interior finish floor.
c. Openings may be equipped with screens, louvers, valves, or other
coverings or devices provided that they permit the automatic entry and
exit of floodwaters.
d. Design and location of all openings must be submitted for review
during the permitting process.
8. Obtain driveway permit from Pulaski County Public Works for any new
driveways off David O' Dodd Road.
9. An alternative to elevating the Dining Hall (and existing large building, if
exceeding the 50% value threshold) would be to flood proof the structure to
a height of three (3) feet above the Base Flood Elevation. The flood proofing
option would require the submittal of the structural design, specifications, and
construction plans, certified by a professional engineer or architect, for
review. Flood proofing must be substantially impermeable to the passage of
water with structural components having the capacity of resisting hydrostatic
and hydrodynamic loads and the effects of buoyancy. The architect or
engineer must certify that the design and methods of construction are in
accordance with the Pulaski County Floodplain Development Code. Design
must include specific elevations.
10. The applicant can contact Daniel Phillips or John Burton at 501-340-6800 for
further information.
F. Building Codes/Landscape:
Building Code: Project is subject to full commercial plan review and approval
prior to issuance of a building permit. For information on submittal requirements
and the review process. This project will require fully developed Architectural,
Structural, Civil and MEP Plans. Contact a commercial plans examiner:
Curtis Richey at 501.371.4724; crich evCcD Iittlerock. gov.
Landscape:
Any new site development must comply with the City's landscape and buffer
ordinance requirements.
r;�
FILE NO.: Z-9305 (Cont.
2. Any new building rehabilitation or expansion may require the existing
landscaping, buffer, or vehicular use areas not meeting the current code
requirements to be brought into compliance. Existing vehicular use areas may
continue as nonconforming until such time as a building permit is granted to
enlarge or reconstruct a structure on the property exceeding ten (10) percent
of the existing gross floor area. At such time ten (10) percent of the existing
vehicular use area shall be brought into compliance on a graduated scale.
3. The City Beautiful Commission recommends preserving as many existing trees
as feasible on this site. Credit toward fulfilling Landscape Ordinance
requirements can be given when preserving trees of six (6) inch caliper
or larger.
G. Transportation/Planning:
Rock Region Metro: The site is not located on a dedicated Rock Region Metro
route.
Planning Division: This request is located Crystal Valley Planning District. District.
The Land Use Plan shows Residential Low Density (RL) for the application area.
The Residential Low Density category provides for single family homes at densities
not to exceed six (6) units per acre. Such residential development is typically
characterized by conventional single family homes, but may include patio or
garden homes and cluster homes, provided that the density remain less than six
(6) units per acre. The applicant has applied for rezoning from R-2 (Single Family
District) to PCD (Planned Commercial Development) to allow the use of the
property as an Event Center.
Master Street Plan: North of the property is Rusty Tractor Lane, a private street.
Since this street is the only access it should be constructed as a Local Street
(Commercial Street). Local Streets that are abutted by non-residential zoning/use
or more intensive zoning than duplexes are considered as "Commercial Streets".
A Collector design standard is used for Commercial Streets. This street may
require dedication of right-of-way and may require street improvements for
entrances and exits to the site.
Bicycle Plan: There are no bike routes shown in the immediate vicinity.
H. SUBDIVISION COMMITTEE COMMENT: (March 14, 2018)
The applicant was present. Staff presented an overview of the item stating there
were a few outstanding technical issues in need of addressing related to the site
plan and the request. Staff requested additional information concerning outdoor
activities proposed for the site. Staff also questioned if live entertainment or
ticketed entertainment would be allowed. Staff requested the applicant provide the
location of any proposed parking and the material proposed for the parking area.
Staff also questioned the proposed signage plan.
E
FILE NO.: Z-9305 (Cont.
Public Works comments were addressed. Staff stated Rusty Tractor Lane was to
be improved to allow access to the site. Staff stated a minimum pavement width
of 20-feet was to be provided. Staff requested the applicant provide the location
of any proposed stormwater detention facilities on the site plan.
Staff noted the comments from the various other departments and agencies. Staff
suggested the applicant contact the departments or agencies directly with any
questions or concerns. There were no more issues for discussion. The Committee
then forwarded the item to the full Commission for final action.
ANALYSIS
The applicant submitted a revised site plan to staff addressing most of the technical
issues associated with the request raised at the March 14, 2018 Subdivision
Committee meeting. The applicant has indicated the proposed parking, the days
and hours of operation and indicated on occasion there will be live entertainment
and ticketed events. The applicant has indicated the proposed signage plan.
The request is to rezone the site from R-2, Single-family to PD-C, Planned
Development Commercial, to allow the use of the property as an events center.
Rusty Tractor Vineyards is located on the historic Kinsel Dairy. The property has
been listed as a working dairy farm for over 50-years. The applicant has convert
the former pasture land into a vineyard and plant 5,000 grape vines on 10-acres
of the property. The first harvest was in 2017.
Rusty Tractor Vineyards is approved with a federal permit as a winery through the
Alcohol, Tabaco, Tax and Trade Bureau (TTB) and has also been approved by the
State of Arkansas Alcohol Beverage Control Commission (ABC) as a Small Farm
Winery. Now that the grapes are maturing the vineyard is producing grapes for
Rusty Tractor Vineyards. The applicant is proposing to use the property as an
events center in conjunction with the vineyards.
The request is to allow the use of the existing barns on the site for wine education
classes, wine tastings and vineyard tours, wine and dinner pairings, outdoor
activities including family functions, musical entertainment and hay rides. The
event centerwill also be available forweddings, receptions and mid -week business
meetings. Local brewed beer will be offered along with small farm wines from
across the State and beyond. The applicant will not apply for a license from the
State to allow liquor sales in conjunction with their events and activities. The
applicant indicates some caterers which are licensed by the State to provide food
and liquor may potentially provide liquor at a private function or event.
The revised cover letter states on occasion there will be live entertainment. There
will also on occasion be fireworks. He indicates on the 4th of July his family hosts
a gathering and there are fireworks associated with their function.
10
FILE NO.: Z-9305 (Cont.
The plan indicates the placement of a 32 stall parking lot. The applicant has
indicated the parking will be paved. The existing private street extending from
David O Dodd Road will be widened to a minimum of 20-feet wide to provide
access the site. The entrance drive to the paved parking will also be a minimum
20-foot driveway width. The applicant notes there will be areas of graveled
parking. The gravel will be placed and contained within the proposed parking area.
The graveled parking will be located south of the proposed paved
parking area.
The applicant indicates an entrance feature and sign will be placed on David O
Dodd Road. This property does not have direct street frontage to David O Dodd
Road but this property owner owns the property which abuts David O Dodd Road.
The applicant will place the entrance feature and sign within a sign easement on
the road frontage. The maximum sign area proposed for the sign is 100 square
feet.
The existing building, 50-feet by 100-feet, will be renovated for the events center.
The plan includes an addition to the southwest corner of the building for a proposed
dining hall. The plan also includes the placement of a patio on the southern facade
of the building. The existing milking barn will be renovated to host small groups.
The plan indicates an extension along the southern facade for a concrete deck.
The hours of operation are from 11 am to 11 pm Monday through Thursday. The
hours on Friday and Saturday are proposed from 10 am to 1 am and the Sunday
hours are proposed from 11 am to midnight. The dumpster hours are indicated
from 7 am to 6 pm Monday through Friday.
The applicant notes the site is screened on the north and west with a natural green
buffer that will remain undisturbed. The property to the east and south are owned
by the applicant. The northern and western perimeters are fenced and the existing
fencing will remain.
Staff is supportive of the applicant's request. The applicant is seeking approval to
allow the use of the site as an events center with most of the activity centered on
the vineyard. He indicates the grounds will be offered to families for picnics and
an area for the families to spread a blanket and enjoy the outdoors. The site is
located outside the city limits but is located adjacent to the city limits on the north
and west sides. To staff's knowledge there are no outstanding technical issues
associated with the request. Staff feels the request to allow the use of the former
dairy farm as an events center will not significantly impact the area.
J. STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
comments and conditions as outlined in paragraphs D, E and F of the agenda staff
report.
11
FILE NO.: Z-9305 (Cont.
PLANNING COMMISSION ACTION: (APRIL 5, 2018)
The applicant was present. There were no registered objectors present. Staff presented
the item with a recommendation of approval of the request subject to compliance with the
comments and conditions as outlined in paragraphs D, E and F of the agenda staff report.
There was no further discussion. The item was placed on the consent agenda and
approved as recommended by staff by a vote of 10 ayes, 0 noes, 0 absent and 1 recusal
(Commissioner Keith Cox).
12
ITEM NO.: 9,
NAME: Meyer Long -form PD-C
LOCATION: located at 10 Rusty Tractor Lane
Planninq Staff Comments:
Z-9305
1. Provide notification of the property owners located within 200-feet of the site including the
certified abstract list, notice form with affidavit executed and proof of mailing. The notice
must be mailed no later than March 21, 2018. The Office of Planning and Development
must receive the proof of notice no later than March 30, 2018.
2. Provide a detail site plan for the lot proposed for, rezoning. The plan should include all
existing improvements and any proposed improvements. The plan should include the
proposed parking plan, any areas proposed with paving, any areas proposed with
graveled parking.
3. Provide the days and hours of operation for the event activities.
4. Provide details of the proposed parking. Are there areas of gravel/paving which will be
included? Are there areas of grass which will be used as parking?
5. Provide details of outdoor activities. Will there be live music? Will there be events which
allow fireworks?
6. Provide the location on any proposed dumpster facilities on the site plan. Include a note
concerning the required screening of any dumpster locations. Will the hours of dumpster
service be limited to daylight hours? If so include a note on the site plan stating such (7
am to 6 pm Monday through Friday).
7. All site lighting must be low level and directional directed downward and into the site.
8. Provide the proposed signage plan. Include the total height, area and location of any
ground signage. Provide the proposed location and square footage of any building
signage.
9. Provide the structure dimensions, dimensioned distances between buildings and
distances from structures to property lines
10. Proposed treatment of the perimeter of the property, including materials and techniques
used such as screens, fences and walls as well as description of uses, setbacks and their
relationship to surrounding uses.
11. Provide details of any proposed fencing for the development including perimeter fencing
and any proposed interior fencing.
12. Provide the proposed construction materials for the buildings including the proposed
roofing material.
13. Provide the maximum building height and the number of stories of the proposed
structures.
14. Provide a letter from the volunteer fire department indicating their knowledge of the
proposed project and their ability to serve the events center. Will a fire hydrant be
required?
VarianceMaivers: None requested.
ITEM NO.: 9.
Z-9305
Engineering Comments:
Public Works Conditions:
1. The driveway and access easement widths do not meet the traffic access and circulation
requirements of Sections 30-43 and 31-210. The driveway within the access easement
should be constructed to at least 20-feet in width with concrete or asphalt.
2. All driveways, easements, and private streets shall be constructed with concrete aprons
per City Ordinance.
3. Stormwater detention ordinance applies to this property if additional impervious surfaces
including roof tops and parking areas are constructed. If additional impervious surfaces
are to be constructed, show the proposed location for stormwater detention facilities on
the plan. Maintenance of the detention pond and all private drainage improvements is the
responsibility of the developer and/or property owner.
4. Any future construction within the floodplain must conform to Pulaski County floodplain
requirements.
5. In accordance with Section 31-176, floodway areas must be shown as floodway
easements or be dedicated to the public. In addition, a 25-foot wide drainage and access
easement is required adjacent to the floodway boundary.
6. Per Section 36-341, floodways shall be kept free of structure involvement including
fences, open storage of materials and equipment, vehicle parking, and other impediments
to the free flow of floodwaters.
Utilities/Fire Department/Parks/County Plannin :
Little Rock Water Reclamation Authority: Outside the service boundary. No comment.
Entergy: Entergy does not object to this proposal. There do not appear to be any conflicts
with existing electrical utilities at this location. A single phase overhead electrical power line
runs along the north and west sides of this property. Contact Entergy in advance to discuss
electrical service requirements, or adjustments to existing facilities (if any) as this project
proceeds.
Centerpoint Energy: No comment received.
AT & T: No comment received.
Central Arkansas Water: No comment received.
Fire Department:
1. Full Plan Review — Maintain Access
2. Fire Hydrants. Maintain fire apparatus access roads at fire hydrant locations as per
Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.1 Access
ITEM NO
a
Z-9305
road width with a hydrant. Where a fire hydrant is located on a fire apparatus access road,
the minimum road width shall be 26 feet, exclusive of shoulders.
3. Grade. Maintain fire apparatus access roads as per Appendix D of the 2012 Arkansas
Fire Prevention Code Vol. 1 Section D103.2 Grade. Fire apparatus access roads shall not
exceed 10 percent in grade except as approved by the fire chief.
4. Loading. Maintain fire apparatus access road design as per Appendix D of the 2012
Arkansas Fire Prevention Code Vol. 1 Section D102.1 Access and loading. Facilities,
buildings or portions of buildings hereafter constructed shall be accessible to fire
department apparatus by way of an approved fire apparatus access road with an asphalt,
concrete or other approved driving surface capable of supporting the imposed load of fire
apparatus weighing at least 75,000 pounds.
5. Commercial and Industrial Developments — 2 means of access. - Maintain fire apparatus
access roads as per Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1
a. Section D104.1 Buildings exceeding three stories or 30 feet in height. Building
or facilities exceeding 30 feet or three stories in height shall have at least two
means of fire apparatus access for each structure.
b. Section D104.2 Building exceeding 62,000 square feet in area. Buildings or
facilities having a gross building area of more than 62,000 square feet shall be
provide with two separate and approved fire apparatus access roads.
c. Exception: Projects having a gross building area of up to 124,000 square feet
that have a single approved fire apparatus access road when all building are
equipped throughout with approved automatic sprinkler systems.
d. D104.3 Remoteness. Where two fire apparatus access roads are required, they
shall be placed a distance apart equal to not less than one half of the length of
the maximum overall diagonal dimension of the lot or area to be served,
measured in a straight line between accesses.
6. 30' Tall Buildings - Maintain aerial fire apparatus access roads as per Appendix D of the
2012 Arkansas Fire Prevention Code Vol. 1 Section D105.1 — D105.4
a. D105.1 Where Required. Where the vertical distance between the grade plane
and the highest roof surface exceed 30', approved aerial fire apparatus access
roads shall be provided. For the purposes of this section the highest roof
surfaces shall be determined by measurement to the eave of a pitched roof, the
intersection of a roof to the exterior wall, or the top of the parapet walls,
whichever is greater.
b. D105.2 Width. Aerial fire apparatus access roads shall have a minimum
unobstructed with of 26', exclusive of shoulders, in the immediate vicinity of the
building or portion thereof.
c. D105.3 Proximity to building. At least one of the required access routes meeting
this condition shall be located within a minimum of 15 feet and a maximum of
30 feet from the building, and shall be positioned parallel to one entire side of
ITEM NO.: 9.
Z-9305
the building. The side of the building on which the aerial fire apparatus access
road is positioned shall be approved by the fire code official.
d. D105.4 Obstructions. Overhead utility and power lines shall not be located over
the aerial fire apparatus access road or between the aerial fire apparatus road
and the building. Other obstructions shall be permitted to be places with the
approval of the fire code official.
7. Dead Ends. Maintain fire apparatus access roads at dead end locations as per
Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.4
Dead Ends. Dead-end fire apparatus access roads in excess of 150 feet shall be
provided with width and turnaround provisions in accordance with Table D103.4.
Requirements for Dead-end fire apparatus access roads.
8. Gates. Maintain fire apparatus access road gates as per Appendix D of the 2012
Arkansas Fire Prevention Code Vol. 1 Section D103.5 Fire apparatus access road
gates. Gates securing the fire apparatus access roads shall comply with all of the
following criteria:
1. Minimum gate width shall be 20 feet.
2. Gates shall be of swinging or sliding type.
3. Construction of gates shall be of material that allow manual operation by one
person.
4. Gate components shall be maintained in an operable condition at all times and
replaces or repaired when defective.
5. Electric gates shall be equipped with a means of opening the gate by fire
department personnel for emergency access. Emergency opening devices shall
be approved by the fire code official.
6. Manual opening gates shall not be locked with a padlock or chain and padlock
unless they are capable of being opened by means of forcible entry tools or
when a key box containing the keys to the lock is installed at the gate location.
7. Locking device specifications shall be submitted for approval \by the fire code
official
8. Electric gate operators, where provided, shall be listed in accordance with UL
325.
9. Gates, intended for automatic operation shall be designed, constructed and
installed to comply with requirements of ASTM F 2200.
9. Fire Hydrants. Locate Fire Hydrants as per Appendix C of the 2012 Arkansas
Fire Prevention Code. Section C101 — C105, in conjunction with Central Arkansas
Water (Jason Lowder 501.377.1245) and the Little Rock Fire Marshal's Office (Capt.
Tony Rhodes 501.918.3757 or Capt. John Hogue 501.918.3754). Number and
Distribution of Fire Hydrants as per Table C105.1.
Parks and Recreation: No comment received.
County Planning Additional information is required for the County to review the proposed
development plan to ensure compliance with building setbacks.
ITEM NO.:
a
PAL0xi119
Building Codes/Landscape:
Building Code: Project is subject to full commercial plan review and approval prior to
issuance of a building permit. For information on submittal requirements and the review
process. This project will require fully developed Architectural, Structural, Civil and MEP
Plans. Contact a commercial plans examiner: Curtis Richey at 501.371.4724;
crichey(a7littlerock. gov
Landscape:
1. Any new site development must comply with the City's landscape and buffer ordinance
requirements.
2. Any new building rehabilitation or expansion may require the existing landscaping, buffer,
or vehicular use areas not meeting the current code requirements to be brought into
compliance. Existing vehicular use areas may continue as nonconforming until such time
as a building permit is granted to enlarge or reconstruct a structure on the property
exceeding ten (10) percent of the existing gross floor area. At such time ten (10) percent
of the existing vehicular use area shall be brought into compliance on a graduated scale.
3. The City Beautiful Commission recommends preserving as many existing trees as
feasible on this site. Credit toward fulfilling Landscape Ordinance requirements can be
given when preserving trees of six (6) inch caliper or larger.
Transportation/Planning:
Rock Region Metro: The site is not located on a dedicated Rock Region Metro route.
Planning Division: This request is located Crystal Valley Planning District. District. The Land
Use Plan shows Residential Low Density (RL) for the application area. The Residential Low
Density category provides for single family homes at densities not to exceed six (6) units per
acre. Such residential development is typically characterized by conventional single family
homes, but may include patio or garden homes and cluster homes, provided that the density
remain less than six (6) units per acre. The applicant has applied for rezoning from R-2
(Single Family District) to PCD (Planned Commercial Development) to allow the use of the
property as an Event Center.
Master Street Plan: North of the property is Rusty Tractor Lane, a private street. Since this
street is the only access it should be constructed as a Local Street (Commercial Street).
Local Streets that are abutted by non-residential zoning/use or more intensive zoning than
duplexes are considered as "Commercial Streets". A Collector design standard is used for
Commercial Streets. This street may require dedication of right-of-way and may require street
improvements for entrances and exits to the site.
Bicycle Plan: There are no bike routes shown in the immediate vicinity.
ITEM NO.: 9.
Z-9305
Revised plat/plan: Submit four (4) copies of a revised preliminary plat/plan (to include the
additional information as noted above) to staff on Wednesday, March 21, 2018.