HomeMy WebLinkAboutZ-9270 Staff AnalysisFILE NO.: Z-9270
NAME: Gardner Short -form PD-R
LOCATION: Located at 900 North Polk Street
191:0011i],1C0
Gardner Custom Homes
c/o Steve Gardner
820 North Harrison Street
Little Rock, AR 72205
SURVEYOR/ENGINEER:
Marlar Engineering Co., Inc.
5318 John F. Kennedy Boulevard
North Little Rock, AR 72116
AREA: 0.25 acres NUMBER OF LOTS: 1
WARD: 3 PLANNING DISTRICT: 4 — Heights/Hillcrest
CURRENT ZONING
ALLOWED USE
PROPOSED ZONING
R-3, Single-family
Single-family residential
-m
PROPOSED USE: Two (2) residences on a single lot
VARIANCE/WAIVERS: None requested.
A. PROPOSAL/REQUEST/APPLICANT'S STATEMENT:
FT. NEW STREET: 0 LF
CENSUS TRACT: 15.01
The applicant is proposing the rezoning of the property located at 900 North Polk
Street from R-3, Single-family to PD-R, Planned Development Residential,
to allow two (2) homes on this single parcel. The property currently has
three (3) separate structures consisting of a detached rear yard garage, a single-
family residence and a front yard detached building that was once a neighborhood
store. The applicant is requesting the PD-R zoning to allow the old store front to
be renovated into a one (1) bedroom studio apartment. An addition to the store
NO.: Z-9270 (Cont.
front building will be placed on the western end of the building to allow for a bath
to be added. The applicant indicates the existing residences will be rehabilitated
or will be razed and a new home constructed on the site. The existing detached
garage will be renovated or if not structurally sound will also be razed and a new
garage constructed in a similar location.
B. EXISTING CONDITION
The site contains a single-family residence, a detached garage and building
located at the intersection of H and Polk Streets originally built as a
non-residential structure. Holy Souls School is located to the east of the site and
the Allen School is located to the southeast of the site. With the exception of these
two (2) uses this area is predominately single-family. There are single-family
homes located to the north and south of the site. Further west, along
H Street, is the Fletcher Library.
C. NEIGHBORHOOD COMMENTS:
All property owners located within 200-feet of the site along with the Hillcrest
Residents Neighborhood Association were notified of the public hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. A driveway apron should be constructed from edge of pavement to at least the
sidewalk. All driveways shall have concrete aprons per City Ordinance.
E. Utilities/Fire Department/Parks/County Planning:
Little Rock Water Reclamation Authorit : Sewer service required for each lot
if subdivided. Sewer main extension may be required. Contact Little Rock Water
Reclamation Authority for additional information.
Entergy: Entergy does not object to this proposal. There do not appear to be any
conflicts with existing electrical utilities based on the information provided. There
is an existing three phase power line running along the north side of Polk Street
adjacent to this property, and another single phase line running along the west
side of the property. Service is already being provided to the existing structures.
Contact Entergy in advance to discuss electrical service requirements, or
adjustments to existing facilities (if any) as this project proceeds. If construction
takes place in the vicinity of the power lines, then OSHA and NESC clearance
requirements must be maintained during and after construction.
Centerpoint Energy: No comment received.
AT & T: No comment received.
FILE NO.: Z-9270 (Cont.
Central Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for
water service must be met.
2. Please submit plans for water facilities to Central Arkansas Water for review.
Plan revisions may be required after additional review. Contact Central
Arkansas Water regarding procedures for installation of water facilities.
Approval of plans by the Arkansas Department of Health Engineering Division
and the Little Rock Fire Department is required.
3. This development will have minor impact on the existing water distribution
system. Proposed water facilities will be sized to provide adequate pressure
and fire protection.
4. Additional fire hydrant(s) will be required. Contact the Little Rock Fire
Department to obtain information regarding the required placement of the
hydrant(s) and contact Central Arkansas Water regarding procedures for
installation of the hydrant(s).
5. If there are facilities that need to be adjusted and/or relocated, contact Central
Arkansas Water. That work would be done at the expense of the developer.
6. A Capital Investment Charge based on the size of meter connection(s) will
apply to this project in addition to normal charges.
Fire Department: No comment.
Parks and Recreation: No comment received.
County Planning: No comment.
F. Building Codes/Landscape:
Building Code: No comment.
Landscape: No comment.
G. Transportation/Planning:
Rock Region Metro: The site is not located on a dedicated Rock Region Metro
Route.
Planning Division: This request is located in Heights Hillcrest Planning District.
The Land Use Plan shows Residential Low Density (RL) for this property. The
Residential Low Density is for single-family homes at densities no greater than six
(6) dwelling units per acre. The applicant has applied for a rezoning from R-2
(Single-family District) to PRD (Planned Residential Development) to allow two (2)
residences on a single lot. The request is within the Hillcrest Overlay District.
3
FILE NO.: Z-9270 (Cont.
Master Street Plan: East side of the property is North Polk Street and it is shown
as a Local Street. The south side of the property is H Street and it is shown as a
Collector on the Master Street Plan. The primary function of Local Streets is to
provide access to adjacent properties. Local Streets that are abutted by
non-residential zoning/use or more intensive zoning than duplexes are considered
as "Commercial Streets". A Collector design standard is used for Commercial
Streets. The primary function of a Collector Road is to provide a connection from
Local Streets to Arterials These streets may require dedication of right-of-way and
may require street improvements for entrances and exits to the site.
Bicycle Plan: There are no bike routes shown in the immediate vicinity.
H. SUBDIVISION COMMITTEE COMMENT: (November 1, 2017)
Mr. Steve Gardner was present representing the request. Staff presented an
overview of the item stating there were few outstanding technical issues in need
of addressing related to the proposed development. Staff requested Mr. Gardner
revise the site plan to include the addition for the proposed residence located in
the former non-residential building.
Public Works comments were addressed. Staff stated the driveway apron was to
be constructed from edge of pavement to at least the sidewalk as a concrete apron.
Staff noted the comments from the various other departments and agencies. Staff
suggested the applicant contact the departments or agencies directly with any
questions or concerns. There were no more issues for discussion. The Committee
then forwarded the item to the full Commission for final action.
ANALYSIS:
The applicant submitted a revised site plan to staff addressing the technical issues
raised at the November 1, 2017, Subdivision Committee meeting. The applicant
has provided the revised plan to include the proposed addition to the former
non-residential building. The applicant has also noted the driveway apron will be
constructed with concrete.
The request is a rezoning of the property from R-3, Single-family to PD-R, Planned
Development Residential, to allow two (2) homes on a lot. The applicant is
proposing to convert a former non-residential building into a second residential
unit. The existing home located on the site will be rehabbed if the building is
structurally sound. If found to not be structurally sound the applicant is proposing
to remove the existing home and construct a new home with a similar building
footprint as the existing home. The applicant notes if there is new construction the
home will range in size from a 1,000 square foot to a 2,158 square foot building
envelope. The applicant notes there may be a desire to add a second level if a
new home is constructed. Should the existing home be removed the applicant has
12
FILE NO.: Z-9270 (Cont.
indicated a five (5) foot side yard setback will be provided along the northern
property line.
The existing non-residential building is proposed as a studio apartment containing
roughly 500 square feet. An addition to the existing structure will be placed along
the western fagade of the building to allow for a plumbing wall. This will then allow
for the addition of a bathroom and allow for a kitchen to be added within the existing
square footage. The addition is proposed as eight (8) feet by 16.4-feet.
The existing detached garage will be renovated or if not structurally sound will also
be razed and a new garage constructed in a similar location. The garage is located
along the western portion of the lot. The garage is located 1.2-feet from the right
of way of H Street. Should the garage be removed the new construction will be
placed in a similar location as the current placement. The garage is proposed as
22-feet by 22-feet. The drive will be realigned and will enter the garage from the
eastern side of the building, removing the need to back into H Street.
Staff is supportive of the applicant's request. The property is located within the
Hillcrest Design Overlay District which has specific development criteria related
to building placement, coverage and massing of structures. The current and
proposed development will comply with the massing and building coverages of the
Design Overlay District. The setback for the garage and the non-residential do not
meet the typical setbacks required of the underlying zoning district or the Design
Overlay District. To staff's knowledge there are no outstanding technical issues in
need of addressing related to the site plan or the proposed reuse of the property.
Staff feels the rezoning to allow the placement of two (2) residences on the single
lot is appropriate.
J. STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
comments and conditions as outlined in paragraphs D, E and F of the agenda staff
report.
PLANNING COMMISSION ACTION:
(NOVEMBER 30, 2017)
The applicant was present. There were two (2) registered objectors present. Staff
presented the item with a recommendation of approval of the request subject to
compliance with the comments and conditions as outlined in paragraphs D, E and F of
the agenda staff report.
Mr. Steve Gardner addressed the Commission on the merits of his request. He stated
his desire was to rezone the property to allow the placement of two (2) residence on a
single lot. He stated the existing home would be rehabbed and if found to not be
structurally sound then the home would be removed. He stated the existing store front
9
FILE NO.: Z-9270 (Cont.
would be converted into a residential unit. He stated the existing garage would be
removed and rebuilt in the same location with a slightly larger footprint. He stated his
desire was to revitalize the site and bring the old store front back into a productive use.
Mr. Lyle Coybill addressed the Commission in opposition of the request. He stated his
home was located across the street from the proposed development. He stated his
concern was the site would become a multi -family dwelling place. He stated if the new
owner decided to he could turn the store front into an Air B & B. He stated if this was the
case then the neighborhood would not know who was living/renting the place. He stated
he was also concerned with lead base paint and asbestos. He stated the site was located
across the street from Holy Souls School and the Francis Allen School. He stated the
asbestos could impact the children of the nearby school and the neighborhood. He stated
Mr. Gardner should be required to test the structures by a specialist removal comply to
ensure compliance with all state and local laws. He stated the existing store front was
located to close to the fire hydrant and the hydrant would have to be removed. He stated
the old store font was located at the intersection of Polk and H Streets which created a
bind spot for the students of the two (2) schools. He stated there were no sidewalks
located on this portion of H Street. He stated the students walked to the library and did
not have a sidewalk to travel. He stated multi -family would bring down property values
in the area. He stated with two (2) units there would potentially be seven (7) to
eight (8) vehicles. He stated there was no street parking on H Street adjacent to the site.
He stated the number of vehicles created a concern. He stated he was trying to protect
the students and felt this development was not good for the students or the homeowners
in the area.
Mr. Robert Black-Ocken addressed the Commission in opposition of the request.
He stated he lived at 824 North Polk Street. He stated his concerns were the same as
Mr. Coybill's. He stated asbestos was a concern. He stated the developer should be
required to hire a contractor to remove the structure. He stated he was also concerned
with the future of the site should Mr. Gardner sell the homes.
Mr. Gardner stated his intention was to redevelop the site and sell the units. He stated
the homes would not be sold individually but as a pair. He stated the store front could be
used as a home office, an in-laws quarters or a bonus room. He stated the property would
not be multi -family. He stated the use would be a primary residence and an accessory
unit. He stated the future owner could rent the accessory dwelling or use as additional
living space. He stated if a new home was constructed it would be period home. He
stated he had met with a fire fighter and he had indicated the fire hydrant would not require
removal. He stated he did not see any reason to tear down the store front just because
it was old. He stated if this was the case then most of Hillcrest was in danger of
being removed.
Commissioner Dillon stated she had concerns with two (2) homes on the single lot. She
questioned if this had been done before. Staff stated the Commission had approved
numerous request to allow two (2) homes on a single parcel. Staff stated typically this
was carriage homes or garage apartments. She stated in most cases these were in the
back and in this case the second residence was in front of the home.
FILE NO.: Z-9270
There was a general discussion of the Commission of the use and the previous use of
the property. It was noted the store front was a candy store in the distance past. The
Commissioners questioned if there would be separate meters for the units. Mr. Gardner
stated there would not be separate meters for the units. He stated one (1) electrical and
one (1) water meter would serve the home and the accessory dwelling.
There was no further discussion. The chair entertained a motion for approval of the item
as presented by staff. The motion carried by a vote of 7 ayes, 1 noes and 3 absent.
7