Loading...
HomeMy WebLinkAboutZ-9237-B Map 2GENERAL SITE NOTES: 1. CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS PRIOR TO COMMENCEMENT OF CONSTRUCTION. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING SAFE AND ADEQUATE WORKING CONDITIONS THROUGHOUT THE DURATION OF CONSTRUCTION OF THE PROPOSED SITE IMPROVEMENTS. 3. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF ALL SITE SETBACKS, EASEMENTS AND DIMENSIONS PRIOR TO COMMENCEMENT OF CONSTRUCTION. 4. ALL CONSTRUCTION MATERIALS AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH THE LATEST STATE AND LOCAL GOVERNMENT CONSTRUCTION STANDARDS AND SPECIFICATIONS. 5. ALL HANDICAP ACCESSIBLE SITE IMPROVEMENTS SHALL BE CONSTRUCTED IN ACCORDANCE WITH ALL FEDERAL, STATE AND LOCAL CODES AND REQUIREMENTS. 6. IF DURING THE COURSE OF CONSTRUCTION THE CONTRACTOR FINDS ANY DISCREPANCIES OR CONFLICTS BETWEEN THE PROPOSED SITE IMPROVEMENTS INDICATED ON THE PLANS AND THE PHYSICAL CONDITIONS OF THE SITE, OR ANY ERRORS OR OMISSIONS WITHIN THE PLANS OR IN THE SITE LAYOUT AS PROVIDED BY THE ENGINEER, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO IMMEDIATELY NOTIFY THE ENGINEER. UNTIL AUTHORIZED TO PROCEED, ANY WORK PERFORMED BY THE CONTRACTOR AFTER SUCH A DISCOVERY WILL BE AT THE CONTRACTOR'S SOLE RISK AND EXPENSE. 7. CONTRACTOR SHALL COORDINATE ALL SITE IMPROVEMENTS WITH ARCHITECTURAL PLANS. ARCHITECTURAL PLANS SHALL BE USED FOR BUILDING STAKEOUT. 8. CONTRACTOR SHALL COORDINATE ALL LANDSCAPE IMPROVEMENTS, INCLUDING NEW PLANTINGS AND TURF AREA RESTORATION REQUIREMENTS, WITH LANDSCAPE PLANS. 9. CONSTRUCTION SURVEY AND STAKEOUT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 10. ALL DIMENSIONS SHOWN ARE MEASURED FROM FACE OF CURB TO FACE OF CURB OR EDGE OF PAVEMENT TO EDGE OF PAVEMENT UNLESS OTHERWISE NOTED. 11. ALL CURB RADII ARE MEASURED AT THE FACE OF CURB UNLESS OTHERWISE NOTED. 12. ALL NEW ASPHALT AND/OR CONCRETE PAVING SHALL MATCH EASBNG PAVEMENTS FLUSH. 13. CONTRACTOR SHALL RESTORE ALL DISTURBED AREAS OUTSIDE OF CONSTRUCTION LIMIT'S TO ORIGINAL CONDITION OR BETTER. 14. CONTRACTOR SHALL REPAIR AT HIS EXPENSE ANY DAMAGE TO EXISTING ASPHALT, CONCRETE, CURBS, SIDEWALKS, ETC. RESULTING FROM CONSTRUCTION TRAFFIC AND/OR OPERATIONS. REPAIRS SHALL BE MADE TO THE SATISFACTION OF THE OWNER AND/OR ENGINEER. 15. ALL FIRE ACCESS LANES WITHIN THE PROJECT AREA SHALL REMAIN IN SERVICE, CLEAN OF DEBRIS, AND ACCESSIBLE FOR USE BY EMERGENCY VEHICLES. 16, ALL DETECTABLE WARNING PLATES SHALL BE PREFORMED PLASTIC INSERTS UNLESS OTHERWISE NOTED. 17. SEE GENERAL NOTES SHEET FOR ADDITIONAL INFORMATION AND REQUIREMENTS. SITE PLAN NOTES: REFER TO THE GEOTECHNICAL ENGINEERING REPORT PREPARED BY TERRACON CONSULTANTS, INC. AND DATED JULY 5TH, 2017 FOR ADDITIONAL INFORMATION REGARDING THE EXISTING SOIL CONDITIONS AND SUBGRADE PREPARATION REQUIREMENTS AND PROPOSED PAVEMENT RECOMMENDATIONS (TERRACON PROJECT NO. 35175065). 2. SEE CONSTRUCTION DETAILS SHEET CTO FOR PAVEMENT SECTION DETAILS. �,_3. SEE GENERAL NOTES SHEET C1.0 FOR EXISTING LEGEND. 9 65T5'45' W Pae.ea• fRTf.': .60�:'l3' a.C� S �L 91'•Jne'9'lT SJ.. T Tq•f!TT'1'T.1 'T T B-3 P R. n b~/ / ,� iI a K�. !/ it y xb II P 1 j / r 5 a ce - ast,w• - zrz,• S _659263 55" W 200.11' m / —� s esze's5' • zee va � �� � � r ��P � llilE MATE 30 ACCESS ROAD / 266 gi' or WAY I 1 i I PROJECT INFORMATION: SITE AREA ±192 ACRES ZONED: R-2 PROPOSED BUILDING AREA: 18,047 SQ. FT. PROPOSED USE: RETAIL BUILDING HEIGHT: PARKING REQUIRED: 60 STALLS (1 STALL PER 300 SF OF GROSS FLOOR AREA) PARKING PROVIDED: 66 STALLS (INCLUDING 3 ADA STALLS) PAVEMENT HATCH LEGEND: PROPOSED CONCRETE SIDEWALK COAA 1430 W. Peachtree St. NW Suite 200 Atlanta, GA 30309 t: 404 601 4000 f: 404 601 3970 PROJECT TEAM ',' S6A 5" PORTLAND CEMENT CO NCRETE TE4" AGGREGATE BASE (MOOT TYPE 5) PROPOSED INTEGRAL BLACK CONCRETE SIDEWALK S6B� 5" PORTLAND CEMENT CONCRETE 4" AGGREGATE BASE (MDOT TYPE 5) PROPOSED CONCRETE LANDING 6" PORTLAND CEMENT CONCRETE coPrkicnr nonce idle drawing is the property othe 411.1 referenced Pm:essboal and 's notf user to Ge _ 4" AGGREGATE BASE (SEE STRUCTURAL PLANS FOR REINFORCEMENT, AGGREGATE, AND ISSUE/REVISIDN RECORD SUBGRADE REQUIREMENTS) DATE DESCRIPTION PROPOSED INTEGRAL BLACK COLORED CONCRETE LANDING 6" PORTLAND CEMENT CONCRETE 4" AGGREGATE BASE (SEE STRUCTURAL PLANS FOR REINFORCEMENT, AGGREGATE, AND SUBGRADE REQUIREMENTS) PROPOSED HEAVY DUTY INTEGRAL BLACK COLORED CONCRETE ` SS 6" PORTLAND CEMENT CONCRETE 4" AGGREGATE BASE SEE STRUCTURAL PLANS FOR REINFORCEMENT, AGGREGATE, AND SUBGRADE REQUIREMENTS) PROPOSED HEAVY DUTY INTEGRAL BLACK COLORED CONCRETE SLAB S9 ae 7" PORTLAND CEMENT CONCRETE . 4" AGGREGATE BASE (SEE GEOTECHNICAL REPORT) PROPOSED ASPHALT PAVEMENT S10 3" ASPHALT SURFACE COURSE 8" AGGREGATE BASE (SEE GEOTECHNICAL REPORT) - �•511- PROPOSED HEAVY DUTY ASPHALT PAVEMENT 2" ASPHALT SURFACE COURSE 2.5" ASPHALT BINDER COURSE 8" AGGREGATE BASE (SEE GEOTECHNICAL REPORT) PROPOSED INTEGRAL BLACK COLORED CONCRETE 512 5" PORTLAND CEMENT CONCRETE 4" AGGREGATE BASE (SEE STRUCTURAL PUNS FOR REINFORCEMENT, AGGREGATE, AND SUBGRADE REQUIREMENTS) . 513 PROPOSED LANDSCAPE AREA (SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION -AND -DETAILS) PROFESSIONAL IN CHARGE JOHN NOURZAD PROFESSIONAL ENGINEER LICENSE NO. XXXX - P' 6w, GRAPHIC SCALE ��®•! ]0 15 ]a Im 1 m SEEING ( IN II ) 1 inch - 30 R. PROJECT MANAGER KERI WILLI QUALITY CONTROL JIM COYLE — oRawN Br _ ERIC CARRANZA PROJECT NAME NORTHERN TOOL EQUIPMENT LITTLE ROCK ARKANSAS INTERSTATE 30 ACCESS ROAD MONOMER PROJECT NUMBER 201705520 SHEET TITLE SITE PLAN SHEET NUMBER C 3.0