Loading...
HomeMy WebLinkAboutZ-9237-A Map 2GENERAL SITE NOTES: PROJECT INFORMATION: 1. CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS PRIOR TO COMMENCEMENT OF CONSTRUCTION. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING SAFE AND ADEQUATE WORKING CONDITIONS THROUGHOUT THE DURATION OF CONSTRUCTION OF THE PROPOSED SITE IMPROVEMENTS. 3. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF ALL SITE SETBACKS, EASEMENTS AND DIMENSIONS PRIOR TO COMMENCEMENT OF CONSTRUCTION. 4. ALL CONSTRUCTION MATERIALS AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH THE LATEST STATE AND LOCAL GOVERNMENT CONSTRUCTION STANDARDS AND SPECIFICATIONS. 5. ALL HANDICAP ACCESSIBLE SITE IMPROVEMENTS SHALL BE CONSTRUCTED IN ACCORDANCE WITH ALL FEDERAL, STATE AND LOCAL CODES AND REQUIREMENTS. 6. IF DURING THE COURSE OF CONSTRUCTION THE CONTRACTOR FINDS ANY DISCREPANCIES OR CONFLICTS BETWEEN THE PROPOSED SITE IMPROVEMENTS INDICATED ON THE PLANS AND THE PHYSICAL CONDITIONS OF THE SITE, OR ANY ERRORS OR OMISSIONS WITHIN THE PLANS OR IN THE SITE LAYOUT AS PROVIDED BY THE ENGINEER, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO IMMEDIATELY NOTIFY THE ENGINEER. UNTIL AUTHORIZED TO PROCEED, ANY WORK PERFORMED BY THE CONTRACTOR AFTER SUCH A DISCOVERY WILL BE AT THE CONTRACTOR'S SOLE RISK AND EXPENSE. 7. CONTRACTOR SHALL COORDINATE ALL SITE IMPROVEMENTS WITH ARCHITECTURAL PLANS. ARCHITECTURAL PLANS SHALL BE USED FOR BUILDING STAKEOUT. 8. CONTRACTOR SHALL COORDINATE ALL LANDSCAPE IMPROVEMENTS, INCLUDING NEW PLANTINGS AND TURF AREA RESTORATION REQUIREMENTS, WITH LANDSCAPE PLANS. 9. CONSTRUCTION SURVEY AND STAKEOUT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 10. ALL DIMENSIONS SHOWN ARE MEASURED FROM FACE OF CURB TO FACE OF CURB OR EDGE OF PAVEMENT TO EDGE OF PAVEMENT UNLESS OTHERWISE NOTED. 11. ALL CURB RADII ARE MEASURED AT THE FACE OF CURB UNLESS OTHERWISE NOTED. 12. ALL NEW ASPHALT AND/OR CONCRETE PAVING SHALL MATCH EXISTING PAVEMENTS FLUSH. 13. CONTRACTOR SHALL RESTORE ALL DISTURBED AREAS OUTSIDE OF CONSTRUCTION LIMITS TO ORIGINAL CONDITION OR BETTER. 14. CONTRACTOR SHALL REPAIR AT HIS EXPENSE ANY DAMAGE TO EXISTING ASPHALT, CONCRETE, CURBS, SIDEWALKS, ETC. RESULTING FROM CONSTRUCTION TRAFFIC AND/OR OPERATIONS. REPAIRS SHALL BE MADE TO THE SATISFACTION OF THE OWNER AND/OR ENGINEER. 15. ALL FIRE ACCESS LANES WITHIN THE PROJECT AREA SHALL REMAIN IN SERVICE, CLEAN OF DEBRIS, AND ACCESSIBLE FOR USE BY EMERGENCY VEHICLES. 16. ALL DETECTABLE WARNING PLATES SHALL BE PREFORMED PLASTIC INSERTS UNLESS OTHERWISE NOTED. 17. SEE GENERAL NOTES SHEET FOR ADDITIONAL INFORMATION AND REQUIREMENTS. SITE PLAN NOTES: 1. REFER TO THE GEOTECHNICAL ENGINEERING REPORT PREPARED BY TERRACON CONSULTANTS, INC. AND DATED JULY 5TH, 21 FOR ADDITIONAL INFORMATION REGARDING THE EXISTING SOIL CONDITIONS AND SUBGRADE PREPARATION REQUIREMENTS AND PROPOSED PAVEMENT RECOMMENDATIONS (TERRACON PROJECT NO. 35175065) SITE KEY NOTES: per. s, S /•b. •�'. Jc•"41#'\1 3 0 eo S1 PROPOSED BUILDING (SEE ARCHITECTURAL AND STRUCTURAL PLANS FOR ADDITIONAL INFORMATION AND DETAILS I+s S2 PROPOSED TRASH ENCLOSURE (SEE ARCHITECTURAL AND STRUCTURAL PLANS _ FOR ADDITIONAL INFORMATION AND DETAILS) �'.'. ` S3 PROPOSED CONCRETE CURB AND GUTTER / S4 PROPOSED REVERSE PITCH CONCRETE CURB AND GUTTER / •` ` •` S5 PROPOSED MONOLITHIC CONCRETE CURB AND SIDEWALK / )+ :...:.:. ...:.:.:. .:a:•:•:.:. S6 PROPOSED CONCRETE SIDEWALK `•` S8 PROPOSED HEAVY DUTY CONCRETE (SEE GEOTECHNICAL REPORT FOR — _ ADDITIONAL INFORMATION AND DETAILS) / • _ S9 PROPOSED HEAVY DUTY CONCRETE DUMPSTER PAD (SEE GEOTECHNICAL i S3 REPORT FOR ADDITIONAL INFORMATION AND DETAILS) / LL S10 PROPOSED HEAVY DUTY ASPHALT PAVEMENT / : �: S30 Sit PROPOSED LIGHT DUTY ASPHALT PAVEMENT S23 S12 PROPOSED DETECTABLE WARNING PLATE " j S13 PROPOSED LANDSCAPE AREA (SEE LANDSCAPE PLANS FOR ADDITIONAL . . . . . . ` . . ` . . ' ` ` ` ' ` ` ` . . . ` ` . ` • . . • ` b INFORMATION AND DETAILS) y°/ / . . . . . . . . . . . . . . • - • • . . +'•` S15 PROPOSED PRECAST CONCRETE WHEEL STOP = / / . ` ` ` S23 PROPOSED FIRE HYDRANT S30 PROPOSED LIGHT POLE x S5 ..�.........'.aa..........a..a. 26.0.'.'.'.'.`.`.`.`.`.`.`.'.'.'.'a`...`..'a'.'.'.'.'.`.'.`.`.`.' F .a.. :`:`:.:`:`:':':':.:':':':':':`:`.... :':':.:':':`:':.:`... t S15 a .. : : ::`'` Q S12 Z� I --� .JL ,�'??� '.'.'.`a`. QS11 �d I ^RIM EL- 7.4' . — 'NV =i277.4' y�ry / 24.57, Wa0 USE SETB4CK _ .. i fi �.. I aJa a` a . a r .i: S13 S30 f ti' ar a d0 a el f� p •/ / S30: •x .. / / r S2 . +. S9 S8 A � N •� NNlUrAC1U a?a 1J CS BUILDING 36" SPOUT WITH SPllSH�.4 tf0 ) '20LL'.1 m 12' ,p NORTHERN TOOL & EQUIPMENT n ±18.000 SF 15.36' LAND USE SETBACK 280.00 F.F.E. — co ...-20' a � a S11 Ot T a I� i 30 ACCESS ROAD SITE AREA: ZONED: PROPOSED BUILDING AREA: PROPOSED USE: BUILDING HEIGHT: PARKING REQUIRED: t2.92 ACRES C-4 18,000 SO. FT. RETAIL 60 STALLS (1 STALL PER 300 SF OF GROSS FLOOR AREA) 66 STALLS (INCLUDING 3 ADA STALLS) PAVEMENT HATCH LEGEND: PROPOSED REVERSE PITCH CURB AND GUTTER S4 (SEE C6.4 FOR ADDITIONAL INFORMATION AND DETAILS) PROPOSED CONCRETE SIDEWALK S6 5" PORTLAND CEMENT CONCRETE 4" AGGREGATE BASE (SEE GEOTECHNICAL REPORT) PROPOSED HEAVY DUTY CONCRETE S8 6" PORTLAND CEMENT CONCRETE 4" AGGREGATE BASE (SEE GEOTECHNICAL REPORT) PROPOSED HEAVY DUTY CONCRETE DUMPSTER PAD S9 ' 7" PORTLAND CEMENT CONCRETE 4" AGGREGATE BASE (SEE GEOTECHNICAL REPORT) PROPOSED HEAVY DUTY ASPHALT PAVEMENT S10 2" ASPHALT SURFACE COURSE 2.5" ASPHALT BINDER COURSE 8" AGGREGATE BASE (SEE GEOTECHNICAL REPORT) PROPOSED LIGHT DUTY ASPHALT PAVEMENT S11 3" ASPHALT SURFACE COURSE 8" AGGREGATE BASE (SEE GEOTECHNICAL REPORT) PROPOSED LANDSCAPE AREA S13 (SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION AND DETAILS) ", CRE Y\ ONE CPV-� GRAPHIC SCALE Greenberghrrow COA#: 21 South Evergreen Avenue Suite 200 Arlington Heights, IL 60005 t: 847 788 9200 f: 847 788 9537 PROJECT TEAM COPY4IGHT NOTICE This drawing is the property of the above referenced Professional and is not to be used for any purpose other than the specific project and site named herein, and cannot be reproduced In any manner without the exaress wnttec permission from i.oe Professional ISSUE/REVISION RECORD DATE DESCRIPTION 07/27/17 CLIENT REVIEW SET 07/31/17 ZBA SUBMITTAL AIR AS LICENSED PROFESSIONAL. ENGINEER film. 17.1l PROFESSIONAL IN CHARGE KERI WILLIAMS PROFESSIONAL ENGINEER LICENSE NO. 17616 PROJECT MANAGER KERI WILLIAMS QUALITY CONTROL JIM COYLE DRAWN BY ERIC CARRANZA PROJECT NAME NORTHERN TOOL + EQUIPMENT LITTLE ROCK ARKANSAS 10010INTERSTATE 30 ACCESS ROAD PROJECT NUMBER SHEET TITLE SITE PLAN SHEET NUMBER ( IN FEET ) 1 inch = 30 ft. C2mO