HomeMy WebLinkAboutZ-9207 Staff AnalysisITEM NO.: 22.
NAME: Lawson Road West Short -form PD-C
LOCATION: located at 5000 Hope Lane
Plannina Staff Comments:
Z-9207
1. Provide notification of the property owners located within 200 feet of the site, including the
certified abstract list, notice form with affidavit executed and proof of mailing. The notice
must be mailed no later than April 12, 2017. The Office of Planning and Development
must receive the proof of notice no later than April 21, 2017.
2. Complete the information sheet from the application package.
3. Provide the proposed signage plan including building and ground signage. The plan
should include the location total height and total sign area for ground signage. The
location and square footage of any building signage.
4. Provide details of any proposed fencing, walls the purpose of these elements. Provide
the construction materials, total height and location.
5. All dumpsters located on the site must be properly screened. The dumpster is indicated
along the street side of the development. Provide a note on the site plan indicating the
proposed screening mechanism. Provide the dumpster service hours. Staff recommends
the hours be limited to 7 am to 6 pm Monday through Friday.
6. Provide a site lighting plan. All site lighting must be low-level and directional, aimed
downward and into the site.
7. Provide the maximum building height in the general notes section of the site plan.
8. Provide the days and hours of operation for the proposed development.
9. The site plan indicates the placement of graveled drives and parking area. Are the areas
proposed for paving at some date in the future?
VarianceMlaivers: None requested.
Public Works Conditions:
1. The private street should connect into Lawson Road with a concrete apron per City
Ordinance.
2. Provide a letter prepared by a registered engineer certifying the intersection sight
distance at the intersection(s) comply with 2004 AASHTO Green Book standards.
Sight distance of at least 445 feet must be provided.
3. Lawson Road is classified on the Master Street Plan as a minor arterial. A dedication
of right-of-way 45 feet from centerline will be required.
4. Stormwater detention ordinance applies to this property. Show the proposed location
for stormwater detention facilities on the plan. Maintenance of the detention pond and
all private drainage improvements is the responsibility of the developer and/or land
owner.
5. If disturbed area is one (1) or more acres, obtain a NPDES stormwater permit from the
Arkansas Department of Environmental Quality prior to the start of construction.
ITEM NO.: 22.
Z-9207
6. In accordance with Section 32-8, no obstruction to visibility shall
triangular area 50 feet back from the intersecting right-of-way
tangent lines for radial dedications) at the intersection of private
Road.
Utilities and Fire Department/County Planning:
Little Rock Wastewater: Outside the service boundary. No comment.
be located within a
line (or intersecting
street with Lawson
Entergy: Entergy does not object to this proposal. An overhead power line exists on the east
side of this property. The main power line runs along Lawson Road. Contact Entergy in
advance to discuss any changes in future service requirements, new facilities locations and
adjustments to existing facilities (if any) as this project proceeds.
Centerpoint Ener : No comment received.
AT & T: No comment received.
Central Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for water service
must be met.
2. A water main extension will be needed to provide water service to this property.
3. The Little Rock Fire Department needs to evaluate this site to determine whether
additional public and/or private fire hydrant(s) will be required. If additional fire hydrant(s)
are required, they will be installed at the Developer's expense.
4. Please submit plans for water facilities and/or fire protection system to Central Arkansas
Water for review. Plan revisions may be required after additional review. Contact Central
Arkansas Water regarding procedures for installation of water facilities and/or fire service.
Approval of plans by the Arkansas Department of Health Engineering Division and the
Little Rock Fire Department is required.
5. A Capital Investment Charge based on the size of meter connection(s) will apply to this
project in addition to normal charges. This fee will apply to all connections including
metered connections off the private fire system.
6. If there are facilities that need to be adjusted and/or relocated, contact Central Arkansas
Water. That work would be done at the expense of the developer.
7. Contact Central Arkansas Water regarding the size and location of the water meter.
8. The facilities on -site will be private. When meters are planned off private lines, private
facilities shall be installed to Central Arkansas Water's materials and construction
specifications and installation will be inspected by an engineer, licensed to practice in the
State of Arkansas. Execution of a Customer Owned Line Agreement is required.
9. Due to the nature of this facility, installation of an approved reduced pressure zone
backflow preventer assembly (RPZA) is required on the domestic water service. This
assembly must be installed prior to the first point of use. Central Arkansas Water requires
that upon installation of the RPZA, successful tests of the assembly must be completed by
a Certified Assembly Tester licensed by the State of Arkansas and approved by Central
ITEM NO
22.
Z-9207
Arkansas Water. The test results must be sent to Central Arkansas Water's Cross
Connection Section within ten days of installation and annually thereafter. Contact the
Cross Connection Section at 501.377.1226 if you would like to discuss backflow
prevention requirements for this project.
10. Fire sprinkler systems which do not contain additives such as antifreeze shall be isolated
with a double detector check valve assembly. If additives are used, a reduced pressure
zone back flow preventer shall be required.
Fire Department: No comment.
Parks and Recreation: No comment received.
County Planning: No comment.
Rock Region Metro:
Building Code: No comment.
Planning Division: This request is located in the Ellis Mountain Planning District. The Land
Use Plan shows Residential Low Density (RL). The Residential Low Density (RL) category
provides for single family homes at densities not to exceed 6 units per acre. Such residential
development is typically characterized by conventional single family homes, but may include
patio or garden homes and cluster homes, provided that the density remain less than 6 units
per acre. The applicant has applied for a rezoning from R-2 (Single -Family District) to Short -
form PD-C (Planned Development Commercial) to allow contractor office and equipment
storage
Master Street Plan: East of the property is Hope Lane and it shown as a Local Street on the
Master Street Plan. The primary function of a Local Street is to provide access to adjacent
properties. A Collector design standard is used for Commercial Streets. This Street may
require dedication of right-of-way and may require street improvements for entrances and
exits to the site.
Bicycle Plan: There are no bike routes shown in the immediate vicinity.
Landscape:
1. Any new site development must comply with the City's landscape and buffer ordinance
requirements.
2. The City Beautiful Commission recommends preserving as many existing trees as
feasible on this site. Credit toward fulfilling Landscape Ordinance requirements can be
given when preserving trees of six (6) inch caliper or larger.
ITEM NO.: 22.
Z-9207
Revised fat! Ian: Submit four (4) copies of a revised preliminary plat/plan (to include the
additional information as noted above) to staff on Wednesday, April 12, 2017.
FILE NO.: Z-9207
NAME: Lawson Road West Short -form PD-C
LOCATION: Located at 5000 Hope Lane
DEVELOPER:
Doug Woodall
14996 West Polk Street
Alexander, AR 72002
ENGINEER:
McGetrick Engineering
11601 Bass Pro Parkway
Little Rock, AR 72210
AREA: 3.2 acres NUMBER OF LOTS
WARD: N/A PLANNING DISTRICT: 18 — Ellis Mountain
CURRENT ZONING: R-2, Single-family
ALLOWED USES: Single-family residential
PROPOSED ZONING: PD-C
PROPOSED USE: Contractor's office and storage
VARIANCE/WAIVERS: None requested.
A. PROPOSAUREQUEST/APPLICANT'S STATEMENT:
FT. NEW STREET: 0 LF
CENSUS TRACT: 42.07
The applicant is requesting a rezoning of the site from R-2, Single-family to
PD-C, Planned Development Commercial, to allow the use of the existing pole
barn and small metal building as office space for a contractor's office and
equipment storage. The site is served by a 20-foot ingress and egress easement
to access Lawson Road. The pole barn will be used for equipment storage, light
construction equipment. The small metal building will be increased in size to
1,000 square feet and be used as an office for a construction company. The hours
of operation are proposed from 7:00 am to 5:00 pm six (6) days per week. The
request includes the allowance of the access drive to remain as a graveled surface.
A septic tank will be placed on the site for sanitary sewer.
FILE NO.: Z-9207 (Cont.)
B. EXISTING CONDITIONS:
The site is located outside the City limits of Little Rock but within the City's
Extraterritorial Planning jurisdiction. The property contains a pole barn and a small
shed. Access to the site is via a private access easement located on an adjacent
property. The area south of this site was recently rezoned to a PD-C to recognize
an existing office user, Data Com. There is an auto repair business located to the
west of this site. There are single-family homes located to the east of the site and
to the south of the site.
C. NEIGHBORHOOD COMMENTS:
All property owners located within 200-feet of the site along with the Crystal Valley
Neighborhood Association were notified of the public hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. The private drive should connect into Lawson Road with a concrete apron per
City Ordinance.
2. Provide a letter prepared by a registered engineer certifying the intersection
sight distance at the intersection(s) comply with 2004 AASHTO Green Book
standards. Sight distance of at least 445 feet must be provided.
3. Lawson Road is classified on the Master Street Plan as a minor arterial.
A dedication of right-of-way 45 feet from centerline will be required.
4. Stormwater detention ordinance applies to this property. Show the proposed
location for stormwater detention facilities on the plan. Maintenance of the
detention pond and all private drainage improvements is the responsibility of
the developer and/or land owner.
5. If disturbed area is one (1) or more acres, obtain a NPDES stormwater permit
from the Arkansas Department of Environmental Quality prior to the start of
construction.
6. In accordance with Section 32-8, no obstruction to visibility shall be located
within a triangular area 50 feet back from the intersecting right-of-way line (or
intersecting tangent lines for radial dedications) at the intersection of private
street with Lawson Road.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Little Rock Wastewater: Outside the service boundary. No comment.
Entergy: Entergy does not object to this proposal. An overhead power line exists
on the east side of this property. The main power line runs along Lawson Road.
Contact Entergy in advance to discuss any changes in future service requirements,
2
FILE NO.: Z-9207 (Cont.)
new facilities locations and adjustments to existing facilities (if any) as this project
proceeds.
Centerpoint_Ene_rgy: No comment received.
AT & T: No comment received.
Central Arkansas Water:
All Central Arkansas Water requirements in effect at the time of request for
water service must be met.
2. A water main extension will be needed to provide water service to this
property.
3. The Little Rock Fire Department needs to evaluate this site to determine
whether additional public and/or private fire hydrant(s) will be required.
If additional fire hydrant(s) are required, they will be installed at the
Developer's expense.
4. Please submit plans for water facilities and/orfire protection system to Central
Arkansas Water for review. Plan revisions may be required after additional
review. Contact Central Arkansas Water regarding procedures for installation
of water facilities and/or fire service. Approval of plans by the Arkansas
Department of Health Engineering Division and the Little Rock Fire
Department is required.
5. A Capital Investment Charge based on the size of meter connection(s) will
apply to this project in addition to normal charges. This fee will apply to all
connections including metered connections off the private fire system.
6. If there are facilities that need to be adjusted and/or relocated, contact Central
Arkansas Water. That work would be done at the expense of
the developer.
7. Contact Central Arkansas Water regarding the size and location of the
water meter.
8. The facilities on -site will be private. When meters are planned off private
lines, private facilities shall be installed to Central Arkansas Water's materials
and construction specifications and installation will be inspected by an
engineer, licensed to practice in the State of Arkansas. Execution of a
Customer Owned Line Agreement is required.
9. Due to the nature of this facility, installation of an approved reduced pressure
zone backflow preventer assembly (RPZA) is required on the domestic water
service. This assembly must be installed prior to the first point of use. Central
Arkansas Water requires that upon installation of the RPZA, successful tests
of the assembly must be completed by a Certified Assembly Tester licensed
by the State of Arkansas and approved by Central Arkansas Water. The test
results must be sent to Central Arkansas Water's Cross Connection Section
within ten days of installation and annually thereafter. Contact the Cross
3
FILE NO.: Z-9207 (Cont.)
Connection Section at 501.377.1226 if you would like to discuss backflow
prevention requirements for this project.
10. Fire sprinkler systems which do not contain additives such as antifreeze shall
be isolated with a double detector check valve assembly. If additives are
used, a reduced pressure zone back flow preventer shall be required.
Fire Department: No comment.
arks and Recreation: No comment received.
County Planning: No comment.
Rock Region Metro: The site is not located on a dedicated Rock Region Metro
bus route.
F. ISSUES/TECHNICAL/DESIGN:
Buildin Code: No comment.
Planning Division: This request is located in the Ellis Mountain Planning District.
The Land Use Plan shows Residential Low Density (RL). The Residential Low
Density (RL) category provides for single family homes at densities not to exceed
6 units per acre. Such residential development is typically characterized by
conventional single family homes, but may include patio or garden homes and
cluster homes, provided that the density remain less than 6 units per acre. The
applicant has applied for a rezoning from R-2 (Single -Family District) to Short -form
PD-C (Planned Development Commercial) to allow contractor office and
equipment storage.
Master Street Plan: East of the property is Hope Lane and it shown as a Local
Street on the Master Street Plan. The primary function of a Local Street is to
provide access to adjacent properties. A Collector design standard is used for
Commercial Streets. This Street may require dedication of right-of-way and may
require street improvements for entrances and exits to the site.
Bicycle Plan: There are no bike routes shown in the immediate vicinity.
Landscape:
1. Any new site development must comply with the City's landscape and buffer
ordinance requirements.
2. The City Beautiful Commission recommends preserving as many existing trees
as feasible on this site. Credit toward fulfilling Landscape Ordinance
requirements can be given when preserving trees of six (6) inch caliper
or larger.
4
FILE NO.: Z-9207 (Cont.)
G. SUBDIVISION COMMITTEE COMMENT: (April 5, 2017)
The applicant was present. Staff presented an overview of the item stating there
were few outstanding technical issues associated with the request in need of
addressing. Staff requested information concerning the proposed placement of
any dumpster facilities, the days and hours of dumpster service, the proposed
hours of operation and the proposed signage plan.
Public Works comments were addressed. Staff stated a paved apron was required
at the driveway intersection with Lawson Road. Staff requested the applicant
provide a letter certifying the sight distance of the driveway intersection on Lawson
Road. Staff also stated the stormwater detention ordinance would apply to any
future development of the site. Staff stated Lawson Road would require right of
way dedication to 45-feet from centerline. Mr. Pat McGetrick stated the applicant
did not own the Lawson Road frontage. Mr. McGetrick stated there was an access
easement allowing the property owner access to his property over property owned
by an adjacent property owner.
Landscaping comments were addressed. Staff stated any new development would
require landscaping. Staff stated the development would require screening along
the perimeters which abutted residentially zoned or used property.
Staff noted the comments from the various other departments and agencies. Staff
suggested the applicant contact the departments or agencies directly with any
questions or concerns. There were no more issues for discussion. The Committee
then forwarded the item to the full Commission for final action.
H. ANALYSIS:
There were no outstanding technical issues associated with the request in need of
addressing via a revised site plan. The applicant notes if signage is placed
the sign will be located near Lawson Road, within their property ownership,
and will conform to signage allowed in commercial zones or a maximum of
thirty-six (36) feet in height and 160 square feet in area.
The request is a rezoning of the site from R-2, Single-family to PD-C, Planned
Development Commercial, to allow the use of the existing pole barn and small
metal building as office space for a contractor's office and equipment storage. The
site is served by a 20-foot ingress and egress easement to access Lawson Road.
The pole barn will be used for light construction equipment storage. The small
metal building will be increased in size to 1,000 square feet and be used as an
office for a construction company.
The hours of operation are proposed from 7:00 am to 5:00 pm six (6) days per
week. The applicant notes there will not be dumpster placed on the site. Staff
recommends should a dumpster be requested in the future the dumpster be
5
FILE NO.: Z-9207
screened as typically required by ordinance. Staff also recommends the hours of
dumpster service be limited to 7 am to 6 pm Monday through Friday.
The request includes the allowance of the access drive to remain as a graveled
surface. A septic tank will be placed on the site for sanitary sewer.
Staff is not supportive of the applicant's request. The applicant is seeking approval
of a site which does not have an established history of a commercial use. Although
there are commercial uses located adjacent to this site there are also single-family
homes located to the east and north of this site. With regard to non -conforming
uses the Zoning Ordinance states nonconformities may continue but the provision
of the ordinance are designed to curtail enlargement or expansion of such
nonconformities and to encourage their eventual elimination in order to preserve
the integrity of the zoning district. The ordinance also states a nonconforming use
that has been discontinued or abandoned for a period of six (6) months shall not
be reestablished or resumed. Any subsequent use or occupancy of such land or
structure shall comply with the regulations of the zoning district in which such land
or structure is located. The property is located within the R-2, Single-family zoning
district. Staff does not feel the requested rezoning is appropriate for this site.
STAFF RECOMMENDATION:
Staff recommends denial of the request.
PLANNING COMMISSION ACTION: (APRIL 27, 2017)
Mr. Doug Woodall was present representing the request. There were no registered
objectors present. There was one (1) person in support of the request. Staff presented
the item with a recommendation of denial.
Mr. Woodall addressed the Commission on the merits of the request. He stated the site
did have a history of commercial uses. He stated the site was three (3) acres of a larger
tract which was owned and used by Little Rock Electric. He stated the Commission
approved a rezoning request for the remainder of the property at their January meeting
rezoning the property to PCD, Planned Commercial Development. He stated this area
was no longer residential. He stated there were homes to the north but for the most part
the area was changing to commercial uses. He stated the City had recently approved a
rezoning just to the east of this site for a General Dollar store, which had been built. He
stated the only change to the current site was to allow a small addition to the office
building. He stated the remainder of the site would not change.
Ms. Barbara Holmes addressed the Commission in support of the request. She stated
the area was no longer residential. She stated her family owned property adjacent to this
site and wished to sell their property for a commercial use. She stated the entire area
was going commercial.
N.
FILE NO.: Z-9207 (Cont.)
A motion was made to approve the request including all staff recommendations and
comments except that of denial. The motion carried by a vote of 9 ayes, 1 no and
1 absent.
7