HomeMy WebLinkAboutZ-9204 Staff AnalysisMarch 30, 2017
ITEM NO.: 8 FILE NO.: Z-9204
NAME: Village at the Gateway — Tower Use Permit
LOCATION: 12506 Vimy Ridge Road
OWNER/APPLICANT: Big Rock Development/Bob Francis
PROPOSAL: A tower use permit is requested to allow for
construction of a 140 foot tall, self-supporting tower
on this R-2 zoned property.
SITE LOCATION:
The tower site is located at the northwest corner of the Village at the
Gateway subdivision which is in the early stages of development. The
development is located on the west side of Vimy Ridge Road, south of
Alexander Road.
2. COMPATIBILITY WITH NEIGHBORHOOD:
The Village at the Gateway residential subdivision is currently developing
to the south and east of the proposed tower site. A large tract of
undeveloped, R-2 zoned property extends to the west. A burial vault
company is located on the PID zoned property to the north. The proposed
tower is to provide wireless internet access to the residents of the
subdivision now under construction. The use should be compatible with
the neighborhood.
Notice of the public hearing was sent to all owners of properties located
within 200 feet of the site and the SWLR United for Progress, Quail Run
and Alexander Road neighborhood associations.
3. ON SITE DRIVES AND PARKING:
Access to the tower site will be via a 10 foot access easement off of one of
the streets in the subdivision. No parking is required other than a space for
any technician needing access to the tower.
4. SCREENING AND BUFFERS:
Screening and landscaping of the tower site must comply with the
provisions of Chapter 36, Article XI I, Section 36-593 as follow:
a. All WCF subject to this section shall contain a permanent six-foot
landscape strip parallel with all sides of the primary use area and
March 30, 2017
ITEM NO.: 8 (Cont.) _ FILE NO.: Z-9204
outside of the opaque fence but within the lease area, except for a
space for ingress and egress to the primary use area.
b. An eight -foot opaque fence shall be constructed, finished side facing
outward, around the primary use area to provide screening and a
background for required landscaping within the six-foot landscape
strip.
c. The opaque fence shall also satisfy the security fence requirement of
subsection (f).
d. The landscape strip on each side of the primary use area shall be
planted with two (2) trees of a two-inch caliper which will grow to a
spacing of fifteen (15) feet which will grow to a minimum twenty (20)
feet in height at maturity. Each landscape strip shall also be planted
with evergreen shrubs of thirty (30) inches height at planting, with a
maximum spacing of forty-eight (48) inches on center and which will
grow to a minimum height of sixty (60) inches at maturity.
5. PUBLIC WORKS:
All driveways shall be concrete aprons per City Ordinance. The
proposed driveway must be constructed to City of Little Rock
commercial driveway Detail PW-34 by the owner at the time the street
is constructed.
6. UTILITY FIRE DEPT. AND CATA COMMENTS:
Little Rock Wastewater: Sewer main extension required with easements if
new sewer service is required for this project.
Entergy: Entergy does not object to this proposal. An existing three
phase, power line exists to the east of this location along Vimy Ridge
Road. It is not in conflict with the proposed development. Contact
Entergy in advance to discuss future service requirements, new facilities
locations and adjustments to existing facilities (if any) as this project
proceeds.
Centerpoint Energy: No comments received.
AT&T: No comments received.
Central Arkansas Water: No objection
Fire Department: No comments
County Planning: No comments
2
March 30, 2017
ITEM NO.: 8 (Cont.
FILE NO.: Z-9204
Building Code: Project is subject to full commercial plan review and
approval prior to issuance of a building permit. For information on
submittal requirements and the review process, contact a commercial
plans examiner:
Mark Alderfer at 501.371.4875; malderferCcDlittlerock gov
Rock Region METRO:
a) Location is not currently served by METRO. We have no objections
to the mobile communications tower.
SUBDIVISION COMMITTEE COMMENT: (MARCH 8, 2017)
The applicant was present. Staff presented the item and noted no additional
information was required. Staff commented that screening and landscaping of
the tower site must comply with the provisions of Chapter 36, Article XI I, Section
36-593. Staff noted that any expansion of the tower compound or addition of
other WCF carriers will require Planning Commission approval as a revision to
the TUP. Staff informed the Committee that this TUP application was necessary
since the proposed 140 foot tall tower was to be located less than 140 feet from
abutting residential properties.
The applicant stated the tower will be used to provide wireless internet to the
residents of the Village at the Gateway Subdivision.
The Committee determined there were no outstanding issues and forwarded the
item to the full Commission.
STAFF ANALYSIS:
The applicant is requesting approval of a Tower Use Permit to allow for
construction of a 140 foot tall tower on the rear of the Village at the Gateway
subdivision currently under development at 12506 Vimy Ridge Road. The tower is
proposed to be located at the northwest corner of the subdivision.
The proposed tower will be used to provide wireless internet access to the
residents of the subdivision. The 140 foot tall, self-supporting tower will hold one
15± pound 24 GHz microwave antenna and up to two 10± pound 5 GHz sector
antennas.
The tower compound will measure 16' X 16'. An 8 ft. tall wood privacy fence will
enclose the compound. A 6 ft. wide landscape strip will be located around all
3
March 30, 2017
ITEM NO.. 8 Cont. FILE NO.: Z-9204
perimeters of the compound, outside the fence. The entire tower site will be
located within a 50' X 50' easement. Access to the tower will be via a 10' access
easement off of one of the streets in the new subdivision.
The tower use permit is required because the proposed tower is located less than
140 feet (the height of the tower) from abutting residential property. The residential
properties to the south and east are owned by the applicant and are part of the
newly developing subdivision that the tower is being designed to serve. The large
tract of R-2 zoned property to the west is undeveloped and heavily wooded. The
proposed tower will be located 48± feet from the property to the west and 75± feet
and 63± feet from the proposed lots to the south and east respectively.
Staff is supportive of the requested TUP. The residential properties affected by the
reduced setback are either undeveloped or are being developed as part of this
applicant's subdivision. The bill of assurance for Village at the Gateway
subdivision will reflect the tower as being a permitted use of this tract.
STAFF RECOMMENDATIO
Staff recommends approval of the requested revised Tower Use Permit subject
to compliance with the following conditions:
1. Compliance with the comments and conditions outlined in Sections 4, 5 and
6 of the agenda staff report.
2. Screening and landscaping of the tower site must comply with the provisions
of Chapter 36, Article XI I, Section 36-593.
3. Any expansion of the tower compound or addition of other WCF carriers will
require Planning Commission approval as a revision to the TUP.
PLANNING COMMISSION ACTION: (MARCH 30, 2017)
The applicant's engineer was present. There was one objector present. Staff
presented the item and a recommendation of approval as outlined in the "staff
recommendation" above.
The applicant stated he would reserve his time to respond to the objector. Cathy
Graves, of 12705 Alexander Road, spoke in opposition. She stated she had
lived and worked in the area for many years and she was concerned about the
possible impact of the tower on the value of her property. She asked if the tower
could be placed elsewhere on the site, farther away from her property.
!!
March 30, 2017
ITEM NO.: 8 Cont. FILE NO.: Z-9204
The engineer responded that the tower was very minimal and had only a couple
of small antennas. He stated he did not see how it could impact Ms. Graves'
property.
Commissioner Laha stated he felt the tower could be relocated.
Commissioner Mays stated he had personal experience with having a tower near
his home and found that there was no impact.
Staff informed the commission that Ms. Graves property was the PID-zoned,
concrete burial vault manufacturing industrial site adjacent to the north, not a
residential property.
In response to question from Commissioner Latture, Ms. Graves stated she did
not live on the property.
A motion was made to approve the application, including all staff comments and
conditions. The motion was approved by a vote of 9 ayes, 2 noes and 0 absent.
5
SUBDIVISION COMMITTEE COMMENTS
MARCH 8, 2017
ITEM NO.8: VILLAGE AT THE GATEWAY
TOWER USE PERMIT
12506 VIMY RIDGE ROAD Z-9204
Planning Staff Comments:
1. The bill of assurance for Village at the Gateway will reflect the tower as being a permitted use of
this tract
2. Screening and landscaping of the tower site must comply with the provisions of Chapter 36, Article
XII, Section 36-593
3. Any expansion of the tower compound or addition of other WCF carriers will require Planning
Commission approval as a revision to the TUP.
Variance/Waivers:
• Setback from adjacent residential
Public Works:
All driveways shall be concrete aprons per City Ordinance. The proposed driveway must be
constructed to City of Little Rock commercial driveway Detail PW-34 by the owner at the time the
street is constructed.
Utilities and Fire Department/County Planning::
Little Rock Wastewater: Sewer main extension required with easements if new sewer service is required
for this project.
Entergy: Entergy does not object to this proposal. An existing three phase, power line exists to the east of
this location along Vimy Ridge Road. It is not in conflict with the proposed development. Contact
Entergy in advance to discuss future service requirements, new facilities locations and adjustments
to existing facilities (if any) as this project proceeds.
Centerpoint Energy: No comments received.
AT&T: No comments received.
Central Arkansas Water: No objection
Fire Department: No comments
ITEM NO.8: CON'T Z-9204
County Planning: No comments
Building Code: Project is subject to full commercial plan review and approval prior to issuance of a
building permit. For information on submittal requirements and the review process, contact a commercial
plans examiner:
Mark Alderfer at 501.371.4875; malderfer@littlerock.gov .
Rock Region METRO: a) Location is not currently served by METRO. We have no objections to the
mobile communications tower.
Planninm Division: No comments
Landscape: Screening and landscaping of the tower site must comply with the provisions of Chapter 36,
Article XII, Section 36-593
Other: Submit responses to staff issues and four (4) copies of a revised site plan (if required) no later than
Wednesday March 15, 2017. Required notices are to be sent via certified mail to all owners of properties
located within two hundred (200) feet of the site no later than Wednesday March 15, 2017. The City -
provided notice form must be used. Proof of notice is to be provided to staff no later than March 24, 2017.