HomeMy WebLinkAboutZ-9184 Staff Analysis19111:8►[01i•1S0.S
NAME: Little Rock Port Authority College Station Sports Complex Long -form PID
LOCATION: Located on the North side of Sloane Drive, 0.3 miles West of
Mauney Road
DEVELOPER:
Pulaski County
201 South Broadway, Suite 400
Little Rock, AR 72201
ENGINEER/SURVEYOR:
Garver, LLC
c/o William E. Ruck
4701 Northshore Drive
North Little Rock, AR 72118
AREA: 13.1 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF
WARD: 1 PLANNING DISTRICT: 25 — Port CENSUS TRACT: 40.07
CURRENT ZONING: 1-3, Heavy Industrial District
ALLOWED USES: Industrial
PROPOSED ZONING: PID
PROPOSED USE: Add sports complex as an allowable use
VARIANCE/WAIVERS: A variance from the City's Land Alteration Ordinance to allow
grading of future development areas with the initial construction.
A. PROPOSAUREQUEST/APPLICANT'S STATEMENT:
The applicant is working with the Little Rock Port Authority to replat and rezone a
13.1-acre parcel of land at the Little Rock Port Industrial Park. The site is located
along Fourche Bayou on the north side of Sloane Drive. The land will be developed
into a sports complex for the College Station community. The development is
proposed in two (2) phases. The planned site improvements include lighted tee
ball and pony league fields which allow conversion to a football field, depending
on the season. The field will be served by restrooms and concessions. The
FILE NO.: Z-9184 (Cont.
second phase includes the placement of an additional ball filed, with restrooms
and concessions. Bleacher seating to accommodate spectators will be installed
with each phase.
A parking lot is indicated from Sloane Drive to serve the two (2) new fields. The
applicant is requesting the allowance of the area to be graveled for a period of two
(2) years prior to paving.
B. EXISTING CONDITIONS:
The site was previously cleared of trees with a scattering of trees located along the
creek bank. This area is primarily industrial with a single-family subdivision located
to the west of this site. Sloane Drive is a two-lane roadway with open ditches for
drainage.
C. NEIGHBORHOOD COMMENTS:
All property owners located within 200-feet of the site along with the College
Station Neighborhood Association and the Apple Blossom Neighborhood
Association were notified of the public hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Show the location of the floodplain in relation to the subject property.
2. All driveways shall be concrete aprons per City Ordinance.
3. The finished floor of the restroom structure must be elevated above the base
flood elevation as determined by a certified engineer or surveyor.
4. A grading permit in accordance with Section 29-186 (c) & (d) will be required
prior to any land clearing or grading activities at the site. Other than residential
subdivisions, site grading and drainage plans must be submitted and approved
prior to the start of construction.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Little Rock Wastewater: Sewer main extension required, with easements, if new
sewer service is required for this project. Contact Little Rock Wastewater Utility for
additional information.
Entergy: Entergy does not object to this proposal. An existing three phase, power
line exists along Sloane Drive on the south side of this property. It does not appear
to be in conflict with the proposed development. Care must be used to maintain
proper clearances in the construction of the entry drive to this property as it will be
constructed underneath the existing power line. Contact Entergy in advance to
2
FILE NO.: Z-9184 Cont.)
discuss future service requirements, new facilities locations and adjustments to
existing facilities (if any) as this project proceeds.
Centerpoint Energy: No comment received.
AT & T: No comment received.
Central Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for
water service must be met.
2. Please submit plans for water facilities and/or fire protection system to Central
Arkansas Water for review. Plan revisions may be required after additional
review. Contact Central Arkansas Water regarding procedures for installation
of water facilities and/or fire service. Approval of plans by the Arkansas
Department of Health Engineering Division and the Little Rock Fire Department
is required.
3. If there are facilities that need to be adjusted and/or relocated, contact Central
Arkansas Water. That work would be done at the expense of the developer.
4. The facilities on -site will be private. When meters are planned off private lines,
private facilities shall be installed to Central Arkansas Water's materials and
construction specifications and installation will be inspected by an engineer,
licensed to practice in the State of Arkansas. Execution of a Customer Owned
Line Agreement is required.
5. Due to the nature of this facility, installation of an approved reduced pressure
zone backflow preventer assembly (RPZA) is required on the domestic water
service. This assembly must be installed prior to the first point of use. Central
Arkansas Water requires that upon installation of the RPZA, successful tests
of the assembly must be completed by a Certified Assembly Tester licensed by
the State of Arkansas and approved by Central Arkansas Water. The test
results must be sent to Central Arkansas Water's Cross Connection Section
within ten days of installation and annually thereafter. Contact the Cross
Connection Section at 501.377.1226 if you would like to discuss backflow
prevention requirements for this project.
6. Fire sprinkler systems which do not contain additives such as antifreeze shall
be isolated with a double detector check valve assembly. If additives are used,
a reduced pressure zone back flow preventer shall be required.
Fire Department:
1. Maintain Access.
2. Fire Hydrants. Maintain fire apparatus access roads at fire hydrant locations
as per Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section
D103.1 Access road width with a hydrant. Where a fire hydrant is located on a
3
FILE NO.: Z-9184 (Cont.
fire apparatus access road, the minimum road width shall be 26 feet, exclusive
of shoulders.
3. Grade. Maintain fire apparatus access roads as per Appendix D of the
2012 Arkansas Fire Prevention Code Vol. 1 Section D103.2 Grade. Fire
apparatus access roads shall not exceed 10 percent in grade except as
approved by the fire chief.
4. Loading. Maintain fire apparatus access road design as per Appendix D of the
2012 Arkansas Fire Prevention Code Vol. 1 Section D102.1 Access and
loading. Facilities, buildings or portions of buildings hereafter constructed shall
be accessible to fire department apparatus by way of an approved fire
apparatus access road with an asphalt, concrete or other approved driving
surface capable of supporting the imposed load of fire apparatus weighing at
least 75,000 pounds.
5. Commercial and Industrial Developments — 2 means of access. - Maintain fire
apparatus access roads as per Appendix D of the 2012 Arkansas Fire
Prevention Code Vol. 1
a. Section D104.1 Buildings exceeding three stories or 30 feet in height.
Building or facilities exceeding 30 feet or three stories in height shall
have at least two means of fire apparatus access for each structure.
b. Section D104.2 Building exceeding 62,000 square feet in area.
Buildings or facilities having a gross building area of more than
62,000 square feet shall be provide with two separate and approved
fire apparatus access roads.
i. Exception: Projects having a gross building area of up to
124,000 square feet that have a single approved fire
apparatus access road when all building are equipped
throughout with approved automatic sprinkler systems.
c. D104.3 Remoteness. Where two fire apparatus access roads are
required, they shall be placed a distance apart equal to not less than
one half of the length of the maximum overall diagonal dimension of
the lot or area to be served, measured in a straight line between
accesses.
6. Fire Hydrants. Locate Fire Hydrants as per Appendix C of the 2012 Arkansas
Fire Prevention Code. Section C101 — C105, in conjunction with Central
Arkansas Water (Jason Lowder 501.377.1245) and the Little Rock Fire
Marshal's Office (Capt. Tony Rhodes 501.918.3757 or Capt. John Hogue
501.918.3754). Number and Distribution of Fire Hydrants as per Table C105.1.
Parks and Recreation: No comment received.
County Planning: No comment.
Rock Region Metro: Location is currently served by METRO on route 20. Both
cyclists and pedestrians use the road shoulders in this industrial area as a
n
FILE NO.: Z-9184(Cont.)
sidewalk. Provide sidewalk from road shoulder to the interior of ballfield facility for
access by pedestrians and cyclists.
F. ISSUES/TECHNICAL/DESIGN:
Building Code: Project is subject to full commercial plan review and approval prior
to issuance of a building permit. For information on submittal requirements and the
review process, contact a commercial plans examiner: Curtis Richey at
501.371.4724; crichey@liftlerock..gov or Mark Alderfer at 501.371.4875;
maiderfer(a),Iittlerock. g_o_v.
Planning Division: This request is located in Port Planning District. The Land Use
Plan shows I (Industrial). The industrial category encompasses a wide variety of
manufacturing, warehousing research and development, processing, and industry
related office and service activities. Industrial development typically occurs on an
individual tract basis rather than according to an overall development plan. The
applicant has applied for a rezoning from 1-3 (Heavy Industrial District) to PID
(Planned Industrial Development) to add a sports complex as an allowable use.
Master Street Plan: To the south of the property is Sloane Drive and it is shown
as a Minor Arterial on the Master Street Plan. A Minor Arterial provides connections
to and through an urban area and their primary function is to provide short distance
travel within the urbanized area. Entrances and exits should be limited to minimize
negative effects of traffic and pedestrians on Sloane Drive since it is a Minor
Arterial. This street may require dedication of right-of-way and may require street
improvements for entrances and exits to the site.
Bicycle Plan: A Class II Bike Lane is shown along Sloane Drive. Bike Lanes
provide a portion of the pavement for the sole use of bicycles.
Landscape:
1. Site plan must comply with the City's landscape and buffer ordinance
requirements.
2. Screening requirements will need to be met for the vehicular use areas
adjacent to street right-of-ways. Provide screening shrubs with an average
linear spacing of not less at three (3) feet within the required landscape area.
Provide trees with an average linear spacing of not less than thirty (30) feet.
3. A perimeter planting strip is required along any side of a vehicular use area that
abuts adjoining property or the right-of-way of any street. This strip shall be at
least nine (9) feet wide. One (1) tree and three (3) shrubs or vines shall be
planted for every thirty (30) linear feet of perimeter planting strip.
4. Eight percent (8%) of the vehicular use area must be designated for green
space; this green space needs to be evenly distributed throughout the parking
area(s). For developments with more than one hundred fifty (150) parking
spaces the minimum size of an interior landscape area shall be three hundred
5
FILE NO.: Z-9184 (Cont.)
(300) square feet. Interior islands must be a minimum of seven and one half
(7 1/2) feet in width. Trees shall be included in the interior landscape areas at
the rate of one (1) tree for every twelve (12) parking spaces.
5. An automatic irrigation system to water landscaped areas shall be required for
developments of one (1) acre or larger.
6. The City Beautiful Commission recommends preserving as many existing trees
as feasible on this site. Credit toward fulfilling Landscape Ordinance
requirements can be given when preserving trees of six (6) inch caliper or
larger.
G. SUBDIVISION COMMITTEE COMMENT: (November 22, 2016)
The applicant was present. Staff presented an overview of the item stating there
were few outstanding technical issues associated with the request. Staff stated
the Port was selling property to Pulaski County to own and operate a ball field for
the College Station community. Staff questioned the placement of any dumpsters
on the site. Staff also requested the placement of any proposed signage.
Public Works comments were addressed. Staff requested the site plan include the
location of the floodplain in relation to the property. Staff stated the minimum
finished floor elevation was to be one (1) foot above the base flood elevation. Staff
stated a grading permit was required prior to any clearing or grading activities on
the site.
Landscaping comments were addressed. Staff stated the parking lot was to be
landscaped per the Landscape Ordinance requirements. Staff stated landscaped
areas were to be irrigated. Staff stated this would include the landscaped areas
within the street buffer. It was noted the paving of the parking would not be put in
place for one (1) to two (2) years. Staff stated the landscaped areas could be
deferred and installed with the paving of parking areas.
Rock Region .Metro comments were addressed. Staff stated the Port area was
served by Rock Region Metro. Staff stated a continuation of pedestrian
infrastructure for access to the transit system was recommended.
Staff noted the comments from the various other departments and agencies. Staff
suggested the applicant contact the departments or agencies directly with any
questions or concerns. There were no more issues for discussion. The Committee
then forwarded the item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised site plan to staff addressing most of the technical
issues associated with the request raised at the November 22, 2016, Subdivision
Committee meeting. The plan indicates the placement of the dumpster and notes
the dumpster will be screened per typical ordinance requirements. The applicant
•
FILE NO.: Z-9184 (Cont.
has also indicated signage is proposed as allowed in industrial zones or a
maximum of 30-feet in height and 72 square feet in sign area.
The request is to rezone 13.1-acres of land at the Little Rock Port Industrial Park
from 1-3, Industrial District to PID, Planned Industrial Development to add a sports
complex as an allowable use. The site is located along Fourche Bayou on the
north side of Sloane Drive. The land is proposed for development into a sports
complex for the College Station community. The facility will be owned by Pulaski
County.
The development is proposed in two (2) phases. The planned site improvements
include a lighted tee ball and pony league field which is proposed to allow
conversion to a football field, depending on the season. The field will be served
by restrooms and concessions. The second phase includes the placement of an
additional ball filed, with restrooms and concessions. Bleacher seating to
accommodate spectators will be installed with each phase. All associated support
facilities such as dugouts, fencing and scoreboards will be provided for each of the
proposed fields. The fields will have lighting. The lighting will be directional,
directed downward and into the site to limit the over spilling of light onto adjacent
properties.
A parking lot is indicated from Sloane Drive to serve the two (2) new fields. The
site plan indicates 60 parking spaces within the parking lot. The applicant is
requesting the allowance of the area to be graveled for a period of two (2) years
prior to paving. Section 36-508 states all areas are to be paved where subject to
wheeled traffic. The applicant is requesting the new parking area be allowed to be
graveled for a period of two (2) years to allow the base to compact. After the two
(2) years the parking area will be paved and landscaped to meet the typical
minimum ordinance requirements of the landscape and buffer ordinances.
The request includes a variance from the City's Land Alteration Ordinance to allow
grading of future phases with the development of the first phase.
Staff is supportive of the applicant's request. The applicant is seeking approval to
add a sports complex as an allowable use for the property. The site is located
within an industrial area but is located near the College Station community and
neighborhoods. To staffs knowledge there are no remaining outstanding technical
issues associated with the request. Staff feels the development of the ball fields
as proposed is appropriate.
STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
comments and conditions as outlined in paragraphs D, E and F of the agenda staff
report.
Staff recommends approval of the variance request to allow grading of future
phases with the development of the first phase.
7
Ia11:a04 WA Le7IBENIOZ•Ti1#
PLANNING COMMISSION ACTION: (DECEMBER 15, 2016)
The applicant was present. There were no registered objectors present. Staff presented
the item with a recommendation of approval of the request subject to compliance with the
comments and conditions as outlined in paragraphs D, E and F of the agenda staff report.
Staff presented a recommendation of approval of the variance request to allow grading
of future phases with the development of the first phase. There was no further discussion.
The item was placed on the consent agenda and approved as recommended by staff by
a vote of 9 ayes, 0 noes, 1 absent and 1 open position.
ITEM NO.: 13.
Z-9184
NAME: Little Rock Port Authority College Station Sports Complex Long -form PID
LOCATION: located on the North side of Sloane Drive, 0.3 miles West of Mauney Road
Planning Staff Comments:
1. Provide notification of the abutting property owners including the certified abstract list,
notice form with affidavit executed and proof of mailing. The notice must be mailed no
later than November 30, 2016. The Office of Planning and Development must receive the
proof of notice no later than December 9, 2016.
2. Provide the proposed signage plan including building and ground signage. The plan
should include the location total height and total sign area for ground signage. The
location and square footage of any building signage.
3. Provide details of any proposed fencing, walls the purpose of these elements. Provide
the construction materials, total height and location.
4. All dumpsters located on the site must be properly screened. Provide a note on the site
plan indicating the location of the dumpster and the proposed screening mechanism.
Provide the dumpster service hours. Staff recommends the hours be limited to 7 am to 6
pm Monday through Friday.
Variance/Waivers
Public Works Conditions:
1. Show the location of the floodplain in relation to the subject property.
2. All driveways shall be concrete aprons per City Ordinance.
3. The finished floor of the restroom structure must be elevated above the base flood
elevation as determined by a certified engineer or surveyor.
4. A grading permit in accordance with Section 29-186 (c) & (d) will be required prior to any
land clearing or grading activities at the site. Other than residential subdivisions, site
grading and drainage plans must be submitted and approved prior to the start of
construction.
Utilities and Fire Department/County Planning:
Little Rock Wastewater: Sewer main extension required, with easements, if new sewer
service is required for this project. Contact Little Rock Wastewater Utility for additional
information.
Entergy: Entergy does not object to this proposal. An existing three phase, power line
exists along Sloane Drive on the south side of this property. It does not appear to be in
conflict with the proposed development. Care must be used to maintain proper clearances in
the construction of the entry drive to this property as it will be constructed underneath the
existing power line. Contact Entergy in advance to discuss future service requirements, new
facilities locations and adjustments to existing facilities (if any) as this project proceeds.
Centerpoint Enemy: No comment received.
AT & T: No comment received.
Central Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for water service
must be met.
2. Please submit plans for water facilities and/or fire protection system to Central Arkansas
Water for review. Plan revisions may be required after additional review. Contact Central
Arkansas Water regarding procedures for installation of water facilities and/or fire service.
Approval of plans by the Arkansas Department of Health Engineering Division and the
Little Rock Fire Department is required.
3. If there are facilities that need to be adjusted and/or relocated, contact Central Arkansas
Water. That work would be done at the expense of the developer.
4. The facilities on -site will be private. When meters are planned off private lines, private
facilities shall be installed to Central Arkansas Water's materials and construction
specifications and installation will be inspected by an engineer, licensed to practice in the
State of Arkansas. Execution of a Customer Owned Line Agreement is required.
5. Due to the nature of this facility, installation of an approved reduced pressure zone
backflow preventer assembly (RPZA) is required on the domestic water service. This
assembly must be installed prior to the first point of use. Central Arkansas Water requires
that upon installation of the RPZA, successful tests of the assembly must be completed by
a Certified Assembly Tester licensed by the State of Arkansas and approved by Central
Arkansas Water. The test results must be sent to Central Arkansas Water's Cross
Connection Section within ten days of installation and annually thereafter. Contact the
Cross Connection Section at 501.377.1226 if you would like to discuss backflow
prevention requirements for this project.
6. Fire sprinkler systems which do not contain additives such as antifreeze shall be isolated
with a double detector check valve assembly. If additives are used, a reduced pressure
zone back flow preventer shall be required.
Fire Department,
1. Maintain Access.
2. Fire Hydrants. Maintain fire apparatus access roads at fire hydrant locations as per
Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.1 Access
road width with a hydrant. Where a fire hydrant is located on a fire apparatus access road,
the minimum road width shall be 26 feet, exclusive of shoulders.
3. Grade. Maintain fire apparatus access roads as per Appendix D of the 2012 Arkansas
Fire Prevention Code Vol. 1 Section D103.2 Grade. Fire apparatus access roads shall not
exceed 10 percent in grade except as approved by the fire chief.
4. Loading. Maintain fire apparatus access road design as per Appendix D of the 2012
Arkansas Fire Prevention Code Vol. 1 Section D102.1 Access and loading. Facilities,
buildings or portions of buildings hereafter constructed shall be accessible to fire
department apparatus by way of an approved fire apparatus access road with an asphalt,
concrete or other approved driving surface capable of supporting the imposed load of fire
apparatus weighing at least 75,000 pounds.
5. Commercial and Industrial Developments — 2 means of access. - Maintain fire apparatus
access roads as per Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1
a. Section D104.1 Buildings exceeding three stories or 30 feet in height. Building
or facilities exceeding 30 feet or three stories in height shall have at least two
means of fire apparatus access for each structure.
b. Section D104.2 Building exceeding 62,000 square feet in area. Buildings or
facilities having a gross building area of more than 62,000 square feet shall be
provide with two separate and approved fire apparatus access roads.
i. Exception: Projects having a gross building area of up to 124,000 square
feet that have a single approved fire apparatus access road when all
building are equipped throughout with approved automatic sprinkler
systems.
c. D104.3 Remoteness. Where two fire apparatus access roads are required, they
shall be placed a distance apart equal to not less than one half of the length of
the maximum overall diagonal dimension of the lot or area to be served,
measured in a straight line between accesses.
6. Fire Hydrants. Locate Fire Hydrants as per Appendix C of the 2012 Arkansas Fire
Prevention Code. Section C101 — C105, in conjunction with Central Arkansas Water
(Jason Lowder 501.377.1245) and the Little Rock Fire Marshal's Office (Capt. Tony
Rhodes 501,918.3757 or Capt. John Hogue 501.918.3754). Number and Distribution of
Fire Hydrants as per Table C105.1.
Parks and Recreation: No comment received.
County Planning: No comment.
Rock Region Metro: Location is currently served by METRO on route 20. Both cyclists and
pedestrians use the road shoulders in this industrial area as a sidewalk. Provide sidewalk
from road shoulder to the interior of ballfield facility for access by pedestrians and cyclists.
Building Code: Project is subject to full commercial plan review and approval prior to
issuance of a building permit. For information on submittal requirements and the review
process, contact a commercial plans examiner: Curtis Richey at 501.371.4724;
criche littlerock, ov or Mark Alderfer at 501.371.4875; malderfer littlerock. ov.
Planning Division: This request is located in Port Planning District. The Land Use Plan
shows I (Industrial). The industrial category encompasses a wide variety of manufacturing,
warehousing research and development, processing, and industry related office and service
activities. Industrial development typically occurs on an individual tract basis rather than
according to an overall development plan. The applicant has applied for a rezoning from 1-3
(Heavy Industrial District) to PID (Planned Industrial Development) to add a sports complex
as an allowable use.
Master Street Plan: To the south of the property is Sloane Drive and it is shown as a Minor
Arterial on the Master Street Plan. A Minor Arterial provides connections to and through an
urban area and their primary function is to provide short distance travel within the urbanized
area. Entrances and exits should be limited to minimize negative effects of traffic and
pedestrians on Sloane Drive since it is a Minor Arterial. This street may require dedication of
right-of-way and may require street improvements for entrances and exits to the site.
Bicycle Plan: A Class II Bike Lane is shown along Sloane Drive. Bike Lanes provide a portion
of the pavement for the sole use of bicycles.
Landscape:
1. Site plan must comply with the City's landscape and buffer ordinance requirements.
2. Screening requirements will need to be met for the vehicular use areas adjacent to
street right-of-ways. Provide screening shrubs with an average linear spacing of not
less at three (3) feet within the required landscape area. Provide trees with an average
linear spacing of not less than thirty (30) feet.
3. A perimeter planting strip is required along any side of a vehicular use area that abuts
adjoining property or the right-of-way of any street. This strip shall be at least nine (9)
feet wide. One (1) tree and three (3) shrubs or vines shall be planted for every thirty
(30) linear feet of perimeter planting strip.
4. Eight percent (8%) of the vehicular use area must be designated for green space; this
green space needs to be evenly distributed throughout the parking area(s). For
developments with more than one hundred fifty (150) parking spaces the minimum
size of an interior landscape area shall be three hundred (300) square feet. Interior
islands must be a minimum of seven and one half (7 1/2) feet in width. Trees shall be
included in the interior landscape areas at the rate of one (1) tree for every twelve (12)
parking spaces.
5. An automatic irrigation system to water landscaped areas shall be required for
developments of one (1) acre or larger.
6. The City Beautiful Commission recommends preserving as many existing trees as
feasible on this site. Credit toward fulfilling Landscape Ordinance requirements can be
given when preserving trees of six (6) inch caliper or larger.