HomeMy WebLinkAboutZ-9168 Staff AnalysisSEPTEMBER 26, 2016
ITEM NO.: 4
File No.: Z-9168
Owner: Crain Investments, LP
Applicant: Keith Harper
Address: 9801 Interstate 30
Description: South portion of 9801 1-30, along the north side of Distribution
Drive
Zoned: 1-2
Variance Requested: A variance is requested from the paving provisions of
Section 36-508 to allow development of a temporary gravel
parking area.
Justification: The applicant's justification is presented in an attached letter.
Present Use of Property: Undeveloped
Proposed Use of Property: Temporary gravel parking area
STAFF REPORT
A. Public Works Issues:
1. At the time permanent hard surface parking is installed; sidewalks with
appropriate handicap ramps are required to be constructed adjacent to
Distribution Drive in accordance with Sec. 31-175 of the Little Rock Code and
the Master Street Plan.
2. If access is proposed from Distribution Drive, all driveways shall be concrete
aprons per City Ordinance. Show the driveway location.
3. A grading permit in accordance with Section 29-186(c) & (d) will be required
prior to any land clearing or grading activities at the site. Other than residential
subdivisions, site grading and drainage plans must be submitted and approved
prior to the start of construction.
4. Show the extent of clearing and grading activities.
B. Landscape and Buffer Issues:
1. Site plan must comply with the City's minimal landscape and buffer ordinance
requirements.
2. All buffers must be maintained and protected from construction activity.
3. Street buffers will be required at six (6) percent of the average depth of the lot.
The minimum dimension shall be one-half (1/2) the full width requirement but in
no case less than nine (9) feet. The maximum dimension required shall be fifty
(50) feet.
SEPTEMBER 26, 2016
ITEM NO.: 4 (CON'T.)
4. Screening requirements will need to be met for the vehicular use areas adjacent
to street right-of-ways. Provide screening shrubs with an average linear spacing
of not less than three (3) feet within the required landscape area. Provide trees
with an average linear spacing of not less than thirty (30) feet.
5. Upon the placement of permanent hard surfacing all parking areas must be
designed and constructed to meet the requirements of the Little Rock City Code
of Ordinances, Chapter 36, Zoning and Chapter 15, Landscape.
6. The City Beautiful Commission recommends preserving as many existing trees
as feasible on this site. Credit toward fulfilling Landscape Ordinance
requirements can be given when preserving trees of six (6) inch caliper or
larger.
C. Staff Analvsis:
The 1-2 zoned property at 9801 Interstate 30 is occupied by a Camper/RV sales
business. The overall property backs up to Distribution Drive. The north half of the
property is occupied by the Camper/RV sales business. Two (2) buildings serve the
operation. The buildings are located at the southeast and southwest corners of the
north half of the property. The remainder of the property is utilized for Camper/RV
display and customer/employee parking. All access is from the 1-30 service road.
Driveways are located at the northeast and northwest corners of the property. The
south half of the overall property is undeveloped and mostly tree covered.
The applicant proposes to clear the majority of the undeveloped portion of the
property and utilize it for a temporary gravel parking lot for campers and RV's, as
noted on the attached site plan. The center portion of the property will be cleared,
with an 18 foot undisturbed buffer being left along the perimeter of the overall south
portion of the property. The applicant proposes to use the gravel parking area on a
temporary basis, with future paving and landscaping of the area.
Section 36-508 of the City's Zoning Ordinance requires that any portion of a property
utilized for a vehicular use area shall be paved where subject to wheeled traffic.
Therefore, the applicant is requesting a variance from this ordinance requirement to
allow temporary use of the gravel parking area.
Staff is supportive of the paving deferral request. Staff views the request as
reasonable. Other similar requests have been granted along 1-30 in the past (Cal -
Ark Trucking, for example). The applicant is proposing to maintain an 18 foot
undisturbed buffer along the perimeter of the property, as well as having access to
the gravel parking area from the north, through the existing camper/RV sales lot.
The property is located within an area of industrial and heavy commercial zoning.
Staff believes that a 24-month deferral of paving for the proposed lot will have no
adverse impact on the adjacent properties or the general area.
2
SEPTEMBER 26, 2016
ITEM NO.: 4 (CON'T.)
D. Staff Recommendation:
Staff recommends approval of the requested deferral of paving variance, subject to
the following conditions:
1. The gravel parking area may be used for a maximum of 24 months.
2. The 18 foot undisturbed perimeter buffer must be maintained.
3. Construction fencing must be installed to protect the undisturbed perimeter buffer
prior to any clearing of the site.
4. The gravel parking area must be hard -packed in a manner that does not result
in the creation of dust, mud, stilt or standing water.
5. Access to the gravel parking area is to only be through the north portion of the
property from 1-30. There is to be no direct access from Distribution Drive.
BOARD OF ADJUSTMENT
(September 26, 2016)
The applicant was present. There were no objectors present. Staff presented the item
and a recommendation of approval as outlined in the "staff recommendation" above.
There was no further discussion. The'item was placed on the consent agenda and
approved as recommended by the vote of 4 ayes, 0 noes and 1 absent.
SEPTEMBER 26, 2016
ITEM NO.: 4
File No.
Owner:
Applicant:
Address:
Description -
Zoned:
Z-9168
Crain Investments, LP
Keith Harper
9801 Interstate 30
South portion of 9801 1-30, along the north side of Distribution
Drive
1-2
Variance Requested: A variance is requested from the paving provisions of
Section 36-508 to allow development of a temporary gravel
parking area.
Justification: The applicant's justification is presented in an attached letter.
Present Use of Property: Undeveloped
Proposed Use of Property: Temporary gravel parking area
STAFF REPORT
A. Public Works Issues:
1. At the time permanent hard surface parking is installed; sidewalks with
appropriate handicap ramps are required to be constructed adjacent to
Distribution Drive in accordance with Sec. 31-175 of the Little Rock Code and
the Master Street Plan.
2. If access is proposed from Distribution Drive, all driveways shall be concrete
aprons per City Ordinance. Show the driveway location.
3. A grading permit in accordance with Section 29-186(c) & (d) will be required
prior to any land clearing or grading activities at the site. Other than residential
subdivisions, site grading and drainage plans must be submitted and approved
prior to the start of construction.
4. Show the extent of clearing and grading activities.
B. Landscape and Buffer Issues-
1 . Site plan must comply with the City's minimal landscape and buffer ordinance
requirements.
2. All buffers must be maintained and protected from construction activity.
3. Street buffers will be required at six (6) percent of the average depth of the lot.
The minimum dimension shall be one-half (1/2) the full width requirement but in
no case less than nine (9) feet. The maximum dimension required shall be fifty
(50) feet.
SEPTEMBER 26, 2016
ITEM NO.: 4 (CON'T.)
4. Screening requirements will need to be met for the vehicular use areas adjacent
to street right-of-ways. Provide screening shrubs with an average linear spacing
of not less than three (3) feet within the required landscape area. Provide trees
with an average linear spacing of not less than thirty (30) feet.
5. Upon the placement of permanent hard surfacing all parking areas must be
designed and constructed to meet the requirements of the Little Rock City Code
of Ordinances, Chapter 36, Zoning and Chapter 15, Landscape.
6. The City Beautiful Commission recommends preserving as many existing trees
as feasible on this site. Credit toward fulfilling Landscape Ordinance
requirements can be given when preserving trees of six (6) inch caliper or
larger.
C. Staff Analysis:
The 1-2 zoned property at 9801 Interstate 30 is occupied by a Camper/RV sales
business. The overall property backs up to Distribution Drive. The north half of the
property is occupied by the Camper/RV sales business. Two (2) buildings serve the
operation. The buildings are located at the southeast and southwest corners of the
north half of the property. The remainder of the property is utilized for Camper/RV
display and customer/employee parking. All access is from the 1-30 service road.
Driveways are located at the northeast and northwest corners of the property. The
south half of the overall property is undeveloped and mostly tree covered.
The applicant proposes to clear the majority of the undeveloped portion of the
property and utilize it for a temporary gravel parking lot for campers and RV's, as
noted on the attached site plan. The center portion of the property will be cleared,
with an 18 foot undisturbed buffer being left along the perimeter of the overall south
portion of the property. The applicant proposes to use the gravel parking area on a
temporary basis, with future paving and landscaping of the area.
Section 36-508 of the City's Zoning Ordinance requires that any portion of a property
utilized for a vehicular use area shall be paved where subject to wheeled traffic.
Therefore, the applicant is requesting a variance from this ordinance requirement to
allow temporary use of the gravel parking area.
Staff is supportive of the paving deferral request. Staff views the request as
reasonable. Other similar requests have been granted along 1-30 in the past (Cal -
Ark Trucking, for example). The applicant is proposing to maintain an 18 foot
undisturbed buffer along the perimeter of the property, as well as having access to
the gravel parking area from the north, through the existing camper/RV sales lot.
The property is located within an area of industrial and heavy commercial zoning.
Staff believes that a 24-month deferral of paving for the proposed lot will have no
adverse impact on the adjacent properties or the general area.
2
SEPTEMBER 26, 2016 S�,s,� fic.c. �c,�.7 lots
ITEM NO.: 4 CON'T.
D. Staff Recommendation: ficivr -.� --ap-5
Staff recommends approval of the requested deferral of paving variance, subject to
the following conditions:
1. The gravel parking area may be used for a maximum of 24 months.
2. The 18 foot undisturbed perimeter buffer must be maintained.
3. Construction fencing must be installed to protect the undisturbed perimeter buffer
prior to any clearing of the site.
4. The gravel parking area must be hard -packed in a manner that does not result
in the creation of dust, mud, stilt or standing water.
5. Access to the gravel parking area is to only be through the north portion of the
property from 1-30. There is to be no direct access from Distribution Drive.
BOARD OF ADJUSTMENT
(September 26, 2016)
The applicant was present. There were no objectors present. Staff presented the item
and a recommendation of approval as outlined in the "staff recommendation" above.
There was no further discussion. The item was placed on the consent agenda and
approved as recommended by the vote of 4 ayes, 0 noes and 1 absent.
3