Loading...
HomeMy WebLinkAboutZ-9155 Staff AnalysisAUGUST 3, 2016 ITEM NO.: 10. LITTLE ROCK TECHNOLOGY PARK COMMERCIAL PARKING LOT CONDITIONAL USE PERMIT WEST SIDE OF 400 BLOCK OF MAIN STREET Z-9155 Planning Staff Comments: 1. The plat/bill of assurance for the Original City does not address use issues. 2. Locate and describe all proposed signage. 3. Locate and describe the proposed pay station. Variance/Waivers: None requested. Public Works: No comments. Utilities and Fire Department/Count. Planning: Little Rock Wastewater: Sewer available to this site. Existing sewer in alley must be retained. Entergy: Entergy does not object to this proposal. Electrical facilities are buried in this area and no change of location or use is required due to this proposal for the parking lot change. Centerpoint Energy: No comments received. AT&T: No comments received. Central Arkansas Water: NO OBJECTIONS; All Central Arkansas Water requirements in effect at the time of request for water service must be met. Fire Department: Maintain Access Building Code: No comment. County Planning: No comments. Rock Region METRO: a) Location is currently served by METRO by multiple routes along Capital Ave. We don't object to the conditional use of the lot as commercial parking. We would like to encourage the future development of the site to match more intensive land use indicative of a vibrant downtown. ITEM NO.: 10. (CON'T) (Z-915 Planning Division: No comments. Landscape: No Comment. Other: Submit responses to staff issues and four (4) copies of a revised site plan (if required) no later than Wednesday, August 10, 2016. Required notices are to be sent via certified mail to all owners of properties located within two hundred (200) feet of the site no later than Wednesday August 10, 2016. The City - provided notice form must be used. Proof of notices is to be provided to staff no later than August 19. August 25, 2016 ITEM NO.: 10 FILE NO.: Z-9155 NAME: Little Rock Technology Park Commercial Parking Lot — Conditional Use Permit LOCATION: West side of 400 Block of Main Street OWNER/APPLICANT: Little Rock Technology Park/ Brent Birch, Executive Director PROPOSAL: A conditional use permit is requested to allow for use of a portion of this UU zoned parking lot as a commercial parking lot. SITE LOCATION: The parking lot is located on the west side of Main Street, between 4th Street and Capitol Avenue. 2. COMPATIBILITY WITH NEIGHBORHOOD: The site is located within the densely developed urban core of downtown Little Rock. Uses around the site include office buildings, mixed use developments, surface parking lots and parking structures. Many, if not most of the surface parking lots are commercial parking lots in one form or another. No change is being proposed to this existing parking lot other than for the possible installation of a pay station. The proposed use is compatible with uses in the area. Notice of the public hearing was sent to all owners of properties located within 200 feet of the site and the Downtown Neighborhood Association. 3. ON SITE DRIVES AND PARKING: The parking lot contains 91 spaces (includinlq 4 handicap spaces), Access is via a single driveway off of West 4 h Street. No changes are proposed. The parking lot was constructed within the past 2 to 3 years and was built to comply with the City's parking and landscape codes. 4. SCREENING AND BUFFERS: All landscaping is to be in good condition and replace any missing plant materials. August 25, 2016 ITEM NO.: 10 (Cont_ 5. PUBLIC WORKS: No Comments. 6. UTILITY, FIRE DEPT. AND CATA COMMENTS: FILE NO.: Z-9155 Little Rock Wastewater: Sewer available to this site. Existing sewer in alley must be retained. Entergy: Entergy does not object to this proposal. Electrical facilities are buried in this area and no change of location or use is required due to this proposal for the parking lot change. Centerpoint Energy: No comments received. AT&T: No comments received. Central Arkansas Water: NO OBJECTIONS; All Central Arkansas Water requirements in effect at the time of request for water service must be met. Fire Department: Maintain access. Building Code: No Comment. County Planning: No Comments. Rock Region METRO: a) Location is currently served by METRO by multiple routes along Capital Ave. We don't object to the conditional use of the lot as commercial parking. We would like to encourage the future development of the site to match more intensive land use indicative of a vibrant downtown. SUBDIVISION COMMITTEE COMMENT: (AUGUST 3, 2016) The applicant was present. Staff presented the item and noted little additional information was needed. The applicant was asked to locate and describe all proposed signage and the proposed pay station. Other Agency Comments were noted. The applicant was advised to respond to staff issues by August 10. The Committee forwarded the item to the full Commission. 2 August 25, 2016 ITEM NO.: 10 (Cont. STAFF ANALYSIS: FILE NO.: Z-9155 In February 2016, the Little Rock Technology Park Authority purchased the existing surface parking lot located on the half block on the west side of Main Street, between 4th Street and Capitol Avenue. The lot is currently leased to the State of Arkansas through a lease the Tech Park Authority assumed in their recent purchase. The Authority's plan is to reduce the number of spots leased to the state and convert the others to public commercial parking, including spaces for the tech park tenants. In the UU zoning district, commercial surface parking lots are permitted only as a conditional use. The parking lot contains 91 spaces, including 4 handicap spaces. Access is via a single driveway off of 4''' Street. The parking lot was constructed within the past 2 to 3 years and was built in compliance with the City's parking and landscape codes. No changes are proposed other than for the installation of a pay station and informational signage. A parking lot management company will manage the lot for the Tech Park Authority. Signage will consist of a single, 30" X 30" informational sign placed near the entrance to the lot off of 4th Street. A single, multi -space pay station, similar to the ones placed by the City in the River Market area, will also be placed near the 4th Street entrance. Staff is supportive of the proposal. The parking lot is existing and no changes are proposed to the lot itself. A commercial parking lot is not out of character with uses in the area which include numerous other surface parking lots and parking structures. The plat/bill of assurance for the Original City does not address use issues. STAFF RECOMMENDATION: Staff recommends approval of the requested conditional use permit subject to compliance with the comments and conditions outlined in Sections 4, 5 and 6 of the agenda staff report. PLANNING COMMISSION ACTION: (AUGUST 25, 2016) The applicant was present. There were no objectors present. Staff presented the item and a recommendation of approval as outlined in the "staff recommendation" above. There was no further discussion. The item was placed on the consent agenda and approved as recommended by staff with a vote of 9 ayes, 0, noes and 2 absent. 3