HomeMy WebLinkAboutZ-9150 Staff AnalysisITEM NO.: 17.
Z-9150
advance to discuss future service requirements, new facilities locations and adjustments to
existing facilities (if any) as this project proceeds.
Centerpoint Enerry: No comment received.
AT & T: No comment received.
Central Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for water service
must be met.
2. The Little Rock Fire Department needs to evaluate this site to determine whether
additional public and/or private fire hydrant(s) will be required. If additional fire hydrant(s)
are required, they will be installed at the Developer's expense.
3. Please submit plans for water facilities and/or fire protection system to Central Arkansas
Water for review. Plan revisions may be required after additional review. Contact Central
Arkansas Water regarding procedures for installation of water facilities and/or fire service.
Approval of plans by the Arkansas Department of Health Engineering Division and the
Little Rock Fire Department is required.
4. A Capital Investment Charge based on the size of meter connection(s) will apply to this
project in addition to normal charges. This fee will apply to all connections including
metered connections off the private fire system.
5. If there are facilities that need to be adjusted and/or relocated, contact Central Arkansas
Water. That work would be done at the expense of the developer.
6. Contact Central Arkansas Water regarding the size and location of water meter.
7. The facilities on -site will be private. When meters are planned off private lines, private
facilities shall be installed to Central Arkansas Water's materials and construction
specifications and installation will be inspected by an engineer, licensed to practice in the
State of Arkansas. Execution of a Customer Owned Line Agreement is required.
8. Due to the nature of this facility, installation of an approved reduced pressure zone
backflow preventer assembly (RPZA) is required on the domestic water service. This
assembly must be installed prior to the first point of use. Central Arkansas Water requires
that upon installation of the RPZA, successful tests of the assembly must be completed by
a Certified Assembly Tester licensed by the State of Arkansas and approved by Central
Arkansas Water. The test results must be sent to Central Arkansas Water's Cross
Connection Section within ten days of installation and annually thereafter. Contact the
Cross Connection Section at 501.377.1226 if you would like to discuss backflow
prevention requirements for this project.
9. Fire sprinkler systems which do not contain additives such as antifreeze shall be isolated
with a double detector check valve assembly. If additives are used, a reduced pressure
zone back flow preventer shall be required.
Fire Department: Full plan review. Change in occupancy. Contact the Little Rock Fire
Marshal's Office (Capt. Tony Rhodes 501.918.3757 or Capt. John Hogue 501.918.3754).
Parks and Recreation: No comment received.
ITEM NO
17.
Z-9150
County Planning: No comment.
Rock Region Metro: Locations along East 6th Street are currently served by METRO on the
Presidential Center -East 6th Street Route 12. Our current annual service changes include add
service to this corridor to support expected development and employment opportunities along
East 6th Street. The roadway redesign as shown will not dimensionally allow for bus service
along Shall Street and East 6th Street where the route will continue to run.
The street corner radii need to be at least 25'-0" for the bus to turn. The parking spaces are
too close to the intersection to allow us to position bus stops. While the "bulbed-out"
crossings are helpful however they are too short to serve as a bus stop. METRO requests a
meeting with relevant departments and the developer in order to discuss our concerns and
make this street design truly multi -modal
Building Code: Project is subject to full commercial plan review and approval prior to
issuance of a building permit. For information on submittal requirements and the review
process, contact a commercial plans examiner:
Curtis Richey at 501.371.4724; cricheyalittlerock.orq or
Mark Alderfer at 501.371.4875; malderferelittlerock.org.
Planning Division: This request is located in 1-30 Planning District. The Land Use Plan shows
Mixed Use Urban (MXU) and Industrial (1) for this properties. Mixed Use Urban category
provides for a mix of residential, office and commercial uses not only in the same block but
also within the same structure. This category is intended for older "urban" areas to allow
dissimilar uses to exist, which support each other to create a vital area. Development should
reinforce the urban fabric creating a 24-hour activity area. Using the Planned Zoning District
or the Urban Use District, high and moderate density developments that result in a vital
(dense) pedestrian oriented area are appropriate. The industrial category encompasses a
wide variety of manufacturing, warehousing research and development, processing, and
industry related office and service activities. Industrial development typically occurs on an
individual tract basis rather than according to an overall development plan. The applicant has
applied to rezone five (5) parcels around the intersection of East 6th Street and Shall Avenue
from UU (Urban Use District) and 1-3 (Heavy Industrial District) to PCD (Planned Commercial
Development) to allow the redevelopment of the area with a mixed use development
including residential, office and commercial uses. This request is within the Presidential Park
Overlay District.
Master Street Plan: The five (5) parcels are around the intersection of East 6th Street and
Shall Avenue which are shown as Locals Streets on the Master Street Plan. The primary
function of Local Streets is to provide access to adjacent properties. Local Streets that are
abutted by non-residential zoning/use or more intensive zoning than duplexes are considered
as "Commercial Streets". A Collector design standard is used for Commercial Streets. These
streets may require dedication of right-of-way and may require street improvements for
entrances and exits to the site.
ITEM NO.: 17.
Z-9150
Bicycle Plan: There is a Class III Bike Route shown on East 61h Street and Shall Avenue.
These bike routes require no additional right-of-way, but either a sign or pavement marking to
identify and direct the route.
Landscape:
1. Site plan must comply with the City's landscape and buffer ordinance requirements and
the Presidential Park Overlay District.
2. Street buffers will be required at six (6) percent of the average depth of the lot. The
minimum dimension shall be one-half (1/2) the full width requirement but in no case less
than nine (9) feet. The maximum dimension required shall be fifty (50) feet. The property
is located in the City's designated mature area. A twenty-five (25%) percent reduction of
the perimeter width requirements is allowed.
3. Screening requirements will need to be met for the vehicular use areas adjacent to street
right-of-ways. Provide screening shrubs with an average linear spacing of not less at three
(3) feet within the required landscape area. Provide trees with an average linear spacing
of not less than thirty (30) feet.
4. Building landscape areas shall be provided at the rate equivalent to planter strip three (3)
feet wide along the vehicular use area. One (1) tree and four (4) shrubs shall be planted in
the building landscape areas for each forty (40) linear feet of vehicular use area abutting
the building.
5. A perimeter planting strip is required along any side of a vehicular use area that abuts
adjoining property or the right-of-way of any street. This strip shall be at least nine (9) feet
wide. One (1) tree and three (3) shrubs or vines shall be planted for every thirty (30) linear
feet of perimeter planting strip. The property is located in the City's designated mature
area. A twenty-five (25%) percent reduction of the perimeter width requirements is
allowed.
6. Eight percent (8%) of the vehicular use area must be designated for green space; this
green space needs to be evenly distributed throughout the parking area(s). For
developments with more than one hundred fifty (150) parking spaces the minimum size of
an interior landscape area shall be three hundred (300) square feet. Interior islands must
be a minimum of seven and one half. (7 1/2) feet in width. Trees shall be included in the
interior landscape areas at the rate of one (1) tree for every twelve (12) parking spaces.
The property is located in the City's designated mature area. A 25% reduction of the
interior parking requirements is acceptable.
7. An irrigation system shall be required for developments of one (1) acre or larger.
8. The development of two (2) acres or more requires the landscape plan to be stamped with
the seal of a Registered Landscape Architect.
9. The City Beautiful Commission recommends preserving as many existing trees as
feasible on this site. Credit toward fulfilling Landscape Ordinance requirements can be
given when preserving trees of six (6) inch caliper or larger.
Revised plat/plam Submit four (4) copies of a revised preliminary plat/plan (to include the
additional information as noted above) to staff on Wednesday, July 27, 2016.
ITEM NO.: 17. Z-9150
NAME. East Village Short -form PCD
LOCATION: located in the 1200 through 1400 Blocks of East 6th Street
Planninq Staff Comments:
1. Provide notification of the property owners located within 200-feet of the development
including the certified abstract list, notice form with affidavit executed and proof of mailing.
The notice must be mailed no later than July 27, 2016. The Office of Planning and
Development must receive the proof of notice no later than August 5, 2016.
2. The site is located within the Presidential Park Design Overlay District. The DOD has
specific development criteria related to street furniture and trees. All landscape
requirements of the base zone shall be enforced, related to location, plant size and
spacing. Along Bond, 3rd, 6th, 9th, and College Streets, all the standards delineated
below apply in urban use -zoned areas the street trees below apply. Any property owner,
due to the spacing requirements, not required to provide a "street tree" or "street furniture"
shall pay an in -lieu fee based on the percentage of frontage along the street divided by
the cost of providing the required street trees and furniture in the ordinance.
a. Street trees are to be species defined in the zoning ordinance (Section 36-414).
- Street trees a minimum of three-inch caliper shall be required (type of trees as
listed in landscape ordinance [chapter 151). The trees shall be located a
minimum of two (2) feet off the back of a curb and shall be thirty (30) feet on
center and no closer than thirty (30) feet to a street intersection with a water
source provided. The tree canopy shall be maintained at least eight (8) feet
above the sidewalk.
b. Benches and receptacles shall be at a spacing of one hundred (100) feet with
none closer than fifty (50) feet to the intersection.
3. No surface parking is allowed along 3rd Street from 1-30 east one thousand, one hundred
fifty (1,150) feet, 6th Street, Bond Street and College/College Street Extension. Parking
structures along these streets must either have non -vehicular uses on the first (ground)
level or a false facade along the street so as to appear to be a non -vehicular use area.
4. The Presidential Park Overlay allows for the use of porous materials to minimize flooding
and pollution due to large amounts of impermeable surfaces. The areas allowed for
porous materials are low impact vehicular use areas and not for areas to be used as
loading areas, primary parking areas, driveway. Does the plan include the placement of
porous materials for any of the proposed parking areas?
5. The overlay sates service and loading areas along East 6th Street are not to be located
along the street side. Will deliveries be made within these areas?
6. General sign regulations as per the base zoning classification except for the first two (2)
floors where the following is required:
a. Awning valances are appropriate locations for signage, sign area not to exceed
six (6) square feet of valance.
b. Neon illumination is permitted if channelized.
c. Letters shall not exceed 30 inches in height.
ITEM NO.: 17. Z-9150
d. Window signs shall not cover more than twenty-five percent of each glass
panel.
7. The plan indicates the placement of a dumpster along East 6th Street within the building
setback. Provide plans of how the dumpster will be screened, materials (fencing and/or
materials of the fence, brick, wood, stone), height of the enclosure and any additional
screening mechanism such as landscape plantings to soften the placement of the
dumpster along the street.
8. Provide the proposed phasing plan for the development. Will all the remodeling and
proposed uses be provided in the first phase or will there be multiple phases of
redevelopment? Will all the parking be added in a single phase or will there be multiple
phases for the proposed parking.
9. Provide the proposed building materials, if new materials are to be added. The UU,
Urban Use Zoning District prohibits the use of corrugated or ribbed materials.
10.The UU, Urban Use Zoning District requires sidewalks to be a minimum of five (5) feet
excluding the first two (2) feet from the curb.
11. Provide the proposed signage plan. The UU, Urban Use Zoning District allows ground
mounted signs as a variance. The signage allowed are as allowed in office zones or a
maximum of six (6) feet in height and 64 square feet in area.
12. Dose the proposed use of the property include a restaurant, bar or lounge with outdoor
seating/dining? If so note the areas proposed for outdoor seating on the site plan. The
ordinance only allows the number of seats in the outdoor seating area to not exceed 50
percent of the seats within the eating place, bar or lounge.
VarianceNVaivers: A variance from Sections 30-43 and 31-210 to allow the drives as
indicated on the site plan.
Public Works Conditions:
1. Due to the proposed use of the property, the Master Street Plan specifies that Shall Street
for the frontage of this property must meet commercial street standards. Dedicate right-
of-way to 30 feet from centerline.
2. Obtain a franchise agreement from Public Works, Bennie Nicolo, bnicolo&littlerock.orq or
501.371.4818 for the private improvements located in the right-of-way including pavers,
colored concrete with score pattern, street trees, irrigation, electrical for lighting trees, etc.
3. With site development, provide the design of street conforming to the Master Street Plan.
Construct one-half street improvements to East 6th Street adjacent to the subject property
proposed for redevelopment including 5-foot sidewalks. The street improvements include
the construction of a left turn lane or a portion of a left turn lane at Shall Street. At the left
turn lane, the street section should be 36 feet at its widest with 200 feet of stack and 100
foot of taper. Plans should reflect the left turn lane.
4. Property on the south side of East 6th Street is shown to be of the same ownership and
proposed to be redeveloped but no proposed street improvements are shown. Is a waiver
being requested for those improvements?
5. Shall Street should be constructed with at least 20 foot curb radiuses.
6. The location of the pedestrian crossing on the west end of East 6th Street should be
moved to the Shall Street intersection due to limited sight distance from railroad bridge
ITEM NO.: 17.
Z-9150
obstructions.
7. All driveways shall be concrete aprons per City Ordinance.
8. Repair or replace any curb and gutter or sidewalk that is damaged in the public right-of-
way prior to occupancy.
9. A grading permit in accordance with Section 29-186 (c) & (d) will be required prior to any
land clearing or grading activities at the site. Other than residential subdivisions, site
grading and drainage plans must be submitted and approved prior to the start of
construction. Is the entire development proposed to be constructed in one (1) phase or
several phases? If constructed in several phases, is an advanced grading permit being
requested? Street improvements cannot be deferred to the last phase. Show phases of
construction.
10. Per Section 29-102 an evaluation should be conducted on the basis of existing
downstream development and any analysis of stormwater runoff with and without the
proposed development. If the proposed development will cause or increase downstream
flooding conditions, provisions to minimize such flooding conditions should be included in
the design of the storm management improvements. Such provisions may include
downstream improvements and/or detention of stormwater runoff and its regulated
discharge to the downstream storm drainage system.
11. Stormwater detention ordinance applies to this property. Maintenance of the detention
pond and all private drainage improvements is the responsibility of the developer and/or
property owner.
12. If disturbed area is one (1) or more acres, obtain a NPDES stormwater permit from the
Arkansas Department of Environmental Quality prior to the start of construction.
13. Street improvement plans shall include signage and striping. Public Works must approve
completed plans prior to construction.
14. Streetlights are required by Section 31-403 of the Little Rock code. Provide plans for
approval to Traffic Engineering. Street lights must be installed prior to platting/certificate
of occupancy. Contact Traffic Engineering, Greg Simmons, gsimmons@littlerock.grg or
501.379.1813 for more information.
15. Driveway locations and widths do not meet the traffic access and circulation requirements
of Sections 30-43 and 31-210. The width of driveway must not exceed 36 feet. Driveway
spacing on this commercial street is at least 250 feet from other driveways and
intersections and 125 feet from side property lines. Variances must be requested.
16. "Stop" signage is shown on East 6th Street. Signage is not approved by this application
and must meet traffic warrants and analysis requirements prior to installation.
Utilities and Fire Department/County Planning:
Little Rock Wastewater: Sewer available to the project. Capacity fee analysis required.
EAD, Environmental Assessment Division, approval required if food prep is to be done on site.
Contact Little Rock Wastewater Utility for additional information.
Entergy: Entergy does not object to this proposal. However, power lines exist along East 6tn
Street, Shall Street, and Thomas Street with multiple crossings and potential conflicts with the
development and landscaping. Extreme caution must be used in the construction activities in
the vicinity of the power lines so that proper clearances are maintained. Contact Entergy in
FILE NO.: Z-9150
NAME: East Village Short -form PCD
LOCATION: Located in the 1200 through 1400 Blocks of East 6th Street
DEVELOPER:
Sixth and Shall LLC
101 South Spring Street
Little Rock, AR 72201
ENGINEER:
Cromwell Architects and Engineers
101 South Spring Street
Little Rock, AR 72201
AREA: 3.29 acres
WARD: 1
CURRENT ZONING
ALLOWED USES
NUMBER OF LOTS: 1 zoning lot FT. NEW STREET: 0 LF
PLANNING DISTRICT: 7 — 1-30 CENSUS TRACT: 2
UU, Urban Use District and 1-3, Industrial District
Mixed - including residential, office, commercial and industrial
uses
PROPOSED ZONING: PCD
PROPOSED USE
UU, Urban Use District uses
VARIANCE/WAIVERS: A variance from Sections 30-43 and 31-210 to allow the drives
on East 6th Street as indicated on the site plan.
A. PROPOSAL/REQUEST/APPLICANT'S STATEMENT:
Cromwell Architects Engineers have purchased five (5) parcels of land in what
they are now calling the East Village, an area east of Interstate 30 around the
intersection of East 6th Street and Shall Avenue. Four (4) of the five (5) parcels
are zoned UU, Urban Use District and one (1) of the parcels is zoned 1-3,
Industrial District. Three (3) of the parcels zoned UU have existing masonry
manufacturing warehouse type buildings and one (1) has an old building
slab/foundation. The parcel zoned 1-3, Industrial District has a small parking lot.
FILE NO.: Z-9150 (Cont.
The property is located within the Presidential Park Design Overlay District. The
applicant is requesting to rezone the site from the UU, Urban Use Zoning District
and the 1-3, Industrial District to PCD to allow development of the site. The
request for the PZD application is to allow the placement of a surface parking lot
along East 6th Street. Section 36-419 states no surface parking is allowed along
3rd Street from 1-30 east one thousand, one hundred fifty (1,150) feet, 6th Street,
Bond Street and College/College Street Extension. Parking structures along
these streets must either have non -vehicular uses on the first (ground) level or a
false facade along the street so as to appear to be a non -vehicular use area.
The applicant is proposing to utilize the existing building on the northwest corner
of East 6th Street and Shall Avenue as lease space. The space may be
subdivided into multiple lease tenants as the future may dictate. To support the
tenants, additional on street parking on both East 6th Street and Shall Avenue is
proposed.
Cromwell Architects and Engineers will relocate their corporate offices to the first
floor of the building located on the northeast corner of East 6th Street and Shall
Avenue. In addition, the firm intends to lease approximately 4,000 square feet of
the first floor east side facing Shall Avenue to a retail user, likely a restaurant
establishment. The plan also includes the development of 15 apartments on the
second floor for lease. There is currently a small parking area at the southeast
corner of the lot which will remain parking for the guests. In addition, the
applicant proposes to provide on street parking at both Shall Avenue, currently
and historically used as parking, and along East 6th Street.
A triangular parcel directly east of Industrial Street has a small masonry building
that will remain. The remaining portion of the lot is currently a parking lot. The
site does not directly abut East 6th Street. The applicant plans to develop the
parcel as secure parking for the office building and the apartment tenants.
The crescent shape easternmost parcel defined by the railroad track, presently
has multiple building foundations and floor slabs. The applicant intends to
redevelop this parcel as a parking lot for their office and the tenants along East
6th Street. Landscape screening and water retention between the parking area
and East 61h Street will be provided. The existing rock retaining wall along East
6th Street, east of Thomas Street, will remain as the street dips significantly at
this location.
The parcel south of East 6th Street is presently a small parking lot. The applicant
intends the area to be retained as parking for off street on grade parking and
prepared for future on street parking to be constructed at a later date as the
south side of East 6th Street develops.
The intent of the development is to create a walkable community with sidewalks
along the street edge, curb and gutter, tree wells at regular intervals and on
street parking all the way long the north side of East 6th Street from the western
2
FILE NO.: Z-9150(Cont.)
railroad bridge to the retaining wall noted above and along Shall Avenue abutting
the property.
B. EXISTING CONDITIONS. -
The property is located in the former manufacturing/warehouse district of the
City. This area is changing significantly with the reuse of the former
manufacturing buildings with new uses such as microbreweries and Rock Town
Distillery. E-stem school has purchased a building to the north of this site and
intends to move a portion of their grades to this location. Further north of the site
is the President Clinton Presidential Park and Heifer International office building.
East 6th Street is a two (2) lane street. There is a sidewalk located on the north
side of the street in disrepair. There is curb located along the street, much of
which is broken and/or missing.
C. NEIGHBORHOOD COMMENTS:
All property owners located within 200-feet of the site along with the Hanger Hill
Neighborhood Association were notified of the public hearing.
D. ENGINEERING COMMENTS. -
PUBLIC WORKS CONDITIONS:
1. Due to the proposed use of the property, the Master Street Plan specifies
that Shall Street for the frontage of this property must meet commercial
street standards. Dedicate right-of-way to 30 feet from centerline.
2. Obtain a franchise agreement from Public Works, Bennie Nicolo,
bnicolo(cDlittlerock orb or 501.371.4818 for the private improvements located
in the right-of-way including pavers, colored concrete with score pattern,
street trees, irrigation, electrical for lighting trees, etc.
3. With site development, provide the design of street conforming to the
Master Street Plan. Construct one-half street improvements to East 6th
Street adjacent to the subject property proposed for redevelopment
including 5-foot sidewalks. The street improvements include the
construction of a left turn lane or a portion of a left turn lane at Shall Street.
At the left turn lane, the street section should be 36 feet at its widest
with 200 feet of stack and 100 foot of taper. Plans should reflect the left
turn lane.
4. Property on the south side of East 6th Street is shown to be of the same
ownership and proposed to be redeveloped but no proposed street
improvements are shown. Is a waiver being requested for those
improvements?
5. Shall Street should be constructed with at least 20-foot curb radius.
3
FILE NO.: Z-9150 (Cont.
6. The location of the pedestrian crossing on the west end of East 6th Street
should be moved to the Shall Street intersection due to limited sight
distance from railroad bridge obstructions.
7. All driveways shall be concrete aprons per City Ordinance.
8. Repair or replace any curb and gutter or sidewalk that is damaged in the
public right-of-way prior to occupancy.
9. A grading permit in accordance with Section 29-186 (c) & (d) will be
required prior to any land clearing or grading activities at the site. Other
than residential subdivisions, site grading and drainage plans must be
submitted and approved prior to the start of construction. Is the entire
development proposed to be constructed in one (1) phase or several
phases? If constructed in several phases, is an advanced grading permit
being requested? Street improvements cannot be deferred to the last
phase. Show phases of construction.
10. Per Section 29-102 an evaluation should be conducted on the basis of
existing downstream development and any analysis of stormwater runoff
with and without the proposed development. If the proposed development
will cause or increase downstream flooding conditions, provisions to
minimize such flooding conditions should be included in the design of the
storm management improvements. Such provisions may include
downstream improvements and/or detention of stormwater runoff and its
regulated discharge to the downstream storm drainage system.
11. Stormwater detention ordinance applies to this property. Maintenance of
the detention pond and all private drainage improvements is the
responsibility of the developer and/or property owner.
12. If disturbed area is one (1) or more acres, obtain a NPDES stormwater
permit from the Arkansas Department of Environmental Quality prior to the
start of construction.
13. Street improvement plans shall include signage and striping. Public Works
must approve completed plans prior to construction.
14. Streetlights are required by Section 31-403 of the Little Rock code. Provide
plans for approval to Traffic Engineering. Streetlights must be installed prior
to platting/certificate of occupancy. Contact Traffic Engineering,
Greg Simmons, gsimmons[c�littlerock.orq or 501.379.1813 for more
information.
15. Driveway locations and widths do not meet the traffic access and circulation
requirements of Sections 30-43 and 31-210. The width of driveway must
not exceed 36 feet. Driveway spacing on this commercial street is at least
250 feet from other driveways and intersections and 125 feet from side
property lines. Variances must be requested.
16. "Stop" signage is shown on East 6th Street. Signage is not approved by this
application and must meet traffic warrants and analysis requirements prior
to installation.
2
FILE NO.: Z-9150 [Cont.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Little Rock Wastewater: Sewer available to the project. Capacity fee analysis
required. EAD, Environmental Assessment Division, approval required if food
prep is to be done on site. Contact Little Rock Wastewater Utility for additional
information.
Enteric y: Entergy does not object to this proposal. However, power lines exist
along East 6t" Street, Shall Street, and Thomas Street with multiple crossings
and potential conflicts with the development and landscaping. Extreme caution
must be used in the construction activities in the vicinity of the power lines so that
proper clearances are maintained. Contact Entergy in advance to discuss future
service requirements, new facilities locations and adjustments to existing facilities
(if any) as this project proceeds.
Centerpoint Energy: No comment received.
AT & T: No comment received.
Central Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for
water service must be met.
2. The Little Rock Fire Department needs to evaluate this site to determine
whether additional public and/or private fire hydrant(s) will be required. If
additional fire hydrant(s) are required, they will be installed at the Developer's
expense.
3. Please submit plans for water facilities and/or fire protection system to Central
Arkansas Water for review. Plan revisions may be required after additional
review. Contact Central Arkansas Water regarding procedures for installation
of water facilities and/or fire service. Approval of plans by the Arkansas
Department of Health Engineering Division and the Little Rock Fire
Department is required.
4. A Capital Investment Charge based on the size of meter connection(s) will
apply to this project in addition to normal charges. This fee will apply to all
connections including metered connections off the private fire system.
5. If there are facilities that need to be adjusted and/or relocated, contact Central
Arkansas Water. That work would be done at the expense of the developer.
6. Contact Central Arkansas Water regarding the size and location of water
meter.
7. The facilities on -site will be private. When meters are planned off private
lines, private facilities shall be installed to Central Arkansas Water's materials
and construction specifications and installation will be inspected by an
engineer, licensed to practice in the State of Arkansas. Execution of a
Customer Owned Line Agreement is required.
FILE NO.: Z-9150 (Cont.
8. Due to the nature of this facility, installation of an approved reduced pressure
zone backflow preventer assembly (RPZA) is required on the domestic water
service. This assembly must be installed prior to the first point of use.
Central Arkansas Water requires that upon installation of the RPZA,
successful tests of the assembly must be completed by a Certified Assembly
Tester licensed by the State of Arkansas and approved by Central Arkansas
Water. The test results must be sent to Central Arkansas Water's Cross
Connection Section within ten days of installation and annually thereafter.
Contact the Cross Connection Section at 501.377.1226 if you would like to
discuss backflow prevention requirements for this project.
9. Fire sprinkler systems which do not contain additives such as antifreeze shall
be isolated with a double detector check valve assembly. If additives are
used, a reduced pressure zone back flow preventer shall be required.
Fire Department: Full plan review. Change in occupancy. Contact the
Little Rock Fire Marshal's Office (Capt. Tony Rhodes 501.918.3757 or
Capt. John Hogue 501.918.3754).
Parks and Recreation: No comment received.
County Planning: No comment.
Rock Region Metro: Locations along East 6th Street are currently served by
METRO on the Presidential Center -East 6th Street Route 12. Our current annual
service changes include add service to this corridor to support expected
development and employment opportunities along East 6th Street. The roadway
redesign as shown will not dimensionally allow for bus service along Shall Street
and East 6th Street where the route will continue to run.
The street corner radii need to be at least 25'-0" for the bus to turn. The parking
spaces are too close to the intersection to allow us to position bus stops. While
the "bulbed-out" crossings are helpful however they are too short to serve as a
bus stop. METRO requests a meeting with relevant departments and the
developer in order to discuss our concerns and make this street design truly
multi -modal.
F. ISSUES/TECHNICAUDESIGN:
Building Code: Project is subject to full commercial plan review and approval
prior to issuance of a building permit. For information on submittal requirements
and the review process, contact a commercial plans examiner:
Curtis Richey at 501.371.4724; crichey@Iittlerock.orq or
Mark Alderfer at 501.371.4875; malderfer@littlerock.org.
R
FILE NO.: Z-9150 (Cont.
Planning Division: This request is located in 1-30 Planning District. The Land Use
Plan shows Mixed Use Urban (MXU) and Industrial (1) for this properties. Mixed
Use Urban category provides for a mix of residential, office and commercial uses
not only in the same block but also within the same structure. This category is
intended for older "urban" areas to allow dissimilar uses to exist, which support
each other to create a vital area. Development should reinforce the urban fabric
creating a 24-hour activity area. Using the Planned Zoning District or the Urban
Use District, high and moderate density developments that result in a vital
(dense) pedestrian oriented area are appropriate. The industrial category
encompasses a wide variety of manufacturing, warehousing research and
development, processing, and industry related office and service activities.
Industrial development typically occurs on an individual tract basis rather than
according to an overall development plan. The applicant has applied to rezone
five (5) parcels around the intersection of East 6th Street and Shall Avenue from
UU (Urban Use District) and 1-3 (Heavy Industrial District) to PCD (Planned
Commercial Development) to allow the redevelopment of the area with a mixed
use development including residential, office and commercial uses. This request
is within the Presidential Park Overlay District.
Master Street Plan: The five (5) parcels are around the intersection of East 6th
Street and Shall Avenue which are shown as Locals Streets on the Master Street
Plan. The primary function of Local Streets is to provide access to adjacent
properties. Local Streets that are abutted by non-residential zoning/use or more
intensive zoning than duplexes are considered as "Commercial Streets".
A Collector design standard is used for Commercial Streets. These streets may
require dedication of right-of-way and may require street improvements for
entrances and exits to the site.
Bicycle Plan: There is a Class III Bike Route shown on East 6th Street and Shall
Avenue. These bike routes require no additional right-of-way, but either a sign or
pavement marking to identify and direct the route.
Landscape:
1. Site plan must comply with the City's landscape and buffer ordinance
requirements and the Presidential Park Overlay District.
2. Street buffers will be required at six (6) percent of the average depth of the
lot. The minimum dimension shall be one-half (1/2) the full width requirement
but in no case less than nine (9) feet. The maximum dimension required shall
be fifty (50) feet. The property is located in the City's designated mature area.
A twenty-five (25%) percent reduction of the perimeter width requirements is
allowed.
3. Screening requirements will need to be met for the vehicular use areas
adjacent to street right-of-ways. Provide screening shrubs with an average
linear spacing of not less at three (3) feet within the required landscape area.
Provide trees with an average linear spacing of not less than thirty (30) feet.
rA
FILE NO.: Z-9150 (Cont.
4. Building landscape areas shall be provided at the rate equivalent to planter
strip three (3) feet wide along the vehicular use area. One (1) tree and four
(4) shrubs shall be planted in the building landscape areas for each
forty (40) linear feet of vehicular use area abutting the building.
5. A perimeter planting strip is required along any side of a vehicular use area
that abuts adjoining property or the right-of-way of any street. This strip shall
be at least nine (9) feet wide. One (1) tree and three (3) shrubs or vines shall
be planted for every thirty (30) linear feet of perimeter planting strip. The
property is located in the City's designated mature area. A twenty-five
(25%) percent reduction of the perimeter width requirements is allowed.
6. Eight percent (8%) of the vehicular use area must be designated for green
space; this green space needs to be evenly distributed throughout the parking
area(s). For developments with more than one hundred fifty (150) parking
spaces the minimum size of an interior landscape area shall be three hundred
(300) square feet. Interior islands must be a minimum of seven and one half
(7 1/2) feet in width. Trees shall be included in the interior landscape areas at
the rate of one (1) tree for every twelve (12) parking spaces. The property is
located in the City's designated mature area. A 25% reduction of the interior
parking requirements is acceptable.
7. An irrigation system shall be required for developments of one (1) acre or
larger.
8. The development of two (2) acres or more requires the landscape plan to be
stamped with the seal of a Registered Landscape Architect.
9. The City Beautiful Commission recommends preserving as many existing
trees as feasible on this site. Credit toward fulfilling Landscape Ordinance
requirements can be given when preserving trees of six (6) inch caliper or
larger.
G. SUBDIVISION COMMITTEE COMMENT: (July 20, 2016)
The applicants were present. Staff presented an overview of the item stating
there were a number of questions concerning the proposed future redevelopment
of the area. Staff requested the applicant provide the proposed phasing plan.
Staff stated the site was located within the Presidential Park Design Overlay
District. Staff questioned the placement of street trees and street furniture.
Public Works comments were addressed. Staff stated dedications of rights of
way along East 6t" Street and Shall Avenue were required to meet the Master
Street Plan. Staff stated along East 6th Street a turn -lane should be installed.
Staff stated the property to the south of East 6th Street was shown to be of the
same ownership and proposed for redevelopment but no proposed street
improvements were indicated. Staff questioned if the improvements would be
completed with a later phase of the development. Staff stated the City's
Stormwater Detention Ordinance would apply to the future development of the
site. Staff stated driveway locations did not meet the typical spacing
0
FILE NO.: Z-9150 (Cont.
requirements of City ordinances. Staff stated the driveways as indicated would
require approval of a variance request by the Commission.
Landscaping comments were addressed. Staff stated the property was located
within the Presidential Park Design Overlay District. Staff stated the overlay had
specific development criteria related to street trees and street furniture. Staff
stated if the trees or furniture could not be placed as outlined by the ordinance
the developer was to pay an in -lieu fee based on calculations outlined in the
ordinance.
Staff noted the comments from the various other departments and agencies.
Staff suggested the applicant contact the departments or agencies directly with
any questions or concerns. There were no more issues for discussion.
The Committee then forwarded the item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised site plan and cover letter to staff addressing a
number of the technical issues associated with the request. The applicant is
seeking a rezoning of the site from UU, Urban Use District and 1-3, Industrial
District to PCD, Planned Commercial Development, to allow the redevelopment
of this area. The property contains five (5) parcels. The developer is dubbing
the area as "the East Village". The area is east of Interstate 30 around the
intersection of East 6th Street and Shall Avenue. Four (4) of the five (5) parcels
are zoned UU, Urban Use District and one (1) of the parcels is zoned 1-3,
Industrial District. Three (3) of the parcels have existing masonry manufacturing
warehouse type buildings and one (1) has an old building slab/foundation. The
parcel zoned 1-3, Industrial District has a small parking lot and is located on
the south side of East 6th Street.
The property is located within the Presidential Park Design Overlay District. The
applicant is requesting to rezone the site from the UU, Urban Use Zoning District
and the 1-3, Industrial District to PCD to allow development of the site with the
placement of a surface parking lot along East 6th Street. Section 36-419 states
no surface parking is allowed along East P Street from 1-30 east one thousand,
one hundred fifty (1,150) feet, East 6th Street, Bond Street and College/College
Street Extension. Parking structures along these streets must either have
non -vehicular uses on the first (ground) level or a false facade along the street so
as to appear to be a non -vehicular use area. The applicant is proposing to place
a surface parking lot along the north side of East 6th Street and is not proposing
to place a false facade along the street.
The applicant is proposing to utilize the existing building on the northwest corner
of East 6th Street and Shall Avenue as lease space. The space may be
subdivided into multiple lease tenants as the future may dictate. To support the
tenants, additional on street parking on both East 6th Street and Shall Avenue are
proposed. The parking will be added within the public right of way. Parking on
9
FILE NO.: Z-9150 (Cont.
Shall Avenue is proposed as angle parking. Parking on East 6th Street is
proposed as parallel spaces along the drive lanes. The applicant has indicated
special pavers will be installed within the Shall Street right of way. A franchise
permit will be required to be obtained for all private improvements within the
public right-of-way including plantings, specialty concrete, irrigation, electrical
components etc. The proposed private improvements within the right-of-way will
be reviewed by City of Little Rock Public Works staff and will be the responsibility
of the applicant to maintain.
Within this area the applicant has indicated a potential leaser may be a
restaurant user. The site plan indicates the placement of a potential outdoor
patio or dining area. The area will be fenced to comply with all State regulations
with regard to fencing and alcohol sales. The site plan indicates a portion of
the patio and potentially accesses to the building may extend into the public right
of way.
Cromwell Architects and Engineers intend to relocate their corporate offices to
the first floor of the building located on the northeast corner of East 6th Street and
Shall Avenue. In addition, the firm intends to lease approximately 4,000 square
feet of the first floor east side facing Shall Avenue to a retail user, likely a
restaurant establishment. This user would potentially have an outdoor patio or
dining area. Once again portions of the outdoor activities may extend into the
public right of way. The outdoor dining area will be fenced to comply with all
State requirements with regard to fencing and alcohol sales. The plan also
includes the potential for development of fifteen (15) multi -family units on the
second floor for lease.
There is currently a small parking area located behind the building with access
from East 6th Street and future access to Industrial Street which will remain
parking for guests. In addition, the applicant proposes to provide on street
parking at both Industrial Street and along East 6th Street both of which have
historically been used for parking.
A parcel directly east of Industrial Street has a small masonry building that will
remain. The remaining portion of the lot is currently a parking lot and will
continue to serve as parking. The applicant has secured approval from the
railroad to allow parking within the railroad right of way across this lot. The area
west of the masonry building does not abut East 6th Street. The applicant plans
to develop this area as secure parking for the office building and the apartment
tenants. The area to the east of the masonry building presently has multiple
building foundations and floor slabs. The applicant intends to redevelop this
parcel as a parking lot for their office and the tenants along East 6th Street.
Landscape screening and water retention between the parking area and East 6th
Street will be provided. The existing rock retaining wall along East 6th Street,
east of Thomas Street, will remain as the street dips significantly at this location.
10
FILE NO.: Z-9150
The parcel south of East 6th Street is presently a small parking lot. The applicant
intends the area to be retained as parking for off street on grade parking and
prepared for future on street parking to be constructed at a later date as the
south side of East 6th Street develops.
The intent of the development is to create a walkable community with sidewalks
along the street edge, curb and gutter, tree wells at regular intervals and on
street parking all the way long the north side of East 6th Street from the western
railroad bridge to the retaining wall noted above and along Shall Avenue abutting
the property.
The applicant is seeking a variance to allow the drives to be located and with
driveway widths that do not meet the traffic access and circulation requirements
of Sections 30-43 and 31-210. The width of driveway should not exceed 36-feet.
Driveway spacing on commercial streets should be a minimum of 250-feet from
other driveways and intersections and 125-feet from side property lines. The
applicant is requesting the variance to allow the drives within the eastern parking
lot to be less than the typical spacing requirements for spacing between drives
and the placement of the drives related to property lines.
The site is located within the Presidential Park Design Overlay District. The DOD
has specific development criteria related to street furniture and trees. All
landscape requirements of the base zone are required related to location, plant
size and spacing. Any property owner, due to the spacing requirements, not
required to provide a "street tree" or "street furniture" shall pay an in -lieu fee
based on the percentage of frontage along the street divided by the cost of
providing the required street trees and furniture in the ordinance.
The applicant has indicated the placement of specialty paving along Shall
Avenue and within the right of way at the intersection of East 6th Street and Shall
Avenue. The applicant has indicated bio-retention will be provided within the
landscaped areas. The applicant has indicated a reduced sidewalk width of
6.5-feet be allowed west of Shall Avenue where parallel parking is indicated and
the east half of the building extends to the south.
The applicant has indicated ribbed metal siding for cladding of the stair and
elevator towers will be added to the Cromwell building and one smaller in -fill
panel will be added at the new glazing wall. The UU, Urban Use Zoning District
prohibits the use of corrugated or ribbed materials unless approved by the
Commission.
The applicant has indicated the proposed signage plan will comply with the
Presidential Park Design Overlay District and the UU, Urban Use Zoning District.
The general sign regulations per the UU, Urban Use zoning district except for the
first two (2) floors where the following is required:
11
FILE NO.: Z-9150 Cont.
a. Awning valances are appropriate locations for signage, sign area not to
exceed six (6) square feet of valance.
b. Neon illumination is permitted if channelized.
c. Letters shall not exceed 30 inches in height.
d. Window signs shall not cover more than twenty-five percent of each glass
panel.
The plan indicates the placement of a dumpster along East 6th Street within the
building setback. The applicant has indicated the dumpster will be screened via
a poured in place concrete pad. The walls will extend above the dumpsters by a
minimum of two (2) feet as typically required per the zoning ordinance.
Staff is supportive of the applicant's request. The applicant is seeking approval
of a rezoning and site plan to allow the redevelopment of a number of buildings
located along East 6 plan
The need for the rezoning is due to the
Presidential Park Design Overlay District and the non-compliance with the
placement of a surface parking lot along East 6th Street. The applicant has
indicated landscape materials will be placed between the public right of way and
the proposed parking areas to soften the impact and reduced the visibility from
the abutting street and the traveling motorist through the area. Staff feels the
applicant's request to rezone the property to PCD and allow the redevelopment
of the area for the East Village is appropriate.
STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
comments and conditions as outlined in paragraphs D, E and F of the agenda
staff report.
Staff recommends approval of the driveway spacing variance request to allow the
drives along East 6Ih Street as indicated on the site plan.
A franchise permit will be required to be obtained for all private improvements
within the public right-of-way including plantings, specialty concrete, irrigation,
electrical components etc. The proposed private improvements within the
right-of-way will be reviewed by City of Little Rock Public Works staff and will be
the responsibility of the applicant to maintain.
PLANNING COMMISSION ACTION:
(AUGUST 11, 2016)
The applicant was present. There were no registered objectors present. Staff
presented the item with a recommendation of approval of the request subject to
compliance with the comments and conditions as outlined in paragraphs D, E and F of
the agenda staff report. Staff presented a recommendation of approval of the driveway
spacing variance request to allow the drives along East 6th Street as indicated on the
12
FILE NO.: Z-9150 (Cont.
site plan. Staff stated a franchise permit was required for all private improvements
within the public right-of-way including plantings, specialty concrete, irrigation, electrical
components etc. Staff stated the proposed private improvements within the right-of-way
would be reviewed by City of Little Rock Public Works staff and would be the
responsibility of the applicant to maintain.
Mr. Dan Fowler, Cromwell Architects, addressed the Commission on the merits of the
request. He stated there had been slight modifications to the site plan. He stated
working with Rock Region Metro the curb radius had been increased on Shall Avenue to
allow for maneuverability of the transit buses. He stated in addition on Industrial Street
the radius had been increased to allow for truck traffic and maneuvering to properties
located to the north.
Commissioner Laha stated his concern was the right of way dedication for Shall
Avenue. He stated he could not find were the right of way was ever dedicated to the
City or accepted by the City as a public street. He stated his concern was in a few
years the heirs of the original property would approach the City requesting to be paid for
the right of way. He requested the item not go forward to the Board of Directors until
the right of way issues was resolved. Commission Laha stated he was also requesting
the site plan be overlaid on the survey. He stated without the survey under the site plan
it was difficult to tell what was going on with the new development.
Staff stated it was their position the right of way was in place. Staff stated the item
would not be held and would be forwarded to the Board of Directors along with the other
items.
There was no further discussion. The chair entertained a motion for approved of the
item as recommended by staff. The motion carried by a vote of 8 ayes, 1 noes and
2 absent.
13