HomeMy WebLinkAboutZ-9064 Staff Analysis3I>A M O C•NWARDISROM
NAME: Isom Short -form PD-O, located at 3224 Shackleford Pass
LOCATION: Located at 3224 Shackleford Pass
DEVELOPER:
Roma Isom
3224 Shackleford Pass
Little Rock, AR 72205
ARCHITECT:
Kwendeche, AIA
2124 Rice Street
Little Rock, AR 72202
SURVEYOR:
Brooks Surveying, Inc.
20820 Arch Street Pike
Hensley, AR 72065
AREA: 0.69 acres
CURRENT ZONING
ALLOWED USES:
PROPOSED ZONING
PROPOSED USE
VARIANCE/WAIVERS:
NUMBER OF LOTS: 1
R-2, Single-family
Single-family residential
FT. NEW STREET: 0 LF
General and professional office
None requested.
A. PROPOSAL/REQUEST/APPLICANT'S STATEMENT:
The existing 2,500 square foot one story residential designed house is currently
used as a single-family residence and is intended to be converted for use as
professional office for a real estate developer, his staff, and two -tenant office
spaces for general and professional office uses. The existing footprint of the
FILE NO.: Z-9064 (Cont.
house will be retained except for the intended enclosure of a rear open deck to
provide additional air-conditioned office space.
A new paved parking lot will be installed in the front yard for four (4) vehicular
parking spaces. The site plan includes the placement of five (5) parking spaces
in the rear yard served by a 12-foot wide driveway extending north of the
building. The existing aluminum picket fence on the front of the property will be
relocated to the west to allow installation of a new five (5) foot wide sidewalk.
All other fences locations will remain in place. A new treated wood wheelchair
accessible ramp will be installed at the entry front of the house and the existing
garage doors will be removed and replaced with a new solid clad facade with an
entry door.
Building signage will be installed in accordance with the current sign ordinance
and the existing trees and shrubbery will be retained in non -paved areas.
A single ground sign will be located along Shackleford Pass.
The applicant is requesting to not install screening via a solid fence or wall or
evergreen plantings along the southern and western perimeters of the site. Both
areas are heavily wooded and are currently not developed. The applicant has
stated should these areas develop with a use less intensive than the office use
proposed by the applicant the required screening will be put in place by the
applicant.
B. EXISTING CONDITIONS:
The site contains a single-family home. The areas to the west and south are
heavily wooded. To the north is a property zoned PD-C which was approved as
a contractor's office and storage yard. East of the site are properties zoned
PCD. The northern lot is an office use. The southern lot is a mixed office and
office warehouse development.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has not received any comment from area property owners.
All property owners located within 200 feet of the site along with the John Barrow
Neighborhood Association were notified of the public hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Due to the proposed use of the property, the Master Street Plan specifies that
Shackleford Pass for the frontage of this property must meet commercial
street standards. Dedicate right-of-way to 30 feet from centerline.
2. With site development, provide the design of street conforming to the Master
Street Plan. Construct one-half street improvement to Shackleford Pass
2
FILE NO.: Z-9064 (Cont.
E
including 5-foot sidewalks with the planned development. The new curb
should connect with the existing curb to the north and maintain the same
width of 15.5 feet from centerline.
3. Remove portions of the existing fence along the north property line out of the
right-of-way.
4. Damage to public and private property due to hauling operations or operation
of construction related equipment from a nearby construction site shall be
repaired by the responsible party prior to issuance of a certificate of
occupancy.
UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer main extension required with easements if new sewer
service is required for this project. This address not currently connected to the
City sewer system. Contact Little Rock Wastewater Utility for additional
information.
Entergy: Entergy does not object to this renovation proposal. Overhead
facilities are in place serving the existing structure. Contact Entergy in advance
regarding future service requirements if they are different than what currently
exist.
CenterPoint Energy: Please be advised that CenterPoint Energy (CNP) owns
and operates natural gas facilities along the eastern property line. An existing
service line is under the site for the new parking lot shown in the proposed
drawing. CNP request that all right-of-way and easements be maintained. CNP
insist AR One Call be called prior to any future construction activities. If there are
any questions or concerns please do not hesitate to contact CNP.
AT & T: No comment received.
Central Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for
water service must be met.
2. The Little Rock Fire Department needs to evaluate this site to determine
whether additional public and/or private fire hydrant(s) will be required.
If additional fire hydrant(s) are required, they will be installed at the
Developer's expense.
3. Please submit plans for water facilities and/or fire protection system to
Central Arkansas Water for review. Plan revisions may be required after
additional review. Contact Central Arkansas Water regarding procedures
for installation of water facilities and/or fire service. Approval of plans by the
Arkansas Department of Health Engineering Division and the Little Rock
Fire Department is required.
3
FILE NO.: Z-9064 (Cont.
4. A Capital Investment Charge based on the size of meter connection(s) will
apply to this project in addition to normal charges. This fee will apply to all
connections including metered connections off the private fire system.
5. If there are facilities that need to be adjusted and/or relocated, contact
Central Arkansas Water. That work would be done at the expense of the
developer.
6. Contact Central Arkansas Water regarding the size and location of water
meter.
7. Due to the nature of this facility, installation of an approved reduced
pressure zone backflow preventer assembly (RPZA) is required on the
domestic water service. This assembly must be installed prior to the first
point of use. Central Arkansas Water requires that upon installation of the
RPZA, successful tests of the assembly must be completed by a Certified
Assembly Tester licensed by the State of Arkansas and approved by
Central Arkansas Water. The test results must be sent to Central Arkansas
Water's Cross Connection Section within ten days of installation and
annually thereafter. Contact the Cross Connection Section at 501.377.1226
if you would like to discuss backflow prevention requirements for this
project.
8. The facilities on -site will be private. When meters are planned off private
lines, private facilities shall be installed to Central Arkansas Water's
materials and construction specifications and installation will be inspected
by an engineer, licensed to practice in the State of Arkansas. Execution of
a Customer Owned Line Agreement is required.
9. Fire sprinkler systems which do not contain additives such as antifreeze
shall be isolated with a double detector check valve assembly. If additives
area used, a reduced pressure zone back flow preventer shall be required.
10. This development will have minor impact on the existing water distribution
system. Proposed water facilities will be sized to provide adequate
pressure and fire protection.
Fire Department: Maintain Access:
Fire Hydrants_. Maintain fire apparatus access roads at fire hydrant locations as
per Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section
D103.1 Access road width with a hydrant. Where a fire hydrant is located on a
fire apparatus access road, the minimum road width shall be 26 feet, exclusive of
shoulders.
Dead Ends. Maintain fire apparatus access roads at dead end locations as
per Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section
D103.4 Dead Ends. Dead-end fire apparatus access roads in excess of 150 feet
4
FILE NO.: Z-9064 (Cont.
shall be provided with width and turnaround provisions in accordance with Table
D103.4. Requirements for Dead-end fire apparatus access roads.
Gates. Maintain fire apparatus access road gates as per Appendix D of the
2012 Arkansas Fire Prevention Code Vol. 1 Section D103.5 Fire apparatus
access road gates. Gates securing the fire apparatus access roads shall
comply with all of the following criteria:
1. Minimum gate width shall be 20 feet.
2. Gates shall be of swinging or sliding type.
3. Construction of gates shall be of material that allow manual operation by
one person.
4. Gate components shall be maintained in an operable condition at all times
and replaces or repaired when defective.
5. Electric gates shall be equipped with a means of opening the gate by fire
department personnel for emergency access. Emergency opening devices
shall be approved by the fire code official.
6. Manual opening gates shall not be locked with a padlock or chain and
padlock unless they are capable of being opened by means of forcible
entry tools or when a key box containing the keys to the lock is installed at
the gate location.
7. Locking device specifications shall be submitted for approval \by the fire
code official
8. Electric gate operators, where provided, shall be listed in accordance with
U L 325.
9. Gates, intended for automatic operation shall be designed, constructed
and installed to comply with requirements of ASTM F 2200.
Fire Hydrants. Locate Fire Hydrants as per Appendix C of the 2012
Arkansas Fire Prevention Code. Section C101 — C105, in conjunction with
Central Arkansas Water (Jason Lowder 501.377.1245) and the Little Rock Fire
Marshal's Office (Captain Tony Rhodes 501.918.3757). Number and Distribution
of Fire Hydrants as per Table C105.1.
Parks and Recreation: No comment received.
County Planning: No comment.
CATA: The site is not located on a dedicated CATA Bus Route.
5
FILE NO.: Z-9064 Cant.
F. ISSUES/TECHNICAL/DESIGN:
Building Code: Due to the occupancy the facility must comply with all
2012 Arkansas Fire Prevention Codes. Contact Building Codes for an on -site
inspection to review conditions and requirements.
Curtis Richey at 501.371.4724; crichey[a7littlerock.orq or
Mark Alderfer at 501.371.4875; malderferCc_7_littlerock.orq.
Planning Division: This request is located in the 1-430 Planning District. The
Land Use Plan shows Mixed Use (MX) for this property. The Mixed Use
category provides for a mixture of residential, office and commercial uses to
occur. A Planned Zoning District is required if the use is entirely office or
commercial or if the use is a mixture of the three (3). The applicant has applied
for a rezoning from R-2 (Single Family District) to PDO (Planned District Office)
to allow for the conversion of the house on the site to an office building with
parking.
Master Street Plan: Shackleford Pass is shown as a Local Street on the Master
Street Plan. The primary function of a Local Street is to provide access to
adjacent properties. Local Streets that are abutted by non-residential zoning/use
or more intensive zoning than duplexes are considered as "Commercial Streets".
A Collector design standard is used for Commercial Streets. This street may
require dedication of right-of-way and may require street improvements for
entrances and exits to the site.
Bicycle Plan: There are no bike routes shown in the immediate vicinity.
Landscape:
Site plan must comply with the City's landscape and buffer ordinance
requirements.
2. Street buffers will be required at six (6) percent of the average depth of the
lot. The minimum dimension shall be one-half ('/2) the full width requirement
but in no case less than nine (9) feet. The maximum dimension required shall
be fifty (50) feet.
3. Trees and shrubs are required planed adjacent to street right-of-way. Plant
material is to be provided at one (1) tree and three (3) shrubs for every
30 linear feet. Existing trees and vegetation can be used to satisfy landscape
requirements.
4. Screening requirements will need to be met for the vehicular use areas
adjacent to street right-of-ways. Provide screening shrubs with an average
linear spacing of not less at three (3) feet within the required landscape area.
Provide trees with an average linear spacing of not less than thirty (30) feet.
FILE NO.: Z-9064 (Cont.
5. A perimeter planting strip is required along any side of a vehicular use area
that abuts adjoining property or the right-of-way of any street. This strip shall
be at least nine (9) feet wide. One (1) tree and three (3) shrubs or vines shall
be planted for every thirty (30) linear feet of perimeter planting strip.
6. A land use buffer six (6) percent of the average width / depth of the lot will be
required when an adjacent property has a dissimilar use of a more restrictive
nature. The minimum dimension shall be nine (9) feet. As a component of all
land use buffer requirements, opaque screening, whether a fence or other
device, a minimum of six (6) feet in height shall be required upon the property
line side of the buffer. The plantings, existing and purposed, shall be provided
within the landscape ordinance of the City, Section 15-81. The properties to
the south and west are zoned R-2, screening will be required.
7. An irrigation system shall be required for developments of one (1) acre or
larger. For developments of less than one (1) acre a there shall be a water
source within seventy-five (75) feet of the plants to be irrigated.
8. The City Beautiful Commission recommends preserving as many existing
trees as feasible on this site. Credit toward fulfilling Landscape Ordinance
requirements can be given when preserving trees of six (6) inch caliper or
larger.
G. SUBDIVISION COMMITTEE COMMENT: (August 5, 2015)
The applicant was present representing the request. Staff presented an
overview of the item stating there were a few outstanding technical issues
associated with the request in need of addressing prior to the Commission
hearing the final request. Staff requested the applicant provide the days and
hours of operation, the number of office suites and any proposed dumpster
locations.
Public Works comments were addressed. Staff stated a dedication of right of
way to 30-feet from centerline was required to meet the minimum Master Street
Plan requirement. Staff stated street construction was required along
Shackleford Pass to correspond with the street widening to the north. Staff
stated the back of curb should be located a minimum of 15.5-feet from centerline.
Landscaping comments were addressed. Staff stated screening of the vehicular
use area was required along Shackleford Pass. Staff stated a minimum
landscape strip of nine (9) feet was required along perimeters of the site abutting
the paved areas. Staff stated a land use buffer and screening was required
along the southern and western perimeters of the site.
Staff noted the comments from the various other agencies. There were no more
issues for discussion. The Committee then forwarded the item to the full
Commission for final action.
7
FILE NO.: Z-9064 (Cont-
H. ANALYSIS:
The applicant submitted a revised site plan addressing a number of the issues
raised at the August 5, 2015, Subdivision Committee meeting. The applicant has
provided the days and hours of operation, the number of office suites and stated
there will not be a dumpster at this site. The revised site plan indicates the right
of way dedication per the master street plan and the applicant has indicated
street construction will be installed per the boundary street ordinance
requirements.
The applicant is requesting to rezone the site from R-2, Single-family to PD-O.
An existing 2,500 square foot one story residential house is proposed for
conversion to an office use as professional office for a real estate developer, his
staff, and two -tenant office spaces for general and professional office uses. The
existing footprint of the house will be retained except for the intended enclosure
of a rear open deck to provide additional air-conditioned office space. The hours
of operation are from 8 am to 5 pm Monday through Friday.
A new paved parking lot will be installed in the front yard for four (4) vehicular
parking spaces. The site plan includes the placement of five (5) parking spaces
in the rear yard served by a 12-foot wide driveway extending north of the
building. The rear parking is proposed as employee parking. Staff recommends
based on the width of the driveway which does not allow for two-way traffic the
drive and parking be signed as employee parking only.
The site plan indicates the placement of seven (7) staff office suite, a director's
office suite and two (2) lease spaces. The site plan indicates the placement of
nine (9) parking spaces to serve the site. The applicant has indicated of the
seven (7) agents there are few occasions all the agents are in the office at the
same time and very seldom are more than one (1) agent serving a client in their
office. Parking for an office use based on one (1) parking space per 400 gross
square feet of floor area would typically require the placement of six (6) parking
spaces. Staff has concerns the parking as proposed may not be adequate to
serve the office use should all the agents be in the office along with the
two (2) lease tenants. There is adequate area to the west of the proposed rear
parking area to add additional parking should parking become an issue in the
future.
The existing aluminum picket fence on the front of the property will be relocated
to the west to allow installation of a new five (5) foot wide sidewalk. All other
fences locations will remain as currently exist. The applicant is requesting to not
install screening via a solid fence or wall or evergreen plantings along the
southern and western perimeters of the site. Both areas are heavily wooded and
are currently not developed. The applicant has stated should these areas
develop with a use less intense than the office use proposed by the applicant the
required screening will be put in place by the applicant.
FILE NO.: Z-9064 (Cont.
Building signage will be installed in accordance with the current sign ordinance.
Building signage will be limited to a maximum of ten (10) percent of the facade
area abutting the public street. A single ground sign will be located along
Shackleford Pass. The applicant has not indicated the size of the sign. Staff
recommends the ground sign be limited to signage allowed in office zones or a
maximum of six (6) feet in height and 64 square feet in area.
Staff is supportive of the request. To staff's knowledge there are no outstanding
technical issues associated with the request. Staff feels the redevelopment of
the site as proposed by the applicant is appropriate.
STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
comments and conditions as outlined in paragraphs D, E and F of the agenda
staff report.
PLANNING COMMISSION ACTION: (AUGUST 27, 2015)
The applicant was present. There were no registered objectors present. Staff
presented the item with a recommendation of approval of the request subject to
compliance with the comments and conditions as outlined in paragraphs D, E and F of
the agenda staff report. There was no further discussion. The item was placed on the
consent agenda and approved as recommended by staff by a vote of 11 ayes, 0 noes
and 0 absent.
ITEM NO.: 15. Z
NAME: Isom Short -form PD-O, located at 3224 Shackleford Pass
LOCATION: located at 3224 Shackleford Pass
Plannina Staff Comments:
1. Provide notification of the property owners located within 200-feet of the
development including the certified abstract list, notice form with affidavit executed
and proof of mailing. The notice must be mailed no later than August 12, 2015. The
Office of Planning and Development must receive the proof of notice no later than
August 21, 2015.
2. Provide the days and hours of operation.
3. Provide the number of office spaces within the proposed renovated office structure.
4. Provide a site lighting plan. All site lighting must be low-level and directional, aimed
downward and into the site.
5. Will there be a dumpster located on the site? If so provide the location and a note
on the site plan indicating the hours of service and the required screening.
6. Provide the proposed building elevations, the proposed construction materials, the
proposed roof treatment, the roof pitch, elevation of any proposed retaining walls.
7. Is any signage proposed for the new construction? If so provide the location of any
proposed signage and provide the height and total square footage.
8. Provide details of any proposed fencing. Provide the location, the total height and
the construction material.
VarianceNVaivers: None requested.
Public Works Conditions:
1. Due to the proposed use of the property, the Master Street Plan specifies that
Shackleford Pass for the frontage of this property must meet commercial street
standards. Dedicate right-of-way to 30 feet from centerline.
2. With site development, provide the design of street conforming to the Master Street
Plan. Construct one-half street improvement to Shackleford Pass including 5-foot
sidewalks with the planned development. The new curb should connect with the
existing curb to the north and maintain the same width of 15.5 feet from centerline.
3. Remove portions of the existing fence along the north property line out of the right-
of-way.
4. Damage to public and private property due to hauling operations or operation of
construction related equipment from a nearby construction site shall be repaired by
the responsible party prior to issuance of a certificate of occupancy.
Utilities and Fire Department/County Planning:
Wastewater:
Entergy: Entergy does not object to this renovation proposal. Overhead facilities
are in place serving the existing structure. Contact Entergy in advance regarding future
service requirements if they are different than what currently exist.
CenterPoint Energy: Please be advised that CenterPoint Energy (CNP) owns and
operates natural gas facilities along the eastern property line. An existing service line is
under the site for the new parking lot shown in the proposed drawing. CNP request that
all right-of-way and easements be maintained. CNP insist AR One Call be called prior to
any future construction activities. If there are any questions or concerns please do not
hesitate to contact CNP.
AT & T: No comment received.
Central Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for water
service must be met.
2. The Little Rock Fire Department needs to evaluate this site to determine whether
additional public and/or private fire hydrant(s) will be required. If additional fire
hydrant(s) are required, they will be installed at the Developer's expense.
3. Please submit plans for water facilities and/or fire protection system to Central
Arkansas Water for review. Plan revisions may be required after additional review.
Contact Central Arkansas Water regarding procedures for installation of water
facilities and/or fire service. Approval of plans by the Arkansas Department of
Health Engineering Division and the Little Rock Fire Department is required.
4. A Capital Investment Charge based on the size of meter connection(s) will apply to
this project in addition to normal charges. This fee will apply to all connections
including metered connections off the private fire system.
5. If there are facilities that need to be adjusted and/or relocated, contact Central
Arkansas Water. That work would be done at the expense of the developer.
6. Contact Central Arkansas Water regarding the size and location of water meter.
7. Due to the nature of this facility, installation of an approved reduced pressure zone
backflow preventer assembly (RPZA) is required on the domestic water service.
This assembly must be installed prior to the first point of use. Central Arkansas
Water requires that upon installation of the RPZA, successful tests of the assembly
must be completed by a Certified Assembly Tester licensed by the State of Arkansas
and approved by Central Arkansas Water. The test results must be sent to Central
Arkansas Water's Cross Connection Section within ten days of installation and
annually thereafter. Contact the Cross Connection Section at 501.377.1226 if you
would like to discuss backflow prevention requirements for this project.
8. The facilities on -site will be private. When meters are planned off private lines,
private facilities shall be installed to Central Arkansas Water's materials and
construction specifications and installation will be inspected by an engineer, licensed
to practice in the State of Arkansas. Execution of a Customer Owned Line
Agreement is required.
9. Fire sprinkler systems which do not contain additives such as antifreeze shall be
isolated with a double detector check valve assembly. If additives area used, a
reduced pressure zone back flow preventer shall be required.
10.This development will have minor impact on the existing water distribution system.
Proposed water facilities will be sized to provide adequate pressure and fire
protection.
Fire Department'.
Maintain Access:
Fire Hydrants. Maintain fire apparatus access roads at fire hydrant locations as per
Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.1 Access
road width with a hydrant. Where a fire hydrant is located on a fire apparatus access
road, the minimum road width shall be 26 feet, exclusive of shoulders.
Dead Ends. Maintain fire apparatus access roads at dead end locations as per
Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.4
Dead Ends. Dead-end fire apparatus access roads in excess of 150 feet shall be
provided with width and turnaround provisions in accordance with Table D103.4.
Requirements for Dead-end fire apparatus access roads.
Gates. Maintain fire apparatus access road gates as per Appendix D of the 2012
Arkansas Fire Prevention Code Vol. 1 Section D103.5 Fire apparatus access road
gates. Gates securing the fire apparatus access roads shall comply with all of the
following criteria:
1. Minimum gate width shall be 20 feet.
2. Gates shall be of swinging or sliding type.
3. Construction of gates shall be of material that allow manual operation by one
person.
4. Gate components shall be maintained in an operable condition at all times and
replaces or repaired when defective.
5. Electric gates shall be equipped with a means of opening the gate by fire
department personnel for emergency access. Emergency opening devices shall
be approved by the fire code official.
6. Manual opening gates shall not be locked with a padlock or chain and padlock
unless they are capable of being opened by means of forcible entry tools or when
a key box containing the keys to the lock is installed at the gate location.
7. Locking device specifications shall be submitted for approval \by the fire code
official
8. Electric gate operators, where provided, shall be listed in accordance with UL
325.
9. Gates, intended for automatic operation shall be designed, constructed and
installed to comply with requirements of ASTM F 2200.
Fire Hydrants. Locate Fire Hydrants as per Appendix C of the 2012 Arkansas Fire
Prevention Code. Section C101 — C105, in conjunction with Central Arkansas Water
(Jason Lowder 501.377.1245) and the Little Rock Fire Marshal's Office (Captain Tony
Rhodes 501.918.3757). Number and Distribution of Fire Hydrants as per Table C105.1.
Parks and Recreation: No comment received.
County Planning: No comment.
CATA: The site is not located on a dedicated CATA Bus Route.
Building Code: Due to the occupancy the facility must comply with all 2012 Arkansas
Fire Prevention Codes. Contact Building Codes for an on -site inspection to review
conditions and requirements. Curtis Richey at 501.371.4724; cricheyglittlerock.org or
Mark Alderfer at 501.371.4875; malderfer@littlerock.org.
Planning Division: This request is located in the 1-430 Planning District. The Land Use
Plan shows Mixed Use (MX) for this property. The Mixed Use category provides for a
mixture of residential, office and commercial uses to occur. A Planned Zoning District is
required if the use is entirely office or commercial or if the use is a mixture of the three
(3). The applicant has applied for a rezoning from R-2 (Single Family District) to PDO
(Planned District Office) to allow for the conversion of the house on the site to an office
building with parking.
Master Street Plan: Shackleford Pass is shown as a Local Street on the Master Street
Plan. The primary function of a
Local Streets that are abutted
than duplexes are considered
Local Street is to provide access to adjacent properties.
by non-residential zoning/use or more intensive zoning
is "Commercial Streets". A Collector design standard is
used for Commercial Streets. This street may require dedication of right-of-way and
may require street improvements for entrances and exits to the site.
Bicycle Plan: There are no bike routes shown in the immediate vicinity.
Landscape-
1. Site plan must comply with the City's landscape and buffer ordinance requirements.
2. Street buffers will be required at six (6) percent of the average depth of the lot. The
minimum dimension shall be one-half (Y2) the full width requirement but in no case
less than nine (9) feet. The maximum dimension required shall be fifty (50) feet.
3. Trees and shrubs are required planed adjacent to street right-of-way. Plant material
is to be provided at 1 tree and 3 shrubs for every 30 linear feet. Existing trees and
vegetation can be used to satisfy landscape requirements.
4. Screening requirements will need to be met for the vehicular use areas adjacent to
street right-of-ways. Provide screening shrubs with an average linear spacing of not
less at three (3) feet within the required landscape area. Provide trees with an
average linear spacing of not less than thirty (30) feet.
5. A perimeter planting strip is required along any side of a vehicular use area that
abuts adjoining property or the right-of-way of any street. This strip shall be at least
nine (9) feet wide. One (1) tree and three (3) shrubs or vines shall be planted for
every thirty (30) linear feet of perimeter planting strip.
6. A land use buffer six (6) percent of the average width / depth of the lot will be
required when an adjacent property has a dissimilar use of a more restrictive nature.
The minimum dimension shall be nine (9) feet. As a component of all land use buffer
requirements, opaque screening, whether a fence or other device, a minimum of six
(6) feet in height shall be required upon the property line side of the buffer. The
plantings, existing and purposed, shall be provided within the landscape ordinance
of the city, section 15-81. The properties to the south and west are zoned R-2,
screening will be required.
7. An irrigation system shall be required for developments of one (1) acre or larger.
For developments of less than one (1) acre a there shall be a water source within
seventy-five (75) feet of the plants to be irrigated.
8. The City Beautiful Commission recommends preserving as many existing trees as
feasible on this site. Credit toward fulfilling Landscape Ordinance requirements can
be given when preserving trees of six (6) inch caliper or larger.
Revised plat/plan: Submit four (4) copies of a revised preliminary plat/plan (to include
the additional information as noted above) to staff on Wednesday, August 12, 2015.