Loading...
HomeMy WebLinkAboutZ-8978 Map 4EXCAVAt: TAIL 0' 7 ;!i: FL 300.50_1 362 3:1 p 303 304SLOPE I I 303 N O ¶ n I G_ 30300 �JOJ 50 I� Sib o0 c--=- 'uu .0 'EXCAVATE TAIL DITCH FL 301.50 q 0 �J03.P] A \V •304.20 4 t !tr ''"+G PLAN 1 GLNf RA ' �Es V� t FI'Ii -I RAT_ CONTRACTOR SHALT_ TAKE ALL PRECAUTIONS NECESSARY TO A PROPERTY DAMAGE 10 ADJACENT PROPERTIES DURING THE ( '?UCTION PHASES OF THIS PROJECT. THE CONTRACTOR WILL BE HELD ; RESPONSIBLE FOR ANY DAMAGES TO THE ADJACENT PROPERTIES �\ x -WRING DURING THE CONSTRUCTION PHASES OF THIS PROJECT. ;- WP "arl;Y/DISCLAIMER IT iz o--SIGNS REPRESENTED IN THESE PLANS ARE IN ACCORDANCE WITH F + + iSHED PRACTICES OF CIVIL ENGINEERING FOR THE DESIGN F+ ONS AND USES INTENDED AT THIS TIME. HOWEVER, NEITHER Tt ' .q ENGINEERING COMPANY, INC., NOR ITS PERSONNEL CAN OR DO WA "IFY THESE DESIGNS OR PLANS AS CONSTRUCTED EXCEPT IN THE SI -.(' CASES WHERE THOMAS ENGINEERING COMPANY PERSONNEL IN AND CONTROL THE PHYSICAL CONSTRUCTION ON A ! L1 , K I'ORARY BASIS AT THE SITE. \\ AVATE 3. SAI T-'' NOTICE TO CONTRACTOR T T D;TCH IN n'CORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, 1_303.50 THE."0N7"RACTOR WILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR C�, itiONS OF THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND Ps2 f-RTY DURING PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL A� 'I.+ CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. it,, J PY OF THE ENGINEER OR OWNER TO CONDUCT CONSTRUCTION RF-.i N OF THE CONTRACTOR'S PERFORMANCE IS NOT IN'ENDED TO N-.,iJ REVIEW OF THE ADEQUACY OF THE CONTRACTOR'S SAFETY Mfg<'IRES, IN, ON OR NEAR THE CONSTRUCTION SITE. 4 AI OPES TO BE GRADED TO 3:1 OR FLATTER UNLESS OTHERWISE ,u ; • A "!FD ON PHIS SHEET. ,. RI:..•�-%'.,ED CONCRETE PIPE (RCP) SHALL BE CLASS III. I i 6. Al.i •'�?4tM DRAIN LINES AND UTILITY LINES UNDER THE PAVEMENT SHALL BE BACK FILLED L4, -, f :-IJSHED STONE. 9 t N R S Nv,l.c TO CONTRACTOR -- ITRAC.- ,: :S SPECIFICALLY CAUTIONED THAT THE LOCATION I r VA.I•JN OF EXISTING UTILITIES AS SHOWN ON THESE PLANS IS h 1 )N RECORDS OF THE VARIOUS UTILITY COMPANIES AND. WHERE ";' I UFASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT io RE -LIED ON AS BEING EXACT OR COMPLETE. THE CONTRACTOR MUST I } fHF APPROPRIATE UTILITY COMPANY AT LEAST 48 HO'RS BEFORE ANY AVADON TO REQUEST EXACT FIELD LOCATIONS OF UT111.,LS IT SHALL yt 'I-c RESPONSIBILITY OF THE CONTRACTOR TO RELOCr7t. ALL EXSTING U �!. .^S WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON ',-1f PLANS. is. N I' GRADE CONTOURS ARE INDICATED ALONG TOP OF COMPLETED I ';'i.RES, TOP OF PAVEMENT AND GUTTER LINE OF CURB, UNLESS nMSE SHOWN. FOR ROUGH GRADING, CONTRACTOR 'FALL ALLOW rC-- "PTHS OF TOPSOIL AND CONCRETE STRUCTURES, FOR PNISH C+ G CONTRACTOR SHALL INSTALL TOPSOIL AND . S,F,p) :TkjRES TO FINISHED GRADE AS INDICATED ON THIS SHEET. III 9, GRAD: TO DRAIN AWAY FROM BJ,LDING AT MINIMUM 1% S!-OPE. 10. THE C.PADWG COP.FRACTOR SHALL INSTALL STRAW BALES OR SILT FENCE AROUND ALL CRAIM1.TA(;E BCXF:S DURING CONS'iRUCHON TO CONTROL EROSION AND s S,( "A ,)N OF THE SITE. It. Al-L i'IbIENS 1N5 ARE SHOWN 1-0 Il-IF. BACK OF CURB. VA7E INSTALL FES INSTALL CONSTRUCT 'BERM TOP = )ITCH FL 300.30 15' RCP CONCRETE 302.40 SPILLWAY 1 302 uro 302� 'INSTALL FES I 302.00 an0.w FL 300.50 I •301.10 FDETENTION AREA n�3' R / N 302.20CONSTRUCT CONCRETE FLUME I 300.)n / w240 3m n 302M 30240 301 30 30100 3ao.70 -� 302. 70 / 7 2.Y CONSTRUCT CONCRETE 3o253 FLUME UTILIZE EXISTING CONCRETE APRON & CURB CUT AT OWNERS DISCRETION. CONSTRUCT I P] 302 m CONTACT ENGINEER OF CONCRETE 303 W,;,p .f GRADING CONFLICTS FLUME OFFICE/ RES M283 1,600 SF 3D340 30 02 W FFE = 303.30 J� I • / •303.ts0 • .03 n / 3ptr 304 // / 3M 120-- 1 303.N / JSLOPf_ FIFE•303J = 305.00 'w2.82 / �b / 3o4so �p FFE = 304.00 / / �..10390 4� BLDG. C 6,000 SF •30300 /Q x0�3 FFE = 30s.50 / 3D3 , 18 ` BLDG. D 15,375 SF FFE = 305.50 •303 W 30 -302 3:1 30T SLOPE 302 U .0 BLDG. A 15,500 SF FFE = 304.00 FFE = 303.50 I CONSTRUCT CONCRETE FLUME LEGEND W3 9 3.12 111p '` FFE = 304.00 �Cj EXISTING CON TOUR BLDG. E 4,650 SF FFE=304.50 CONSTRUCT t00 PROPOSED CONTOUR / 'CONCRETE FFE = 305.50 f� / 1 FLUME O� \ SHOWS SPOT ELEVATION - NEW CONSTRUCTION 02 V 327 / Q J� NOTE: SPOT ELEVATIONS ALONG CURBS ARF GU1"lER UNLESS OTHERWISE StTOWN. AT Co 303.43 A /FFE = 305,00 30358 149 •30450 •yw p 30e <o FFE = 305.00 7 / 304 90 364 / 302 40 Jam! i �30341- r30455 \� UTILIZE EXISTING CONCRETE i APRON & CURB CUT AT / OWNERS DISCRETION. CONTACT ENGINEER OF GRADING CONFLICTS i M3.10 3 GRAPHIC SCALE, 20 0 10 20 40 90 ( IN FEET ) I inch = 20 ft. 10OF AU'*1011 4/,RKAN8AS , ASS�)) _�t. oC. R O + U` 41 , Hptiuz N : REGISTERED ENGINIEEFi1WG PROFESSIONAL cr,No.. 94ENGINEER No.11643 • ���5 R ti3 // �, 4 un,4 REVISED 4/26/16 -ADDED TO BLDG C�""`�� �a,Q,Qo�oL. GRADING PLAN h ��� THOMAS USA STORAGE boo/} Ft� ENGINEERING STAGECOACH ROAD �6 COMPANY LITTLE ROCK, ARKANSAS 2,_�� APPROVED DRAWN BY DATE SHEET NO. 810 LOOKOUT ROAD, N. LITTLE ROCK, AR. 72116 � ITRP 4/10/'5 2 SCA.E TEL: 501-753-4-463 FAX. 501-753-6814 s 2D