HomeMy WebLinkAboutZ-8977 Staff AnalysisILE NO.: Z-8977
NAME: South Bowman Road Long -form PD-R
LOCATION: Located at 4212 South Bowman Road
DEVELOPER:
EBW LLC
26 Collins Industrial Place
North Little Rock, AR 72113
ENGINEER:
Marlar Engineering
5318 JFK Boulevard
North Little Rock, AR 72116
AREA: 16.02 acres
RRENT ZONING
ALLOWED USES
PROPOSED ZONING:
PROPOSED USE
NUMBER OF LOTS: 1
R-2, Single-family
Single-family residential
.m
Multi -family
FT. NEW STREET: 0 LF
VARIANCE/VVAIVERS: A variance from the City Land Alteration Ordinance to allow
advanced grading of future phases with the construction of the first phase,
A. PROPOSAL/REQUEST/APPLICANT'S STATEMENT:
The applicant is requesting a rezoning from R-2, Single-family to PD-R to allow
the development of 192-units of multi -family housing on this 16.02-acre tract.
The buildings are proposed as three (3) story buildings with a maximum building
height of 35-feet. There are eight (8) buildings proposed, each containing
24-units. The site plan indicates the placement of an office/clubhouse, pool and
covered pavilions as amenities for the residents. The plan indicates the
placement of covered and uncovered parking on the site. The perimeter fencing
includes the placement of an eight (8) foot solid brick fence along the northern
and southern perimeters. A solid wood fence is proposed along the western
perimeter. Brick and rod iron fencing will be placed along South Bowman Road.
FILE NO.: Z-8977 (Cont.)
B. EXISTING CONDITIONS:
South Bowman Road adjacent to the site is an unimproved two (2) lane road with
open ditches for drainage. The property proposed for development is tree
covered with a single-family home located near the northern property line on
South Bowman Road. There is vacant C-2, Shopping Center District zoned
property to the east. South of the site is a manufactured home park with homes
abutting this properties southern boundary. North of the site is a large property
which contains a single-family residence with a number of outbuildings and
barns. Further south of the site is the Baptist School of Nursing, an office
warehouse development, a convenience store and a number of automobile
dealerships located on Colonel Glenn Road.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has received several informational phone calls from area
residents. All property owners located within 200-feet of the site along with the
John Barrow Neighborhood Association and Southwest Little Rock United for
Progress were notified of the public hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. South Bowman Road is classified on the Master Street Plan as a minor
arterial. A dedication of right-of-way 45-feet from centerline will be required.
2. With site development, provide the design of street conforming to the
Master Street Plan. Construct one-half street improvement to South
Bowman Road including 5-foot sidewalks with the planned development.
The new back of curb should be located 29.5-feet from centerline. Striping
and tapers must be provided for a left turn lane.
3. A grading permit in accordance with Section 29-186 (c) and (d) will be
required prior to any land clearing or grading activities at the site. Other
than residential subdivisions, site grading and drainage plans must be
submitted and approved prior to the start of construction. Is a variance
being requested to advance grade future phases of development with
construction of the first phase?
4. Provide a Sketch Grading and Drainage Plan per Section 29-186 (e).
5. Show the emergency access location to the property.
6. If disturbed area is one (1) or more acres, obtain a NPDES stormwater
permit from the Arkansas Department of Environmental Quality prior to the
start of construction.
7. A minimum undisturbed strip 25-feet wide except for reasonable
access shall be provided along each side of streams having a
10-year storm >150 cfs. The undisturbed strip should be measured from
2
FILE NO.: Z-8977 (Cont.
the top of the bank. After permits have been obtained from the USCOE for
the creek to be filled, the buffer strips can be removed.
8. Street Improvement plans shall include signage and striping. Public Works
must approve completed plans prior to construction.
9. Streetlights are required by Section 31-403 of the Little Rock code. Provide
plans for approval to Traffic Engineering. Streetlights must be installed prior
to platting/certificate of occupancy. Contact Traffic Engineering
501.379.1813, Greg Simmons, for more information.
10. Driveway locations and widths do not meet the traffic access and circulation
requirements of Sections 30-43 and 31-210. The width of driveway must not
exceed 36-feet. The proposed center island should be removed.
11. Provide a letter prepared by a registered engineer certifying the sight
distance at the intersection(s) comply with 2004 AASHTO Green Book
standards. Provide location of the future street on the east side of Bowman
Road on the plan. Conflicting left turn movements should be avoided.
12. Show emergency access location to the property.
13. The owner and/or manager of each multi -family residence of 100 or more
dwelling units shall provide recycling and encourage participation by the
tenants, renters, or owners of each unit. Contact Melinda Glasgow at
501.371.4646 for more information.
14. Retaining walls designed to exceed 15-feet in height are required to seek a
variance for construction. Provide proposed wall elevations.
15. Prior to construction of retaining walls, an engineer's certification of design
and plans must be submitted to Public Works for approval. After
construction, an as -built certification is required for construction of the
retaining wall. Retaining walls with geotextile reinforcing mats should not be
placed on the property line and the mats extend beyond the property line.
16. The flood statement should be modified with the correct zone identification.
17. Damage to public and private property due to hauling operations or
operation of construction related equipment from a nearby construction site
shall be repaired by the responsible party prior to issuance of a certificate of
occupancy.
18. Provide a Sketch Grading and Drainage Plan per Section 29-186 (e).
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer available to this project. Sewer main relocation required to
construct project as shown. Capacity Contribution required for apartment use.
Contact Little Rock Wastewater Utility for additional information.
Entergy: Entergy has no objection to this development. A 3-phase power line
exists along South Bowman Road. Care should be used in any excavation work
on the southern edge of this project as an underground distribution line runs
3
NO.: Z-8977 (Cont.
along the rear lot lines of the development to the south. Contact Entergy well in
advance to work out line routing, easements and service requirements. All future
extensions will be on the front lot line.
Center -Point Enerav: No comment received.
AT & T: No comment received.
Central Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for
water service must be met.
2. Please submit plans for water facilities and/or fire protection system to Central
Arkansas Water for review. Plan revisions may be required after additional
review. Contact Central Arkansas Water regarding procedures for installation
of water facilities and/or fire service. Approval of plans by the Arkansas
Department of Health Engineering Division and the Little Rock Fire
Department is required.
3. This development will have minor impact on the existing water distribution
system. Proposed water facilities will be sized to provide adequate pressure
and fire protection.
4. If there are facilities that need to be adjusted and/or relocated, contact Central
Arkansas Water. That work would be done at the expense of the developer.
5. Additional fire hydrant(s) will be required. Contact the Little Rock Fire
Department to obtain information regarding the required placement of the
hydrant(s) and contact Central Arkansas Water regarding procedures for
installation of the hydrant(s).
6. A Capital Investment Charge based on the size of meter connection(s) will
apply to this project in addition to normal charges...
Fire Department: Fire hydrants per code, maintain access per code, fire
sprinkler system per code, fire alarms per code, access drives 26-feet, two -ways
to enter and exit the development. Contact the Little Rock Fire Department
for additional information.
County Planning: No comment.
CATA: The area is not currently served by CATA but it is in the long range
planning for South Bowman Road. This location appears it will concentrate
ridership potentially in the future. CATA would request for consideration ADA
accessible sidewalks and a pullout along South Bowman Road for the
development.
4
FILE NO.: Z-8977 (Cont.
Parks and Recreation: No comment received.
F. ISSUES/TECHNICAL/DESIGN:
Building Code: Project is subject to full commercial plan review approval prior
to issuance of a building permit. For information on submittal requirements and
the review process, contact a commercial plans examiner: Curtis Richey at
501.371.4724; criche ,littlerock.org or Mark Alderfer at 501.371.4875;
malderfer littlerock.or .
Planning Division: This request is located in the Ellis Mountain Planning District.
The Land Use Plan shows Residential Low Density (RL) for this property. The
Residential Low Density category provides for single family homes at densities
not to exceed 6-units per acre. Such residential development is typically
characterized by conventional single family homes, but may include patio or
garden homes and cluster homes, provided that the density remain less than
6-units per acre. The applicant has applied for a rezoning from R-2 (Single
Family District) to PDR (Planned District Residential) to allow the construction of
an apartment development on this site at a density of 12±- units per acre.
Master Street Plan: South Bowman Road is a Minor Arterial Street on the
Master Street Plan. A Minor Arterial provides connections to and through an
urban area and their primary function is to provide short distance travel within the
urbanized area. Entrances and exits should be limited to minimize negative
effects of traffic and pedestrians on South Bowman Road. This street may
require dedication of right-of-way and may require street improvements for
entrances and exits to the site.
Bicycle Plan: A Class II Bike Lane is shown along South Bowman Road. Bike
Lanes provide a portion of the pavement for the sole use of bicycles.
Landscape:
1. Site plan must comply with the City's landscape and buffer ordinance
requirements.
2. Street buffers will be required at six (6) percent of the average depth of the
lot. The minimum dimension shall be one-half (1/2) the full width requirement
but in no case less than nine (9) feet. The maximum dimension required shall
be fifty (50) feet. Easements cannot count toward fulfilling this requirement.
The plantings, existing and purposed, shall be provided within the City's
landscape ordinance requirements.
a. The approximate average depth of the lot is one thousand one
hundred (1,100) feet. A fifty foot (50) foot wide buffer is required
along Bowman Road.
5
FILE NO.: Z-8977 (Cont.
3. A land use buffer will be required when an adjacent property has a dissimilar
use of a more restrictive nature. As a component of all land use buffer
requirements, opaque screening, whether a fence or other device, a minimum
of six (6) feet in height shall be required upon the property line side of the
buffer. A minimum of seventy (70) percent of the land use buffer shall be
undisturbed. Easements cannot count toward fulfilling this requirement. The
plantings, existing and purposed, shall be provided within the landscape
ordinance of the City, Section 15-81.
4. The surrounding properties are zoned R-2, Single-family therefore, a
minimum buffer will be required at six (6) percent of the average depth and
width of the lot. The maximum dimension required shall be fifty (50) feet in all
instances.
a. The approximate average width of the lot is six hundred fifty (650)
feet. A thirty-nine (39) foot wide buffer is required along the north
and south property lines.
b. The approximate average depth of the lot is one thousand
one hundred (1,100) feet. A fifty foot (50) foot buffer is required
adjacent to the west property line.
5. A perimeter planting strip is required along any side of a vehicular use area
that abuts adjoining property. This strip shall be at least nine (9) feet wide.
Provide trees with an average linear spacing of not less than thirty (30) feet
within the perimeter planting strip. Provide three (3) shrubs or vines for every
thirty (30) linear feet of perimeter planting strip.
6. Eight percent (8%) of the vehicular use area must be designated for green
space; this green space needs to be evenly distributed throughout the parking
area(s). The minimum size of an interior landscape area shall be three
hundred (300) square feet for developments with more than one hundred fifty
(150) parking spaces. Interior islands must be a minimum of seven and one
half (7 1/2) feet in width. Trees shall be included in the interior landscape
areas at the rate of one (1) tree for every twelve (12) parking spaces.
7. The development of two (2) acres or more requires an approved landscape
plan stamped with the seal of a registered landscape architect prior to the
issuance of a building permit.
8. A landscape irrigation system shall be required for developments of one (1)
acre or larger.
9. The City Beautiful Commission recommends preserving as many existing
trees as feasible on this site. Credit toward fulfilling Landscape Ordinance
requirements can be given when preserving trees of six (6) inch caliper or
larger.
[.1
FILE NO.: Z-8977 (Cont.
L
SUBDIVISION COMMITTEE COMMENT:
(October 8, 2014)
Mr. Mike Marlar was present representing the request. Staff presented an
overview of the development stating there were a number of technical issues
associated with the request in need of addressing prior to the Commission acting
on the request. Staff questioned the proposed signage plan, the proposed
perimeter fencing and the dumpster screening mechanism. Staff requested the
site plan indicate the maximum building height and the number of units per
building.
Public Works comments were addressed. Staff questioned the retaining wall
design and height. Staff stated the fabric for the wall could not extend beyond
the applicants ownership. Staff stated the City's stormwater detention ordinance
would apply to the development of the site. Staff also stated the site would
require a secondary/emergency access and requested the revised site plan
indicate the location of the secondary access.
Landscaping comments were addressed. Staff stated street and land use buffers
were required to meet the minimum ordinance standards. Staff stated a 50-foot
street buffer was required along South Bowman Road. Staff stated a 50-foot
land use buffer was required along the western perimeter. Staff stated the land
use buffer required along the northern and southern perimeters was to be
39-feet. Staff stated screening was required along the north, south and western
perimeter.
Staff noted the comments from the various other agencies. There were no more
issues for discussion. The Committee then forwarded the item to the full
Commission for final action.
K ANALYSIS:
The applicant submitted a revised site plan to staff addressing a number of the
issues raised at the October 8, 2014, Subdivision Committee meeting. The site
plan indicates the placement of perimeter fencing, the maximum building height
and the number of units per building. The site plan also includes the placement
of a secondary access for the development and the placement of buffering along
the sites northern, western and southern perimeters.
The request is for approval of a rezoning from R-2, Single-family to PD-R to allow
the development of 192-units of multi -family housing on this 16.02-acre tract
for a density of 11.99-units per acre. The buildings are proposed as
three (3) story buildings with a maximum building height of 35-feet. There are
eight (8) buildings proposed, each containing 24-units. The site plan indicates
the placement of an office/clubhouse, pool and covered pavilions as amenities
for the residents. The buildings are proposed brick exteriors with architectural
singled roofs.
7
FILE NO.: Z-8977 (Cont.
The site plan indicates the placement of covered and uncovered parking on the
site. The plan includes the placement of 430 parking spaces. Included in the
430 parking spaces are 13 covered parking structures with approximately
10-spaces within the covered structure. Per the Zoning Ordinance parking for
multi -family developments is calculated at one and one-half parking spaces per
unit. Based on 192 unis a total of 286 parking spaces is required.
The perimeter fencing includes the placement of an eight (8) foot solid brick
fence along the northern and southern perimeters. A wood fence is proposed
along the western property line. Brick and rod iron fencing will be placed along
South Bowman Road.
The site plan includes the placement of several dumpster locations. A
note on the site plan indicates dumpsters will be screened per typical
ordinance requirements. The hours of dumpster service will be limited to
6 am to 7 pm daily.
The site plan includes the placement of an identification sign at the entrance to
the development. The sign is indicated with a maximum height of six (6) feet and
a maximum sign area of 72-square feet. The sign is located within a planted
landscape feature within the divided entrance to the development.
Staff is supportive of the request. The development is proposed at a density of
12± units per acres. The site plan as presented appears to provide adequate
area for outdoor livability and recreational opportunities for the residents. Staff
feels the developer has done a good job in trying to preserve buffers along the
site perimeters. Staff does not feel the development as proposed will have a
significant impact on the adjacent property.
STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
comments and conditions as outlined in paragraphs D, E and F of the agenda
staff report.
Staff recommends approval of the variance request from the City's Land
Alteration Ordinance to allow grading of future phases with the construction of
the first phase.
PLANNING COMMISSION ACTION: (OCTOBER 30, 2014)
The applicant was present. There was one registered objectors present. Staff
presented the item with a recommendation of approval of the request subject to
compliance with the comments and conditions as outlined in paragraphs D, E and F of
the agenda staff report. Staff presented as recommendation of approval of the variance
request from the City's Land Alteration Ordinance to allow grading of future phases with
the construction of the first phase.
0
Z-8977 (Cont.
Mr. Mike Marlar of Marlar Engineering addressed the Commission. He stated the
development was to allow the construction of multi -family at a density of 12 units per
acre. He stated the developer was agreeable to including the taper as required by
Public Works staff and in providing detention for the 5, 10 and 25 year storm events.
He stated the developer was not agreeable to relocating the perimeter fence off the
property line as was being requested by the adjacent neighbor. He stated the
developer would maintain the undisturbed buffer but the buffer would be located inside
the proposed development. He noted the request included grading within the buffer
area along the southern perimeter and around the area of encroachment with the pipe
stem lot.
Mr. Charles Sullivan addressed the Commission with concerns. He stated his property
was located north of the proposed development. He stated his primary concern was
drainage. He stated the existing dry -wash which ran through his property drained this
site as well as a much larger area. He stated presently there were trees and grass to
aid in absorption of the water but once the site was paved then more water would be
discharged from the site which would potentially impact his only way in and out of his
property. He stated secondly his concern was the buffer. He stated it was his
understanding there was to be a buffer between single-family and multi -family.
He stated the plan as presented did not allow for a buffer on his side of the fence and all
the buffering was located on the opposite side of the eight (8) foot tall brick wall.
He stated his next concern was lighting. He stated he had visited the developer's
project in Maumelle and the lighting was not fixed to the site. He stated the lighting was
on the second and third level and the lighting did overspill the property lines.
Mr. Marlar stated he would speak to the developer but the lighting would comply with
City code and would not be seen from the adjacent property. He stated the stormwater
would be addressed as requested by Mr. Sullivan. He stated he would work with the
City engineer to determine the best design practice to ensure detention was being
provided. Mr. Marlar stated buffering was being provided along Mr. Sullivan's property
line as required by City ordinance.
There was a general discussion by the Commission on the merits of the request. The
Commission noted this development was somewhat less dense than the previous
development discussed. The Commission noted there were additional options for the
residents to travel and most would likely go to Colonel Glenn Road for access to
services.
Staff questioned Mr. Marlar if he was willing to relocate the development sign outside
the entrance drive median. Mr. Marlar stated the sign would not be placed within the
median drive landscaped area. Mr. Marlar stated the developer was requesting to
grade within the undisturbed land use buffer area around the pipe stem lot located
within the development and potentially in areas along the south property line adjacent to
the mobile home park. Staff stated they were supportive of this request provided the
buffers on the north and west were maintained.
9
FILE NO.: Z-8977 (Cont.
There was no further discussion of the item. The Chair entertained a motion for
approval of the item, as presented by staff. The motion carried by a vote of 10 ayes
0 noes and 1 absent.
10
ITEM NO.: 12
NAME: South Bowman Road Long -form PD-R
LOCATION: located at 4212 South Bowman Road
Z-8977
Planninq Staff Comments:
1. Provide notification of property owners located within 200-feet of the site including
the certified abstract list, notice form with affidavit executed and proof of mailing.
The notice must be mailed no later than October 15, 2014. The Office of Planning
and Development must receive the proof of notice no later than October 24, 2014.
2. On the site plan include the number of units in each of the building types and provide
the total number of units proposed.
3. Provide a note on the plan indicating the covered parking, will the covered parking
be open or will the covered parking be garages?
4. Provide the maximum building height for the structures.
5. Will the mail kiosk be located inside or outside the gates? Provide the location for
the mail kiosk on the site plan.
6. Will the fence located on the perimeter of the site be solely brick or will the fence
contain a combination of brick and/or wood?
7. Include on the site plan a note concerning the dumpster screening. Provide the
hours of dumpster service on the site plan.
8. Provide the proposed signage plan including, the location, the total height and total
sign area.
9. The PZD Section of the Ordinance states -
a. Perimeter treatment. Notwithstanding any other provisions of a planned
zoning district, all uses of land or structures shall meet the open space,
buffer or green strip provisions of this chapter and Chapters 15 and 21 of
this Code.
b. Open space. Well designed open space is an important factor in providing
for innovative design and visual attractiveness. Open space shall be
evaluated utilizing the following general guidelines: A minimum of ten (10)
to fifteen (15) percent of gross planned residential district (PRD) areas
shall be designated as common usable open space.
Variance/Waivers: Advanced grading.
Public Works Conditions:
1. South Bowman Road is classified on the Master Street Plan as a minor arterial. A
dedication of right-of-way 45-feet from centerline will be required.
2. With site development, provide the design of street conforming to the Master Street
ITEM NO.: 12.
Plan. Construct one-half street improvement to South Bowman Road including 5-
foot sidewalks with the planned development. The new back of curb should be
located 29.5-feet from centerline. Striping and tapers must be provided for a left turn
lane.
3. A grading permit in accordance with Section 29-186 (c) and (d) will be required prior
to any land clearing or grading activities at the site. Other than residential
subdivisions, site grading and drainage plans must be submitted and approved prior
to the start of construction. Is a variance being requested to advance grade future
phases of development with construction of the first phase?
4. Provide a Sketch Grading and Drainage Plan per Section 29-186 (e).
5. Show the emergency access location to the property.
6. If disturbed area is one (1) or more acres, obtain a NPDES stormwater permit from
the Arkansas Department of Environmental Quality prior to the start of construction.
7. A minimum undisturbed strip 25-feet wide except for reasonable access shall be
provided along each side of streams having a 10-year storm >150 cfs. The
undisturbed strip should be measured from the top of the bank. After permits have
been obtained from the USCOE for the creek to be filled, the buffer strips can be
removed.
8. Street Improvement plans shall include signage and striping. Public Works must
approve completed plans prior to construction.
9. Streetlights are required by Section 31-403 of the Little Rock code. Provide plans
for approval to Traffic Engineering. Streetlights must be installed prior to
platting/certificate of occupancy. Contact Traffic Engineering 501.379.1813, Greg
Simmons, for more information.
10. Driveway locations and widths do not meet the traffic access and circulation
requirements of Sections 30-43 and 31-210. The width of driveway must not exceed
36-feet. The proposed center island should be removed.
11. Provide a letter prepared by a registered engineer certifying the sight distance at the
intersection(s) comply with 2004 AASHTO Green Book standards. Provide location
of the future street on the east side of Bowman Road on the plan. Conflicting left
turn movements should be avoided.
12. Show emergency access location to the property.
13. The owner and/or manager of each multi -family residence of 100 or more dwelling
units shall provide recycling and encourage participation by the tenants, renters, or
owners of each unit. Contact Melinda Glasgow at 501.371.4646 for more
information.
14. Retaining walls designed to exceed 15-feet in height are required to seek a variance
for construction. Provide proposed wall elevations.
15. Prior to construction of retaining walls, an engineer's certification of design and plans
must be submitted to Public Works for approval. After construction, an as -built
certification is required for construction of the retaining wall. Retaining walls with
geotextile reinforcing mats should not be placed on the property line and the mats
extend beyond the property line.
16. The flood statement should be modified with the correct zone identification.
17. Damage to public and private property due to hauling operations or operation of
construction related equipment from a nearby construction site shall be repaired by
the responsible party prior to issuance of a certificate of occupancy.
18. Provide a Sketch Grading and Drainage Plan per Section 29-186 (e).
Item # 12.
ITEM NO.: 12. Z-8977
Utilities and Fire Department/County Planning:
Wastewater: Sewer available to this project. Sewer main relocation required to
construct project as shown. Capacity Contribution required for apartment use. Contact
Little Rock Wastewater Utility for additional information.
Entergy: Entergy has no objection to this development. A 3-phase power line exists
along South Bowman Road. Care should be used in any excavation work on the
southern edge of this project as an underground distribution line runs along the rear lot
lines of the development to the south. Contact Entergy well in advance to work out line
routing, easements and service requirements. All future extensions will be on the front
lot line.
Center -Point Energy: No comment received.
AT & T: No comment received.
Central Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for water
service must be met.
2. Please submit plans for water facilities and/or fire protection system to Central
Arkansas Water for review. Plan revisions may be required after additional review.
Contact Central Arkansas Water regarding procedures for installation of water
facilities and/or fire service. Approval of plans by the Arkansas Department of
Health Engineering Division and the Little Rock Fire Department is required.
3. This development will have minor impact on the existing water distribution system.
Proposed water facilities will be sized to provide adequate pressure and fire
protection.
4. If there are facilities that need to be adjusted and/or relocated, contact Central
Arkansas Water. That work would be done at the expense of the developer.
5. Additional fire hydrant(s) will be required. Contact the Little Rock Fire Department to
obtain information regarding the required placement of the hydrant(s) and contact
Central Arkansas Water regarding procedures for installation of the hydrant(s).
6. A Capital Investment Charge based on the size of meter connection(s) will apply to
this project in addition to normal charges..
Fire Department: Fire hydrants per code, maintain access per code, fire sprinkler
system per code, fire alarms per code, access drives 26-feet, two -ways to enter and exit
the development. Contact the Little Rock Fire Department for additional information.
Item # 11
ITEM NO.: 12.
County Planning: No comment.
CATA: The area is not currently served by CATA but it is in the long range planning for
South Bowman Road. This location appears it will concentrate ridership potentially in
the future. CATA would request for consideration ADA accessible sidewalks and a
pullout along South Bowman Road for the development.
Parks and Recreation: No comment received.
Building Code: Project is subject to full commercial plan review approval prior to
issuance of a building permit. For information on submittal requirements and the review
process, contact a commercial plans examiner: Curtis Richey at 501.371.4724;
crichey@liftlerock.org or Mark Alderfer at 501.371.4875; malderfer@liftlerock.orq.
Planning Division: This request is located in the Ellis Mountain Planning District. The
Land Use Plan shows Residential Low Density (RL) for this property. The Residential
Low Density category provides for single family homes at densities not to exceed 6-
units per acre. Such residential development is typically characterized by conventional
single family homes, but may include patio or garden homes and cluster homes,
provided that the density remain less than 6-units per acre. The applicant has applied
for a rezoning from R-2 (Single Family District) to PDR (Planned District Residential) to
allow the construction of an apartment development on this site at a density of 17.98-
units per acre.
Master Street Plan: South Bowman Road is a Minor Arterial Street on the Master Street
Plan. A Minor Arterial provides connections to and through an urban area and their
primary function is to provide short distance travel within the urbanized area. Entrances
and exits should be limited to minimize negative effects of traffic and pedestrians on
South Bowman Road. This street may require dedication of right-of-way and may
require street improvements for entrances and exits to the site.
Bicycle Plan: A Class II Bike Lane is shown along South Bowman Road. Bike Lanes
provide a portion of the pavement for the sole use of bicycles.
Landscape:
1. Site plan must comply with the City's landscape and buffer ordinance requirements.
2. Street buffers will be required at six (6) percent of the average depth of the lot. The
minimum dimension shall be one-half ('/2) the full width requirement but in no case
less than nine (9) feet. The maximum dimension required shall be fifty (50) feet.
Easements cannot count toward fulfilling this requirement. The plantings, existing
and purposed, shall be provided within the City's landscape ordinance requirements.
Item # 12.
ITEM NO.: 12.
a. The approximate average depth of the lot is one thousand one hundred
(1,100) feet. A fifty foot (50) foot wide buffer is required along Bowman
Road.
3. A land use buffer will be required when an adjacent property has a dissimilar use of
a more restrictive nature. As a component of all land use buffer requirements,
opaque screening, whether a fence or other device, a minimum of six (6) feet in
height shall be required upon the property line side of the buffer. A minimum of
seventy (70) percent of the land use buffer shall be undisturbed. Easements cannot
count toward fulfilling this requirement. The plantings, existing and purposed, shall
be provided within the landscape ordinance of the City, Section 15-81.
4. The surrounding properties are zoned R-2, Single-family therefore, a minimum buffer
will be required at six (6) percent of the average depth and width of the lot. The
maximum dimension required shall be fifty (50) feet in all instances.
a. The approximate average width of the lot is six hundred fifty (650) feet. A
thirty-nine (39) foot wide buffer is required along the north and south
property lines.
b. The approximate average depth of the lot is one thousand one hundred
(1,100) feet. A fifty foot (50) foot buffer is required adjacent to the west
property line.
5. A perimeter planting strip is required along any side of a vehicular use area that
abuts adjoining property. This strip shall be at least nine (9) feet wide. Provide trees
with an average linear spacing of not less than thirty (30) feet within the perimeter
planting strip. Provide three (3) shrubs or vines for every thirty (30) linear feet of
perimeter planting strip.
6. Eight percent (8%) of the vehicular use area must be designated for green space;
this green space needs to be evenly distributed throughout the parking area(s). The
minimum size of an interior landscape area shall be three hundred (300) square feet
for developments with more than one hundred fifty (150) parking spaces. Interior
islands must be a minimum of seven and one half (7 1/2) feet in width. Trees shall
be included in the interior landscape areas at the rate of one (1) tree for every twelve
(12) parking spaces.
7. The development of two (2) acres or more requires an approved landscape plan
stamped with the seal of a registered landscape architect prior to the issuance of a
building permit.
8. A landscape irrigation system shall be required for developments of one (1) acre or
larger.
9. The City Beautiful Commission recommends preserving as many existing trees as
feasible on this site. Credit toward fulfilling Landscape Ordinance requirements can
be given when preserving trees of six (6) inch caliper or larger.
Revised plat/plan: Submit four (4) copies of a revised preliminary plat/plan (to include
the additional information as noted above) to staff on Wednesday, October 15, 2014.
Item # 12.