HomeMy WebLinkAboutZ-8866-A Staff AnalysisFILE NO.: Z-8866-A
NAME: Chenal Curve Short -form PCD
LOCATION: Located at 16900 Chenal Parkway
DEVELOPER:
Reese Commercial
11719 Hinson Road, Suite 130
Little Rock, AR 72212
ENGINEER:
Crafton Tull and Associates
10825 Financial Center Parkway, Suite 300
Little Rock, AR 72211
AREA: 3.042 acres NUMBER OF LOTS: 1
CURRENT ZONING:
C-3, General Commercial District
ALLOWED USES:
Retail
PROPOSED ZONING:
PCD
PROPOSED USE:
VARIANCEM/AIVERS:
FT. NEW STREET: 0 LF
C-3, General Commercial District — allow signage differing
from the Chenal Parkway Design Overlay District
None requested.
A. PROPOSAL/REQUEST/APPLICANT'S STATEMENT:
The applicant is requesting a rezoning of the site from C-3, General Commercial
District to Planned Commercial Development to allow the placement of signage
inconsistent with signage allowed in the Chenal/Financial Center Design Overlay
District. The Overlay allows the placement of a single monument style sign per
parcel, except when the parcel fronts on two (2) different streets upon which
one (1) sign per street frontage is allowed.
FILE NO.: Z-8866-A (Cont.
The applicant is requesting to place two (2) sign locations on Chenal Parkway. A
sign is proposed along the eastern boundary of the site. The sign is proposed
eight (8) feet in height and 80 square feet in area. The site plan also indicates
a sign at the entrance drive to the shopping center. The sign is proposed
eight (8) feet in height and 80 square feet in area. There is an existing sign
located on Lot 1, the carwash lot which is also being considered in this
rezoning request.
A sign is proposed along Kirk Road. The property has a narrow frontage at Kirk
Road, less than nine (9) feet. The sign is proposed eight feet six inches (8'6") in
height with an overall width of eight (8) feet for a total sign area of 64.6 square
feet.
B. EXISTING CONDITIONS:
The site is developing with a carwash and a strip retail center. Uses proposed in
the retail center are a liquor store and a Tropical Smoothie Cafe. East of the site
is a convenience store located at the intersection of Kirk Road and Chenal
Parkway. North of the site is a wooded tract which has a large power line and
easement bisecting the parcel. South and west of the site, across Chenal
Parkway are properties zoned PCD and C-3, General Commercial District which
have not developed. Improvements to Kanis Road and Chenal Parkway
adjacent to the site appear to be in place.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has not received any comment from area property owners.
All property owners located within 200 feet of the site along with the Parkway
Place Property Owners Association were notified of the public hearing.
D. ENGINEERING COMMENT
PUBLIC WORKS CONDITIONS:
In accordance with Section 32-8, no obstruction to visibility shall be located
within a triangular area 50 feet back from the intersecting right-of-way line (or
intersecting tangent lines for radial dedications) at the intersection of
Kirk Road with the private street on the north.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: No objection.
Entergy: Entergy does not object to the proposed signs and sign locations in
this proposal. Contact Entergy in advance regarding future service requirements
to the development, line extensions, and future facilities locations as this project
proceeds.
2
FILE NO.- Z-8866-A
CenterPoint Energy: No comment received.
AT & T: No comment received.
Central Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for
water service must be met.
2. The Little Rock Fire Department needs to evaluate this site to determine
whether additional public and/or private fire hydrant(s) will be required. If
additional fire hydrant(s) are required, they will be installed at the Developer's
expense.
3. Please submit plans for water facilities and/or fire protection system to Central
Arkansas Water for review. Plan revisions may be required after additional
review. Contact Central Arkansas Water regarding procedures for installation
of water facilities and/or fire service. Approval of plans by the Arkansas
Department of Health Engineering Division and the Little Rock Fire
Department is required.
4. A Capital Investment Charge based on the size of meter connection(s) will
apply to this project in addition to normal charges. This fee will apply to all
connections including metered connections off the private fire system.
5. If there are facilities that need to be adjusted and/or relocated, contact Central
Arkansas Water. That work would be done at the expense of the developer.
6. Contact Central Arkansas Water regarding the size and location of water
meter.
7. Due to the nature of this facility, installation of an approved reduced pressure
zone backflow preventer assembly (RPZA) is required on the domestic water
service. This assembly must be installed prior to the first point of use.
Central Arkansas Water requires that upon installation of the RPZA,
successful tests of the assembly must be completed by a Certified Assembly
Tester licensed by the State of Arkansas and approved by Central Arkansas
Water. The test results must be sent to Central Arkansas Water's Cross
Connection Section within ten days of installation and annually thereafter.
Contact the Cross Connection Section at 501.377.1226 if you would like to
discuss backflow prevention requirements for this project.
8. Fire sprinkler systems which do not contain additives such as antifreeze shall
be isolated with a double detector check valve assembly. If additives area
used, a reduced pressure zone back flow preventer shall be required.
Fire Department: No comment.
3
FILE NO.: Z-8866-A (C
Parks and Recreation: No comment received.
County Planning: No comment.
Rock Region Metro: The area is not currently served by METRO. We would like
to emphasize maintaining the sidewalk connections to the neighborhood for
transit rider access to jobs and shopping. The area is part of our future plans for
the West Little Rock express and community shuttle/flex service. METRO has
plans to provide service enhancements.
F. ISSUES/TECHNICAL/DESIGN:
Building Code: No comment.
Planning Division: This request is located in the Chenal Planning District. The
Land Use Plan shows Commercial (C) for this property. The commercial
category includes a broad range of retail and wholesale sales of products,
personal and professional services, and general business activities. Commercial
activities vary in type and scale, depending on the trade area that they serve.
This site is with the Chenal/Financial Center Design Overlay District. The
applicant has applied for a rezoning from C-3, General Commercial District to
PCD (Planned Commercial Development District) to have signage inconsistent
with the Design Overlay District on the site.
Master Street Plan: Chenal Parkway is a Principal Arterial on the Master Street
Plan. A Principal Arterial is to serve through traffic and to connect major traffic
generators or activity centers within the urbanized area. Entrances and exits
should be limited to minimize negative effects of traffic and pedestrians along
Chenal Parkway since it is an Arterial. This street may require dedication of
right-of-way and may require street improvements for entrances and exits to the
site.
Bicycle Plan: A Class I Bike Path is shown along Chenal Parkway. A Bike Path
is to be a paved path physically separate for the use of bicycles. Additional
right-of-way or an easement is recommended. Nine -foot paths are
recommended to allow for pedestrian use as well (replacing the sidewalk).
Landscape: No comment.
G. SUBDIVISION COMMITTEE COMMENT: (September 16, 2015)
Mr. Frank Riggins was present representing the request. Staff presented an
overview of the item stating there were few outstanding technical issues
associated with the request. Staff stated the request was to rezone the site to
Planned Commercial Development to allow the placement of signs inconsistent
with the Chenal/Financial Center Design Overlay District. Staff stated the
proposed signage plan included the allowance of three (3) signs on Chenal
2
FILE NO.: Z-8866-A
Parkway and one (1) sign on Kirk Road. Staff stated the DOD only allowed the
placement of a single sign per parcel or lot per street frontage.
Public Works comments were addressed. Staff stated no obstruction to visibility
was allowed within a fifty (50) foot triangular area of the intersection.
Staff noted the comments from the various other agencies. There were no more
issues for discussion. The Committee then forwarded the item to the full
Commission for final action.
H. ANALYSIS:
There were no outstanding technical issues associated with the request raised at
the September 16, 2015, Subdivision Committee meeting. The applicant is
requesting approval of a Planned Commercial Development to rezone the site
from C-3, General Commercial District to PCD to allow the placement of signage
which is inconsistent with signage allowed in the Chenal/Financial Center Design
Overlay District (DOD). The DOD allows the placement of a single monument
style sign per parcel, except when the parcel fronts on two (2) different streets
upon which one (1) sign per street frontage is allowed. The PCD zoning
encompasses both Lot 2, the location of the strip retail center and Lot 1, the
location of the carwash due to the fact the sign proposed on Kirk Road includes
advertisement for both the strip center and carwash.
The applicant is requesting to place two (2) sign locations on Chenal Parkway. A
sign is proposed along the eastern boundary of the site. The sign is proposed
eight (8) feet in height and 80 square feet in area. The site plan also indicates a
sign at the entrance drive to the shopping center. The sign is proposed
eight (8) feet in height and 80 square feet in area.
The DOD has specific development criteria related to signage and overhead
utilities. The Overlay states Signage. Signage shall comply with the Little Rock
Sign Ordinance, except for ground mounted signs. The maximum size of
principal site signs along Chenal/Financial Center Parkway shall be one hundred
(100) square feet in area and eight (8) feet in height. Each landowner will be
permitted to erect one (1) sign per parcel, except for parcels fronting on
two (2) different streets upon which one (1) per street frontage may be erected.
The signs will be "monument" type signs. There are three (3) signs proposed for
Lot 2; the eastern boundary and the two (2) at the entrance to the development.
A sign is proposed along Kirk Road. The property has a narrow frontage at Kirk
Road, less than nine (9) feet. The sign is proposed eight feet six inches (8'6") in
height with an overall width of eight (8) feet for a total sign area of 64.6 square
feet. A noted the DOD allows monument style ground signs with a maximum
height of eight (8) feet and a maximum sign area of 100 square feet.
5
FILE NO.: Z-8866-A (Cont.
Staff is not supportive of the application as filed. The applicant is seeking
approval to place two (2) sign locations on Lot 2. There is an existing sign
location on Lot 1 which would allow the applicant three (3) sign location along the
Parkway. Per the DOD only two (2) locations, one (1) sign location per parcel, is
allowed. Staff feels the signage plan as proposed for Chenal Parkway is
excessive. The DOD is limited in the areas of enforcement with the primary
purpose of the DOD being related to signage and overhead utilities. Staff is
however supportive of allowing the placement of signage along Kirk Road.
STAFF RECOMMENDATION. -
Staff recommends denial of the application as filed.
PLANNING COMMISSION ACTION: (OCTOBER 8, 2015)
The applicant was present. There were no registered objectors present. Staff
presented the item stating the applicant had amended the request to reduce the
proposed ground signs on the Parkway to one (1) sign per parcel. Staff stated
the request also included the placement of a ground sign along Kirk Road. Staff stated
all ground signs were to be monument style signs with a maximum height of eight (8)
feet and a maximum sign area of 100 square feet. Staff stated building signs were
proposed on the facades abutting Chenal Parkway and on the eastern fagade of the
carwash. Staff stated they were now supportive of the applicant's request. Staff
presented a recommendation of approval of the request subject to compliance with the
comments and conditions as outlined in paragraphs D, E and F of the agenda staff
report. There was no further discussion. The item was placed on the consent agenda
and approved as recommended by staff by a vote of 9 ayes, 0 noes and 2 absent.
0
ITEM NO.: 15. Z-8866-A
NAME: Chenal Curve Short -form PCD
LOCATION: located at 16900 Chenal Parkway
Planninq Staff Comments:
1. Provide notification of property owners located within 200-feet of the development
including the certified abstract list, notice form with affidavit executed and proof of
mailing. The notice must be mailed no later than September 23, 2015. The Office of
Planning and Development must receive the proof of notice no later than October 2,
2015. WILL COMPLY.
2. The DOD has specific development criteria related to signage and overhead utilities.
The Overlay states Signage. Signage shall comply with the Little Rock Sign
Ordinance, except for ground mounted signs. The maximum size of principal site
signs along Chenal/Financial Center Parkway shall be one hundred (100) square
feet in area and eight (8) feet in height. Each landowner will be permitted to erect
one (1) sign per parcel, except for parcels fronting on two (2) different streets upon
which one (1) per street frontage may be erected. The signs will be "monument" type
signs. There are three (3) signs proposed for Lot 2. The eastern boundary and the
two (2) at the entrance to the development. NOTED. THE PLANS HAVE BEEN
REVISED TO SHOW 1 SIGN AT THE ENTRANCE AT KANIS INSTEAD OF THE
PREVIOUSLY SHOWN TWO SIGNS FORMING A "V" SHAPE.
3. The sign ordinance allows - One (1) freestanding sign per premises, not to exceed
two (2) square feet in sign area for each linear foot of main street frontage up to a
maximum of one hundred sixty (160) square feet. Such sign shall not exceed a
height of thirty-six (36) feet. It appears the frontage along Kirk Road is 9-feet. This
would allow 18 square feet. The sign as proposed contains 64 square feet of sign
area. NOTED.
4. This review only includes the review for the placement of additional ground signs for
Lot 2. NOTED.
Variance/Waivers:
Public Works Conditions:
1. In accordance with Section 32-8, no obstruction to visibility shall be located within a
triangular area 50 feet back from the intersecting right-of-way line (or intersecting
tangent lines for radial dedications) at the intersection of Kirk Road with the private
street on the north. THE SIGN ON KIRK ROAD WILL NOT ENCROACH INTO THE
50' SIGHT TRIANGLE.
Utilities and Fire Department/County Planning:
Wastewater: No objection. NOTED.
Entergy: Entergy does not object to the proposed signs and sign locations in this
proposal. Contact Entergy in advance regarding future service requirements to the
development, line extensions, and future facilities locations as this project proceeds.
NOTED.
CenterPoint Enemy:
AT & T:
Central Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for water
service must be met. N/A.
2. The Little Rock Fire Department needs to evaluate this site to determine whether
additional public and/or private fire hydrant(s) will be required. If additional fire
hydrant(s) are required, they will be installed at the Developer's expense. N/A.
3. Please submit plans for water facilities and/or fire protection system to Central
Arkansas Water for review. Plan revisions may be required after additional review.
Contact Central Arkansas Water regarding procedures for installation of water
facilities and/or fire service. Approval of plans by the Arkansas Department of
Health Engineering Division and the Little Rock Fire Department is required. N/A.
4. A Capital Investment Charge based on the size of meter connection(s) will apply to
this project in addition to normal charges. This fee will apply to all connections
including metered connections off the private fire system. N/A.
5. If there are facilities that need to be adjusted and/or relocated, contact Central
Arkansas Water. That work would be done at the expense of the developer. N/A.
6. Contact Central Arkansas Water regarding the size and location of water meter. N/A.
7. Due to the nature of this facility, installation of an approved reduced pressure zone
backflow preventer assembly (RPZA) is required on the domestic water service.
This assembly must be installed prior to the first point of use. Central Arkansas
Water requires that upon installation of the RPZA, successful tests of the assembly
must be completed by a Certified Assembly Tester licensed by the State of Arkansas
and approved by Central Arkansas Water. The test results must be sent to Central
Arkansas Water's Cross Connection Section within ten days of installation and
annually thereafter. Contact the Cross Connection Section at 501.377.1226 if you
would like to discuss backflow prevention requirements for this project. N/A.
8. Fire sprinkler systems which do not contain additives such as antifreeze shall be
isolated with a double detector check valve assembly. If additives area used, a
reduced pressure zone back flow preventer shall be required. N/A.
Fire Department: No comment. NOTED.
Parks and Recreation: No comment received. NOTED.
County Planning: No comment. NOTED.
ROCK REGION METRO:
Buildina Code: No comment. NOTED
Planning Division: This request is located in the Chenal Planning District. The Land
Use Plan shows Commercial (C) for this property. The commercial category includes a
broad range of retail and wholesale sales of products, personal and professional
services, and general business activities. Commercial activities vary in type and scale,
depending on the trade area that they serve. This site is with the Chenal/Financial
Center Design Overlay District. The applicant has applied for a rezoning from C-3,
General Commercial District to PCD (Planned Commercial Development District) to
have signage inconsistent with the Design Overlay District on the site. NOTED.
Master Street Plan: Chenal Parkway is a Principal Arterial on the Master Street Plan. A
Principal Arterial is to serve through traffic and to connect major traffic generators or
activity centers within the urbanized area. Entrances and exits should be limited to
minimize negative effects of traffic and pedestrians along Chenal Parkway since it is an
Arterial. This street may require dedication of right-of-way and may require street
improvements for entrances and exits to the site. N/A.
Bicycle A Class I Bike Path is shown along Chenal Parkway. A Bike Path is to be a paved
path physically separate for the use of bicycles. Additional right-of-way or an easement is
recommended. Nine -foot paths are recommended to allow for pedestrian use as well (replacing
the sidewalk). N/A.
Landscape: No comment. NOTED.
Revised plat/plan: Submit four (4) copies of a revised preliminary plat/plan (to include
the additional information as noted above) to staff on Wednesday, September 23, 2015.
WILL COMPLY.