HomeMy WebLinkAboutZ-8833-A Staff AnalysisFILE NO.: Z-8833-A
NAME: Massey Short -form PCD
LOCATION: Located on the East side of Highway 300, just North of Chenal Parkway
DEVELOPER:
Jeff Massey
10225 Barret Road
Roland, AR 72135
ENGINEER:
McGetrick and McGetrick Engineers
P.O. Box 30441
Little Rock, AR 72260
AREA: 3.39 acres
CURRENT ZONING:
ALLOWED USES:
PROPOSED ZONING
PROPOSED USE:
NUMBER OF LOTS: 2
R-2, Single-family
Single-family residential
PCD
FT. NEW STREET: 0 LF
Contractor's Office and Contractor's Maintenance Yard
VARIANCES/WAIVERS REQUESTED: None requested.
BACKGROUND:
On January 24, 2013, the Little Rock Planning Commission provided a recommendation
of approval of a rezoning request of this site and additional property located to the south
of this site to allow the rezoning from R-2, Single-family to PCD. The requested
rezoning contained 5.1 acres. The redevelopment of the site consisted of six (6)
covered parking areas for recreational vehicles, boats, buses, trailers, etc. along with
60 uncovered parking spaces for this same type of vehicle storage. The item was
presented to the Board of Directors on April 16, 2013. The Board of Directors approved
the request to rezone the site to PCD. The Mayor vetoed the approval and the rezoning
was denied.
FILE NO.: Z-8833-A (Cont.)
A. PROPOSAL/REQUEST/APPLICANT'S STATEME
The request is to rezone 3-acres located on Highway 300 from R-2, Single-family
to PCD, Planned Commercial Development, to allow the creation of two lots and
the construction of a building on each lot to be used as a contractor's office and
contractor's maintenance yard. There will be an area of outdoor storage for
contractor's equipment located within a screened area behind the buildings. The
proposal includes the allowance of this area to be graveled and not paved as
typically required by City ordinance. The hours of operation are from 6 am to
8 pm six days per week.
The property is located outside the City limits of Little Rock but is located within
the City's Extraterritorial Planning Jurisdiction.
B. EXISTING CONDITIONS:
The property abuts the City limits on the south side. The site contains a
non-residential building which was formerly used as a commercial business/truck
repair. South of the site there is a single-family home and a beauty salon. The
immediate area is primarily residential uses with homes located on large tracts.
There are non-residential uses and zoning located north of the site at the
intersection of East Pinnacle Road (C-1, Neighborhood Commercial) and West
Pinnacle Road (PCD) on the north side. There is undeveloped 0-3, General
Office District zoned property to the south of this site. Further south is
undeveloped C-3, General Commercial District zoned property.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has not received any comment from area
property owners located within 200-feet of the site along with th
West Little Rock Neighborhoods, the Aberdeen Court Pro
Association and the Duqesne Place Property Owners Association
of the public hearing.
D. ENGINEERING COMME
PUBLIC WORKS CONDITIONS;
residents. All
e Coalition of
perty Owners
were notified
1. Hwy 300 is classified on the Master Street Plan as a minor arterial. A
dedication of right-of-way 45 feet from centerline will be required.
2. With site development, provide the design of street conforming to the Master
Street Plan. Construct one-half street improvements to Hwy 300 including
5-foot sidewalks with the planned development. The new back of curb should
be placed 29.5 feet from centerline adjacent to the subject property.
3. Stormwater detention ordinance applies to this property. Show the proposed
location for stormwater detention facilities on the plan.
K
FILE NO.: Z-8833-A (Cont.)
4. If disturbed area is one (1) or more acres, obtain a NPDES stormwater permit
from the Arkansas Department of Environmental Quality prior to the start of
construction.
5. Streetlights are required by Section 31-403 of the Little Rock code. Provide
plans for approval to Traffic Engineering. Streetlights must be installed prior
to platting/certificate of occupancy. Contact Traffic Engineering 379-1813
(Greg Simmons) for more information.
6. Driveway locations do not meet the traffic access and circulation
requirements of Sections 30-43 and 31-210. The lots must share a single
driveway access centered on the property line. The width of driveway must
not exceed 36 feet. Driveways are required to be spaced 150 feet from
property lines and 300 feet from other driveways.
7. Provide a letter prepared by a registered engineer certifying the sight distance
at the intersections comply with 2004 AASHTO Green Book standards.
8. Obtain permits for improvements within State Highway right-of-way from
AHTD, District VI. AHTD is currently conducting a review of the application
pertaining to required street improvements.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Located outside the City limits, City sewer is not available. Provide
Septic Certification and/or Approval from the Arkansas Department of Health.
Entergy: This plat has been forwarded to Entergy Transmission since the
property runs along the north edge of the T-line Easement with parking spaces
shown in the easement. There do not appear to be any conflicts with Entergy
Distribution.
Center -Point Energy: No comment received.
AT & T: No comment received.
Central Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for
water service must be met.
2. A water main extension will be needed to provide water service to this
property.
3. This development will have minor impact on the existing water distribution
system. Proposed water facilities will be sized to provide adequate
pressure and fire protection.
4. The Little Rock Fire Department needs to evaluate this site to determine
whether additional public or private fire hydrant(s) will be required. If
3
FILE NO.: Z-8833-A (Cont.
additional fire hydrant(s) are required, they will be installed at the
Developer's expense.
5. Please submit plans for water facilities and/or fire protection system to
Central Arkansas Water for review. Plan revisions may be required after
additional review. Contact Central Arkansas Water regarding procedures
for installation of water facilities and/or fire service. Approval of plans by the
Arkansas Department of Health Engineering Division and the Little Rock
Fire Department is required.
6. Contact Central Arkansas Water regarding the size and location of the water
meter.
7. A Capital Investment charge based on the size of meter connection(s) will
apply to this project in addition to normal charges. This fee will apply to all
connections including metered connections off the private fire system.
8. If there are facilities that need to be adjusted and/or relocated, contact
Central Arkansas Water. That work would be done at the expense of the
developer.
9. Due to the nature of this facility, installation of an approved reduced
pressure zone backflow preventer assembly (RPZA) is required on the
domestic water service. This assembly must be installed prior to the first
point of use. Central Arkansas Water requires that upon installation of the
RPZA, successful tests of the assembly must be completed by a Certified
Assembly Tester licensed by the State of Arkansas and approved by
Central Arkansas Water. The test results must be sent to Central Arkansas
Water's Cross Connection Section within ten days of installation and
annually thereafter. Contact the Cross Connection Section at 377-1226 if
you would like to discuss backflow prevention requirements for this project.
10. The facilities on -site will be private. When meters are planned off private
lines, private facilities shall be installed to Central Arkansas Water's material
and construction specifications and installation will be inspected by an
engineer, licensed to practice in the State of Arkansas. Execution of
Customer Owned Line Agreement is required.
Fire Department: Place fire hydrant(s) per code. Maintain access. Contact the
Little Rock Fire Department for additional information.
County Planning:
Obtain septic approval from AHD and fire department approval from
volunteer fire department.
2. Dedicate Right of Way as required to equal one-half of 90 feet (45 feet) from
centerline.
3. Obtain driveway permit from Pulaski County Public Works (340-6800).
4. Need to plat lots. 2 new lots are being created.
4
FILE NO.: Z-8833-A (Cont.)
5. Obtain variance for construction to Master Road Plan standards for Hwy
300.
6. Label easement or Right of Way for overhead power lines.
7. Show front 40' setbacks.
8. Show state plane coordinates for 2 property corners.
9. Show source of title.
10. Tie survey to two section corners.
CATA: Approved as submitted. Located on the HWY 10 #25 Pinnacle Mountain
Express Route
Parks and Recreation: No comment received-
F. ISSUES/TECHNICAL/DESIGN:
Planning Division: This request is located in the Pinnacle Planning District. The
Land Use Plan shows Residential Low Density (RL) for this property. This
category provides for single family homes at densities not to exceed 6 units per
acre. Such residential development is typically characterized by conventional
single family homes, but may include patio or garden homes and cluster homes,
provided that the density remain less than 6 units per acre. The applicant has
applied for a rezoning from R-2 (Single Family District) to PCD (Planned
Commercial District) to allow the development of office/warehouse facilities with
outdoor storage on the site.
Master Street Plan: Highway 300 is a Minor Arterial on the Master Street Plan.
A Minor Arterial provides connections to and through an urban area and their
primary function is to provide short distance travel within the urbanized area.
Entrances and exits should be limited to minimize negative effects of traffic and
pedestrians on Highway 300 since it is a Minor Arterial. This street may require
dedication of right-of-way and may require street improvements for entrances
and exits to the site.
Bicycle Plan: A Class II Bike Lanes are shown along Highway 300. Bike Lanes
provide a portion of the pavement for the sole use of bicycles.
Landscape:
1. Site plan must comply with the City's landscape and buffer ordinance
requirements.
2. The property located to the south is zoned residentially. The zoning buffer
ordinance would typically require the placement of a 28.86-foot landscape
strip adjacent to this site. Seventy percent of the area is to remain
undisturbed. Utility easements cannot count in computing the depth of the
5
FILE NO.: Z-8833-A (Cont.
buffer. The parking area and a portion of the building are located within the
required land use buffer.
3. Screening will be required along the northern, eastern and southern
perimeters where adjacent to residentially zoned and/or used property.
4. A small amount of building landscaping will be required with the development
of the site.
5. An automatic irrigation system to water landscaped areas will be required.
6. Prior to the issuance of a building permit, it will be necessary to provide
landscape plans stamped with the seal of a registered landscape architect.
G. SUBDIVISION COMMITTEE COMMENT:
(August 1, 2013)
Mr. Pat McGetrick of McGetrick Engineering was present representing the
request. Staff presented an overview of the development stating there were few
outstanding technical issues associated with the request. Staff questioned if the
storage areas would be graveled or paved. Staff also questioned if there would
be dumpsters located on the site and the hours of service of the dumpster
facilities. Staff requested Mr. McGetrick provide the proposed construction
materials for the buildings.
Public Works comments were addressed. Staff stated a dedication of right of
way was required along Highway 300 to 45-feet from centerline. Staff also stated
the City's Stormwater Detention Ordinance would apply to the development of
the site and requested Mr. McGetrick show the proposed location of the
detention facilities on the site plan. Staff stated the Highway Department was
reviewing the request to determine if street improvements would be required.
Landscaping comments were addressed. Staff stated a street buffer was
required along Highway 300 with an average depth of 28.8 square feet. Staff
stated screening was required along the northern, southern and eastern
perimeters. Staff also stated an automatic irrigation system would be required to
water landscaped areas.
Staff noted comments from the other reporting departments and agencies
suggesting the applicant contact them individually for additional clarification.
There was no further discussion of the item. The Committee then forwarded the
item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised site plan to staff addressing a number of the
issues raised at the August 1, 2013, Subdivision Committee meeting. The
revised plan indicates the placement of a single drive shared between the two
lots. The Arkansas Highway and Transportation Department has indicated no
boundary street improvements to Highway 300 will be required. AHTD indicates
[.1
FILE NO.: Z-8833-A Cont.)
there is a concern with sight distance. The Engineer has certified there is ample
sight distance from the relocated driveway and he will verify with AHTD prior to
construction.
The revised site plan includes a dumpster location for each of the individual lots
and a note indicating the hours of dumpster service would be limited to daylight
hours. The business hours of operation are from 6 am to 8 pm six (6) days per
week. The detention areas have been indicated on the site plan.
The request is to rezone 3-acres from R-2, Single-family to PCD, Planned
Commercial Development, to allow the creation of two lots and the construction
of a building on each lot to be used as a contractor's office and contractor's
maintenance yard. Tract 1 is indicated containing 1.48 acres and Tract 2
containing 1.91 acres.
The property is located outside the City limits of Little Rock but is located within
the City's Extraterritorial Planning Jurisdiction. Since the property is located
outside the City limits the development will not be allowed to connect to City
sewer. The applicant has indicated septic systems will be provided for each of
the individual lots. The applicant states prior to construction of the building,
septic approval from the Arkansas Department of Health will be obtained.
The building located on Tract 1 contains 5,000 square feet with 11 parking
spaces. The building located on Tract 2 contains 10,000 square feet and
21 parking spaces. The site plan indicates an area of outdoor storage on each of
the lots for storage of contractor's equipment and materials. The area will be
screened with a six (6) foot opaque screening fence and located behind the
buildings.
The developer proposes the areas of storage will be graveled. Section 36-508
states all areas subject to wheeled traffic are to be paved. The applicant has
indicated paving materials will not hold up to the machinery to be placed within
this area. The applicant is requesting to be allowed to place a hard packed
gravel within the storage area.
Signage has not been indicated on the site plan. Staff recommends, if approved,
signage is limited to signage allowed in office zones or a maximum of six (6) feet
in height and sixty-four (64) square feet in area. Building signage should be
limited to ten (10) percent of the fagade area abutting the public street.
The buildings are proposed as single story buildings constructed with a
residential appearance. The maximum building height proposed is 25-feet. The
roof will be constructed of standing seam metal or with asphalt shingles. The
front exterior of the buildings will be wood, brick, stucco or stone or a
combination of materials. The applicant is requesting to use vinyl or metal siding
7
ILE NO.: Z-8833-A
on the sides and rear of the buildings. There will be overhead doors on the rear
of the buildings to allow access into the building for storage of equipment or
materials.
Staff is not supportive of the proposed rezoning of the site to allow the use of the
property for a contractor's office and contractor's maintenance yard. Staff does
not feel this site is appropriate for the contractor's office and contractor's
maintenance yard. The Land Use Plan shows Residential Low Density (RL) for
this property. The area is developed primarily as residential with single-family
homes located on large tracts. Just to the south is an area shown on the City's
Future Land Use Plan as Office and Multi -family. Staff feels the outdoor storage
aspect of this development is too intense for this area.
STAFF RECOMMENDATION:
Staff recommends denial of the request.
PLANNING COMMISSION ACTION:
(AUGUST 22, 2013)
The applicant was present. There were no registered objectors present. The Chair
informed the applicant there were eight (8) Commissioners present. The Chair stated it
was the Commission's practice that when fewer than nine (9) Commissioners were
present the applicant was offered the option of deferral to a later meeting to allow more
members to be present to hear the request. The Chair stated for an item to be
approved six (6) positive votes were required.
Mr. Pat McGetrick requested a deferral of the item.
The Chair informed Mr. McGetrick the item would be deferred to the October 3, 2013,
Subdivision Hearing. A motion was made to approve the deferral request. The motion
carried by a vote of 8 ayes, 0 noes and 3 absent.
PLANNING COMMISSION ACTION:
(SEPTEMBER 19, 2013)
There has been no change to the application request since the previous public hearing.
Staff continues to recommend denial of the request.
PLANNING COMMISSION ACTION:
(OCTOBER 3, 2013)
Mr. Pat McGetrick and Mr. Jeff Massey were present representing the request. There
was one registered objector present. Staff presented the item with a recommendation
of denial.
1.1
FILE NO.: Z-8833-A (Cont.
Mr. McGetrick stated he was the engineer for the project. He stated the applicant had
agreed to pave the rear parking area which was an amendment to the original
application filed. He stated there would be limited outdoor storage of equipment. He
stated there would be no materials stored outdoors. He stated the request was to allow
the development of the site with two buildings. He stated the buildings would be
residential in character and style. He stated the developer would place an 8-foot fence
around the storage area. He stated the development would comply with the typical
standards of the ordinances including landscaping.
Mr. Massey stated his home was in this area. He stated he felt the development of an
office use on the site was a good fit. He stated there was a power transmission line
running along the sites southern perimeter and he did not feel the site would develop as
residential. He stated his business was small and there were four to five employees.
He stated he did not own a huge amount of equipment.
Ms. Ruth Bell, League of Women Voters, addressed the Commission in opposition to
the request. She stated the League was concerned with the open display aspect of the
request. She stated she felt the placement of the use was more suitable for an open
display area and not with a residential area. She stated she was also concerned with
the placement of an 8-foot fence. She also questioned if an 8-foot fence would in fact
screen the applicant's equipment. She stated she did not feel the use was appropriate
for an area which was redeveloping as residential.
Mr. Massey stated there was no open display with his business. He stated all the
equipment would be screened from Highway 300. He provided the Commission with
concept photos of the proposed building design. He stated the building would be
craftsman style and constructed of materials compatible was residential home building.
There was a general discussion by the Commission concerning the request and the
placement of equipment within the rear of the building. The Commission questioned
Mr. Massey if he was amending his request to place the paving within the rear of the
building. Mr. Massey stated he was amending his request to commit to paving the site
as typically required by City ordinance. The Commission questioned staff if the original
application included outdoor storage of materials. Staff stated there was no mention of
outdoor storage of materials in the original application.
A motion was made to approve the request as amended including all staff
recommendations and comments except that of denial. The motion carried by a vote of
7 ayes, 1 no, 2 absent and 1 open position.
9
ITEM NO.: 12. Z-8833-A
NAME: Massey Short -form PCD
LOCATION: located on the East side of Highway 300, just North of Chenal Parkway
Planning Staff Comments:
1. Provide notification of the abutting property owners including the certified abstract
list, notice form with affidavit executed and proof of mailing. The notice must be
mailed no later than August 7, 2013. The Office of Planning and Development must
receive the proof of notice no later than August 16, 2013.
2. Provide details of the proposed sanitary sewer - will septic be used to serve the
proposed new buildings? If so provide approval from the Arkansas Department of
Health.
3. Will there be any fencing located around the perimeters of the site? If so note on the
site plan the location of the fencing, the proposed construction material and the total
height.
4. Will there be a dumpster located on the site? If so note the location of the dumpster
facility along with a note indicating the screening of the dumpster.
5. If there is a dumpster will the hours of service be limited to daylight hours? If so note
the hours of dumpster service on the site plan.
6. The request includes the placement of office/warehouse and an outdoor storage
area. Is the proposed use a contractors storage yard?
7. Will the areas of outdoor storage be paved or is the area proposed as a graveled
storage yard?
8. The days and hours of operation are proposed from 6 am to 8 pm six days per week.
9. Provide the proposed construction materials for the new buildings.
10. Provide the maximum building height for the proposed structures.
VarianceANaivers: None requested.
Public Works Conditions:
1. Hwy 300 is classified on the Master Street Plan as a minor arterial. A dedication of
right-of-way 45 feet from centerline will be required.
2. With site development, provide the design of street conforming to the Master Street
Plan. Construct one-half street improvements to Hwy 300 including 5-foot sidewalks
with the planned development. The new back of curb should be placed 29.5 feet
from centerline adjacent to the subject property.
3. Stormwater detention ordinance applies to this property. Show the proposed
location for stormwater detention facilities on the plan.
4. If disturbed area is one (1) or more acres, obtain a NPDES stormwater permit from
the Arkansas Department of Environmental Quality prior to the start of construction.
5. Streetlights are required by Section 31-403 of the Little Rock code. Provide plans
for approval to Traffic Engineering. Streetlights must be installed prior to
platting/certificate of occupancy. Contact Traffic Engineering 379-1813 (Greg
Item # 12.
Simmons) for more information.
6. Driveway locations do not meet the traffic access and circulation requirements of
Sections 30-43 and 31-210. The lots must share a single driveway access centered
on the property line. The width of driveway must not exceed 36 feet. Driveways are
required to be spaced 150 feet from property lines and 300 feet from other
driveways.
7. Provide a letter prepared by a registered engineer certifying the sight distance at the
intersections comply with 2004 AASHTO Green Book standards.
8. Obtain permits for improvements within State Highway right-of-way from AHTD,
District VI. AHTD is currently conducting a review of the application pertaining to
required street improvements.
Utilities and Fire Department/County Planning:
Wastewater: Located outside the City limits, City sewer is not available. Provide Septic
Certification and/or Approval from the Arkansas Department of Health.
Entergy: This plat has been forwarded to Entergy Transmission since the property runs
along the north edge of the T-line Easement with parking spaces shown in the
easement. There do not appear to be any conflicts with Entergy Distribution.
Center -Point Energy: No comment received.
AT & T: No comment received.
Central Arkansas Wate
1. All Central Arkansas Water requirements in effect at the time of request for water
service must be met.
2. A water main extension will be needed to provide water service to this property.
3. This development will have minor impact on the existing water distribution system.
Proposed water facilities will be sized to provide adequate pressure and fire
protection.
4. The Little Rock Fire Department needs to evaluate this site to determine whether
additional public or private fire hydrant(s) will be required. If additional fire hydrant(s)
are required, they will be installed at the Developer's expense.
5. Please submit plans for water facilities and/or fire protection system to Central
Arkansas Water for review. Plan revisions may be required after additional review.
Contact Central Arkansas Water regarding procedures for installation of water
facilities and/or fire service. Approval of plans by the Arkansas Department of
Health Engineering Division and the Little Rock Fire Department is required.
6. Contact Central Arkansas Water regarding the size and location of the water meter.
7. A Capital Investment charge based on the size of meter connection(s) will apply to
this project in addition to normal charges. This fee will apply to all connections
including metered connections off the private fire system.
8. If there are facilities that need to be adjusted and/or relocated, contact Central
Arkansas Water. That work would be done at the expense of the developer.
9. Due to the nature of this facility, installation of an approved reduced pressure zone
backflow preventer assembly (RPZA) is required on the domestic water service.
Item # 12.
This assembly must be installed prior to the first point of use. Central Arkansas
Water requires that upon installation of the RPZA, successful tests of the assembly
must be completed by a Certified Assembly Tester licensed by the State of Arkansas
and approved by Central Arkansas Water. The test results must be sent to Central
Arkansas Water's Cross Connection Section within ten days of installation and
annually thereafter. Contact the Cross Connection Section at 377-1226 if you would
like to discuss backflow prevention requirements for this project.
10. The facilities on -site will be private. When meters are planned off private lines,
private facilities shall be installed to Central Arkansas Water's material and
construction specifications and installation will be inspected by an engineer, licensed
to practice in the State of Arkansas. Execution of Customer Owned Line Agreement
is required.
Fire Department: Place fire hydrant(s) per code. Maintain access. Contact the Little
Rock Fire Department for additional information.
County Planning:
1. Obtain septic approval from AHD and fire department approval from volunteer fire
department.
2. Dedicate Right of Way as required to equal one-half of 90 feet (45 feet) from
centerline.
3. Obtain driveway permit from Pulaski County Public Works (340-6800).
4. Need to plat lots. 2 new lots are being created.
5. Obtain variance for construction to Master Road Plan standards for Hwy 300.
6. Label easement or Right of Way for overhead power lines.
7. Show front 40' setbacks.
8. Show state plane coordinates for 2 property corners.
9. Show source of title.
10. Tie survey to two section corners.
CATA: Approved as submitted. Located on the HWY 10 #25 Pinnacle Mountain
Express Route
Parks and Recreation: No comment received.
Planninq Division: This request is located in the Pinnacle Planning District. The Land
Use Plan shows Residential Low Density (RL) for this property. This category provides
for single family homes at densities not to exceed 6 units per acre. Such residential
development is typically characterized by conventional single family homes, but may
include patio or garden homes and cluster homes, provided that the density remain less
than 6 units per acre. The applicant has applied for a rezoning from R-2 (Single Family
District) to PCD (Planned Commercial District) to allow the development of
office/warehouse facilities with outdoor storage on the site.
Master Street Plan: Highway 300 is a Minor Arterial on the Master Street Plan. A Minor
Arterial provides connections to and through an urban area and their primary function is
to provide short distance travel within the urbanized area. Entrances and exits should
be limited to minimize negative effects of traffic and pedestrians on Highway 300 since it
Item # 12.
is a Minor Arterial. This street may require dedication of right-of-way and may require
street improvements for entrances and exits to the site.
Bicycle Plan: A Class II Bike Lanes are shown along Highway 300. Bike Lanes provide
a portion of the pavement for the sole use of bicycles.
Landscape:
1. Site plan must comply with the City's landscape and buffer ordinance requirements.
2. The property located to the south is zoned residentially. The zoning buffer
ordinance would typically require the placement of a 28.86-foot landscape strip
adjacent to this site. Seventy percent of the area is to remain undisturbed. Utility
easements can not count in computing the depth of the buffer. The parking area
and a portion of the building are located within the required land use buffer.
3. Screening will be required along the northern, eastern and southern perimeters
where adjacent to residentially zoned and/or used property.
4. A small amount of building landscaping will be required with the development of the
site.
5. An automatic irrigation system to water landscaped areas will be required.
6. Prior to the issuance of a building permit, it will be necessary to provide landscape
plans stamped with the seal of a registered landscape architect.
Revised plat/plan: Submit four (4) copies of a revised preliminary plat/plan (to include
the additional information as noted above) to staff on Wednesday, August 7, 2013.
Item # 12.