HomeMy WebLinkAboutZ-8826 Staff AnalysisJanuary 10, 2013
ITEM NO.: 7 FILE NO.: Z-8826
NAME: Family Dollar Store — Conditional Use Permit
LOCATION: 801 East Roosevelt Road
OWNER/APPLICANT: Hastings Realty/Crafton Tull
PROPOSAL: A conditional use permit is requested to allow the
construction of a Family Dollar Store on this 1-2
zoned, 1.07 acre tract.
SITE LOCATION:
The property is located on the south side of East Roosevelt Road, two
blocks east of 1-30, across from Horace Mann School.
2. COMPATIBILITY WITH NEIGHBORHOOD:
The property is located in an area of mixed zoning and uses. Uses in the
immediate area include a wholesale business, a welding supply company,
a convenience store with gas pumps, a school and undeveloped industrial
property. Additional commercial uses are located farther east. The site is
currently occupied by a vacant bank building. The proposed new retail
store should be compatible with the neighborhood and will provide a
needed service to this part of the community.
Notice of the public hearing was sent to all owners of properties located
within 200 feet of the site and the Community Outreach Neighborhood
Association.
3. ON SITE DRIVES AND PARKING:
This 9,100 square foot retail store requires 30 parking spaces. 38 parking
spaces are proposed in front and on the east side of the store. Access will
be via a shared driveway over the lot to the west. Both properties are
currently owned by the same entity. Prior to a building permit, a cross
access easement will be executed to legitimize the shared driveway. A
second driveway off the private drive to the south will provide access for
delivery trucks only.
4. SCREENING AND BUFFERS:
Site plan must comply with the City's minimal landscape and buffer
ordinance requirements.
January 10, 2013
ITEM NO.: 7 Cont.) FILE NO.: Z-8826
The zoning buffer ordinance requires an average twelve foot (12') wide
street buffer along E. Roosevelt Road and in no case to be less than nine
foot (9').
The landscape ordinance requires a nine foot (9') wide landscape strip
around the sites entirety. Currently, there are three (3) locations this
minimal amount is not being met. Along the northern property line and
along the
western property line; revise. A variance from this minimal requirement
must be obtained from the City Beautiful Commission prior to the issuance
of a building permit.
The landscape ordinance requires building landscaping currently there is
zero (0) being proposed. A variance from this minimal requirement must
be obtained from the City Beautiful Commission prior to the issuance of a
building permit.
5. PUBLIC WORKS COMMENTS:
1. At time of building permit, sidewalks with appropriate handicap ramps
are required in accordance with Section 31-175 of the Little Rock
Code and the Master Street Plan. Sidewalk should be constructed
on McAlmont Street and the private drive on the south. The back of
the sidewalk adjacent to Roosevelt should be placed at the property
line. The back of the sidewalk adjacent to McAlmont Street and the
south private drive should be located twelve (12) feet off the back of
curb.
2. With site development, provide design of street conforming to the
Master Street Plan. Construct one-half street improvement to
Roosevelt Road including five (5) foot sidewalks with planned
development.
3. At time of building permit, repair or replace any curb and gutter or
sidewalk that is damaged in the public right-of-way prior to
occupancy.
4. Plans of all work in right-of-way shall be submitted for approval prior
to start of work. Obtain barricade permit prior to doing any work in
the right-of-way from Traffic Engineering at (501) 379-1805 (Travis
Herbner).
5. At time of building permit, obtain permits for improvements within
State Highway right-of-way from AHTD, District VI.
2
January 10, 2013
ITEM NO.: 7
FILE NO.: Z-8826
6. A grading permit in accordance with Section 29-186 (c) & (d) will be
required prior to any land clearing or grading activities at the site.
Other than residential subdivisions, site grading and drainage plans
must be submitted and approved prior to the start of construction.
7. Storm water detention ordinance applies to this property. Show the
proposed location for storm water detention facilities on the plan. If it
is believed detention does not apply, calculations must be provided
showing the pre and post impervious area.
8. The private streets should be located in platted access easements.
9. The driveway to the site off Roosevelt Road should be located within
an access easement.
10. If disturbed area is one or more acres, obtain a NPDES storm water
permit from the Arkansas Department of Environmental Quality prior
to the start of construction.
11. A special Grading Permit for Flood Hazard Areas will be required per
Section 8-283 prior to construction. An elevation certificate is
required to be provided prior to issuance of the certificate of
occupancy.
12. The minimum finish floor elevation of at least one foot above the
base flood elevation is required to be shown on plat and grading
plans. The mechanical equipment for the structure must be elevated
to above the base flood elevation.
13. Currently, Roosevelt Road at this location floods during intense rain
events.
14. One site striping and signage plans should be forwarded to Public
Works, Traffic Engineering for approval with the site development
package.
15. Driveway locations and widths do not meet the traffic access and
circulation requirements of Sections 30-43 and 31-210. The width of
driveway must not exceed thirty-six (36) feet.
6. UTILITY. FIRE DEPT. AND CATA COMMENTS:
Wastewater: Sewer available to this project.
Entergy: No comment received.
Centerpoint Energy: No comment received.
AT&T (SBC): No comment received.
3
January 10, 2013
ITEM NO.: 7(Cont.)FILE NO.: Z-8826
Water: All Central Arkansas Water requirements in effect at the time of
request for water service must be met.
The Little Rock Fire Department needs to evaluate this site to determine
whether additional public and/or private fire hydrant(s) will be required. If
additional fire hydrant(s) are required, they will be installed at the
Developer's expense.
Please submit plans for water facilities and/or fire protection system to
Central Arkansas Water for review. Plan revisions may be required after
additional review. Contact Central Arkansas Water regarding procedures
for installation of water facilities and/or fire service. Approval of plans by
the Arkansas Department of Health Engineering Division and Little Rock
Fire Department is required.
Contact Central Arkansas Water regarding the size and location of the
water meter.
If there are facilities that need to be adjusted and/or relocated, contact
Central Arkansas Water. That work would be done at the expense of the
developer.
Due to the nature of this facility, installation of an approved reduced
pressure zone backflow preventer assembly (RPZ) is required on the
domestic water service. This assembly must be installed prior to the first
point of use. Central Arkansas Water (CAW) requires that upon
installation of the RPZA, successful tests of the assembly must be
completed by a Certified Assembly Tester licensed by the State of
Arkansas and approved by CAW. The test results must be sent to CAW's
Cross Connection Section within ten days of installation and annually
thereafter. Contact the Cross Connection Section at 377-1226 if you
would like to discuss backflow prevention requirements for this project.
The facilities on -site will be private. When meters are planned off private
lines, private facilities shall be installed to Central Arkansas Water's
material and construction specifications and installation will be inspected
by an engineer, licensed to practice in the State of Arkansas. Execution of
Customer Owned Line Agreement is required.
Fire Department: Fire hydrants (per Code). Maintain access of at least
twenty (20) feet.
County Planning: No Comments.
CATA: The site is located on a CATA bus route.
n
January 10, 2013
ITEM NO.: 7(Cont.)FILE NO.: Z-8826
SUBDIVISION COMMITTEE COMMENT: (DECEMBER 20, 2012)
The applicant was present. Staff asked the applicant to provide a copy of the
existing bill of assurance, a signage plan and a fencing plan. Staff asked what
the proposed days and hours of operation would be. It was noted that access to
the site off of Roosevelt was across the adjacent lot and the survey did not
indicate an access easement to allow the shared access. It was noted that a
variance was requested to allow a reduced setback on the west side.
Public Works, Utility and Landscape Comments were presented and discussed.
It was noted Roosevelt Road was a state highway and coordination with AHTD
was required. Staff stated the cross access easement for the driveway over the
adjacent property would need to be platted prior to building permit submittal.
The applicant was advised to respond to staff issues by December 26, 2012.
The Committee determined there were no other issues and forwarded the item to
the full Commission.
STAFF ANALYSIS:
A conditional use permit is requested to allow for the construction of a new, 9,180
square foot Family Dollar Store on the 1-2 zoned, 1.07 acre tract located at 801
East Roosevelt Road. A vacant bank building which currently occupies the site
will be removed.
The building will be one story in height and will have a masonry finish on the front
with a metal parapet. Sides and rear of the building will be a tan -colored metal.
The building will have a low sloped, metal roof. Paved parking for 38 vehicles
will be located in front and beside the store. Access will be via a shared
driveway over the lot to the west. The delivery area is off of the private drive at
the rear of the store. Signage will consist of a single ground -mounted sign which
complies with the 1-2 district standard (20' in height and 72 square feet in area)
and wall signs on the front and side facades of the building. The wall sign on the
west side requires a variance since that side does not have direct street frontage.
Days and hours of operation are 8:00 — 9:00 p.m., Monday through Saturday and
9:00 a.m. — 9:00 p.m., Sunday. No fencing is proposed other than the screening
fence around the dumpsters and a chainlink fence around the mechanical units
for security. A variance is requested to allow a setback of 0 feet on the west
side. If the property were zoned C-3, no setback would be required. However, in
1-2, a 15-foot side yard is required. Staff is supportive of the setback variance.
Both lots are currently owned by the same entity. The presence of a shared
driveway and a parking area on that adjacent lot provides adequate separation
from any future use on that lot.
5
January 10, 2013
ITEM NO.: 7 (Cont.) FILE NO.: Z-8826
The applicant submitted responses addressing most of the issues raised at
Subdivision Committee. Sidewalks on Roosevelt and the private street to the
east are shown as required. The driveway width on Roosevelt Road has been
reduced to 36 feet. All access easements for the private streets and shared
driveway will be executed prior to building permit submittal. Underground
stormwater detention will be provided. Landscape areas have been increased to
comply with requirements. The site is located in the designated mature area of
the City which does allow for some reduction in buffer and landscape areas. The
applicant states there is no current bill of assurance for this tract. Lighting is not
indicated on the plan but any site lighting should be low-level and directional,
aimed downward and into the site.
There remains only one outstanding issue. Staff has called for placement of a
sidewalk along the private drive on the south side of the tract. The applicant has
requested not to have to install that sidewalk. As of this writing, that issue had
not been resolved.
Otherwise, staff supports the requested CUP, including the building setback and
wall sign variances.
STAFF RECOMMENDATION:
Staff's recommendation is forthcoming.
PLANNING COMMISSION ACTION: (JANUARY 10, 2013)
The applicant was present. There were no objectors present. Staff informed the
commission that Public Works had taken another look at the application and
plan. The industrial zoned subdivision has no existing sidewalks except along
Roosevelt Road which is a public street. The other two streets adjacent to the
site are private streets and do not have sidewalks. The developer is widening
Roosevelt Road and installing a sidewalk. A sidewalk is also being installed
adjacent to McAlmont Street which is the private street located east of the site
and which provides an entrance to the subdivision. It has been determined that a
sidewalk is no longer required to be installed along the private street located
south of the site.
In light of the resolution of the sidewalk issue, staff recommended approval of the
requested CUP subject to compliance with the following conditions:
1. Compliance with the comments and conditions outlined in Sections 4, 5 and 6
of the agenda staff report.
January 10, 2013
ITEM NO.: 7(Cont.)FILE NO.: Z-8826
2. All site lighting is to be low-level and directional, shielded downward and into
the site.
Staff recommended approval of variances to allow a zero (0) foot setback on the
west perimeter and to allow a wall sign on the west fagade without direct street
frontage. There was no further discussion. The item was placed on the consent
agenda and approved as recommended by staff. The vote was 9 ayes, 0 noes,
1 absent and 1 open position.
F
ITEM NO.: 7. FAMILY DOLLAR STORE CONDITIONAL USE PERMIT
801 E. ROOSEVELT ROAD Z-8826
Planning Staff Comments:
1. Provide a copy of the existing Bill of Assurance for the site; available at the Pulaski County Circuit Clerk's
office.
2. Access is proposed on the property to the west. No access easement is indicated. Provide proof of access
easement.
3. Provide signage plan.
4. Provide days and hours of operation.
5. All site lighting is to be low-level and directional, aimed downward and into the site.
6. Indicate and describe any proposed fencing.
Variance/Waivers:
• Zero foot setback on west side
Public Works:
1. At time of building permit, sidewalks with appropriate handicap ramps are required in accordance with
Section 31-175 of the Little Rock Code and the Master Street Plan. Sidewalk should be constructed on
McAlmont Street and the private drive on the south. The back of the sidewalk adjacent to Roosevelt should
be placed at the property line. The back of the sidewalk adjacent to McAlmont Street and the south private
drive should be located twelve (12) feet off the back of curb.
2. With site development, provide design of street conforming to the Master Street Plan. Construct one-half
street improvement to Roosevelt Road including five (5) foot sidewalks with planned development.
3. At time of building permit, repair or replace any curb and gutter or sidewalk that is damaged in the public
right-of-way prior to occupancy.
4. Plans of all work in right-of-way shall be submitted for approval prior to start of work. Obtain barricade
permit prior to doing any work in the right-of-way from Traffic Engineering at (501) 379-1805 (Travis
Herbner).
5. At time of building permit, obtain permits for improvements within State Highway right-of-way from
AHTD, District VI.
6. A grading permit in accordance with Section 29-186 (c) & (d) will be required prior to any land clearing or
grading activities at the site. Other than residential subdivisions, site grading and drainage plans must be
submitted and approved prior to the start of construction.
7. Storm water detention ordinance applies to this property. Show the proposed location for storm water
detention facilities on the plan. If it is believed detenI ioii does not apply, calculations must be provided
showing the pre and post impervious area.
8. The private streets should be located in platted access easements.
9. The driveway to the site off Roosevelt Road should be located within an access easement.
10. If disturbed area is one or more acres, obtain a NPDES storm water permit from the Arkansas Department
of Environmental Quality prior to the start of construction.
11. A special Grading Permit for Flood Hazard Areas will be required per Section 8-283 prior to construction.
An elevation certificate is required to be provided prior to issuance of the certificate of occupancy.
12. The minimum finish floor elevation of at least one foot above the base flood elevation is required to be
shown on plat and grading plans. The mechanical equipment for the structure must be elevated to above
the base flood elevation.
13. Currently, Roosevelt Road at this location floods during intense rain events.
14. One site striping and signage plans should be forwarded to Public Works, Traffic Engineering for approval
with the site development package.
ITEM NO.: 7. CON'T Z-8826
15. Driveway locations and widths do not meet the traffic access and circulation requirements of Sections 30-
43 and 31-210. The width of driveway must not exceed thirty-six (36) feet.
Utilities and Fire De artment/Coun Planning:
Wastewater: Sewer available to this project.
Entergy: No comment received.
Centerpoint Energy: No comment received.
AT&T (SBC): No comment received.
Water: All Central Arkansas Water requirements in effect at the time of request for water service must be met.
The Little Rock Fire Department needs to evaluate this site to determine whether additional public and/or private
fire hydrant(s) will be required. If additional fire hydrant(s) are required, they will be installed at the Developer's
expense.
Please submit plans for water facilities and/or fire protection system to Central Arkansas Water for review. Plan
revisions may be required after additional review. Contact Central Arkansas Water regarding procedures for
installation of water facilities and/or fire service. Approval of plans by the Arkansas Department of Health
Engineering Division and Little Rock Fire Department is required.
Contact Central Arkansas Water regarding the size and location of the water meter.
If there are facilities that need to be adjusted and/or relocated, contact Central Arkansas Water. That work would
be done at the expense of the developer.
Due to the nature of this facility, installation of an approved reduced pressure zone backflow preventer assembly
(RPZ) is required on the domestic water service. This assembly must be installed prior to the first point of use.
Central Arkansas Water (CAW) requires that upon installation of the RPZA, successful tests of the assembly must
be completed by a Certified Assembly Tester licensed by the State of Arkansas and approved by CAW. The test
results must be sent to CAW's Cross Connection Section within ten days of installation and annually thereafter.
Contact the Cross Connection Section at 377-1226 if you would like to discuss backflow prevention requirements
for this project.
The facilities on -site will be private. When meters are planned off private lines, private facilities shall be installed
to Central Arkansas Water's material and construction specifications and installation will be inspected by an
engineer, licensed to practice in the State of Arkansas. Execution of Customer Owned Line Agreement is required.
Fire Department: Fire hydrants (per Code). Maintain access of at least twenty (20) feet.
County Planning: No Comments.
CATA: The site is located on a CATA bus route.
PIanning Division_ No Comments.
Landscape: Site plan must comply with the City's minimal landscape and buffer ordinance requirements.
The zoning buffer ordinance requires an average twelve foot (12') wide street buffer along E. Roosevelt Road and
in no case to be less than nine foot (9').
The landscape ordinance requires a nine foot (9') wide landscape strip around the sites entirety. Currently, there
are three (3) locations this minimal amount is not being met. Along the northern property line and along the
ITEM NO.: 7. (CON'T). (Z-8826)
western property line; revise. A variance from this minimal requirement must be obtained from the City Beautiful
Commission prior to the issuance of a building permit.
The landscape ordinance requires building landscaping currently there is zero (0) being proposed. A variance from
this minimal requirement must be obtained from the City Beautiful Commission prior to the issuance of a building
permit.
Other: Submit responses to staff issues and four (4) copies of a revised site plan (if required) no later than
Wednesday December 26, 2012. Required notices are to be sent via certified mail to all owners of properties
located within two hundred (200) feet of the site no later than Wednesday December 26, 2012. The City -provided
notice form must be used. Proof of notice is to be provided to staff no later than January 4, 2013.