HomeMy WebLinkAboutZ-8817 Staff AnalysisFILE NO.: Z-8817
NAME: Stone's Throw Brewing Short -form PD-C
LOCATION: Located at 402 E. 9th Street
DEVELOPER:
Theron Cash
Stone's Throw Brewing, LLC
7 Creekside Court
Little Rock, AR 72211
SURVEYOR:
Brooks Surveying, Inc.
20820 Arch Street Pike
Hensley, AR 72065
AREA: 0.092 acres NUMBER OF LOTS: 1 lot
CURRENT ZONING: R-4A
ALLOWED USES
PROPOSED ZONING:
PROPOSED USE:
Multi -family residential
PD-C
FT. NEW STREET: 0 LF
Add a brewery as an allowable uses
VARIANCES/WAIVERS REQUESTED: None requested.
A. PROPOSAL/REQUEST/APPLICANT'S STATEMENT:
The applicant is requesting a zoning change for the property located at 402 East
Ninth Street from R-4A to PD-C. The applicant is requesting the rezoning to
allow use of the existing building as a Microbrewery. The outward appearance
and form of the property will remain unaltered. The business will be created and
operated within the confines of the Arkansas Native Brewery Act as established
in Title 3 of Arkansas Code, Subchapter 12, as well as all applicable Federal
Laws. 1,900 square feet of the building will be dedicated to production and
storage of beer and malt beverage. This includes all consumables and
equipment required.
FILE NO.: Z-8817 (Cont.)
A small portion of the space is planned to be used as a small tasting room, with a
limited retail function, to be used in conjunction with brewing tours, as required in
regulations. In the tasting room small samples of product will be given after the
tour, with opportunity to buy packages for off premise consumption, as well as
by -the -glass sales. Within the area 750 square feet will be brewery production,
320 square feet for keg cleaning, 235 square feet for storage and cooler space,
360 square feet for the tasting room and 110 square feet for the tasting bar.
There will be a maximum occupancy of 20 customers within the bar area. The
hours of operation for the tour and retail aspect of the business are very limited.
B. EXISTING CONDITIONS:
This area contains a mixture of uses including the Arts Center, a high rise
multi -family building, offices and single-family homes. There are two (2) large
churches in the area, a homeless day center and retail uses. The building was
constructed as a non-residential building and has housed a number of uses over
the years. There is currently a barber shop on the lower level with a residence
on the upper level. There is a graveled parking lot to the north of the building
which provides parking for the building.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has received a few informational phone calls from area
residents. All property owners located within 200 feet of the site, the MacArthur
Park Property Owners Association and the Downtown Neighborhood Association
were notified of the public hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Repair or replace any curb and gutter or sidewalk that is damaged in the
public right-of-way prior to occupancy. Sidewalk is damaged adjacent to
Rock Street.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer service unknown for this property. Sewer main located in
alley east of the property. Contact Little Rock Wastewater for additional
information.
Entergy: No comment received.
Center -Point Energy: No comment received.
AT & T: No comment received.
2
FILE NO.: Z-8817 Cont.
Central Arkansas Water: All Central Arkansas Water requirements in effect at
the time of request for water service must be met. Contact Central Arkansas
Water regarding the size and location of the water meters. If there are facilities
that need to be adjusted and/or relocated, contact Central Arkansas Water. That
work would be done at the expense of the developer. Contact Central Arkansas
Water if additional fire protection or metered water service is required. The Little
Rock Fire Department needs to evaluate this site to determine whether additional
public and/or private fire hydrant(s) will be required. If additional fire hydrant(s)
are required, they will be installed at the Developer's expense. Due to the nature
of the facility, installation of an approved reduced pressure zone backflow
preventer assembly (RPZ) is required on the domestic water service. This
assembly must be installed prior to the first point of use. Central Arkansas Water
requires that upon installation of the RPZ assembly, successful test of the
assembly must be completed by a Certified Assembly Tester licensed by the
State of Arkansas and approved by Central Arkansas Water. The test results
must be sent to Central Arkansas Water's Cross Connection Section within ten
(10) days of installation and annually thereafter. Contact the Cross Connection
Section at 377-1226 if you would like to discuss backflow prevention
requirements for this project.
Fire Department: Approved as submitted.
County Planning: No comment.
CATA: The site is located within a few blocks of several central CATA Bus
Routes. The CATA Bus Route #20 — the College Station Route, runs along East
9th Street adjacent to this site. CATA Bus Routes #2, #16, #19 and #20 travel
north and south along S. Scott Street which is located two (2) blocks west of the
site.
Parks and Recreation: No comment received.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division: This request is located in the Downtown Planning District.
The Land Use Plan shows Residential Medium Density (RM) for this property.
The Residential Medium Density category accommodates a broad range of
housing types including single family attached, single family detached, duplex,
town homes, multi -family and patio or garden homes. Any combination of these
and possibly other housing types may fall in this category provided that the
density is between six (6) and twelve (12) dwelling units per acre. The applicant
has applied for a rezoning from R-4A (Low Density Residential District) to PD-C
(Planned District Commercial) to allow for the use of the existing structure for a
Micro -Brewery.
Master Street Plan: 9th Street is a Collector and Rock Street is a Local Street on
the Master Street Plan. The primary function of a Collector Street is to provide a
connection from Local Streets to Arterials. The primary function of a Local Street
3
FILE NO.: Z-8817 (Cont.
is to provide access to adjacent properties. Local Streets that are abutted by
non-residential zoning/use or more intensive zoning than duplexes are
considered as "Commercial Streets". A Collector design standard is used for
Commercial Streets. These streets may require dedication of right-of-way and
may require street improvements for entrances and exits to the site.
Bicycle Plan: There are no bike routes shown in the immediate vicinity.
Landscape:
1. Site plan must comply with the City's landscape and buffer ordinance
requirements.
2. Landscaping, per Chapter 15 of the City of Little Rock's Landscape
Ordinance, will be required in conjunction with any new parking associated
with this site.
G. SUBDIVISION COMMITTEE COMMENT: (November 15, 2012)
The applicants were present representing the request. Staff presented an
overview of the development stating there were a number of questions
concerning the process of brewing. Staff also questioned if the applicant would
be using the parking lot located to the north of the site. Staff questioned the days
and hours of operation and if there would be any events held at the site such as
tastings. Staff also questioned if the existing residential use would continue on
the upper floor of the building.
Public Works comments were addressed. Staff stated customer access and
parking to the site was very limited. Staff also stated any broken curb, gutter or
sidewalk located within the public right of way was to be repaired prior to the
issuance of a certificate of occupancy.
Landscaping comments were addressed. Staff stated street trees were
recommended within this area. Staff also stated any new paved areas would
require landscaping to meet the City's Landscape Ordinance requirements.
Staff noted comments from the other reporting departments and agencies
suggesting the applicant contact them individually for additional clarification.
There was no further discussion of the item. The Committee then forwarded the
item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised cover letter to staff addressing a number of the
issues raised at the November 15, 2012, Subdivision Committee meeting. The
revised cover letter states the ingredients will include grains and hops which will
be received in bulk. The applicant states orders will be enough to satisfy the
needs for two to three months. The deliveries will be made by truck or box van.
4
The goods as well as all the products and equipment will be stored internally to
the building. All excess waste including spent grains and water will be disposed
of properly. Water will be expelled to the sanitary sewer by use of floor drains.
The spent grains will be stored in a bin internally to the building until they are
picked up to be used in livestock feed.
There are no employees of the business. There are four members of the LLC
who will brew the products. The brewing hours will be during daylight hours and
on weekends. There is limited noise produced by the brewing process. Limiting
the brewing hours to daylight hours will minimize impacts on the nearby
residential uses.
The applicant plans for retail sales and tasting as a portion of the business.
There will not be set days and hours of operation but it is anticipated the retail
business will not be open more than five (5) days per week with the hours
between 2 pm and 9 pm. Special tasting events will occasionally be held but no
more than 12 per year. The events will be during normal business hours on the
weekends. During weekday events the applicant has stated they will be open
slightly later than 10 pm. Staff is unclear on the proposed closing time and feels
all events and sales should be limited to 2 pm to 9 pm.
The brewery will not occupy the entire building. On the ground level, there is a
barber shop. Above the barber shop is an apartment which is currently occupied.
The applicant has stated they do have access to an adjacent parking lot. There
are approximately ten (10) spaces within the parking area. The applicant has
access to five (5) of the spaces. The parking area is graveled. The McArthur
Park Guidelines for Rehabilitation and New Construction states parking for
commercial, office and institutional parking should be limited to the rear yard
area. If this is not possible, parking may be in a side yard but located to the rear
of the front wall of the structure. Fencing or shrubbery should screen the parking
area. Parking lots between buildings should align edge screening with the front
facades of adjacent buildings and the site property lines. Parking areas should
be surfaced with gravel or concrete, not asphalt, aggregate or brick. Any
modification to the paved areas must be approved by the McArthur Park Historic
District Commission.
The applicant is not proposing any ground signage. The site is located within the
McArthur Park Historic District which regulates signage. The guidelines for
rehabilitation and new construction state signs attached to the building should not
cover or obscure architectural features. The Guidelines for Commercial
Structures states signs on commercial buildings should be in proportion to the
building and should be made of historic materials, such as finished carved wood,
glass, copper or bronze letters. Signs of plastic, plywood or unfinished wood are
not appropriate. Signs should be placed at traditional locations, such as on
storefront beltcourses, upper fagade walls, hanging or mounted inside windows,
FILE NO.: Z-8817 (Cont.
or projecting from the face of the building. Lighting for signs should be
concealed; up -lit or spot lighting is recommended. "Ghost" signs (historic painted
wall signs, frequently on sides of brick building) should be preserved and not
removed. All signs must be approved by the McArthur Park Historic District
Commission.
Staff is supportive of the request. Staff feels however the existing parking area
should be resurfaced with a hard surface material. Staff is supportive of a
deferral of the hard surfacing material for a period of two (2) years. The applicant
will need to coordinate with the Historic District Commission on the preferred
materials and construction specifications. At the time of resurfacing additional
landscaping may be required. Staff feels the rezoning of this building from R4-A
to PD-C to allow the continued use of the building as a barber shop and a
residential unit and to add a brewery to the building is appropriate provided the
applicant provide the upgrades to the existing parking area.
STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
comments and conditions as outlined in paragraphs D, E and F of the agenda
staff report.
Staff recommends the existing parking area be resurfaced with a hard surface
material within two (2) years of the date of the issuance of the certificate of
occupancy for the building.
PLANNING COMMISSION ACTI
(DECEMBER 13, 2012)
The applicants were present. There were no registered objectors present. Staff
presented the item with a recommendation of approval of the request subject to
compliance with the comments and conditions as outlined in paragraphs D, E and F of
the agenda staff report. Staff also presented a recommendation the existing parking
area be resurfaced with a hard surface material within two (2) years of the date of the
issuance of the certificate of occupancy for the building.
There was no further discussion of the item. The Chair entertained a motion for
approval of the item as presented by staff on the Consent Agenda. The motion carried
by a vote of 8 ayes, 0 noes and 3 absent.
A
ITEM NO.: 12,
NAME: Stone's Throw Brewing Short -form PD-1
LOCATION: located at 402 E. 9th Street
Planning Staff Comments:
1. Provide notification of the property owners located within 200-feet of the site
including the certified abstract list, notice form with affidavit executed and proof of
mailing. The notice must be mailed no later than November 28, 2012. The Office of
Planning and Development must receive the proof of notice no later than December
7, 2012.
2. How are ingredients received by the business? Are there bulk materials involved in
the manufacture/brewing process?
3. Are there excess waste products produced from the brewing process? Where will
the waste product be stored? How will the waste product be disposed of?
4. Are there employees of the business? If so provide the number of persons reporting
to the building for employment on a daily basis or on a contractual basis.
5. Provide the days and hours of operation for the brewery.
6. Will there be customers accessing the site for purchase or tasting of the product? If
so provide the hours of service.
7. Will the brewery hold tasting events? If so provide the number of monthly/yearly
events and the time frame for the events.
8. Will the brewery occupy the entire building at this location? If not what other
activities will take place.
9. Does the brewery have access to the adjoining parking lot to the north? Are there
any agreements in place to provide parking to serve the brewery?
10. Will there be a dumpster located on the site? If so provide the location for the
dumpster and a note indicating if the hours of dumpster service will be limited to
daylight hours?
Variance/Waivers: None requested.
Public Works Conditions:
1. Repair or replace any curb and gutter or sidewalk that is damaged in the public right-
of-way prior to occupancy. Sidewalk is damaged adjacent to Rock Street.
2. Customer access to the site is very limited. No parking is provided on -site for
customers.
Utilities and Fire Department/County Planning:
Wastewater: Sewer service unknown for this property. Sewer main located in alley
east of the property. Contact Little Rock Wastewater for additional information.
Entergy: No comment received.
Item # 12.
Center -Point Energy: No comment received.
AT & T: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at the time
of request for water service must be met. Contact Central Arkansas Water regarding
the size and location of the water meters. If there are facilities that need to be adjusted
and/or relocated, contact Central Arkansas Water. That work would be done at the
expense of the developer. Contact Central Arkansas Water if additional fire protection
or metered water service is required. The Little Rock Fire Department needs to
evaluate this site to determine whether additional public and/or private fire hydrant(s)
will be required. If additional fire hydrant(s) are required, they will be installed at the
Developer's expense. Due to the nature of the facility, installation of an approved
reduced pressure zone backflow preventer assembly (RPZ) is required on the domestic
water service. This assembly must be installed prior to the first point of use. Central
Arkansas Water requires that upon installation of the RPZ assembly, successful test of
the assembly must be completed by a Certified Assembly Tester licensed by the State
of Arkansas and approved by Central Arkansas Water. The test results must be sent to
Central Arkansas Water's Cross Connection Section within ten (10) days of installation
and annually thereafter. Contact the Cross Connection Section at 377-1226 if you
would like to discuss backflow prevention requirements for this project.
Fire Department: Approved as submitted.
County Planning: No comment.
CATA: The site is located within a few blocks of two central CATA Bus Routes. The
CATA Bus Route #20 — the College Station Route, runs along East 9th Street adjacent
to this site. CATA Bus Routes #2, #16, #19 and #20 travel north and south along S.
Scott Street which is located two (2) blocks west of the site.
Parks and Recreation: No comment received.
Planning Division: This request is located in the Downtown Planning District. The Land
Use Plan shows Residential Medium Density (RM) for this property. The Residential
Medium Density category accommodates a broad range of housing types including
single family attached, single family detached, duplex, town homes, multi -family and
patio or garden homes. Any combination of these and possibly other housing types may
fall in this category provided that the density is between six (6) and twelve (12) dwelling
units per acre. The applicant has applied for a rezoning from R-4A (Low Density
Residential District) to PDI (Planned District Industrial) to allow for the use of the
existing structure for a Micro -Brewery.
Master Street Plan:
Master Street Plan.
from Local Streets
access to adjacen
t
Item # 12.
Streets". A Collector design standard is used for Commercial Streets. These streets
may require dedication of right-of-way and may require street improvements for
entrances and exits to the site.
Bicycle Plan: There are no bike routes shown in the immediate vicinity.
Landscape.
1. Site plan must comply with the City's landscape and buffer ordinance requirements.
2. Street trees being planted are highly recommended.
3. Landscaping, per Chapter 15 of the City of Little Rock's Landscape Ordinance, will
be required in conjunction with any new parking associated with this site.
Revised plat/plan: Submit four (4) copies of a revised preliminary plat/plan (to include
the additional information as noted above) to staff on Wednesday, November 21, 2012.
Item # 12.