Loading...
HomeMy WebLinkAboutZ-8646 Staff AnalysisITEM NO.: 17. NAME: 13th Street Short -form PD-R Z-8646 LOCATION: located North of West 13th Street between South Park and Dennison Streets Planning Staff Comments: 1. Provide notification of property owners located within 200-feet of the site, complete with the certified abstract list, notice form with affidavit executed and proof of mailing. The notice must be mailed no later than April 6, 2011. The Office of Planning and Development must receive the proof of notice no later than April 15, 2011. 2. The site is located within the Central High DOD. The ordinance states the front building setback shall be 15-feet. All other setbacks are to (shall) match the zoning ordinance — 25-foot rear, 5-foot side. 3. The overlay has specific design requirements. Provide staff with building elevations to determine if the proposed development is in compliance with the DOD. 4. Provide details of the proposed construction materials. Provide the roof pitch of the homes. Each of the homes must have a front porch. 5. Provide details of any proposed fencing including location, construction material and total height. 6. The parking located along South Dennison Street should be relocated away from the street. 7. Where will be mechanical equipment be located on the lots? 8. All utilities within the development are to be buried. 9. Trees greater than 14-inches in diameter shall be protected from removal and damage. Locate all trees greater than 14-inches in diameter on the site plan. Tree removal can only be done if approved by the City's Urban Forester. 10. The DOD requires the placement of two trees in the front yard setback. The species of tree are to be selected from the list of appropriate trees listed in Chapter 15. 11. Stop the access easement at the rear of the homes. 12. Label all setbacks. VarianceA[Vaivers: None requested. Public Works Conditions: 1. A 20-foot radial dedication of right-of-way is required at the intersection of South Park Street and West 13th Street. 2. A 20-foot radial dedication of right-of-way is required at the intersection of South Dennison Street and West 13th Street. 3. Repair or replace any curb and gutter or sidewalk that is damaged in the public right- of-way prior to occupancy. 4. If disturbed area is one (1) or more acres, obtain a NPDES stormwater permit from Item #�i.� the Arkansas Department of Environmental Quality prior to the start of construction. 5. Remove old curb cuts adjacent to these properties. Utilities and Fire Department/County Planning: Wastewater: Sewer main extension required with easements for Lots 1, 2, 4 and 5. Contact the Little Rock Wastewater Utility for additional information. Entergy: Property owners are responsible for cost of relocating power lines. Contact Entergy for additional information. Center -Point Energy: No comment received. AT & T: No comment received. Central Arkansas Water: All Central Arkansas Water requirements in effect at the time of request for water service must be met. The Little Rock Fire Department needs to evaluate this site to determine whether additional public and/or private fire hydrant(s) are required. If additional fire hydrant(s) are required, they will be installed at the Developer's expense. Submit plans for water facilities and/or fire projection system to Central Arkansas Water for review. Plan revisions may be required after additional review. Approval of plans by Central Arkansas Water, the Arkansas Department of Health Engineering Division and the Little Rock Fire Department is required. Contact Central Arkansas Water regarding the size and location of the water meter. Fire Department: Place fire hydrants per code. Contact the Little Rock Fire Department for additional information. County Planning: No comment. CATA: Approved as submitted. The site is not located on a dedicated CATA Bus Route. Parks and Recreation: No comment. Planning Division: This request is located in the Central City Planning District. The Land Use Plan shows Residential Low Density for this property. The applicant has applied for a rezoning to Planned Development Residential to allow the redevelopment of the 13th Street block face with five (5) two-story residential structures each totaling approximately 1,800 square feet. Master Street Plan: Park Street, Dennison Street and West 13th Street are all Local Streets. The primary function of a Local Street is to provide access to adjacent properties. Local Streets which are abutted by non-residential zoning/use or more intensive zoning than duplexes are considered as "Commercial Streets". These streets have a design standard the same as a Collector. These streets may require dedication of right-of-way and may require street improvements for entrances and exits to the site. Bicycle Plan: There are no bike routes shown in the immediate vicinity. Item #� Landscape: No comment on this single-family development. Revised plat/plan: Submit four (4) copies of a revised preliminary plat/plan (to include the additional information as noted above) to staff on Wednesday, April 6, 2011. Item # August 25, 2011 ITEM NO.: A NAME: 13th Street Short -form PD-R FILE NO.: Z-8646 LOCATION: Located North of West 13th Street between South Park and Dennison Streets DEVELOPER: Vann & Associates P.O. Box 164681 Little Rock, AR 72206 FNC11INFFR Crafton, Tull and Associates 10825 Financial Centre Parkway, Suite 300 Little Rock, AR 72211 AREA: 0.344 acres CURRENT ZONING: ALLOWED USES: OPOSED ZONING NUMBER OF LOTS: 5 R-4, Two-family FT. NEW STREET: 0 LF Single-family and Two-family Residential M PROPOSED USE: Single -family —Create 5 lots VARIANCES/WAIVERS REQUESTED: None requested. A. PROPOSAL/REQUEST/APPLICANTS STATEMENT: The application request is a rezoning from R-4, two-family to PD-R to allow the redevelopment of this site with single-family homes. The development consists of five, two story residential structures each totaling approximately 1,800 square feet. The site is located within the Central High Design Overlay District. Off-street parking will be provided for the residents. Some portions of the existing sidewalks and curb and gutter will be reconstructed as a result of construction of the new driveways. On -street parking on West 13th, South Park and Dennison Streets will remain. A six foot wood privacy fence will be installed along the north property line that separates this development from adjacent August 25, 2011 SUBDIVISION ITEM NO.: A FILE NO.: Z-86 properties on South Park and Dennison Streets. Front yard setbacks will be 7.5-feet on 13th Street. Side yard setbacks will be five feet on the interior and ten feet on South Park and Dennison Streets. A 7.5-foot rear yard setback is proposed. Existing trees not in direct conflict with the proposed development will be protected during construction. Additional landscaping will be installed to comply with City ordinance and the DOD requirements. B. EXISTING CONDITIONS: The property is a narrow strip, which is currently vacant, fronting on West 13th Street. East of the site fronting Park Street are single-family homes, the Central High Visitor Center and three residential buildings currently under construction by the Little Rock Housing Authority. Across West 13th Street to the south are single-family homes, a parking lot serving Central High School and further south is the Central High School Campus. West of the site on Dennison Street is a multi -family building and a bar located just south of West 12th Street. C. NEIGHBORHOOD COMMENTS: As of this writing, staff has received a number of informational phone calls from area property owners. All property owners located within 200 feet of the site, all residents, who could be identified, located within 300 feet of the site, the Central High Neighborhood Association and the Capitol Hill Neighborhood Association were notified of the public hearing. D. ENGINEERING COMMENTS: PUBLIC WORKS CONDITIONS: 1. A 20-foot radial dedication of right-of-way is required at the intersection of South Park Street and West 13th Street. 2. A 20-foot radial dedication of right-of-way is required at the intersection of South Dennison Street and West 13tt' Street. 3. Repair or replace any curb and gutter or sidewalk that is damaged in the public right-of-way prior to occupancy. 4. If disturbed area is one (1) or more acres, obtain a NPDES stormwater permit from the Arkansas Department of Environmental Quality prior to the start of construction. 5. Remove old curb cuts adjacent to these properties. 2 August 25, 2011 SI IRniVi.oinN ITEM NO.: A Cont. FILE NO.: Z-8646 E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING: Wastewater: Sewer main extension required with easements for Lots 1, 2, 4 and 5. Contact the Little Rock Wastewater Utility for additional information. Enter : Property owners are responsible for cost of relocating power lines. Contact Entergy for additional information. Center -Point Energy: Approved as submitted. AT & T: No comment received. Central Arkansas Water: All Central Arkansas Water requirements in effect at the time of request for water service must be met. The Little Rock Fire Department needs to evaluate this site to determine whether additional public and/or private fire hydrant(s) are required. If additional fire hydrant(s) are required, they will be installed at the Developer's expense. Submit plans for water facilities and/or fire projection system to Central Arkansas Water for review. Plan revisions may be required after additional review. Approval of plans by Central Arkansas Water, the Arkansas Department of Health Engineering Division and the Little Rock Fire Department is required. Contact Central Arkansas Water regarding the size and location of the water meter. Fire Department: Place fire hydrants per code. Contact the Little Rock Fire Department for additional information. County Planning: No comment. CATA: Approved as submitted. The site is not located on a dedicated CATA Bus Route. Parks and Recreation: No comment. F. ISSUES/TECHNICAL/DESIGN: Planning Division: This request is located in the Central City Planning District. The Land Use Plan shows Residential Low Density for this property. The applicant has applied for a rezoning to Planned Development Residential to allow the redevelopment of the 13th Street block face with five (5) two-story residential structures each totaling approximately 1,800 square feet. C3 August 25, 2011 SUBDIVISION ITEM NO.. A (Cont. FILE NO.: Z-8646 Master Street Plan: Park Street, Dennison Street and West 13th Street are all Local Streets. The primary function of a Local Street is to provide access to adjacent properties. Local Streets which are abutted by non-residential zoning/use or more intensive zoning than duplexes are considered as 'Commercial Street'. These streets have a design standard the same as a Collector. These streets may require dedication of right-of-way and may require street improvements for entrances and exits to the site. Bicycle Plan: There are no bike routes shown in the immediate vicinity. Landscape: No comment on this single-family development. G. SUBDIVISION COMMITTEE COMMENT: (March 31, 2011) Mr. Brad Peterson and Mr. Charles Vann were present representing the request. Staff presented an overview of the request stating there were additional items necessary to complete the review process. Staff stated the property was located within the Central High Design Overlay District. Staff stated the site plan as presented did not comply with the typical standards of the DOD. Staff requested additional information concerning the design, location of the mechanical and if there were any trees located on the site. Public Works comments were addressed. Staff stated radial dedications were required at the intersections of 13th and Dennison and 131h and Park Streets. Staff also stated if the disturbed area exceeded one acre an NPDES stromwater permit from the State was required. Staff stated all old curb cuts adjacent to the property were to be removed with the new development. Staff noted comments from the other reporting departments and agencies suggesting the applicant contact them individually for additional clarification. There was no further discussion of the item. The Committee then forwarded the item to the full Commission for final action. H. ANALYSIS: The applicant submitted a revised site plan to staff addressing a number of the issues raised at the March 31, 2011, Subdivision Committee meeting. The revised plan indicates the air conditioning units will be located at the rear of the homes and the site plan notes there are not any significant trees located on the site. The applicant has provided staff with a building elevation for the proposed structures. M August 25, 2011 SUBDIVISION ITEM NO.: A Cont. FILE NO.: Z-8646 The request is to rezone these two (2) residential lots from R-4, Two-family District to PD-R to allow the redevelopment of the site with five (5) single-family homes. The development will consist of five (5), two-story residential structures each totaling approximately 1,800 square feet. The site plan indicates the placement of covered parking as well. Off-street parking will be provided for the residents. Some portions of the existing sidewalks and curb and gutter will be reconstructed as a result of construction of the new driveways. On -street parking on West 131h, South Park and Dennison Streets will remain. The site plan indicates the placement of a six (6) foot wood privacy fence along the north property line that separates this development from adjacent properties on South Park and Dennison Streets. The site plan indicates the placement of a front yard setbacks of 7.5-feet on 13tn Street. A side yard setback of ten (10) feet is proposed on South Park and Dennison Streets. The rear yard setback is indicated at 7.5-feet. The plan indicates the placement of five (5) foot side yard setbacks for Lot 1. The remaining lots are indicated with a shared covered parking area located along the common property line. The applicant has indicated there are no existing trees on the site. A note on the plan indicates additional landscaping will be installed to comply with City ordinance and the DOD requirements. The site is located within the Central High Design Overlay District. The DOD for single-family development states in order to be compatible with the historic nature of the neighborhood, new construction and additions to existing structures shall comply with specific criteria. Plans for new construction, additions and modifications which are subject to the DOD shall be submitted to the Department of Planning and Development. The Planning Department will review the plans for consistency with the detailed requirements of the DOD ordinance and consistency with the historic nature of the district. In the case of an undeveloped block face, the requirements shall relate to the adjacent block faces. The DOD states a roof pitch of less than 8:12 is prohibited. Decorative roof features such as metal cresting, tile ridge caps, or other ornamentation are to be reinstalled when roofing or doing roof repairs. If tile roofs exist they are to be preserved. The materials of the exterior shell must be wood, brick, other masonry, or a material that resembles wood (i.e., vinyl siding, etc.). The orientation of the buildings is to be consistent with that of other structures on the developed block face. The primary entrance is to be consistent with that of other 5 August 25, 2011 SUBDIVISION ITEM NO.: A (Cont. FILE NO.: Z-8646 structures on the developed block face. The front yard setback for all R-2 and R-3 Single-family and R-4 Two-family district zoned property is to be fifteen (15) feet. All other setbacks are to comply with the property's zoning district. Residential structures must have a front porch that is a passageway from the street to the front door of the unit(s) on new residential construction and additions/modifications to the front facade of existing residential structures. Mechanical service equipment (including, but not limited to, air conditioner condensing units, transformers, solar collectors, satellite dishes, etc.) must be located in the rear yards or on a rear -facing roof. No off-street parking pads are allowed between the front of the principal structure and a public street. Surface parking is to be located behind or adjacent to a structure. Driveways are permitted to be installed in the front yard setback, but not between the principal structure and a public street. Parking pads are defined as permanent surfaces of concrete, asphalt, modular pavers, masonry, gravel or other permanent surfaces to be used for the purpose of parking or storage of vehicles. Detached garage and carport locations are to be located to the rear or the principal structure and must not be located in the front setback. Attached garages must have garage door openings that face side streets, interior lot lines, or alleys. Accessory building coverage within the twenty-five (25) foot rear yard setback must be no more than forty (40) percent of the area. Accessory building setbacks are to comply with Sections 36-254 and 36-256 of the Little Rock Code of Ordinances. The applicant has indicated construction materials will comply with those identified in the DOD. The roofs will also exceed an 8:12 pitch. The orientation of the buildings does comply with the homes located on the developed block face along West 13th Street and the primary entrances is consistent with that of other structures on the developed block face. The homes are proposed with a front porch on each of the units. All mechanical service equipment will be located as outlined in the DOD. The development as proposed does not comply with the front yard setback per the DOD of 15-feet. The rear yard setback is also inconsistent with the typical setback prescribed by the DOD. The site plan indicates parking located adjacent to the structure. A detached covered parking area is indicated on the site plan. The covered structures are located beyond the front setback per the DOD. N August 25, 2011 Ri iRniviRinN ITEM NO.: A Cont. FILE NO.: Z-8646 Although the site does not fully comply with the Central High DOD staff is supportive of the request. The primary variation from the DOD is related to the front and rear yard setbacks. Based on the existing lot configuration and the development as proposed the lots do not allow for setbacks as outlined in the DOD. Staff supports this variation because of the development pattern in the area. Staff feels based on the institutional use located just south of this site there is a direct impact on redevelopment of this site. There are two (2) single-family homes located across West 13th Street and a large surface parking lot for Central High School. In addition to the southeast is the Central High School Visitors center. The site is directly impacted by street parking of students and faculty of Central High School. To staffs knowledge there are no remaining outstanding technical issues associated with the request. Staff feels the addition of five (5) single-family homes as proposed should provide a positive impact on the area. STAFF RECOMMENDATION: Staff recommends approval of the request subject to compliance with the comments and conditions as outlined in paragraphs D, E and F of the agenda staff report. PLANNING COMMISSION ACTION: (APRIL 21, 2011) The applicant was present. There was one registered objector present. Staff presented the item stating the applicant was requesting a deferral of the item to the June 2, 2011, public hearing. Staff stated the deferral request would require a waiver of the Commission's By-laws with regard to the late deferral request. There was no further discussion of the item. The Chair entertained a motion for approval of the By-law waiver with regard to the late deferral request. The motion carried by a vote of 10 ayes, 0 noes and 1 absent. The Chair entertained a motion for approval of the item as presented by staff. The motion carried by a vote of 10 ayes, 0 noes and 1 absent. STAFF UPDATE: The applicant submitted a revised site plan to staff reducing the number of units from five (5) to four (4). The site plan indicates the placement of a front yard setbacks of 7.5-feet on 13th Street. A side yard setback of ten (10) feet is proposed on South Park and Dennison Streets. The rear yard setback is indicated at 7.5-feet. The plan 7 August 25, 2011 SUBDIVISION ITEM NO.: A (Cont. FILE NO.: Z-8646 indicates the placement of five (5) foot side yard setbacks. Drives will be extended from West 13th Street to the structures to allow for off-street parking. Within the Central High DOD no off-street parking pads are allowed between the front of the principal structure and a public street. Surface parking is to be located behind or adjacent to a structure. Driveways are permitted to be installed in the front yard setback, but not between the principal structure and a public street. Parking pads are defined as permanent surfaces of concrete, asphalt, modular pavers, masonry, gravel or other permanent surfaces to be used for the purpose of parking or storage of vehicles. The applicant has indicated the parking pads will comply with the typical DOD standard. There has not been a change in the design of the structures from the original submission. The DOD states a roof pitch of less than 8:12 is prohibited. Decorative roof features such as metal cresting, tile ridge caps, or other ornamentation are to be reinstalled when roofing or doing roof repairs. The materials of the exterior shell must be wood, brick, other masonry, or a material that resembles wood (i.e., vinyl siding, etc.). The orientation of the buildings is to be consistent with that of other structures on the developed block face. The primary entrance is to be consistent with that of other structures on the developed block face. The front yard setback for all R-2 and R-3 Single-family and R-4 Two-family district zoned property is to be fifteen (15) feet. All other setbacks are to comply with the property's zoning district. The structures are proposed with a front setback of 7.5 feet which is not consistent wit the typical DOD standard. The rear yard setback is also inconsistent with the typical setback prescribed by the DOD (7.5-feet). Residential structures must have a front porch that is a passageway from the street to the front door of the unit(s) on new residential construction and additions/modifications to the front facade of existing residential structures. Mechanical service equipment must be located in the rear yards or on a rear -facing roof. The development will comply with the DOD requirements. Staff continues to support the request although there are variations with the Central High DOD. The primary variation from the DOD is related to the front and rear yard setbacks. Based on the existing lot configuration and the development as proposed the lots do not allow for setbacks as outlined in the DOD. As previously stated staff supports the variation because of the development pattern in the area. Staff continues to feel based on the institutional use located just south of this site there is a direct impact on redevelopment of these lots. There are two (2) single-family homes located across West 13th Street and a large surface parking lot for Central High School along with the Central High School Visitors center located to the southeast. The site is directly impacted by street parking of students and faculty of Central High School. IQ August 25, 2011 SUBDIVISION Cont. FILE NO.: Z-8646 The property is currently zoned R-4, Two-family district which would allow for the construction of two (2) duplex structures on these two (2) residential lots resulting in the same density as proposed by the applicant. Staff feels the placement of the single- family homes as proposed will add value to the neighborhood allowing new residents the opportunity to purchase homes in the neighborhood. To staffs knowledge there are no remaining outstanding technical issues associated with the request. Staff recommends approval of the request subject to compliance with the comments and conditions as outlined in paragraphs D, E and F of the agenda staff report. PLANNING COMMISSION ACTION: (JUNE 2, 2011) The applicant was present. There were no registered objectors present. Staff presented the item stating the applicant had submitted a request dated May 19, 2011, requesting a deferral of the item to the July 14, 2011, public hearing. Staff stated the applicant had indicated the deferral request was necessary to allow the applicant and the Central High Neighborhood Association additional time to work through issues related to the site plan. Staff stated they were supportive of the deferral request. There was no further discussion of the item. The chair entertained a motion for approval of the item as presented by staff. The motion carried by a vote of 9 ayes, 0 noes and 2 absent. STAFF UPDATE: Upon further review, staff has discovered an error in the previous analysis. The applicant had indicated there were no trees on the site. There are in fact several trees on the east half of the site. The DOD states: `Trees greater than fourteen (14) inches in diameter measured at four and one-half (4 '/z) feet above ground shall be protected form removal and damages in future development of the district. Any development within fifty (50) feet of any such tree shall be reviewed prior to development to assure protective measures are included and in place. Tree removal can only be done is approved by the Citys Urban Forester" The applicant has been advised to provide a tree survey and to include information pertinent to the trees on the site plan. The plan will then be forwarded to the Urban Forester for review and comment. Staff recommends deferral of this item to the August 25, 2011 agenda with the applicant to submit the required plans prior to the August 4, 2011 Subdivision Committee meeting. 9 August 25, 2011 SUBDIVISION ITEM NO.: A (Cont. FILE NO.: Z-8646 PLANNING COMMISSION ACTION: (JULY 14, 2011) The applicant was not present. There were no objectors present. Staff presented he item and a recommendation of deferral as noted in the staff update above. There was no further discussion. The item was placed on the consent agenda and approved for deferral to the August 25, 2011 meeting by a vote of 10 ayes, 0 noes and 1 absent. STAFF UPDATE: The applicant submitted a revised site plan to staff addressing staffs concerns regarding existing trees on the site. It appears one tree greater than 14-inches, an 18-inch willow oak, will be removed during construction. The tree proposed for removal is located within the northeastern portion of the site on proposed Lot 2. The removal of the tree is necessary to provide parking on this lot. A note on the site plan indicates all other trees will be retained and preserved during construction. Staff has provided the Citys Urban Forester with a copy of the site plan and requested comment concerning the tree removal. As of this writing the Urban Forester has not responded to staff. Modifications have been made to the site plan to aid in minimizing the neighborhood's concerns. The site plan indicates four lots with one house facing Park Street and another facing Dennison Street with two houses which will appear to be"carriage house§' or ancillary structures facing and taking access from 13th Street. The two "carriage house' will be single-family residences on individual lots of record. This is being done to preserve the character of the neighborhood. The style of having a "Main housd' and 'barriage housd' is not uncommon in the neighborhood. The "main house and carriage housd' package will be offered as one package to prospective buyers for ownership and rental property. If this is not marketable, then the'Imain housd' and "carriage housd' will be marketed separately. The front setback for the homes fronting South Dennison and Park Streets is indicated at 15-feet. The front setback for the homes located on West 13th Street are indicated at 5-feet. The rear yards for the homes fronting South Dennison Street and Park Street are indicated at 15-feet. The rear yard for the homes fronting West 13th Street are indicated at 5-feet. All side yard setbacks are indicated at 5-feet. The DOD states the front yard setback shall be 15-feet. All other setbacks shall be as prescribed by the propertys zoning district. The fronts of the homes located on West 131h Street and all rear yard setbacks do not comply with the typical standards of the DOD or the zoning district. The applicant has indicated the development will comply with all other aspects of the Central High DOD with regard to building design, construction materials, tree plantings and the placement of mechanical equipment. 10 August 25, 2011 SUBDIVISION ITEM NO.: A(Cont.)FILE NO.: Z-8546 Staff is supportive of the request. Staff does not feel the proposal to allow redevelopment of this site with four units of residential housing will adversely impact the area. PLANNING COMMISSION ACTION: (AUGUST 25, 2011) The applicant was present. There were no registered objectors present. Staff presented the item stating the City's Urban Forester had reviewed the plan and had approved the removal of the tree located at the northeastern portion of the site. Staff stated the applicant would be required to plant two trees in the front yard of each of the homes, a total of eight (8) trees, to comply with the Central High Design Overlay District requirements. Staff stated the Central High Neighborhood Association had provided them with a letter of support for the development as currently proposed. Staff stated to their knowledge there are no remaining outstanding technical issues associated with the request. Staff presented a recommendation of approval of the request subject to compliance with the comments and conditions as outlined in paragraphs D, E and F of the agenda staff report There was no further discussion of the item. The Chair entertained a motion for approval of the item as presented by staff. The motion carried by a vote of 9 ayes, 0 noes and 2 absent. 11 FILE NO.: Z-8646 NAME: 13th Street Short -form PD-R LOCATION: Located North of West 13th Street between South Park and Dennison Streets DEVELOPER: Vann & Associates P.O. Box 164681 Little Rock, AR 72206 ENGINEER: Crafton, Tull and Associates 10825 Financial Centre Parkway, Suite 300 Little Rock, AR 72211 AREA: 0.344 acres CURRENT ZONING ALLOWED USES PROPOSED ZONING NUMBER OF LOTS: 5 R-4, Two-family FT. NEW STREET: 0 LF Single-family and Two-family Residential -m PROPOSED USE: Single-family — Create 5 lots VARIANCESM/AIVERS REQUESTED: None requested. A. PROPOSAL/REQUEST/APPLICANT'S STATEMENT: The application request is a rezoning from R-4, two-family to PD-R to allow the redevelopment of this site with single-family homes. The development consists of five, two story residential structures each totaling approximately 1,800 square feet. The site is located within the Central High Design Overlay District. Off-street parking will be provided for the residents. Some portions of the existing sidewalks and curb and gutter will be reconstructed as a result of th construction of the new driveways. On -street parking on West 13, South Park FILE NO.: Z-8646 (Cont. and Dennison Streets will remain. A six foot wood privacy fence will be installed along the north property line that separates this development from adjacent properties on South Park and Dennison Streets. Front yard setbacks will be 7.5-feet on 13th Street. Side yard setbacks will be five feet on the interior and ten feet on South Park and Dennison Streets. A 7.5-foot rear yard setback is proposed. Existing trees not in direct conflict with the proposed development will be protected during construction. Additional landscaping will be installed to comply with City ordinance and the DOD requirements. B. EXISTING CONDITIONS: The property is a narrow strip, which is currently vacant, fronting on West 13th Street. East of the site fronting Park Street are single-family homes, the Central High Visitor Center and three residential buildings currently under construction by the Little Rock Housing Authority. Across West 13th Street to the south are single-family homes, a parking lot serving Central High School and further south is the Central High School Campus. West of the site on Dennison Street is a multi -family building and a bar located just south of West 12th Street. C. NEIGHBORHOOD COMMENTS: As of this writing, staff has received a number of informational phone calls from area property owners. All property owners located within 200 feet of the site, all residents, who could be identified, located within 300 feet of the site, the Central High Neighborhood Association and the Capitol Hill Neighborhood Association were notified of the public hearing. D. ENGINEERING COMMENTS: PUBLIC WORKS CONDITIONS: 1. A 20-foot radial dedication of right-of-way is required at the intersection of South Park Street and West 13th Street. 2. A 20-foot radial dedication of right-of-way is required at the intersection of South Dennison Street and West 13th Street. 3. Repair or replace any curb and gutter or sidewalk that is damaged in the public right-of-way prior to occupancy. 4. If disturbed area is one (1) or more acres, obtain a NPDES stormwater permit from the Arkansas Department of Environmental Quality prior to the start of construction. 5. Remove old curb cuts adjacent to these properties. 2 FILE NO.: Z-8546 Cont. E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING: Wastewater: Sewer main extension required with easements for Lots 1, 2, 4 and 5. Contact the Little Rock Wastewater Utility for additional information. Entergy: Property owners are responsible for cost of relocating power lines. Contact Entergy for additional information. Center -Point Ener : Approved as submitted. AT & T: No comment received. Central Arkansas Water: All Central Arkansas Water requirements in effect at the time of request for water service must be met. The Little Rock Fire Department needs to evaluate this site to determine whether additional public and/or private fire hydrant(s) are required. If additional fire hydrant(s) are required, they will be installed at the Developer's expense. Submit plans for water facilities and/or fire projection system to Central Arkansas Water for review. Plan revisions may be required after additional review. Approval of plans by Central Arkansas Water, the Arkansas Department of Health Engineering Division and the Little Rock Fire Department is required. Contact Central Arkansas Water regarding the size and location of the water meter. Fire Department: Place fire hydrants per code. Contact the Little Rock Fire Department for additional information. County Planning: No comment. CATA: Approved as submitted. The site is not located on a dedicated CATA Bus Route. Parks and Recreation: No comment. F. ISSUES/TECHNICAL/DESIGN: Planning Division: This request is located in the Central City Planning District. The Land Use Plan shows Residential Low Density for this property. The applicant has applied for a rezoning to Planned Development Residential to allow the redevelopment of the 13'h Street block face with five (5) two-story residential structures each totaling approximately 1,800 square feet. Master Street Plan: Park Street, Dennison Street and West 13`h Street are all Local Streets. The primary function of a Local Street is to provide access to adjacent properties. Local Streets which are abutted by non-residential zoning/use or more intensive zoning than duplexes are considered as 0 FILE NO.: Z-8646 (Cont. "Commercial Streets". These streets have a design standard the same as a Collector. These streets may require dedication of right-of-way and may require street improvements for entrances and exits to the site. Bicycle Plan: There are no bike routes shown in the immediate vicinity. Landscape: No comment on this single-family development. G. SUBDIVISION COMMITTEE COMMENT: (March 31, 2011) Mr. Brad Peterson and Mr. Charles Vann were present representing the request. Staff presented an overview of the request stating there were additional items necessary to complete the review process. Staff stated the property was located within the Central High Design Overlay District. Staff stated the site plan as presented did not comply with the typical standards of the DOD. Staff requested additional information concerning the design, location of the mechanical and if there were any trees located on the site. Public Works comments were addressed. Staff stated radial dedications were required at the intersections of 13th and Dennison and 13th and Park Streets. Staff also stated if the disturbed area exceeded one acre an NPDES stromwater permit from the State was required. Staff stated all old curb cuts adjacent to the property were to be removed with the new development. Staff noted comments from the other reporting departments and agencies suggesting the applicant contact them individually for additional clarification. There was no further discussion of the item. The Committee then forwarded the item to the full Commission for final action. H. ANALYSIS: The applicant submitted a revised site plan to staff addressing a number of the issues raised at the March 31, 2011, Subdivision Committee meeting. The revised plan indicates the air conditioning units will be located at the rear of the homes and the site plan notes there are not any significant trees located on the site. The applicant has provided staff with a building elevation for the proposed structures. The request is to rezone these two (2) residential lots from R-4, Two-family District to PD-R to allow the redevelopment of the site with five (5) single-family homes. The development will consist of five (5), two-story residential structures each totaling approximately 1,800 square feet. The site plan indicates the placement of covered parking as well. Off-street parking will be provided for the residents. Some portions of the existing sidewalks and curb and gutter will be reconstructed as a result of construction of the new driveways. On -street parking on West 13th, South Park and Dennison Streets will remain. M FILE NO.: Z-8646 (Cont. The site plan indicates the placement of a six (6) foot wood privacy fence along the north property line that separates this development from adjacent properties on South Park and Dennison Streets. The site plan indicates the placement of a front yard setbacks of 7.5-feet on 13tn Street. A side yard setback of ten (10) feet is proposed on South Park and Dennison Streets. The rear yard setback is indicated at 7.5-feet. The plan indicates the placement of five (5) foot side yard setbacks for Lot 1. The remaining lots are indicated with a shared covered parking area located along the common property line. The applicant has indicated there are no existing trees on the site. A note on the plan indicates additional landscaping will be installed to comply with City ordinance and the DOD requirements. The site is located within the Central High Design Overlay District. The DOD for single-family development states in order to be compatible with the historic nature of the neighborhood, new construction and additions to existing structures shall comply with specific criteria. Plans for new construction, additions and modifications which are subject to the DOD shall be submitted to the Department of Planning and Development. The Planning Department will review the plans for consistency with the detailed requirements of the DOD ordinance and consistency with the historic nature of the district. In the case of an undeveloped block face, the requirements shall relate to the adjacent block faces. The DOD states a roof pitch of less than 8:12 is prohibited. Decorative roof features such as metal cresting, the ridge caps, or other ornamentation are to be reinstalled when roofing or doing roof repairs. If the roofs exist they are to be preserved. The materials of the exterior shell must be wood, brick, other masonry, or a material that resembles wood (i.e., vinyl siding, etc.). The orientation of the buildings is to be consistent with that of other structures on the developed block face. The primary entrance is to be consistent with that of other structures on the developed block face. The front yard setback for all R-2 and R-3 Single-family and R-4 Two-family district zoned property is to be fifteen (15) feet. All other setbacks are to comply with the property's zoning district. Residential structures must have a front porch that is a passageway from the street to the front door of the unit(s) on new residential construction and additions/modifications to the front facade of existing residential structures. Mechanical service equipment (including, but not limited to, air conditioner condensing units, transformers, solar collectors, satellite dishes, etc.) must be located in the rear yards or on a rear -facing roof. No off-street parking pads are allowed between the front of the principal structure and a public street. Surface parking is to be located behind or adjacent to a structure. Driveways are permitted to be installed in the front yard setback, but 61 FILE NO.: Z-8646 (Cont. not between the principal structure and a public street. Parking pads are defined as permanent surfaces of concrete, asphalt, modular pavers, masonry, gravel or other permanent surfaces to be used for the purpose of parking or storage of vehicles. Detached garage and carport locations are to be located to the rear or the principal structure and must not be located in the front setback. Attached garages must have garage door openings that face side streets, interior lot lines, or alleys. Accessory building coverage within the twenty-five (25) foot rear yard setback must be no more than forty (40) percent of the area. Accessory building setbacks are to comply with Sections 36-254 and 36-256 of the Little Rock Code of Ordinances. The applicant has indicated construction materials will comply with those identified in the DOD. The roofs will also exceed an 8:12 pitch. The orientation of the buildings does comply with the homes located on the developed block face along West 13th Street and the primary entrances is consistent with that of other structures on the developed block face. The homes are proposed with a front porch on each of the units. All mechanical service equipment will be located as outlined in the DOD. The development as proposed does not comply with the front yard setback per the DOD of 15-feet. The rear yard setback is also inconsistent with the typical setback prescribed by the DOD. The site plan indicates parking located adjacent to the structure. A detached covered parking area is indicated on the site plan. The covered structures are located beyond the front setback per the DOD. Although the site does not fully comply with the Central High DOD staff is supportive of the request. The primary variation from the DOD is related to the front and rear yard setbacks. Based on the existing lot configuration and the development as proposed the lots do not allow for setbacks as outlined in the DOD. Staff supports this variation because of the development pattern in the area. Staff feels based on the institutional use located just south of this site there is a direct impact on redevelopment of this site. There are two (2) single-family homes located across West 13th Street and a large surface parking lot for Central High School. In addition to the southeast is the Central High School Visitors center. The site is directly impacted by street parking of students and faculty of Central High School. To staffs knowledge there are no remaining outstanding technical issues associated with the request. Staff feels the addition of five (5) single-family homes as proposed should provide a positive impact on the area. STAFF RECOMMENDATION: Staff recommends approval of the request subject to compliance with the comments and conditions as outlined in paragraphs D, E and F of the agenda staff report. n FILE NO.: Z-8646 (Cont. PLANNING COMMISSION ACTION: (APRIL 21, 2011) The applicant was present. There was one registered objector present. Staff presented the item stating the applicant was requesting a deferral of the item to the June 2, 2011, public hearing. Staff stated the deferral request would require a waiver of the Commission's By-laws with regard to the late deferral request. There was no further discussion of the item. The Chair entertained a motion for approval of the By-law waiver with regard to the late deferral request. The motion carried by a vote of 10 ayes, 0 noes and 1 absent. The Chair entertained a motion for approval of the item as presented by staff. The motion carried by a vote of 10 ayes, 0 noes and 1 absent. STAFF UPDATE The applicant submitted a revised site plan to staff reducing the number of units from five (5) to four (4). The site plan indicates the placement of a front yard setbacks of 7.5-feet on 13th Street. A side yard setback of ten (10) feet is proposed on South Park and Dennison Streets. The rear yard setback is indicated at 7.5-feet. The plan indicates the placement of five (5) foot side yard setbacks. Drives will be extended from West 13th Street to the structures to allow for off-street parking. Within the Central High DOD no off-street parking pads are allowed between the front of the principal structure and a public street. Surface parking is to be located behind or adjacent to a structure. Driveways are permitted to be installed in the front yard setback, but not between the principal structure and a public street. Parking pads are defined as permanent surfaces of concrete, asphalt, modular pavers, masonry, gravel or other permanent surfaces to be used for the purpose of parking or storage of vehicles. The applicant has indicated the parking pads will comply with the typical DOD standard. There has not been a change in the design of the structures from the original submission. The DOD states a roof pitch of less than 8:12 is prohibited. Decorative roof features such as metal cresting, tile ridge caps, or other ornamentation are to be reinstalled when roofing or doing roof repairs. The materials of the exterior shell must be wood, brick, other masonry, or a material that resembles wood (i.e., vinyl siding, etc.). The orientation of the buildings is to be consistent with that of other structures on the developed block face. The primary entrance is to be consistent with that of other structures on the developed block face. The front yard setback for all R-2 and R-3 Single-family and R-4 Two-family district zoned property is to be fifteen (15) feet. All other setbacks are to comply with the property's zoning district. The structures are 7 FILE NO.: Z-8646 (Cont. proposed with a front setback of 7.5 feet which is not consistent wit the typical DOD standard. The rear yard setback is also inconsistent with the typical setback prescribed by the DOD (7.5-feet). Residential structures must have a front porch that is a passageway from the street to the front door of the unit(s) on new residential construction and additions/modifications to the front facade of existing residential structures. Mechanical service equipment must be located in the rear yards or on a rear -facing roof. The development will comply with the DOD requirements. Staff continues to support the request although there are variations with the Central High DOD. The primary variation from the DOD is related to the front and rear yard setbacks. Based on the existing lot configuration and the development as proposed the lots do not allow for setbacks as outlined in the DOD. As previously stated staff supports the variation because of the development pattern in the area. Staff continues to feel based on the institutional use located just south of this site there is a direct impact on redevelopment of these lots. There are two (2) single-family homes located across West 13th Street and a large surface parking lot for Central High School along with the Central High School Visitors center located to the southeast. The site is directly impacted by street parking of students and faculty of Central High School. The property is currently zoned R-4, Two-family district which would allow for the construction of two (2) duplex structures on these two (2) residential lots resulting in the same density as proposed by the applicant. Staff feels the placement of the single- family homes as proposed will add value to the neighborhood allowing new residents the opportunity to purchase homes in the neighborhood. To staff's knowledge there are no remaining outstanding technical issues associated with the request. Staff recommends approval of the request subject to compliance with the comments and conditions as outlined in paragraphs D, E and F of the agenda staff report. PLANNING COMMISSION ACTION: (JUNE 2, 2011) The applicant was present. There were no registered objectors present. Staff presented the item stating the applicant had submitted a request dated May 19, 2011, requesting a deferral of the item to the July 14, 2011, public hearing. Staff stated the applicant had indicated the deferral request was necessary to allow the applicant and the Central High Neighborhood Association additional time to work through issues related to the site plan. Staff stated they were supportive of the deferral request. There was no further discussion of the item. The chair entertained a motion for approval of the item as presented by staff. The motion carried by a vote of 9 ayes, 0 noes and 2 absent. FILE NO.: Z-8646 (font. AFF UPDATE: Upon further review, staff has discovered an error in the previous analysis. The applicant had indicated there were no trees on the site. There are in fact several trees on the east half of the site. The DOD states: "Trees greater than fourteen (14) inches in diameter measured at four and one-half (4 '/2) feet above ground shall be protected form removal and damages in future development of the district. Any development within fifty (50) feet of any such tree shall be reviewed prior to development to assure protective measures are included and in place. Tree removal can only be done is approved by the City's Urban Forester." The applicant has been advised to provide a tree survey and to include information pertinent to the trees on the site plan. The plan will then be forwarded to the Urban Forester for review and comment. Staff recommends deferral of this item to the August 25, 2011 agenda with the applicant to submit the required plans prior to the August 4, 2011 Subdivision Committee meeting. PLANNING COMMISSION ACTION: (JULY 14, 2011) The applicant was not present. There were no objectors present. Staff presented he item and a recommendation of deferral as noted in the staff update above. There was no further discussion. The item was placed on the consent agenda and approved for deferral to the August 25, 2011 meeting by a vote of 10 ayes, 0 noes and 1 absent. STAFF UPDATE: The applicant submitted a revised site plan to staff addressing staff's concerns regarding existing trees on the site. It appears one tree greater than 14-inches, an 18- inch willow oak, will be removed during construction. The tree proposed for removal is located within the northeastern portion of the site on proposed Lot 2. The removal of the tree is necessary to provide parking on this lot. A note on the site plan indicates all other trees will be retained and preserved during construction. Staff has provided the City's Urban Forester with a copy of the site plan and requested comment concerning the tree removal. As of this writing the Urban Forester has not responded to staff. Modifications have been made to the site plan to aid in minimizing the neighborhood's concerns. The site plan indicates four lots with one house facing Park Street and another facing Dennison Street with two houses which will appear to be "carriage houses" or ancillary structures facing and taking access from 13th Street. The two "carriage houses" will be single-family residences on individual lots of record. This is 9 FILE NO.: Z-8646 (Cont. being done to preserve the character of the neighborhood. The style of having a "main house" and "carriage house" is not uncommon in the neighborhood. The "main house and carriage house" package will be offered as one package to prospective buyers for ownership and rental property. If this is not marketable, then the "main house" and "carriage house" will be marketed separately. The front setback for the homes fronting South Dennison and Park Streets is indicated at 15-feet. The front setback for the homes located on West 13th Street are indicated at 5-feet. The rear yards for the homes fronting South Dennison Street and Park Street are indicated at 15-feet. The rear yard for the homes fronting West 13th Street are indicated at 5-feet. All side yard setbacks are indicated at 5-feet. The DOD states the front yard setback shall be 15-feet. All other setbacks shall be as prescribed by the property's zoning district. The fronts of the homes located on West 13th Street and all rear yard setbacks do not comply with the typical standards of the DOD or the zoning district. The applicant has indicated the development will comply with all other aspects of the Central High DOD with regard to building design, construction materials, tree plantings and the placement of mechanical equipment. Staff is supportive of the request. Staff does not feel the proposal to allow redevelopment of this site with four units of residential housing will adversely impact the area. PLANNING COMMISSION ACTION: (AUGUST 25, 2011) The applicant was present. There were no registered objectors present. Staff presented the item stating the City's Urban Forester had reviewed the plan and had approved the removal of the tree located at the northeastern portion of the site. Staff stated the applicant would be required to plant two trees in the front yard of each of the homes, a total of eight (8) trees, to comply with the Central High Design Overlay District requirements. Staff stated the Central High Neighborhood Association had provided them with a letter of support for the development as currently proposed. Staff stated to their knowledge there are no remaining outstanding technical issues associated with the request. Staff presented a recommendation of approval of the request subject to compliance with the comments and conditions as outlined in paragraphs D, E and F of the agenda staff report There was no further discussion of the item. The Chair entertained a motion for approval of the item as presented by staff. The motion carried by a vote of 9 ayes, 0 noes and 2 absent. `K