HomeMy WebLinkAboutZ-8554 Staff AnalysisJuly 15, 2010
ITEM NO.: A
NAME -
LOCATION:
OWNER/APPLICANT
FILE NO.: Z-8554
Lot 2, Biehslich Addition Hotel —
Conditional Use Permit
6100 S. University Avenue
Home Bank of Arkansas/Albert King
PROPOSAL: A conditional use permit is requested to allow for the
construction of a 30-room hotel on this 1-2 zoned,
.91 ± acre lot.
1. SITE LOCATION:
The property is located on the west side of S. University Avenue, two
tracts north of 65th Street.
2. COMPATIBILITY WITH NEIGHBORHOOD -
The site is located in an area of fairly intense commercial and light
industrial uses and zoning. University Avenue is lined with a variety of
such uses. A single family neighborhood is located to the west, across
Mabelvale Pike. Access to this site will be from the commercial area
along University. Allowing a small hotel on this 1-2 zoned property would
appear to be compatible with uses and zoning in the area and should have
less impact on nearby properties than if the site were developed with
some of the allowable 1-2 uses.
All owners of properties located within 200 feet of the site, all residents
within 300 feet who could be identified and the SWLR United for Progress,
Geyer Springs, South Brookwood and Meadowcliff-Brookwood
Neighborhood Associations were notified of this request.
3. ON SITE DRIVES AND PARKING:
The proposed 30-room hotel requires 33 parking spaces (1 per room plus
10%). A single driveway is proposed off of University Avenue, providing
access to 37 parking spaces.
4. SCREENING AND BUFFE
Site plan must comply with the City's landscape and buffer ordinances
requirements.
July 15, 2010
ITEM NO.: A (Cont-
LE NO.: Z-85
The dumpster is located within the nine foot (9) wide perimeter landscape
strip; remove.
A small amount of building landscaping will be required with this
application.
Areas set aside for buffers and landscaping appear to be sufficient in area.
An automatic irrigation system to water landscaped areas will be required.
Prior to a building permit being issued, it will be necessary to provide an
approved landscape plan stamped with the seal of a Registered
Landscape Architect.
The City Beautiful Commission recommends preserving as many existing
trees as feasible on this site. Credit toward fulfilling Landscape Ordinance
requirements can be given when properly preserving trees of six (6) inch
caliper or larger.
5. PUBLIC WORKS COMMENTS:
1. At the time of issuance of a building permit, provide design of street
conforming to the Master Street Plan. Construct one-half street
improvement to Mabelvale Pike including 5-foot sidewalks with
planned development. The new back of curb should be located
eighteen (18) feet from centerline.
6. UTILITY FIRE DEPT. AND CATA COMMENTS:
Wastewater: Sewer available to this project.
Entergy: No comments received.
Centerpoint Energy: No comments received.
AT&T (SBC): No comments received.
Water: All Central Arkansas Water requirements in effect at the time of
request for water service must be met.
The Little Rock Fire Department needs to evaluate this site to determine
whether additional public and/or private fire hydrant(s) will be required. If
additional fire hydrant(s) are required, they will be installed at the
Developer's expense.
K
July 15, 2010
ITEM NO.: A
FILE NO.: Z-8554
Please submit plans for water facilities and/or fire protection system to
Central Arkansas Water for review. Plan revisions may be required after
additional review. Contact Central Arkansas Water regarding procedures
for installation of water facilities and/or fire service. Approval of plans by
the Arkansas Department of Health Engineering Division and Little Rock
Fire Department is required.
METERS AND FIRESERVICE CONNECTIONS WILL BE MADE FROM
MABELVALE PIKE.
Contact Central Arkansas Water regarding the size and location of the
water meter.
A Capital Investment Charge based on the size of meter connection(s) will
apply to this project in addition to normal charges. This fee will apply to all
connections including metered connections off the private fire system.
Due to the nature of this facility, installation of an approved reduced
pressure zone backflow preventer assembly (RPZ) is required on the
domestic water service. This assembly must be installed prior to the first
point of use. Central Arkansas Water (CAW) requires that upon
installation of the RPZA, successful tests of the assembly must be
completed by a Certified Assembly Tester licensed by the State of
Arkansas and approved by CAW. The tests results must be sent to
CAW's Cross Connection Section within ten days of installation and
annually thereafter. Contact the Cross connection Section at 377-1226
if you would like to discuss backflow prevention requirements for this
project.
VICINITY MAP NEEDS TO BE CORRECTED.
Fire Department: Place fire hydrants per Code.
County Planning: No Comments.
CATA: The site is located on a CATA Bus route.
SUBDIVISION COMMITTEE COMMENT: (MAY 13, 2010)
The applicants were present. Staff presented the item and noted additional
information was needed regarding building materials and height, signage, site
lighting and fencing. Staff asked if there would be any other uses such as a
conference/meeting space, restaurant or lounge. Staff noted the survey did not
correctly indicate the 25 foot building lines along both street frontages, as noted
3
July 15, 2010
ITEM NO.: A (Cont.
FILE NO.- Z-8554
on the 1969 plat. In response to a question from staff, the applicant indicated
there would be no swimming pool.
Public Works, Utility and Landscape Comments were noted. The applicant was
advised to contact those agencies if there were any questions.
The Committee determined there were no outstanding issues and forwarded the
item to the full Commission.
STAFF ANALYSIS:
A conditional use permit is requested to allow for the construction of a two-story,
30-room hotel on this vacant, 1-2 zoned, .91± acre lot. The proposed hotel will
not contain any other uses such as conference/meeting space, restaurant or
lounge. The site will not have a swimming pool.
Access to the site will be from University Avenue. There will be no access from
Mabelvale Pike, to the rear. The building will be constructed of wood frame with
E.I.F.S. and stone exterior. The building will have a pitched roof and the building
will have a height of approximately 28 feet. A single ground -mounted sign not to
exceed 30 feet in height will be located on the University Avenue perimeter. A
wall sign will also be permitted on the building facade facing University Avenue.
Paved parking is provided for 37 vehicles, exceeding the ordinance requirement
of 33 spaces. Dumpster screening will be installed to comply with ordinance.
The applicant responded to most of the issues raised at Subdivision Committee,
as noted above. A corrected survey has been submitted, showing the 25'
building lines along both street perimeters. To staff's knowledge, there are no
outstanding issues. The proposed use would appear to be compatible with uses
and zoning in the area. The 1969 bill of assurance for Biehshich Addition does
not address use issues.
STAFF RECOMMENDATION:
Staff recommends approval of the requested CUP subject to compliance with the
following conditions:
1. Compliance with the comments and conditions in Sections 4, 5 and 6 of the
agenda staff report.
10
July 15, 2010
ITEM NO.: A (Cont.
FILE NO.: Z-8554
2. All site lighting is to be low level and shielded downward and into the site.
3. The ground sign is not to exceed 30 feet in height and 72 square feet in area
(as allowed in the 1-2 District).
PLANNING COMMISSION ACTION:
(JUNE 3, 2010)
The applicant was not present. There were no objectors present. Staff
recommended deferral of the item to the July 15, 2010 meeting to allow the
applicant to meet with neighbors. There was no further discussion. The item
was placed on the consent agenda and approved for deferral by a vote of
10 ayes, 0 noes and 1 absent.
STAFF UPDATE:
The applicant has met with area neighborhood associations since the June 3,
2010 Commission meeting. The applicant has amended the application to
include the installation of a 6-foot tall wood privacy fence along the Mabelvale
Pike perimeter of the site and the condition that there will be no windows on the
building's west facade (facing Mabelvale Pike).
Staff continues to recommend approval of the amended application.
PLANNING COMMISSION ACTION:
(JULY 15, 2010)
The applicant was present. There were no objectors present. One person was
present in support. Staff informed the Commission that the Cloverdale,
Mead owcliff-Brookwood and SWLRUP Neighborhood Associations had voted to
support the application and the South Brookwood Neighborhood Association had
voted not to oppose the item.
Staff informed the Commission that the application had been amended to include
the installation of a 6-foot tall wood privacy fence along the Mabelvale Pike
perimeter of the site and to include the condition that there will be no windows on
the building's west facade (facing Mabelvale Pike).
Staff recommended approval of the amended application, including all comments
and conditions noted in the "staff recommendation" above. There was no further
discussion. The item was placed on the consent agenda and approved as
recommended by staff by a vote of 10 ayes, 0 noes and 1 absent.
5
SUBDIVISION COMMITTEE COMMENTS
MAY 13, 2010
ITEM NO.: 12. LOT 2 BIEHSLICH ADDITION HOTEL
CONDITIONAL USE PERMIT — 6100 S. UNIVERSITY AVENUE Z-8554
Planninit Staff Comments:
1. The 1969 Bill of Assurance for Biehslich Addition does not address use issues.
2. Provide corrected survey. The April 2010 Richardson survey does not reflect the twenty-five (25) foot
platted building lines along both street frontages as indicated on the 1969 plat and the June 2009 Brooks
survey.
3. Provide building heights, materials and roof design.
4. Provide signage plan.
5. Locate and describe site lighting; should be low-level and shielded downward and into the site.
6. Locate and describe any proposed fencing.
7. Locate and describe required dumpster screening.
8. Will the facility contain any other uses such as conference/meeting space, restaurant or lounge?
9. No pool is indicated.
Variance/Waivers:
* None requested.
Public Works:
1. At the time of issuance of a building permit, provide design of street conforming to the Master Street Plan.
Construct one-half street improvement to Mabelvale Pike including 5-foot sidewalks with planned
development. The new back of curb should be located eighteen (18) feet from centerline.
Utilities and Fire De artment/C.ount Planning:
Wastewater: Sewer available to this project.
Entergy: No comments received.
Centerpoint Energy: No comments received.
AT&T (SBC): No comments received.
Water: All Central Arkansas Water requirements in effect at the time of request for water service must be met.
The Little Rock Fire Department needs to evaluate this site to determine whether additional public and/or private
fire hydrant(s) will be required. If additional fire hydrant(s) are required, they will be installed at the Developer's
expense.
Please submit plans for water facilities and/or fire protection system to Central Arkansas Water for review. Plan
revisions may be required after additional review. Contact Central Arkansas Water regarding procedures for
installation of water facilities and/or fire service. Approval of plans by the Arkansas Department of Health
Engineering Division and Little Rock Fire Department is required.
METERS AND FIRESERVICE CONNECTIONS WILL BE MADE FROM MABELVALE PIKE.
Contact Central Arkansas Water regarding the size and location of the water meter.
A Capital Investment Charge based on the size of meter connection(s) will apply to this project in addition to
normal charges. This fee will apply to all connections including metered connections off the private fire system.
ITEM NO.. 12. (Cont.) Z-8554
Due to the nature of this facility, installation of an approved reduced pressure zone backflow preventer assembly
(RPZ) is required on the domestic water service. This assembly must be installed prior to the first point of use.
Central Arkansas Water (CAW) requires that upon installation of the RPZA, successful tests of the assembly must
be completed by a Certified Assembly Tester licensed by the State of Arkansas and approved by CAW. The tests
results must be sent to CAW's Cross Connection Section within ten days of installation and annually thereafter.
Contact the Cross connection Section at 377-1226 if you would like to discuss backflow prevention requirements
for this project.
VICINITY MAP NEEDS TO BE CORRECTED.
Fire Department: Place fire hydrants per Code.
County Planning: No Comments.
CATA: The site is located on a CATA Bus route.
Planning Division: No Comments.
Landscape: Site plan must comply with the City's minimal landscape and buffer ordinances requirements.
The dumpster is located within the nine foot (9) wide perimeter landscape strip; remove.
A small amount of building landscaping will be required with this application.
Areas set aside for buffers and landscaping appear to be sufficient in area.
An automatic irrigation system to water landscaped areas will be required.
Prior to a building permit being issued, it will be necessary to provide an approved landscape plan stamped with the
seal of a Registered Landscape Architect.
The City Beautiful Commission recommends preserving as many existing trees as feasible on this site. Credit
toward fulfilling Landscape Ordinance requirements can be given when properly preserving trees of six (6) inch
caliper or larger.
Other: Submit responses to staff issues and four (4) copies of revised site plan (if required) by Wednesday May
19, 2010. Required notices are to be sent via certified mail no later than Wednesday May 19, 2010 and proof of
notification returned to staff by May 28, 2010.