Loading...
HomeMy WebLinkAboutZ-8523-A Staff AnalysisITEM NO.: 7. NAME: Southwest Power Pool Zoning Site Plan Review LOCATION: located at 16100 Pride Valley Road Planning Staff Comments: 1. Provide notification of property owners located within 200 feet of the site, complete with the certified abstract list, notice form with affidavit executed and proof of mailing. The notice must be mailed no later than March 24, 2010. The Office of Planning and Development must receive the proof of notice no later than April 2, 2010. 2. The property is currently zoned R-2, Single-family but staff is applying the 0-2 development standards to the requested site plan review. 3. Provide details of any proposed perimeter fencing including location and construction materials. 4. Identify on the site plan buffer areas to be protected. Provide details outlining methods to be employed to protect these permanent undisturbed buffers. 5. The 0-2 zoning district states no building hereafter erected or structurally altered shall exceed a height of forty-five (45) feet at the required front, side or rear yard setback lines. Building heights proposed in excess of forty-five (45) feet may be authorized by the planning commission in conjunction with the site plan review. However, the following formula shall rule: At the height permitted at said yard setback lines, one (1) foot may be added to the height of the building for each foot that the building or portion thereof is set back from the required yard lines. In no instance shall the maximum height of the building exceed one hundred twenty (120) feet. The building is indicated with a maximum building height of 84 feet and a setbacks ranging from 88.81 feet to 104.7 feet. 6. The front, side and rear yard setbacks per the 0-2 zoning district shall be not less than twenty-five (25) feet Variance/Waivers: None requested. Public Works Conditions: 1. Pride Valley Road is classified on the Master Street Plan as a collector street. A dedication of right-of-way 30 feet from centerline will be required. Additional right-of- way of 40 feet from centerline will be required to be dedicated for construction of a right turn lane. 2. Provide a letter prepared by a registered engineer certifying the sight distance at the intersections comply with 2004 AASHTO Green Book standards. 3. The new proposed street is classified on the Master Street Plan as a collector street. A dedication of right-of-way of a total of 60 feet. Additional right-of-way will be required to be dedicated for construction of a round -a -bout. 4. With site development, provide the design of the street conforming to the Master Street Plan. Construct one-half street improvements to Pride Valley Road including Item # 7. 5-foot sidewalk with the planned development. Per code, these improvements must be constructed adjacent to the development. The plan shows paving the southern half of Pride Valley Road to 18 feet from centerline. Will one-half street improvements to the north side of Pride Valley and paving of the southern half of Pride Valley Road west of new collector street and Pride Valley Road intersection be constructed with one-half street improvements? 5. With site development, provide the design of the street conforming to the Master Street Plan. Construct full street improvements to the new collector street including 5-foot sidewalks on both sides with the planned development. Curb and gutter will be required to be installed on both sides of the street. 6. All driveways shall be concrete aprons per City Ordinance. 7. Provide a letter prepared by a registered engineer certifying the sight distance at the driveways comply with 2004 AASHTO Green Book standards. 8. A Sketch Grading and Drainage Plan should be submitted per Section 29-186 (e). 9. Stormwater detention ordinance applies to this property. Show the proposed location for stormwater detention facilities on the plan. 10. If disturbed area is one (1) or more acres, obtain a NPDES stormwater permit from the Arkansas Department of Environmental Quality prior to the start of construction. 11. Regulations and requirements pertaining to floodplain development should be obtained from Pulaski County Planning Department. 12.If the property is annexed into the City in the future, in accordance with Section 31- 176, floodway areas must be shown as floodway easements or be dedicated to the public. In addition, a 25 foot wide access easement is required adjacent to the floodway boundary. 13.A special Grading Permit for Flood Hazard Areas will be required per Section 8-283 prior to construction. 14. Alteration of the water course will require approval from the Little Rock District of the US Army Corps of Engineers prior to start of work. 15. The proposed alteration of the addition of a bridge in the floodway will require flood map revisions. Obtain a conditional letter of map revision approval from Public Works and the Federal Emergency Management Agency prior to issuance of a grading permit and/or a building permit. 16. Plans of all work in right-of-way shall be submitted for approval prior to start of work. Obtain barricade permit prior to doing any work in the right-of-way from Traffic Engineering at (501) 379-1805 (Travis Herbner). 17. Street improvement plans shall include signage and striping. Traffic Engineering must approve completed plans prior to construction. 18.Streetlights are required by Section 31-403 of the Little Rock code. Provide plans for approval to Traffic Engineering. Streetlights must be installed prior to platting/certificate of occupancy. Contact Traffic Engineering 379-1813 (Steve Philpott) for more information. 19. Driveway widths do not meet the traffic access and circulation requirements of Sections 30-43 and 31-210. The width of driveway must not exceed 36 feet. The south driveway entrance lane and the interior one way drive lanes should be at least 18 feet in width for emergency access. 20. Driveway widths do not meet the traffic access and circulation requirements of Sections 30-43 and 31-210. The width of driveway must not exceed 36 feet. A variance must be requested to exceed this width. The median of the south driveway should be more bull nosed instead of rounded to assistance drivers to enter in the Item # 7. correct lane. The south driveway entrance lane and the interior one way drive lanes should be at least 18 feet in width for emergency access. 21. Provide a letter prepared by a registered engineer certifying the sight distance at the intersections comply with 2004 AASHTO Green Book standards. 22. Complete improvements to Kirk Road, the new collector street, and the Pride Valley Road improvements adjacent to the development must be completed prior to issuance of the certificate of occupancy for the first building in the development. 23. Per Section 29-170(j) of the City code, damage to private or public property due to hauling operations or operation of construction related equipment from the development shall be repaired by the responsible party prior to issuance of a certificate of occupancy. Utilities and Fire Department/County Planning: Wastewater: Sewer main extension is required with easements for this project. Contact Little Rock Wastewater Utility for additional information. Entergy: Easements are required for existing and/or new facilities around the sites perimeter. A thirty (30) foot overhead or ten (10) foot under ground easement is required. Contact Entergy for additional information. Center -Point Energy: No comment received. AT & T: No comment received. Central Arkansas Water: The site is located within Waster District #349. Contact Barry Hass to obtain information concerning connection fees. All Central Arkansas Water requirements in effect at the time of request for water service must be met. This development will have minor impact on the existing water distribution system. Proposed water facilities will be sized to provide adequate pressure and fire protection. Please submit plans for water facilities and/or fire protection system to Central Arkansas Water for review. Plan revisions may be required after additional review. Contact Central Arkansas Water regarding procedures for installation of water facilities and/or fire service. Approval of plans by the Arkansas Department of Health Engineering Division and Little Rock Fire Department is required. Additional fire hydrant(s) will be required. Contact the Little Rock Fire Department to obtain information regarding the required placement of the hydrant(s) and contact Central Arkansas Water regarding procedures for installation of the hydrant(s). Contact Central Arkansas Water regarding the size and location of the water meter. A Capital Investment Charge based on the size of meter connection(s) will apply to this project in addition to normal charges. This fee will apply to all connections including metered connections off the private fire system. The facilities on -site will be private. When meters are planned off private lines, private facilities shall be installed to Central Arkansas Water's material and construction specifications and installation will be inspected by an engineer, licensed to practice in the State of Arkansas. Execution of Customer Owned Line Agreement is required. Due to the nature of this facility, installation of an approved reduced pressure zone backflow preventer assembly (RPZ) is required on the domestic water service. This assembly must be installed prior to the first point of use. Central Arkansas Water (CAW) requires that upon installation of the RPZA, successful tests of the assembly must be completed Item # 7. by a Certified Assembly Tester licensed by the State of Arkansas and approved by CAW. The test results must be sent to CAW's Cross Connection Section within ten days of installation and annually thereafter. Contact the Cross Connection Section at 377- 1226 if you would like to discuss backflow prevention requirements for this project. Fire Department: Place fire hydrants per code. Contact the Little Rock Fire Department for additional information. County Planning: No comment. CATA: The site is not located on a dedicated CATA Bus Route. Parks and Recreation: The Parks Department would like the landowner to allow trail access both to and by the property. Contact Mark Webre for additional information. Plannina Division: No comment. Landscape. 1. Site plan must comply with the City's minimal landscape and buffer ordinance requirements. 2. The landscape ordinance requires eight percent (8%) of the paved surface area but allocated for interior islands. These islands must be a minimum of three hundred square feet in area and evenly distributed throughout the site; revise. 3. An automatic irrigation system to water landscaped areas will be required. 4. Prior to the issuance of a building permit, it will be necessary to provide an approved landscape plan stamped with the seal of a Registered Landscape Architect. 5. The City Beautiful Commission recommends preserving as many existing trees as feasible on this site. Credit toward fulfilling Landscape Ordinance requirements can be given when preserving trees of six (6) inch caliper or larger. Revised plat/plan: Submit four (4) copies of a revised preliminary plat/plan (to include the additional information as noted above) to staff on Wednesday, March 24, 2010. Item # T April 8, 2010 ITEM NO.: 7 NAME: Southwest Power Pool Zoning Site Plan Review LOCATION: Located at 16100 Pride Valley Road DEVELOPER Southwest Power Pool 145 N. McKinley Street, Suite 140 Little Rock, AR 72205 ENGINEER: Development Consultants Inc. 2200 North Rodney Parham Road Little Rock, AR 72212 FILE NO.: Z-8523-A A AREA: 21.16 acres NUMBER OF LOTS: 1 FT. NEW STREET: 1,900 LF CURRENT ZONING: R-2, Single-family — Proposed 0-2, Office and Institutional PLANNING DISTRICT: 18 — Ellis Mountain CENSUS TRACT: 42.07 VARIANCESIWAIVERS REQUESTED: 1. A variance request from Sections 30-43 and 31-210 to allow the entry driveway to be located nearer the property line than typically allowed per the ordinance and to allow the driveway width to exceed the typically ordinance standard. 2. A deferral request for the placement of the required sidewalk along the western side of the new collector street until such time as the property adjacent to the sidewalk is developed. A. PROPOSAUREQUESTIAPPLICANT'S STATEMENT: After a year long review process and examination of numerous possible sites, Southwest Power Pool (SPP) has selected this site at Pride Valley April 8, 2010 SUBDIVISION ITEM NO.: 7 (Cont. ILE NO.: Z-8523-A Road for their new corporate campus location. Many specific site characteristics were required for a project of this nature and the proposed location was the best choice for a central Arkansas location. The subject site will allow SPP to create a campus atmosphere, rather than a basic office development. There will also be room for future expansions when they become necessary. The site will be purchased, owned and developed by SPP. There will be a coordinated effort between SPP and the current land owners to construct the boundary street improvements. The current land owners will also construct an extension of Kirk Road, with a bridge over Rock Creek, to provide access to Chenal Parkway. SPP has a strong desire to preserve as many trees as possible in the perimeters, and where feasible in other areas of the site. To make this possible, a four-story office building with a three story parking deck has been proposed. Making the primary structures multi -story reduces the surface area coverage on the site and allows more green space to be maintained. The combined building area proposed is 220,000 gross square feet. A total of 759 parking spaces is proposed. The building site coverage is 20.38 percent. B. EXISTING CONDITIONS: The property is currently undeveloped and wooded, with varying degrees of slope. The property generally slopes upward from Pride Valley Road. There is a wide Entergy easement with large electrical transmission lines which runs north/south through the west portion of the property near Zanzibar Road. The general area contains a mixture of uses and zoning. A mixture of commercial uses, including a Kroger store, car dealership, bank and lumberyard, is located to the north and northeast along Chenal Parkway. Single-family residences on large lots are located to the east, west and south (across Pride Valley Road). There is also undeveloped R-2 zoned property to the south. C. NEIGHBORHOOD COMMENTS: As of this writing, staff has received a number of phone calls requesting additional information from area residents. All property owners located within 200 feet of the site, the Parkway Place Property Owners Association and the Coalition of West Little Rock Neighborhoods were notified of the public hearing. 2 April 8, 2010 SUBDIVISION ITEM NO.: 7 Cont. FILE NO.: Z-8523-A D. ENGINEERING COMMENTS: PUBLIC WORKS CONDITIONS: 1, Pride Valley Road is classified on the Master Street Plan as a collector street. A dedication of right-of-way 30 feet from centerline will be required. Additional right-of-way of 40 feet from centerline will be required to be dedicated for construction of a right turn lane. 2. Provide a letter prepared by a registered engineer certifying the sight distance at the intersections comply with 2004 AASHTO Green Book standards. 3. The new proposed street is classified on the Master Street Plan as a collector street. A dedication of right-of-way of a total of 60 feet. Additional right-of-way will be required to be dedicated for construction of a round -a -bout. 4. With site development, provide the design of the street conforming to the Master Street Plan. Construct one-half street improvements to Pride Valley Road including 5-foot sidewalk with the planned development. Per code, these improvements must be constructed adjacent to the development. The plan shows paving the southern half of Pride Valley Road to 18 feet from centerline. 5. With site development, provide the design of the street conforming to the Master Street Plan. Construct full street improvements to the new collector street including 5-foot sidewalk on both sides with the planned development. Curb and gutter will be required to be installed on both sides of the street. 6. All driveways shall be concrete aprons per City Ordinance. 7. Provide a letter prepared by a registered engineer certifying the sight distance at the driveways comply with 2004 AASHTO Green Book standards. 8. A Sketch Grading and Drainage Plan should be submitted per Section 29-186 (e). 9. Stormwater detention ordinance applies to this property. Show the proposed location for stormwater detention facilities on the plan. 10. If disturbed area is one (1) or more acres, obtain a NPDES stormwater permit from the Arkansas Department of Environmental Quality prior to the start of construction. 3 April 8, 2010 SI IRnIV14inN ITEM NO.: 7 (Cont. E NO.- Z-8 11. Regulations and requirements pertaining to floodplain development should be obtained from Pulaski County Planning Department. 12. If the property is annexed into the City in the future, in accordance with Section 31-176, floodway areas must be shown as floodway easements or be dedicated to the public. In addition, a 25 foot wide access easement is required adjacent to the floodway boundary. 13. A special Grading Permit for Flood Hazard Areas will be required per Section 8-283 prior to construction. 14. Alteration of the water course will require approval from the Little Rock District of the US Army Corps of Engineers prior to start of work. 15. The proposed alteration of the addition of a bridge in the floodway will require flood map revisions. Obtain a conditional letter of map revision approval from Public Works and the Federal Emergency Management Agency prior to issuance of a grading permit and/or a building permit. 16. Plans of all work in right-of-way shall be submitted for approval prior to start of work. Obtain barricade permit prior to doing any work in the right-of-way from Traffic Engineering at (501) 379-1805 (Travis Herbner). 17. Street improvement plans shall include signage and striping. Traffic Engineering must approve completed plans prior to construction. 18. Streetlights are required by Section 31-403 of the Little Rock code. Provide plans for approval to Traffic Engineering. Streetlights must be installed prior to platting/certificate of occupancy. Contact Traffic Engineering 379-1813 (Steve Philpott) for more information. 19. Driveway widths do not meet the traffic access and circulation requirements of Sections 30-43 and 31-210. The width of driveway must not exceed 36 feet. The south driveway entrance lane and the interior one way drive lanes should be at least 18 feet in width for emergency access. 20. Driveway widths do not meet the traffic access and circulation requirements of Sections 30-43 and 31-210. The width of driveway must not exceed 36 feet. A variance must be requested to exceed this width. The median of the south driveway should be more bull nosed instead of rounded to assistance drivers to enter in the correct lane. The south driveway entrance lane and the interior one way drive lanes should be at least 18 feet in width for emergency access. In April 8, 2010 qI IRnwi.oi )N ITEM NO.: 7 (Cont.) FILE NO.: Z-8523-A 21. Provide a letter prepared by a registered engineer certifying the sight distance at the intersections comply with 2004 AASHTO Green Book standards. 22. Complete improvements to Kirk Road, the new collector street, and the Pride Valley Road improvements adjacent to the development must be completed prior to issuance of the certificate of occupancy for the first building in the development. 23. Per Section 29-170(j) of the City code, damage to private or public property due to hauling operations or operation of construction related equipment from the development shall be repaired by the responsible party prior to issuance of a certificate of occupancy. E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING: Wastewater: Sewer main extension is required with easements for this project. Contact Little Rock Wastewater Utility for additional information. Enter : Easements are required for existing and/or new facilities around the sites perimeter. A thirty (30) foot overhead or ten (10) foot under ground easement is required. Contact Entergy for additional information. Center -Point Ener : No comment received. AT & T: No comment received. Central Arkansas Water: The site is located within Water District #349. Contact Barry Hass to obtain information concerning connection fees. All Central Arkansas Water requirements in effect at the time of request for water service must be met. This development will have minor impact on the existing water distribution system. Proposed water facilities will be sized to provide adequate pressure and fire protection. Please submit plans for water facilities and/or fire protection system to Central Arkansas Water for review. Plan revisions may be required after additional review. Contact Central Arkansas Water regarding procedures for installation of water facilities and/or fire service. Approval of plans by the Arkansas Department of Health Engineering Division and Little Rock Fire Department is required. Additional fire hydrant(s) will be required. Contact the Little Rock Fire Department to obtain information regarding the required placement of the hydrant(s) and contact Central Arkansas Water regarding procedures for installation of the hydrant(s). Contact Central Arkansas Water regarding the size and location of the water meter. A Capital Investment Charge based on the size of meter 5 April 8, 2010 SUBDIVISION EM NO.: 7 (Cont. FILE NO.: Z-8523-A connection(s) will apply to this project in addition to normal charges. This fee will apply to all connections including metered connections off the private fire system. The facilities on -site will be private. When meters are planned off private lines, private facilities shall be installed to Central Arkansas Water's material and construction specifications and installation will be inspected by an engineer, licensed to practice in the State of Arkansas. Execution of Customer Owned Line Agreement is required. Due to the nature of this facility, installation of an approved reduced pressure zone backflow preventer assembly (RPZ) is required on the domestic water service. This assembly must be installed prior to the first point of use. Central Arkansas Water (CAW) requires that upon installation of the RPZA, successful tests of the assembly must be completed by a Certified Assembly Tester licensed by the State of Arkansas and approved by CAW. The test results must be sent to CAW's Cross Connection Section within ten days of installation and annually thereafter. Contact the Cross Connection Section at 377-1226 if you would like to discuss backflow prevention requirements for this project. Fire Department: Place fire hydrants per code. Contact the Little Rock Fire Department for additional information. County Planning: No comment received. CATA: The site is not located on a dedicated CATA Bus Route. Parks and Recreation: The Parks Department would like the landowner to allow trail access both to and by the property. Contact Mark Webre for additional information. F. ISSUES/TECHNICAUDESIGN: Planning Division- No comment. Landscape: 1. Site plan must comply with the City's landscape and buffer ordinance requirements. 2. The landscape ordinance requires eight percent (8%) of the paved surface area be allocated for interior islands. These islands must be a minimum of three hundred square feet in area and evenly distributed throughout the site. n April 8, 2010 SUBDIVISION ITEM NO.: 7 !Cant. FILE NO.: Z-8523-A 3. An automatic irrigation system to water landscaped areas will be required. 4. Prior to the issuance of a building permit, it will be necessary to provide an approved landscape plan stamped with the seal of a Registered Landscape Architect. 5. The City Beautiful Commission recommends preserving as many existing trees as feasible on this site. Credit toward fulfilling Landscape Ordinance requirements can be given when preserving trees of six (6) inch caliper or larger. G. SUBDIVISION COMMITTEE COMMENT: (March 18, 2010) Mr. Robert Brown of DCI was present representing the application. Staff presented an overview stating the Commission reviewed a rezoning request for an area including this tract at their previous public hearing. Staff stated the property was presently zoned R-2, Single-family but the requested rezoning was for 0-2, Office and Institutional District. Staff stated the review was based on the development criteria for the 0-2 zoning district. Staff stated the Planning Staff comments were more informational than additional information required. Public Works comments were addressed. Staff stated Pride Valley Road was classified on the Master Street Plan as a collector street. Staff stated a 30 foot right of way dedication would be required from centerline. Staff stated a special grading permit for flood hazard areas would be required prior to construction. Staff stated driveway widths did not meet the traffic access and circulation requirements. Mr. Brown stated the desire was to create a boulevard entrance to the building. He stated he would work with the Fire Department and Public Works staff to satisfy their concerns related to the driveway widths. Landscaping comments were addressed. Staff stated eight percent of the interior parking.areas were to be landscaped with landscape islands. Staff stated an automatic irrigation system would be required to water landscaped areas. Staff also stated at the time of development a landscape plan stamped with the seal of a registered landscape architect would be required. Staff noted comments from the other reporting departments and agencies suggesting the applicant contact them individually for additional clarification. There was no further discussion of the item. The Committee then forwarded the item to the full Commission for final action. 7 April 8, 2010 SUBDIVISION ITEM NO.: 7 Cont. H. ANALYSIS: FILE NO.: Z-8523-A Mr. Robert Brown submitted a revised site plan to staff addressing the few issues raised at the March 18, 2010, Subdivision Committee meeting. The request includes a variance to allow the driveway to remain as proposed. The request also includes a deferral of the sidewalk placement along the western side of the new collector street until such time this area is developed. The revised cover letter states all permits will be acquired prior to construction on the site. The site is being reviewed with the 0-2, Office and Institutional zoning district criteria. The 0-2 zoning district states no building hereafter erected or structurally altered shall exceed a height of forty-five (45) feet at the required front, side or rear yard setback lines. Building heights proposed in excess of forty-five (45) feet may be authorized by the planning commission in conjunction with the site plan review. However, the following formula shall rule: At the height permitted at said yard setback lines, one (1) foot may be added to the height of the building for each foot that the building or portion thereof is set back from the required yard lines. In no instance shall the maximum height of the building exceed one hundred twenty (120) feet. The building is indicated with a maximum building height of 84 feet and a setbacks ranging from 88.81 feet to 104.7 feet. The building height proposed is within the allowance of the 0-2 zoning district. The front, side and rear yard setbacks per the 0-2 zoning district shall not be less than twenty-five (25) feet. The setbacks far exceed the typical ordinance standards of the 0-2 zoning district. A security fence is proposed surrounding the Operations Center the eastern most building located on the site plan. The fence will be six (6) feet in height and is proposed as a security style ornamental metal picket with top pickets that are bent outward on the north, west, and south sides. Within the buffer area on the eastern side, the fence will be a six (6) foot black chain link fence with security wire turned to the inside of the enclosure. The entire perimeter of the overall site will not be fenced. The 50-foot land use buffer on the eastern perimeter will be maintained with a minimum of 70 percent of the area undisturbed to comply with ordinance requirements. Mr. Brown has indicated undisturbed areas and other tree preservation areas will be protected with temporary fencing during construction to prevent access and disturbance. The developers :, April 8, 2010 SUBDIVISION ITEM NO.: 7 [Cont. FILE NO.: Z-8523-A have indicated there will be a strong effort to preserve existing trees in all perimeter areas wherever feasible. The request includes a variance of Sections 30-43 and 31-210 to allow a drive in excess of 36 feet on the new collector street. The main entrance drive is proposed with an opening 50 feet in width. The drive allows for one entrance lane and two exit lanes with a ten foot landscape median. The applicant has provided an approved plan from the Little Rock Fire Department stating their concurrence with the drive as proposed. Public Works has also indicated support of the drive. The developers have indicated the variance request to maintain the drive widths as shown in the boulevard street section will enhance traffic calming through the site and discourage truck access at this location. The request also includes a deferral of the sidewalk construction on the western half of the new collector street until the property located adjacent to the sidewalk is developed. The developers have indicated the required half -street right-of-way dedications, with an area for a right turn lane on Pride Valley Road will be provided upon completion of the improvements. Upon completion of the street improvements for the new collector street the right of way will also be provided to the City. The required half -street street improvements, with a right turn lane, on Pride Valley Road will be installed per the Boundary Street Ordinance. The south half of Pride Valley Road will be widened to 18 feet with asphalt only. At this time there is no additional widening proposed for Pride Valley Road west of the new collector street. A transition back to the existing pavement width will be provided at this location. The street design for the new collector street will meet the Master Street Plan standards. According to the developer all street and drainage improvements will be built at the time of construction of the street. Sidewalks will be constructed along the east side. The request includes a deferral of sidewalk placement on the west side until the adjacent property develops. The site plan includes several possible locations for surface detention on the site plan. The developer has indicated the method proposed is to create small berms within the wooded areas to accomplish temporary ponding and provide the required detention. 9 April 8, 2010 SUBDIVISION ITEM NO.: 7 (Cont.) FILE NO.: Z-8523-A The developer has reviewed the floodway easement with City of Little Rock Engineering and both agree that the easement and access easement along the floodway should follow the floodway lines established in the FIRM maps that are pending approval at this time. The floodway line in this area will move between 124 and 145 feet north of the applicant's boundary when the map revisions are confirmed. Neither of the easements will be required as a part of the current site plan review request or permitting for Southwest Power Pool. There will be no alteration of the Rock Creek water course that is a part of this project. A flood map revision for the proposed Kirk Road bridge is not required. The bridge has been designed so there is no rise in flood elevations. A 404 Permit is currently in process with the Corps of Engineers for the Kirk Road bridge and is a separate infrastructure project by the current land owners. The landscape ordinance requires eight percent (8%) of the paved surface area be allocated for interior islands. These islands must be a minimum of three hundred square feet in area and evenly distributed throughout the site. The revised site plan has increased the sizes of two islands at the Operations Center parking lot. Two additional islands were added to the future building lot at the north. The parking area in front of the main building is the top level of a parking deck structure and tree islands will not be installed there. The parking deck structure is proposed to minimize the surface area of parking and maximize tree preservation on the remainder of site. The developers have indicated there will be significant numbers of existing trees preserved on this site. To staff's knowledge there are no outstanding technical issues in need of addressing related to this item. The site plan review for the site is based on development criteria for 0-2 zoned property. Based on the development standards of the various City ordinances the development appears to meet the intent. Although there are two ordinances the developers are seeking variances from staff does not feel these variances will significantly impact the development or the area. Staff recommends prior to development of the site the rezoning request be finalized and approved by the Little Rock Board of Directors. STAFF RECOMMENDATION: Staff recommends approval of the request subject to compliance with the comments and conditions as outlined in paragraphs, D, E and F of the agenda staff report. 10 April 8, 2010 SI IRnIVi.qInN ITEM NO.: 7 (Cont.) FILE NO.: Z-8523-A Staff recommends the property be rezoned to 0-2, Office and Institutional District prior to development of the site. Staff recommends approval of the variance request from Sections 30-43 and 31-210 to allow the driveway to remain with a minimum spacing from the property line less than typically required per the ordinance and to allow the driveway width to exceed the width typically allowed per City ordinance. Staff recommends approval of the deferral request to allow the placement of the sidewalk along the western side of the new collector street until such time as the property adjacent to the sidewalk is developed. PLANNING COMMISSION ACTION: (APRIL 8, 2010) Mr. Robert Brown of Development Consultants, Inc. was present representing the request. There were registered objectors present. The item was heard in conjunction with an annexation request for a larger area than the site proposed for development (A-319). Staff presented an overview along with a recommendation of approval of the request subject to compliance with the comments and conditions as outlined in paragraphs, D, E and F of the agenda staff report. Staff presented a recommendation the property be rezoned to 0-2, Office and Institutional District prior to development of the site. Staff presented a recommendation of approval of the variance request from Sections 30-43 and 31-210 to allow the driveway to remain with a minimum spacing from the property line less than typically required per the ordinance and to allow the driveway width to exceed the width typically allowed per City ordinance. Staff presented a recommendation of approval of the deferral request to allow the placement of the sidewalk along the western side of the new collector street until such time as the property adjacent to the sidewalk is developed. Staff stated the applicant was requesting variance from the Land Alteration Regulations per Section 29-187(e)(3) to exceed the cut and slope requirements of Section 29-190. Staff stated the applicant was proposing 2:1 slopes which were steeper than the maximum allowed of 3:1 slope without installing retaining walls or terraces. Staff stated the applicant was also proposing a 31 foot cut just east of the office building which exceed the maximum allowed 30 foot cut. Staff presented a recommendation of approval of a variance request from the Land Alteration Regulations per Section 29-187(e)(3) to exceed the cut and slope requirements of Section 29-190. Staff stated the applicant was proposing the 2:1 slopes to preserve trees for LEED certification. Staff stated the slopes would 11 April 8, 2010 SUBDIVISION ITEM NO.: 7 (Cont.) FILE NO.: Z-8523-A be hydroseeded with drought tolerant grass mixtures and covered with erosion control blankets. Mr. Randy Copper addressed the Commission with concerns. He stated the intersection of Pride Valley Road and Kanis Road was very congested during drop-off and pick-up times of Baker Elementary School. He questioned if the new road accessing the site would be open at the time Southwest Power Pool began operations from this site. Mr. Barry Haas addressed the Commission stating he was not objecting to the request but was providing information to the Commission concerning the water district located in the area. He stated the property was located within Water District 349. He stated the property would be assessed for payment of the water district dues even if the property received water from another source. Ms. Jenny Adair addressed the Commission with concerns. She questioned how site lighting would be handled. She stated the homes in the area were located in the country and for the development to have a vast amount of lighting would be out of character for the area. She questioned who the neighborhood would contact during construction if litter became a problem. She also questioned who to contact if there were issues with Pride Valley Road. She questioned if any additional building could be expected outside the plan presented. Mr. Robert Brown addressed the Commission stating a traffic study had been conducted on the site and the traffic engineers felt the new road and Pride Valley Road could handle the additional traffic to the area. He stated the extension of Kirk Road would be complete by the time Southwest Power Pool began operating from the site. He stated the developers were well aware of the water district assessment and were working to determine the best way to pay the assessments. Mr. Brown stated the site would contain lighting but all lighting would be directed into the site. He stated with the extensive buffering on the site and the building being set down into the cut -slope it was unlikely the lighting would be visible to the neighbors. He stated the City would require streetlights to be installed on the new street and Pride Valley Road which he felt would have more of an impact than the development. Mr. Brown stated the only construction would be the office building and operations center. He stated the site plan did include a building for future expansion. There was a general discussion by the Commission concerning the request and access to the site. Mr. Brown stated the extension of Kirk Road would be complete prior to Southwest Power Pool obtaining their certificate of occupancy. The Commission questioned the number of jobs created and the number of employees of the company. Mr. Brown stated preliminary estimates were the 12 April 8, 2010 SUBDIVISION ITEM N FILE NO.: Z-8523-A creation of 200 jobs and at the peak 500 employees would access the site. He stated not all employees worked an 8:00 am to 5:00 pm day. He stated the operations employees worked a different schedule than the office workers. The Chair entertained a motion for approval of the variance request from the Land Alteration Ordinance. The motion carried by a vote of 10 ayes, 0 noes and 1 absent. The Chair entertained a motion for approval of the item as presented by staff. The motion carried by a vote of 10 ayes, 0 noes and 1 absent. 13