HomeMy WebLinkAboutZ-8442-A Map 2T� Fn.d.
Rod
W,�rE
SI
0' 20' 40* R
10
"ALE 1 20 O
BASIS OF BEARING. �
ASSUMED T�''�6
i
o
J
-
Fnc�
A/C
1, Reb,
2" a3
'- -
4 �-
# 9730
wCa7
MTS89°43'23"
146,130'
I
0
0
97.0� # h9.
LOT
6
_ .
# 8.5G
# 98/19
CO
# 97./ ..
o�-A'b000.00
E5000-00
0
LLE1 100.00
O
�
--—Bil.k�
# 96.67
A/
°E
S89059'48"E
146.32
1 °.. Rebar
ELE
Note:
All utilities shown per visible field evidence. Sub-surfarr,
utilities were not located on this project. Surveyor is not
responsible for existing underground utilitiesthat are incorrectly
located, emitted frorn or added to this plat.
J -1.J2
-Block Wall
146.46'
6.69 � �-
1.12 � #
951—
97.75
20' Allcy per City of
Little Rock Parcel Map
(Not on record per City
\ of Little Rock Public
Works Dept.) Assumed
9.7; :�/ Closed.
M S'8.9059'48"E 50.00'
96.=5
—Reba.r
S.31 # 6. 3
# 96 27
Fnd. —�
3, 4" Pipe
96, 90
9[ 52
9.6�9r_49
r- c- 1 story
p Frame \'
Residence
LOT 8
ARKANSA.S' BAP
Tl•'t'
COLLEGE \\ # Block Wall
32.36 16.00' �b5 LOT 10
�i?1t�'M�AS BAPTL-
"i lewatk°
�l
C�LLEG1:'
c
p 98.42
End.
Chisled "Y'Q 1
i
Lo
1 Story
Concrete
Building
Asphalt
5.73
41.92
1I
N1=S89058*12"Eg146. � - End. \\
4 Pipe
�� ,� -7 -
ZOT 9 Q 28.70'
-4RAANl:z AS BAPTISTS I Story
_ COLLEGE :�� j Frame
z
Reside nce.
LC 14.18'
C Covere ^:
c P O ch or r;1420I
Set V2-
Rebar
b End.
a L' Set 1/2"� 2 yv 1" Pipe
146.23' ¢� Rebar 8.902 ' 8"E' 50.00 11T: N89°22'et -38"E 50.Q2'
c
n .
1" Pipe
95.92
CL ih 161h Sl. —
A survey
of Lots 8,9
and 10,
all in
Block 26,
Centennial
Addition
f- the
City of Little
Rock, Arkalzs(i-_
recorded
in Book G3,
Pa ye 256"). in i lz�
J
r anscf
'c�u liouse.�
a
I fo zl o d)
This
„ _
u.11=
rzohl' of
It.,a y and
easements
on record-.
LEGEND
6
Gas Riser
0)
Clean, Out
(a
Sanitary Sewer Manhole
®
Metal Drainage Grate
T
Telephone Pedestal
T7ee
tJ
Electric ,deter
-`
Power Pole
-
Guy Wire Ane1107-
�-
Light Pole
Sign
4.
Center Line
Basketball coat
P
Flag Pole
G
Control Points
e
Teth.erball Pole
Fire Hydrant
..
Gate Post
Gas Meter
s
Water Meter
S 8C Manhole
Water Valve
Inlet Manhole
Junction Box
-�:
Handicap Parking
w3
Down Spout
•
Found Monument
o
Set Monu7nent
rc�
Concrete Guard Post
®
Mailbox
RPZ Valve
0
Shrub
�pk
Right of Way Monument
�
Water Hydrant
-
Underground Telephone
= —
Sanitary Sewer Main
Overhead Electric
- c —
Underground Gas
w—
Waterline
- —
Underground Electric
Fence
Concrete
-�
1 I/ - CERTIFICATE
ELL, THl' UitiDERSICATED, A REGISTERED LAND SURVEYOR HEREBY CERTIFIES THAT (A) THIS SURVEY A -VD THE PROPERT)
DESCRIPTION SET FORTH HEREON ARE TRUE AND CORRECT AND PREPARED FROM A\' -ACTUAL OA-THE CP,OL AD SUP.V£Y OF THE
REAL PP,OPERTY SHOWN HEREON: (B) SUCH SURVEY WAS CONDUCTF,D BY THE St RVEYOR OR UNDER HL- DIRECT StPEPI-ISIO"NT.
(C) ALL MONUMENTS SHOWN HEREON ACTUALLY EXIST AND THE LOCATION, SIZE AND TYPE OF MATERIAL THEREOF ARE
CORRECTLY SHOWN (D) DISTANCES ARE GIVEN IN FEET AND DECIMAL PART THEREOF (E) THE BO \DAPIES, DIME -SI0:'VS,
AND OTHER DETAILS SHOWN HEREON ARE TRUE AND CORRECT.
FOR THE USE AND BENEFIT OF ARKANSAS BAPTIST COLLEGE
BY------- -
R£GISTERED LA \-D SURVEYOR # 1542
DATE
J
ti
J
v
�
o
ca
u