HomeMy WebLinkAboutZ-8416-A Staff AnalysisJune 30, 2011
ITEM NO.: 6 FILE NO.: Z-8416-A
NAME: Liberty Hill Missionary Baptist Church Parking Lot —
Conditional Use Permit
LOCATION: 1215 S. Schiller Street
OWNER/APPLICANT: Liberty Hill Missionary Baptist Church/Patrick McGetrick
PROPOSAL: fA conditional use permit is requested to allow for the
expansion of an existing church parking lot onto these
two vacant, R-4 zoned lots.
SITE LOCATION:
The church is located on the southeast corner of West 12th and S. Schiller
Streets. The proposed parking lot expansion is located at the south end of
the church property, on the east side of S. Schiller Street.
2. COMPATIBILITY WITH NEIGHBORHOOD:
The church is located in an area of mixed zoning and uses; including a
variety of residential uses, a beauty salon, Central High and the Central
High Visitors Center facilities. The property is outside of the Central High
DOD. Single-family residences are located to the south and east. A few
vacant lots, including these two, are scattered throughout the area. With
attention given to properly screening and landscaping, the proposed
parking lot expansion should be compatible with the neighborhood.
Notice was sent to all owners of properties located within 200 feet of the
site, all residents within 300 feet who could be identified and the Central
High and Capitol Hill Neighborhood Associations.
3. ON SITE DRIVES AND PARKING:
An existing parking lot is located directly south of the church. Three (3)
driveways provide access to that parking lot. This proposal is to expand
the parking lot onto two (2) vacant lots adjacent to the south. Each of the
residential lots have a driveway; resulting in a total of five (5) driveways on
the site. The applicant proposes to reconfigure the existing driveways and
create one driveway for the new parking lot; resulting in a total of four (4)
driveways. Access will also be provided onto the alley, which will be
improved by the applicant. Additional parking is located east of the alley.
June 30, 2011
ITEM NO.: 6 Cont. FILE NO.: Z-8416-A
4. SCREENING AND BUFFERS:
Site plan must comply with the City's landscape and buffer ordinance
requirements.
The zoning buffer ordinance will require a land use buffer along the
southern perimeter of the site. Seventy percent (70%) of the area must
remain undisturbed. If sufficient vegetation is not present then additional
landscaping will be required to be planted within this land use buffer area.
Screening is required due to the residential use along the western
perimeter of the site. This screening is to be a six (6) foot high opaque
screen, either a wooden fence with its face side directed outward, a wall,
or dense evergreen plantings. Preserved vegetation may suffice for this
screening requirement thus eliminating the need for an opaque fence.
This area is not to be thinned/cleared out and must provide a year around
screening to suffice.
An automatic irrigation system to water landscaped areas will be required
The City Beautiful Commission recommends preserving as many existing
trees as feasible on this site. Credit toward fulfilling Landscape Ordinance
requirements can be given when properly preserving trees of six (6) inch
caliper or larger.
5. PUBLIC WORDS COMMENTS:
1. Driveway locations and widths do not meet the traffic access and
circulation requirements of Sections 30-43 and 31-210. Only a total of
two (2) driveways can be installed to access the existing parking lot
and the proposed parking lot. The width of driveway must not exceed
thirty-six (36) feet.
2. At time of building permit issuance since the alley is being used for
access to the parking lots, the alley should be repaved providing a
width of twenty (20) feet of asphalt adjacent to the property.
6. UTILITY FIRE DEPT. AND CATA COMMENTS:
Wastewater: Sewer available to this project.
Entergy: Approved as submitted.
Centerpoint Energy: Approved as submitted.
2
June 30, 2011
ITEM NO.: 6 (Cont.) _ FILE NO.: Z-8416-A
AT&T (SBC): No comments received.
Water: No objections. All Central Arkansas Water requirements in effect
at the time of request for water service must be met.
Contact Central Arkansas Water if additional fire protection or metered
water service is required or regarding the size and location of the water
meter.
Due to the nature of this facility, installation of an approved reduced
pressure zone backflow preventer assembly (RPZ) is required on the
domestic water service. This assembly must be installed prior to the first
point of use. Central Arkansas Water (CAW) requires that upon
installation of the PRZA, successful tests of the assembly must be
completed by a Certified Assembly Tester licensed by the State of
Arkansas and approved by CAW. The test results must be sent to CAW's
Cross connection Section within ten (10) days of installation and annually
thereafter. Contact the Cross connection Section at 377-1226 if you
would like to discuss backflow prevention requirements for this project.
Fire Department: Approved as submitted.
County Planning: No Comments.
CATA: Approved as submitted. A CATA bus route is located along 12`h
Street.
SUBDIVISION COMMITTEE COMMENT: (JUNE 9, 2011)
Patrick McGetrick was present, representing the application. Staff presented the
item and noted additional information was needed regarding any future fencing,
site lighting and signage. The applicant was advised to provide a copy of the bill
of assurance. In response to a question, Mr. McGetrick stated he thought the
previously approved charter school was still operating in the church.
Public Works and Landscape Comments were discussed. Mr. McGetrick stated
he would get with Public Works staff to address the driveway issue. The
Committee determined it was appropriate to require a nine (9) foot wide land use
buffer on the south; based on the width of the new parking lot, not the overall
depth of the entire church site. Mr. McGetrick asked if the screening requirement
along the south perimeter could be waived if that neighboring property owner
requested such. Staff responded that the screening requirement could be
waived but the minimum landscaping requirements must be installed.
3
June 30, 2011
ITEM NO.: 6(Cont.)FILE NO.: Z-8416-A
The applicant was advised to submit responses to staff issues no later than
Wednesday, June 15, 2011. The Committee forwarded the item to the full
Commission.
TAFF ANALYSIS;
Liberty Hill Missionary Baptist Church is located at the southeast corner of West
12th and Schiller Streets. The church building is located on the corner and
parking is located south of the church, along the east side of Schiller Street. On
November 13, 2008, the Commission approved a conditional use permit to allow
a charter school to locate in a portion of the existing church building. The church
is requesting approval of a conditional use permit to allow for the extension of the
parking lot onto two (2) vacant residential lots adjacent to the south of the
existing parking lot: The existing parking lot driveways will be reconfigured and a
new driveway will be constructed. When the project is complete, there will
actually be one less driveway than currently exists on the site. For this reason
and due to the light traffic volume on Schiller Street, Public Works staff will
support a driveway spacing variance to allow the driveways as proposed.
The revised plan indicates the required landscape areas, as agreed to at
Subdivision Committee. No signage is proposed. The neighboring property
owner to the south has requested that screening not be installed. Landscaping
will be placed in this area as would typically be required in perimeter planting
strips. Lighting will be installed on existing poles at the corners of the property.
The lighting will be low-level and directed inward to the site. The century -old bill
of assurance for Centennial is handwritten and illegible but likely does not
address use issues.
To staff's knowledge, there are no issues.
STAFF RECOMMENDATION:
Staff recommends approval of the requested C.U.P. subject to compliance with
the comments and conditions outlined in Sections 4, 5 and 6 of the agenda staff
report.
Staff recommends approval of a driveway spacing variance to allow the
driveways as proposed.
Staff recommends approval of a buffer/screening variance on the south perimeter
subject to that area being landscaped as typically required in a perimeter
landscape strip.
El
June 30, 2011
ITEM NO.: 6 (Cont.) FILE NO.: Z-8416-A
PLANNING COMMISSION ACTION: (JUNE 30, 2011)
The applicant was present. There was one objector present. Staff presented the
item and a recommendation of approval as outlined in the "staff
recommendation" above.
Patrick McGetrick, the applicant, stated he would reserve his time to respond to
issues that might be raised by the objector.
Kinyonna Tilmon, of 1318 S. Summit St., spoke in opposition. She stated the
church had existing parking lots that were not being used. She questioned the
loss of green space.
Mr. McGetrick stated the lots were currently vacant. He stated two (2) of the four
(4) existing trees on the site would be saved. Mr. McGetrick stated the existing
parking was being re -striped which would result in the loss of some of the
spaces. He stated the church had expansion plans. He stated the new parking
would be landscaped and the alley would be improved.
In response to a question from Commissioner Nunnley, Mr. McGetrick stated the
expansion plans had not been formalized.
In response to a question from Commissioner Fountain, Mr. McGetrick stated the
alley would be paved and widened.
A motion was made to approve the application, including all staff comments and
conditions. The motion was approved by a vote of 10 ayes, 0 noes and 1 absent.
5