HomeMy WebLinkAboutZ-8416 Staff AnalysisNovember 13, 2008
ITEM NO.: 9
FILE NO.: Z-8416
NAME: Collegiate Choices Charter School —
Conditional Use Permit
LOCATION: 1215 S. Schiller Street
OWNER/APPLICANT: Liberty Hill Baptist Church/
Todd Rice, CBC Hathaway Group
PROPOSAL: A conditional use permit is requested to allow a
portion of the existing church building on this R-4/C-3
zoned property to be used for a charter school.
SITE LOCATION:
The site is located at the southeast corner of West 12th Street and S.
Schiller Street.
2, COMPATIBILITY WITH NEIGHBORHOOD:
The existing church is located on an arterial street in an area of mixed
zoning and uses. The Arkansas Children's Hospital campus is located
generally northeast of the site. The block of 0-2 zoned property directly to
the north is undeveloped. Properties to the east are zoned 0-3 and R-4
and contain a barber shop and the church parking lot. Kids First Child
Development Center, a function of UAMS, occupies the C-3 zoned block
located to the east. Single family and two-family residences are located to
the west and south. The school proposes to utilize one building of this
existing church. The existing parking lots will be used as well. Allowing
the addition of the proposed school to this existing institutional site
appears to be compatible with the neighborhood.
All owners of properties located within 200 feet of the site; all residents
within 300 feet who could be identified and the Capitol Hill and Central
High Neighborhood Associations were notified of this request.
3. ON SITE DRIVES AND PARKING:
The proposed school will have an enrollment of up to 216 students in
grades 5 through 8. Staffing will consist of no more than 20 persons. The
church property includes a 40+ space parking lot located south of the
November 13, 2008
ITEM NO.: 9 (Cont.
tIWi LI05WAt ,[i[:
building and a 50+ space parking lot located across the alley to the east of
the building.
Staff parking will occur in a portion of the parking lot south of the church.
The rear portion of that parking lot will be utilized as an outside play area.
The parking lot to the east of the church will remain available for use as
needed.
Drop-off or pick-up of students is proposed to occur at the front door of the
education facility, on the Schiller Street side. The street is wide enough to
accommodate two-way traffic and still allow a safe parking area adjacent
to the curb in front of the building for drop-off and pick-up. Prior to the
start of the school year, instructions will be provided to all parents
regarding drop-off and pick-up procedures. Those bringing students to the
school or picking students up will be directed to arrive from the south.
They will then exit to the north, onto West 12th Street. A paid traffic officer
will be utilized to facilitate traffic movement through the Schiller
Street/West 12t" Street intersection. School staff will oversee the drop-off
and pick-up process directly in front of the school. The City is agreeable
to a plan to mark the area in front of the building for drop-off and pick-up
during designated hours each school day.
4. SCREENING AND BUFFERS:
No comments on this use -only issue. Any additional development of
buildings or parking areas will require compliance with the City's
landscape and buffer ordinances.
5. PUBLIC WORKS COMMENTS:
1. Provide a traffic flow plan for faculty access and student drop-off and
pick-up.
2. At the time of development, if the alley is planned to be used for
proposed traffic patterns, the alley should be repaved for your use.
6. UTILITY. FIRE DEPT. AND CATA COMMENTS:
Wastewater: Sewer available to this project.
Entergy: No comments received.
Centerpoint Energy: No comments received.
AT&T (SBC): No comments received.
2
November 13, 2008
ITEM NO.: 9 (Cont.) FILE NO.: Z-8413
Water: Contact Central Arkansas Water if larger and/or additional water
meter(s) are required.
Fire Department: No comments received.
County Planning: No Comments.
CATA: This site is located on a CATA bus route.
SUBDIVISION COMMITTEE COMMENTS: (OCTOBER 23, 2008)
Todd Rice was present, representing the application. Staff briefly described the
proposed conditional use permit for a charter school. Staff noted that a copy of
the current Bill of Assurance needed to be provided. Mr. Rice explained that a
title company had searched for a Bill of Assurance, but could not locate one.
Staff noted that some additional information was needed related to a signage
plan, playground area, drop off/pick-up areas and days/hours of operation. Mr.
Rice indicated that the additional information, along with a corrected survey,
would be provided to staff. He explained that the church is not currently using
the portion of the building proposed for the charter school.
The Public Works requirements were briefly discussed. After the discussion, the
Committee forwarded the application to the full Commission for final action.
STAFF ANALYSIS
Liberty Hill Baptist Church is located on the R-4 and C-3 zoned property at 1215
S. Schiller Street. The church's two-story brick, education building is located on
the north perimeter of the site. The education building is currently not being used
by the church. A conditional use permit is requested to allow Collegiate Choices
to operate a charter school for children in grades 5 through 8 in the education
building.
The Charter School is anticipated to open with an initial enrollment of 100
students; expanding to its total enrollment of 216 students by the beginning of the
second year of operation. The school plans on a staff of no more than 20
persons. Hours of operation will be 7:00 a.m. to 6:00 p.m., Monday through
Thursday and 7:00 a.m. to 4:30 p.m. on Friday. The school will be closed to
normal classroom activity on weekends.
The church property contains a 40+ space parking lot located south of the church
building and a 50+ space parking lot located across the alley, east of the building.
Employee parking will occur in the front (west) portion of the south parking lot.
3
November 13, 2008
I�►�i�►[�1�'l[+�7ii�
FILE NO.: Z-8416
The rear (east) portion of the south parking lot will be used for playground area.
The parking lot east of the alley will remain available for use if needed. An
existing small playground belonging to the church, located east of the alley, will
also be used.
Staff is not aware of any outstanding issues. The applicant has responded to
issues raised at Subdivision Committee. A traffic circulation/drop-off and pick-up
plan has been submitted and approved by staff as reflected in Section 3 of the
agenda staff report. The 1925 bill of assurance does not address use issues.
The applicant is proposing to utilize an under-utilized portion of this existing
church. No exterior changes are proposed other than for the use of a portion of
the south parking lot for a playground area. Staff believes the proposed use is
compatible with uses in the area.
STAFF RECOMMENDATION:
Staff recommends approval of the requested C.U.P. subject to compliance with
the following conditions:
1. Compliance with the comments and conditions outlined in Sections 4, 5 and 6
of the agenda staff report.
2. Signage is to be limited to that allowed in office and institutional zones.
3. A 6-foot tall, opaque, wood screening fence is to be erected on the south and
east perimeters of the playground area located south of the church building.
PLANNING COMMISSION ACTION: (NOVEMBER 13, 2008)
The applicant was present. There were no objectors present. Staff presented
the item and a recommendation of approval subject to compliance with the
conditions outlined in the "staff recommendation" above. There was no further
discussion. The item was placed on the consent agenda and approved as
recommended by staff. The vote was 7 ayes, 0 noes, 2 absent and 2 open
positions.
12