HomeMy WebLinkAboutZ-8367 Staff AnalysisFILE NO.: Z-8367
NAME: BCD Empowerment Center Short -form POD
LOCATION: Located at 3604 West 12th Street
EVELOPER:
Black Community Developers, Inc.
3805 West 12th Street
Little Rock, AR 72204
ENGINEER:
Crafton Tull and Sparks
10825 Financial Center Parkway
Little Rock, AR 72211-3554
AREA: 1.65 acres NUMBER OF LOTS: 1 zoning lot FT. NEW STREET: 0 LF
CURRENT ZONING: R-3, Single-family and R-4, Two-family
ALLOWED USES: Single-family residential and duplex housing
PROPOSED ZONING: POD
PROPOSED USE:
Residential alcohol and drug treatment
VARIANCES/WAIVERS REQUESTED: None requested.
A. PROPOSAL/REQUEST/APPLICANT'S STATEMENT:
The project will occupy all b.ut one lot of an entire block in the Coy's
Addition to the City of Little Rock. The plan is to remove all the existing
structures and build the proposed Empowerment Center. The idea behind
the overall layout and architecture is to maintain the neighborhood feel
and curb appeal with pedestrian friendly front fagade and porch with all the
vehicular traffic being located in the rear. The developers have located all
dumpster and service areas adjacent to the commercial uses along the
west, and the main office parking area with entry court is located on the
northeast corner of the site. Additional screening of the parking area is
provided by the installation of a 3 Y2 foot screening fence on the north side
FILE NO.: Z-8367 (Cont.)
of the parking lot. There will also be an outdoor courtyard and activity
area in the center of the site between the dormitory buildings. This area
will be fenced with a 6-8" privacy fence for control, security and privacy of
the patients within the facility.
The Empowerment Center is proposed as a state of the art, living and
learning center. One of the programs of the Empowerment Center will be
to provide residential alcohol and drug treatment services. Not only will
the program provide certified cutting edge prevention, intervention and
treatment services, but also comprehensive life skills training designed to
empower residents to succeed in all aspects of their life.
The mission of the Empowerment Center is to be a highly customized
living and learning, program providing independent living skills, vocational
training with a focus on the green environment and social integration. The
entire community will benefit from continued and additional
comprehensive programs that include support services, research,
education, prevention, intervention and treatment. The vision for the
Empowerment Center is to be a cognitive behavioral therapeutic program
implemented in a premier facility providing empowerment programs for the
community. The Empowerment Center will be a unique facility which will
provide a holistic approach to living.
The Empowerment Center will serve as a national model for faith and
community based organizations. The Center will provide hands-on
training to interested nonprofits, church groups and educational institutions
from across the nation. In addition, the Empowerment Center staff with
shared expertise through consultation with other faith based programs and
the production of conferences and training seminars for the community at
large.
The Empowerment Center will provide the following space: administrative
office space, office space for (4) potential partners, computer lab, wellness
center, community rooms, commercial kitchen, auditorium/dining room
with seating capacity of 100, fitness room, classroom/training center, male
dormitory (24 beds), female dormitory (24 beds) and lounge.
B. EXISTING CONDITIONS:
The site contains a number of single-family domes most of which are
occupied. The area along West 12"' Street is predominately commercial
and institutional while the areas off West 121" Street are primarily
residential. To the north of the site is a facility providing services to
juveniles. South of the site is Will's House, a facility providing housing for
persons recently released from treatment facilities. West of the site is the
2
FILE NO.: Z-8367 (Cont.)
M
0
Willie Hinton center and further west is the sales store for a non-profit
service provider.
NEIGHBORHOOD COMMENTS -
As of this writing, staff has received a number of informational phone calls
and a number of calls in opposition of the request from area property
owners. All property owners located within 200 feet of the site, all
residents who could be identified, located within 300 feet of the site, along
with the Capitol Hill, the Central High, the Hope, the Forest Hills, the
Stephens Area Faith and the Pine to Woodrow Neighborhood
Associations were notified of the Public Hearing.
ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Due to the proposed use of the property, the Master Street Plan
specifies that Maple Street for the frontage of this property must meet
commercial street standards. Dedicate right-of-way to 30 feet from
centerline.
2. Due to the proposed use of the property, the Master Street Plan
specifies that 11th Street for the frontage of this property must meet
commercial street standards. Dedicate right-of-way to 30 feet from
centerline.
3. Due to the proposed use of the property, the Master Street Plan
specifies that Valentine Street for the frontage of this property must
meet commercial street standards. Dedicate right-of-way to 30 feet
from centerline.
4. 12th Street is classified on the Master Street Plan as a minor arterial
with special design standards. A dedication of right-of-way 35 feet
from centerline will be required.
5. A 20-foot radial dedication of right-of-way is required at all
intersections.
6. With site development, provide the design of street conforming to the
Master Street Plan. Construct one-half street improvement to Maple
Street including 5-foot sidewalks with the planned development. The
new back of curb should be 18 feet from centerline. The intersection
curb radius at Maple Street and 11th Street should be improved to a
30-foot radius as shown on plan.
7. With site development, provide the design of street conforming to the
Master Street Plan. Construct one-half street improvement to 11th
Street including 5-foot sidewalks with the planned development. The
new back of curb should be located 18 feet from centerline or as
3
FILE NO.: Z-8367 (Cont.)
shown on plan. The intersection curb radius at 11th Street and
Valentine Street should be a 30-foot radius as shown on plan.
8. With site development, provide the design of street conforming to the
Master Street Plan. Construct one-half street improvement to
Valentine Street including 5-foot sidewalks with the planned
development. The new back of curb should be located 18 feet from
centerline.
9. The intersection curb radius at West 12th and Maple Streets should
be constructed to a 30-foot radius.
10. Sidewalk easements should be platted where the sidewalk is outside
of the new right-of-way.
11. The sidewalk on Valentine Street should extend to the property in line
with the remainder of the sidewalk and then turn toward Valentine
Street.
12. The curb should be extended to the property line in line with the
remaining curb and then turn toward the existing street.
13. All old curb cuts should be closed with curbing.
14. Repair or replace any curb and gutter or sidewalk that is damaged in
the public right-of-way prior to occupancy.
15. A grading permit in accordance with Section 29-186 (c) and (d) will
be required prior to any land clearing or grading activities at the site.
Other than residential subdivisions, site grading and drainage plans
must be submitted and approved prior to the start of work.
16. Storm water detention ordinance applies to this property. Show the
proposed location for storm water detention facilities on the plan.
17. Plans of all work in right-of-way shall be submitted for approval prior
to start of work. Obtain barricade permit prior to doing any work in
the right-of-way from Traffic Engineering at (501) 379-1805 (Travis
Herbner).
18. If disturbed area is one (1) or more acres, obtain a NPDES storm
water permit from the Arkansas Department of Environmental Quality
prior to the start of construction.
19. On site striping and signage plans should be forwarded to Public
Works, Traffic Engineering for approval with the site development
package.
20. Obtain permits prior to doing any street cuts or curb cuts. Obtain
barricade permit prior to doing any work in the right-of-way. Contact
Traffic Engineering at (501) 379-1805 (Travis Herbner) for more
information.
r.I
FILE NO.: Z-8367 (Cont.
21. Per Section 29-189(d), groups of trees and individual trees that are
not to be removed or are located within required undisturbed buffer
areas shall be protected during construction by protective fencing
and shall not be used for material storage or for a any other purpose.
22. Streetlights are required by Section 31-403 of the Little Rock code.
Provide plans for approval to Traffic Engineering. Streetlights must
be installed prior to platting/certificate of occupancy. Contact Traffic
Engineering 379-1813 (Steve Philpott) for more information.
23. The driveways should be constructed with maximum 15-foot
radiuses.
24. Remove parallel parking spaces from Maple Street due to lack of
sight distance for drivers trying to access Maple Street from the
parking area. This will allow the back of sidewalk to be moved to the
property line.
25. Obtain a franchise agreement from Public Works (Bennie Nicolo,
371-4818) for the vehicle parking in the right-of-way.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer available to this property.
Entergy: No comment received.
Center -Point Energy: No comment received.
AT & T: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in
effect at the time of request for water service must be met. Contact
Central Arkansas Water Works regarding the size and location of the
water meter(s). If buildings are have a fire sprinkler system, please submit
plans for water facilities and/or fire protection system to Central Arkansas
Water for review. Contact Central Arkansas Water regarding procedures
for installation of water facilities and/or fire service. Approval of plans by
the Arkansas Department of Health Engineering Division and Little Rock
Fire Department is required. Fire sprinkler systems which do not contain
additives such as antifreeze shall be isolated with a double detector check
valve assembly. If additives are used, a reduced pressure zone backflow
preventer shall be required.
Fire Department: Install and place fire hydrants per code. Contact the
Little Rock Fire Department for additional information.
County Planning: No comment.
5
FILE NO.: Z-8367 (Cont.)
CATA: The site is not located on CATA Bus Route #3 — the Baptist
Medical.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division: This request is located in the 1-630 Planning District.
The Land Use Plan shows Single Family and Mixed Use for this property.
The applicant has applied for a Planned Office Development for a
residential/training facility.
A Land Use Plan Amendment from Single Family to Mixed Use is a
separate item on this agenda (LU08-09-02).
Master Street Plan: 12th Street is a Minor Arterial. A Minor Arterial
provides connections to and through an urban area and their primary
function is to provide short distance travel within the urbanized area.
Entrances and exits should be limited to minimize negative effects of
traffic and pedestrians on 12th Street since it is a Minor Arterial. Maple
Street, West 11th Street and Valentine Street are Local Streets. The
primary function of a Local Street is to provide access to adjacent
properties. Local Streets which are abutted by non-residential zoning/use
or more intensive zoning than duplexes are considered as "Commercial
Streets". These streets have a design standard the same as a Collector.
These streets may require dedication of right-of-way and may require
street improvements for entrances and exits to the site.
Bicycle Plan: There are no bike routes in the immediate vicinity.
Neighborhood Action Plan: This area is covered by the Stephens
Neighborhood Action Plan. The Public Safety goal states: "Remove
unsafe housing from the neighborhood." This application would remove
several vacant/unsafe buildings from this City block in the neighborhood.
Landscape:
1. The site plan must comply with the City's landscape ordinance
requirements.
2. An automatic irrigation system to water landscaped areas will be
required.
3. Prior to the issuance of a building permit, it will be necessary to provide
an approved landscape plan stamped with the seal of a Registered
Landscape Architect.
1.1
FILE NO.: Z-8367 (Cont.)
4. The City Beautiful Commission recommends preserving as many
existing trees as feasible on tree covered sites. Credit toward fulfilling
Landscape Ordinance requirements can be given when preserving
trees of six (6) inch caliper or larger.
G. SUBDIVISION COMMITTEE COMMENT: (July 17, 2008)
Mr. Barry Williams was present representing the request. Staff presented
an overview of the proposed development stating there were a few
technical issues in need of addressing which had been raised. Staff
stated a minimum of ten to fifteen percent of the site was to be designated
as landscaping. Staff requested the applicant provide the percentage
designated for landscape. Staff also requested Mr. Williams provide the
percentage of building coverage proposed. Staff stated site lighting was
to be directional, directed downward and into the site.
Public Works comments were addressed. Staff stated dedication of right
of way for Maple, 11th, and Valentine would be required to 30 feet from
centerline. Staff stated a right of way dedication of 35-feet from centerline
would be required along West 12th Street. Staff also stated a 20-foot
radial dedication would be required at all the intersections. Staff stated
the intersecting curb of Maple and West 12th Street should be constructed
to a 30-foot radius. Staff stated the proposed parking along Maple Street
should be removed due to sight distance concerns.
Landscaping comments were addressed. Staff stated the street buffer
around the sites entirety was to be 18 feet and in no case less than
one-half. Staff stated an automatic irrigation system was required and
prior to the issuance of a building permit a stamped landscape plan
prepared by a landscape architect would be required. Staff stated street
trees were encouraged.
Staff noted comments from the various other reporting departments and
agencies. There was no further discussion of the item. The Committee
then forwarded the item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised site plan to staff addressing most of the
issues raised at the July 17, 2008, Subdivision Committee meeting. The
applicant has indicated right of way dedications, radial dedications and
street buffering per the typical ordinance standards. The applicant has
also provided the percentage of building coverage and the percentage of
landscape area in the general notes section of the site plan.
7
FILE NO.: Z-8367 (Cont.
The site is being reviewed as an establishment for care of alcoholic,
narcotic or psychiatric patients. According to the definition section of the
zoning ordinance this use is defined as an establishment offering
residence for outpatient treatment to alcoholic, narcotic or psychiatric
patients. The use is an allowable use under the 0-1, Quiet Office Zoning
District. The activities are currently taking place at Hoover Place located
at Hoover Methodist Church just a few blocks west of this site.
The center will provide on -site living accommodations through dormitory
style housing offering 24 beds for females and 24 beds for male clients.
Other activities on the site include office space for (4) potential partners,
computer lab, wellness center, community rooms, commercial kitchen,
auditorium/dining room with seating capacity of 100, fitness room,
classroom/training center. The residential treatment portion of the facility
will operate 24 hours per day. The office portion of the development will
operate during normal business hours with activities such as graduations
or community meetings taking place during non -typical business hours.
These activities will be limited and no schedule has been created for these
activities. Most activities take place on weekends and most nightly
activity should conclude before 9:00 pm.
The site plan includes 22,000 square feet of building space,
22,143 square feet of hardscape area and 24,029 square feet of green
space area. The total square footage designated for green space area
represents 35.25 percent of the site. The site plan also includes an
outdoor courtyard and recreation area and, within the building,
recreational areas will be provided.
44 on -site parking spaces are indicated on the site plan. The developer
also has indicated paving will be added along 11th Street to provide nine
additional parking spaces. Based on typical ordinance requirements the
required parking for the facility would be 51 spaces. The residential
portion of the development would require the placement of 24 parking
spaces and the office portion 27 parking spaces. Staff does not feel the
lesser number of parking spaces will adversely impact the development or
the area. Typically the residents will not be driving.
The building is proposed with a 25-foot front yard setback and an 80-foot
(±) rear yard setback. The western setback is proposed as 17.35 feet
from the property line and the eastern setback is proposed as 16.74 feet.
The site plan indicates the sidewalk located within the property boundary
along the northern, eastern and western perimeters. The developer is
requesting to place the sidewalks as proposed to allow for the addition of
street parking in the future without relocating the sidewalk. A street buffer
averaging eighteen feet in width is typically required around the site's
perimeter and in no case less than nine feet or one-half the buffer
requirement. The site plan indicates the placement of a 12-foot landscape
E:
FILE NO.: Z-8367 (Cont.)
strip, the sidewalk and an additional 17 feet of landscaping along the
western perimeter, a 10 to 12-foot landscape strip along the northern
perimeter with the sidewalk located south of the proposed decorative
screening fence and a 8-foot landscape strip a 6-foot sidewalk and a
12-foot landscape strip along the eastern perimeter. Staff is supportive of
the sidewalks and street buffer as proposed. The sidewalks will be
located within a sidewalk easement. Although, the buffering does not meet
the typical ordinance standards, staff feels the buffering as proposed will
provide adequate landscaping to enhance the site and the area.
The site plan indicates the placement of a screening wall located along the
northern perimeter between the proposed parking area and 11th Street.
The wall is proposed as protection to the nearby residents and to screen
the parking lot and to provide a shield for the automobile headlights
utilizing these stalls. The site plan indicates the placement of a six-foot
opaque privacy fence along the eastern perimeter where adjacent to an
existing single-family home, which is to remain. Site lighting is to be low
level and directional, directed downward and into the site.
The dumpster has been located along Maple Street. The dumpster has
been located near the non-residential activities along West 12th Street.
The dumpster hours of service have not been limited. Staff recommends
the hours of service be limited to daylight hours to lessen the impact on
the nearby neighborhoods.
The maximum building height proposed is 50 feet from the finished floor
elevation. The building is proposed as a multi -story building and
constructed with a hipped roof. The building design is proposed in a
residential style with the building being constructed with architectural
elements to break the massing of the facades. Signage is proposed
consistent with signage allowed in office zones or a maximum of six feet in
height and sixty-four square feet in area.
The developers hope to construct the entire project in a single phase but
have requested a phasing plan for the development of the site. According
to the applicant, the center will be constructed as funding becomes
available. Phase I of the development will consist of one of the dormitory
buildings and about one-half of the parking most closely associated with it.
The courtyard space will also be constructed and a wood privacy fence
will be installed to delineate the courtyard area. The second phase will be
one of two options, the beginning of the administration building to the
south or the erection of the second dormitory building. Regardless, phase
two will include the completion of the parking lot to the north. Phase III will
be the completion of the portion of the administration or dormitory areas
that have not been completed. According to the applicant, the site will be
developed in three phases but there is potential for five phases depending
9
FILE NO.: Z-8367 (Cont.)
upon how the administration building is constructed. The operation of
Phase I includes several options including a temporary kitchen within or
beside the dormitory itself, or the existing kitchen and dining hall at the
Hoover House will be used for meal preparation.
The request includes the phasing of street improvements as well. The
street improvements to Maple Street would be constructed with the first
building and as the second building comes on-line the improvements
nearest the construction will be completed. The improvements to West
12th Street will be completed at the time of the construction of the
administration building. The developer has indicated with the phasing of
the street improvements this will allow the cost to be spread over three
phases reducing the burden of cost.
Staff has concerns with the development's location and the proposed
phasing plan. Staff feels with a portion of the activities taking place at
Hoover House and the remaining activities taking place on this site there
is potential for a saturation of this type of institutional activities within the
neighborhood. To the south of this site is a similar type use, Will's House,
which provides transitional housing for men recently released from
treatment. There are also a number of activities and uses in the area
geared to the youth of the community. North of the site is the Florence
Crittenden House and west of the site is the Willie Hinton Neighborhood
Resource Center. Although, staff feels the activities and undertakings
provided by the Hoover Methodist Church and the Hoover House are
valuable to the community staff questions if this is the appropriate location
for the use. Based on these concerns staff cannot support the request.
STAFF RECOMMENDATIONS:
Staff is not supportive of the request.
PLANNING COMMISSION ACTION: (AUGUST 7, 2008)
The applicant was present. There were no registered objectors present. Staff
stated upon further review, based upon meeting with the applicant and staff, it
had been determined that the proposed facility did not fall under the definition of
a correctional facility. Staff stated as such, no separate Conditional Use Permit
was required. Staff stated the applicant may proceed forward through the
process, as filed. Staff presented a recommendation of deferral of this site to the
September 18, 2008, agenda. Staff stated new notice would be given to all
parties as was done for the initial filing.
10
FILE NO.: Z-8367 (Cont.)
There was no further discussion of the item. The Chair entertained a motion for
placement of the item on the Consent Agenda for Deferral as recommended by
staff. The motion carried by a vote of 9 ayes, 0 noes and 2 absent.
PLANNING COMMISSION ACTION: (SEPTEMBER 18, 2008)
Mr. Barry Williams and a number of representatives of the Black Community
Developers were present representing the request. There were registered
objectors and supporters present. Staff presented the item with a
recommendation of non-support.
Mr. Williams addressed the Commission on the merits and technical aspects of
the development. Reverend Robinson addressed the Commission on the goals
of the Black Community Developers.
Reverend Robinson stated there had been a lot of activity along the 121h Street
Corridor. He stated the BCD wanted to be a part of the new activity and new
development in the area. He stated the City was considering a new police
substation and reviewing efforts for revitalizing the area and the BCD wanted to
share and be a part of the efforts. He stated the BCD had met weekly to ensure
a quality development. He stated he appreciated all who had come to speak in
support of the development and those who came to speak in opposition. He
stated the care provided by BCD needed to take place in the City not in the
County or on the outskirts of the Community.
Mr. Williams stated the activities were currently taking place at Hoover United
Methodist Church. He stated the facility currently housed 24 men. He stated the
center served 12 women also but the women were housed elsewhere. He stated
there were currently eight structures on the block and three were occupied.
Mr. Williams stated the BCD had under contract or had already purchased all the
properties proposed for rezoning. He stated the parking would be placed in the
rear and the structure pulled to the street to have the look and feel of a
residential structure. He stated the building would be constructed of brick and
siding with a front porch along 12th Street. He stated the new facility would be a
5 million dollar investment into the neighborhood. He stated one of the property
owners did not desire to sell and the center would provide buffering and
screening around his home and the office uses would be located within this area
to protect the homeowner.
Mr. Williams stated the BCD had revised their proposed phasing plan due to
concerns raised by staff. He stated the original phasing plan allowed bringing on
line one dormitory at a time which would then leave a portion of the activities at
Hoover United Methodist Church. He stated with the revised plan both dorms
would come on-line in the first phase. He stated the current clients served would
not be increased and the additional space would be used as a temporary kitchen
11
FILE NO.: Z-8367 (Cont.)
and office space. He stated once the administrative offices were completed the
addition dormitory space would be completed and the additional 12 women
clients would be added. He stated all street construction would be completed in
the first phase. He stated the entire site design package would also be
completed with the first phase. Mr. Williams stated the relocation of the
treatment aspect of the BCD activities would allow for a City funded youth
program currently taking place at Hoover United Methodist Church to be
separated.
Reverend John Hammond addressed the Commission in opposition. He stated
there were a number of questions in need of addressing before the Commission
reviewed the request. He questioned the number of patients, the number of
employees, if the patients were local or from other areas of the state or even
nationally. He questioned the success rate of the program. He questioned how
the center would embrace the community. He questioned the age ranges of the
residents. He stated his desire was to see the neighborhood improve but felt this
would detract from the area.
Ms. Nancy Robinson addressed the commission addressed the Commission in
opposition. She stated she was a resident of 824 Johnson Street. She stated
she was opposed to the decision of constructing this facility within a
neighborhood. She stated the value of homes would go down. She stated she
wanted to keep the value of homes up in the area. She stated the neighborhood
was drug infested and the residents could not go out at night because of the
area. She stated she was raising children in the area and the site was located
near her grandchildren's daycare. She stated the 5 million dollars could go to a
better cause and be of better benefit than construction of a rehab center within
the neighborhood.
Mr. Ted Atkins addressed the Commission in opposition of the request. He
stated he had lived in the neighborhood for 30 plus years. He stated there were
two school bus stops located within the area proposed for rezoning. He stated
children walked to school through this area. He stated this was not the location
for a rehab center. He stated he did not want to go out his front door and/or take
his children to the bus stop and be forced to see drug, alcohol or psychiatric
patients.
Ms. Ruth Bell, League of Women Voters, addressed the Commission in
opposition of the request. She stated the League felt this site was inappropriate
for this type facility to be located within a residential neighborhood. She stated
she was aware of the daycare because a number of residents had come down
and spoke at the public hearing addressing the need for the daycare facility. She
stated if BCD was only using one-half of the block with the activities taking place
along 12th Street then the League would be more supportive of the development
in this area. She stated a structure this intense did not belong in a residential
setting.
12
FILE NO.: Z-8367 (Cont.)
Ms. Jeanette Booth addressed the Commission in opposition. She stated she
was the past president of the Pine to Woodrow neighborhood association. She
stated for a number of years she worked to better the community and lost
finances doing so. She stated the desire of the neighborhood was to add value
to the area. She stated the residents took pride in their neighborhood even
though the area was drug infested. She stated she was opposed to a mega
rehab facility within the residential neighborhood. She stated the BCD was
saying a dormitory would add pride and value to the neighborhood and she was
here to tell the Commission no. She stated property values would decrease and
more drug dealers would move to the area. She stated the BCD was not looking
at the big picture but at the inside of the building. She stated a number of the
patients recovered but a number fell back into the previous life. She requested
the Commission vote with the people and the property owners not the building
and the drug use.
Ms. Lorena Bush addressed the Commission in opposition. She stated she had
lived in the neighborhood for 38 years and lived one-half block from the proposed
facility. She stated she was very opposed to the rezoning.
Ms. Maudella Morehead addressed the Commission in opposition. She stated
she represented Hope Neighborhood Association. She stated the anchor of a
neighborhood should be strong and family oriented. She stated the BCD had
opened the doors to recurring substance abusers and housed a substance abuse
living center within crack alley. She stated 12t' Street was the central corridor of
the City and after a number of years the City now recognized this. She stated
work was progressing with the Mayor and City leaders to add vitality back to the
area. She stated her desire was to add residential units to the area. She stated
the neighborhood was looking at plans to add walking paths, open spaces,
restaurants and business to the area. She stated Mid -town was not the place for
this center. She stated the center needed to be on the outskirts of town.
Ms. Quentilla Jones addressed the Commission in opposition of the request.
She stated she lived in the area and her home was one of the homes proposed
for removal. She stated she did not want to move. She stated she had raised
her children in this home and was not ready to sell and move away from the
area.
Mr. William Oldham addressed the Commission in opposition. He provided the
Commission with a petition containing 140 names in opposition of the request.
Ms. Debbie Stripling, Director of the Florence Crittenden Youth home addressed
the Commission in opposition of the request. She stated the youth center
provided services to children whose parents were ordered to treatment centers
for rehab. She stated the court typically did not allow the youth and parents to
have contact. She stated there was a potential for the youth to be housed across
13
FILE NO.: Z-8367 (Cont.
the street from the parents within the treatment program. She stated this could
cause a difficult situation.
Mr. Williams stated Ms. Jones property was under contract and BCD could
provide a copy of the contract but did not have the contract with them this
evening. Mr. Charles Vann addressed the Commission stating the agreement
was for BCD to construct Ms. Jones a new home on Oak Street. He stated
Ms. Jones had recently visited the site of her new home with the Reverend and
himself as little as three weeks ago.
Mr. Williams stated the BCD had served a diverse clientele from various
backgrounds and income levels. He stated the success rate was 92 percent. He
stated the new development would add value to the area. He stated with the
new center a courtyard would be constructed for both the patients and the
residents. He stated currently when the men took breaks they were forced to
hang out on the sidewalk. He stated with the new center the private courtyard
would allow the men to take their break within this area. He stated the new
center would have better security and security cameras. He stated the front of
the building would be designed to add to the community. He stated if school bus
stops needed to be moved then the BCD would work with the school district to
move the stops.
Ms. Deborah Bell addressed the Commission. She stated the BCD had a
number of partners and offered a number of programs for the residents. She
stated the center was not just a rehab but provided a holistic approach to
rehabilitation. She stated the BCD had constructed 24 new homes in the area
and many of the homeowner had completed the rehab program offered by BCD.
Reverend Robinson stated he had lived in the neighborhood for 39 years and his
mother and grandmother had also lived in the community.
Mr. Robert Webb addressed the Commission in support of the request. He
stated the BCD was an asset to the Community and the City. He stated the City
and the police department did not respond to calls within the area. He stated
911 calls were slow to be answered and when residents placed limbs on the curb
for collection the piles would lay for a long time before the City came to pick up
the debris. He stated a vote against BCD was a vote against the neighborhood.
George Jean Allen addressed the Commission. She stated she was working
with the Pine to Woodrow Neighborhood association and had seen the
neighborhood decline. She stated the area had a number of boarded homes and
felt the new construction would be an asset to the community. She stated the
Commission needed to think about what was good for the community. She
stated crime was in the neighborhood. She stated the facility would help to deter
crime.
14
FILE NO.: Z-8367 (Cont.)
Raven Gregory addressed the Commission in support. She stated she had lived
in the neighborhood for four years and seen the crime in a state of change. She
stated the BCD was there to help the community. She stated a recovery center
would help everyone. She stated the community needed to help each other.
Reverend Robinson stated the BCD was a part of the longevity of the community.
He stated the 24 new homes constructed by the BCD were done so to add to the
community. He questioned why the BCD would do anything to take away from
the area it was trying so hard to revitalize.
Deputy City Attorney Cindy Dawson stated if the BCD could not provide a copy of
the contract or an affidavit with Ms. Jones' signature then the Commission had
no ground to hear the item. She stated the code was very specific and
Ms. Jones had stated in the public hearing BCD did not have authorization to
rezone her property.
There was a general discussion by the Commission concerning what was
acceptable proof for rezoning. Staff stated an executed affidavit by the property
owner or a contract which included language regarding rezoning.
A motion was made to defer the item to the October 30, 2008, public hearing.
The motion carried by a vote of 8 ayes, 0 noes and 3 absent.
STAFF UPDATE:
The applicant is working to secure affidavits and extended contracts for the
proposed properties not currently owned by the Black Community Developers.
Staff will have copies of the contracts and the affidavits on file prior to the
Commission acting on the request.
PLANNING COMMISSION ACTION: (OCTOBER 30, 2008)
Mr. Barry Williams was present representing the request. There were registered
objectors present. Staff presented the item stating the item was previously
deferred because of concerns over the authorization for a parcel of property
located within the development area. Staff stated BCD had provided staff with all
the required information concerning affidavits and contracts to purchase on the
property not owned by BCD. Staff questioned if the Commission would like a full
presentation on the item. The Commission indicated a full presentation from staff
was not required.
Mr. Barry Williams presented the Commission with an overview of the
development and the proposal of the Black Community Developers. He stated
the development would be constructed in two phases with the residential
15
FILE NO.: Z-8367 (Cont.)
treatment in the first phase. He stated 24 men and 12 women would be housed
at the site. He stated the remainder of the area for the women would be used as
office space and areas for feeding the clients until the additional phases were
complete. He stated the 12th Street Corridor Committee met this week and the
desire of the area was for the Pine/Cedar Street area to become an institutional
node. He stated with Hoover, the Willie Hinton Center and the Empowerment
Center this completed that desire. He stated the educational component of the
Empowerment Center would also provide educational and training opportunities
which also met the goal for the future desires of development for the 12th Street
Corridor.
Ms. Maudella Morehead addressed the Commission in opposition of the request.
She stated she represented the Hope Neighborhood Association and was a
parent and grandparent. She stated she understood the need for rehabilitation
services but the mid town area did not need any more such facilities. She stated
such facilities were better served if located outside the neighborhood. She stated
the services offered were a duplication of services. She stated all the services
proposed were provided at UAMS. She requested the Commission not allow the
development within the community. She stated with a no vote the community
would be empowered to rise up and make a change.
Ms. Elsie Adkins addressed the Commission. She stated she lived in the area
for 40 years. She stated she did not feel the use of the property was a good use
to be located near children. She stated her children and grandchildren played in
the yard and felt with the addition of the Empowerment Center they would not be
as safe. She stated the youth living at the Crittenden Home felt like the facility
was a home and also should not be exposed to the residents of the treatment
facility.
Mr. Ted Adkins addressed the Commission in opposition. He stated within the
area proposed for the treatment center there were a number of school bus stops.
He stated the children catching the school buses should not be exposed to
persons within the rehab program. He stated a number of the persons within the
treatment program were doing so to beat the system and not go to prison. He
stated these were the persons the children should not be forced to be around.
He stated the youth of today are our leaders of tomorrow. He stated it was all
about the children.
Ms. Ruth Bell addressed the Commission in opposition. She stated the League
of Women Voters was not supportive of the request. She stated the
neighborhood was influx and was turning the corner. She stated this was due to
a great deal of work on behalf of the area residents and work by the Hoover
United Methodist Church. She stated the use was too intense for the site and the
neighborhood. She stated with the addition of the Phase II activities the use of
the site would be even more intense than in the initial phase. She stated the
League did not feel this was the right location.
HY
FILE NO.: Z-8367 (Cont.)
Ms. Debbie Stipling addressed the Commission. She stated she was
representing the Florence Crittenden Home. She stated the facility was a mercy
shelter for children infant to 17 years of age. She stated the center had served
98 children this year. She stated the concern of the center was for the safety of
the youth and the outside surroundings. She stated it was important to keep the
neighborhood historic.
Mrs. C. Killingsworth addressed the Commission in opposition. She stated had
lived in the community for 40 plus years. She stated the neighbors had cleaned
up the area removing a drug house. She stated the neighborhood did not need
another facility such as the Hoover House. She stated the community had its
share of rehab facilities. She stated there were a number of residents who lived
in their homes who did not feel safe and with the placement of a rehab facility in
the area this would only increase their insecure feelings.
Mr. Barry Williams stated the properties being considered for development were
5 vacant lots, 5 uninhabited structures and 3 residences. He stated the school
bus stops could be relocated to ensure the safety of the children. He stated the
courtyard area would be fenced to keep the clients secure as well as the
residents. He stated the redevelopment of the site would add value to the
neighborhood not take away from property values.
Ms. Deborah Bell addressed the Commission in support. She provided the
Commission with letters of support from persons within the community. She
stated the facility was relocating from Hoover House to this site and would not be
a duplication of services. She stated based on National Marketing Models
facilities worked best when placed within a residential neighborhood and not in
areas away from interaction. She stated BCD operated programs for youth as
well as the rehabilitation service. She stated they were very concerned with
providing services which did not interfere with other programs offered.
Reverend Robinson stated BCD had constructed 24 new homes in the area. He
stated BCD would not be doing anything they felt would decrease property
values in the area. He stated there were a number of residents who were
experiencing the NIMBY syndrome. He stated the location was an appropriate
location and if the Commission did not feel this was an appropriate location he
requested the Commission help him find a location.
Commissioner Nunnley stated he was well aware of longevity. He stated when
the request came in for Wills House the Commission was told they did not want
to be intrusive into the neighborhood. He stated the development as proposed
smacked with intrusiveness. He stated to put the development in the
neighborhood was mission creep. He stated he felt the developers would be
back in three years wanting something larger.
17
FILE NO.: Z-8367 (Cont.)
Commissioner Williams stated he did not agree. He stated he felt the proposed
location was an appropriate location for the center. He stated BCD had
constructed 24 new homes in the area and he did not feel BCD would do
anything that would negatively impact the area. He stated there were not enough
jails and prisons to hold all the convicted persons for drugs and alcohol. He
stated centers such as this were necessary to keep the jail system at a
manageable level.
A motion was made to approve the request. The motion carried by a vote of
6 ayes, 4 noes 0 absent and 1 open position.
ITEM NO.: 13.1. Z-8367
NAME: BCD Empowerment Center Short -form POD
LOCATION: located at 3604 West 12th Street
Planning Staff Comments_
1. Provide notification of property owners located within 200 feet of the site, complete
with the certified abstract list, notice form with affidavit executed and proof of
mailing. The notices must be mailed no later than July 23, 2008. The Office of
Planning and Development must receive the proof of notice no later than August 1,
2008.
2. A minimum of 10 to 15 percent of the site is to be designated to landscape. Provide
the percentage provide.
3. Provide the percentage of building coverage, the percentage of landscaping and the
percentage of paved area.
4. The residential aspect of the development will require a Conditional Use Permit in
accordance with the placement of a correctional institution. See Section 36-
107(13)(a).
5. Site lighting must be low level and directional, directed downward and into the site.
Variance/Waivers:
Public Works Conditions:
1. Due to the proposed use of the property, the Master Street Plan specifies that Maple
Street for the frontage of this property must meet commercial street standards.
Dedicate right-of-way to 30 feet from centerline.
2. Due to the proposed use of the property, the Master Street Plan specifies that 11th
Street for the frontage of this property must meet commercial street standards.
Dedicate right-of-way to 30 feet from centerline.
3. Due to the proposed use of the property, the Master Street Plan specifies that
Valentine Street for the frontage of this property must meet commercial street
standards. Dedicate right-of-way to 30 feet from centerline.
4. 12th Street is classified on the Master Street Plan as a minor arterial with special
design standards. A dedication of right-of-way 35 feet from centerline will be
required.
5. A 20 foot radial dedication of right-of-way is required at all intersections.
6. With site development, provide the design of street conforming to the Master Street
Plan. Construct one-half street improvement to Maple Street including 5-foot
sidewalks with the planned development. The new back of curb should be 18 feet
from centerline. The intersection curb radius at Maple Street and 11th Street should
be improved to a 30 foot radius as shown on plan.
7. With site development, provide the design of street conforming to the Master Street
Plan. Construct one-half street improvement to 11th Street including 5-foot
Item # 13.1.
sidewalks with the planned development. The new back of curb should be located
18 feet from centerline or as shown on plan. The intersection curb radius at 11th
Street and Valentine Street should be a 30 foot radius as shown on plan.
8. With site development, provide the design of street conforming to the Master Street
Plan. Construct one-half street improvement to Valentine Street including 5-foot
sidewalks with the planned development. The new back of curb should be located
18 feet from centerline.
9. The intersection curb radius at West 12th and Maple Streets should be constructed
to a 30 foot radius.
10. Sidewalk easements should be platted where the sidewalk is outside of the new
right-of-way.
11. The sidewalk on Valentine Street should extend to the property in line with the
remainder of the sidewalk and then turn toward Valentine Street if desired.
12.The curb should be extended to the property line in line with the remaining curb and
then turn toward the existing street.
13. All old curb cuts should be closed with curbing.
14. Repair or replace any curb and gutter or sidewalk that is damaged in the public right-
of-way prior to occupancy.
15.A grading permit in accordance with Section 29-186 (c) and (d) will be required prior
to any land clearing or grading activities at the site. Other than residential
subdivisions, site grading and drainage plans must be submitted and approved prior
to the start of work.
16. Storm water detention ordinance applies to this property. Show the proposed
location for storm water detention facilities on the plan.
17. Plans of all work in right-of-way shall be submitted for approval prior to start of work.
Obtain barricade permit prior to doing any work in the right-of-way from Traffic
Engineering at (501) 379-1805 (Travis Herbner).
18. If disturbed area is one (1) or more acres, obtain a NPDES storm water permit from
the Arkansas Department of Environmental Quality prior to the start of construction.
19.On site striping and signage plans should be forwarded to Public Works, Traffic
Engineering for approval with the site development package.
20.Obtain permits prior to doing any street cuts or curb cuts. Obtain barricade permit
prior to doing any work in the right-of-way. Contact Traffic Engineering at (501) 379-
1805 (Travis Herbner) for more information.
21. Per Section 29-189(d), groups of trees and individual trees that are not to be
removed or are located within required undisturbed buffer areas shall be protected
during construction by protective fencing and shall not be used for material storage
or for a any other purpose.
22.Streetlights are required by Section 31-403 of the Little Rock code. Provide plans
for approval to Traffic Engineering. Streetlights must be installed prior to
platting/certificate of occupancy. Contact Traffic Engineering 379-1813 (Steve
Philpott) for more information.
23.The driveways should be constructed with maximum 15 foot radiuses.
24. Remove parallel parking spaces from Maple Street due to lack of sight distance for
drivers trying to access Maple Street from the parking area. This will allow the back
of sidewalk to be moved to the property line.
25.Obtain a franchise agreement from Public Works (Bennie Nicolo, 371-4818) for the
vehicle parking in the right-of-way.
Item # 13.1.
Utilities and Fire Department/County Planning:
Wastewater: Sewer available to this property.
Entergy: No comment received.
Center -Point Energy: No comment received.
AT & T: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at the
time of request for water service must be met. Contact Central Arkansas Water Works
regarding the size and location of the water meter(s). If buildings are have a fire
sprinkler system, please submit plans for water facilities and/or fire protection system to
Central Arkansas Water for review. Contact Central Arkansas Water regarding
procedures for installation of water facilities and/or fire service. Approval of plans by the
Arkansas Department of Health Engineering Division and Little Rock Fire Department is
required. Fire sprinkler systems which do not contain additives such as antifreeze shall
be isolated with a double detector check valve assembly. If additives are used, a
reduced pressure zone backflow preventer shall be required.
Fire Department: Install and place fire hydrants per code. Contact the Little Rock
Fire Department for additional information.
County Planning: No comment.
CATA: The site is not located on CATA Bus Route #3 — the Baptist Medical
Center Route.
Planning Division: This request is located in the 1-630 Planning District. The Land Use
Plan shows Single Family and Mixed Use for this property. The applicant has applied
for a Planned Office Development for a residential/training facility.
A Land Use Plan Amendment from Single Family to Mixed Use is a separate item on
this agenda (LU08-09-02).
Master Street Plan: 12th Street is a Minor Arterial. A Minor Arterial provides
connections to and through an urban area and their primary function is to provide short
distance travel within the urbanized area. Entrances and exits should be limited to
minimize negative effects of traffic and pedestrians on 12th Street since it is a Minor
Arterial. Maple Street, West 11th Street and Valentine Street are Local Streets. The
primary function of a Local Street is to provide access to adjacent properties. Local
Streets which are abutted by non-residential zoning/use or more intensive zoning than
duplexes are considered as "Commercial Streets". These streets have a design
standard the same as a Collector. These streets may require dedication of right-of-way
and may require street improvements for entrances and exits to the site.
Bicycle Plan: There are no bike routes in the immediate vicinity.
Item # 13.1.
NeLqhborhood Action Plan: This area is covered by the Stephens Neighborhood Action
Plan. The Public Safety goal states: "Remove unsafe housing form the neighborhood."
This application would remove several vacant/unsafe buildings from this city block in the
neighborhood.
Landscape:
1. The site plan must comply with the City's landscape and buffer ordinance
requirements.
2. The zoning street buffer requires an average eighteen foot wide (18') street buffer
around the sites entirety and in no case should be less than half. It appears that this
can easily be met by simply shifting the sidewalks into the public right-of-way.
3. Street trees are both encouraged and appreciated.
4. An automatic irrigation system to water landscaped areas will be required.
5. Prior to the issuance of a building permit, it will be necessary to provide an approved
landscape plan stamped with the seal of a Registered Landscape Architect.
6. The City Beautiful Commission recommends preserving as many existing trees as
feasible on tree covered sites. Credit toward fulfilling Landscape Ordinance
requirements can be given when preserving trees of six (6) inch caliper or larger.
Revised plat/plan: Submit four (4) copies of a revised preliminary plat/plan (to include
the additional information as noted above) to staff on Wednesday, July 23, 2008.
Item # 13.1.