HomeMy WebLinkAboutZ-8359 Map 4ID=
11" HORIZONTAL CABLES @ 311/16" O.0
- - CONCRETE DECK W/ TUBE STEEL
FRAME- SEE STRUCTURAL
REVERSE DOOR SWING REQUIRED -
CHANGE OUT EXISTING DOOR
CLOSED STEEL STEPS WITH
12' MIN. _ _ CONCRETE STEP PANS- HAND - - — - — -
KNUCKLE RAILS FROM 1 1/2" O.D. STEEL
CLEARANCE _ - _ TUBING
TYR
�_------ — .NOTE:
-- SERVICE RAMP BY OTHERS
-
- -
4'-2" BETWEEN STRINGERS
A l NORTH ELEVATION VIEW (WJ DECK SECTION)
` AP
SCALE 1/2" = V-O"
,--EXISTING GUTTER
NOTE:
SERVICE DOCK AND RAMP BY OTHERS
CTA10 CChTInKl
SCALE 1/4" = T'-U'
EAST ELEVATION VIEW (WI DECK
SCALE 1/2" = 1'-O"
RAILING FROM 2" TUBE STEEL NEWELS,
TOP AND BOTTOM RAILS WITH 1/4" STEEL
UnQ17nKMAl nAD5 CQ (_ Q 11 nal n n
I
DRAWINGS, WRITTEN MATERIAL, AND DESIGN CONCEP T S SHALL
NOT BE USED OR REPRODUCED IN WHOLE OR PART IN ANY FORM
WITHOUT PRIOR CONSENT OF DAVID W. PERRYARCHITECT. DO
NOT SCALE DRAWINGS. USE GIVEN DIMENSIONS ONLY. IF NOT
SHOWN, VERIFY DIMENSIONS WITH THE ARCHITECT.
CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS AND
CONDITIONS AT JOB SITE.
Z
N W
N Z
Luam
Q
NQ
~ O
0
cr
Q m
N
fr
W
0 z�
¢UJ
Oz
—
a
�'
J �
0
La
cr
w
�
Z.
z
P
o
W
0 n
/>
r
S
W ,
WWl.l.4
U3
�a.a.
ui
r`
•
CC
•o
I
0\NI111111///
a REGISTERED �5
ARCHITECT �
No. C-131 a
aPjagalnittttt
I REVISIONS I DATE
DECK STAIR
SECTIONS
AND
ELEVATIONS
Ua
MAY
09, 2008
Z55
DATE
JOB NO.
A2.1
V
I
SHEET
OF