HomeMy WebLinkAboutZ-8338 Map 3'STER PAD
TE
NAY
STORMWATER DETENTION CALCULATIONS
AREA - 3.51 Acres
Average Slope - 10%
Undeveloped
Runoff Coefficient 0.55
Time of Concentration (min.) 10
25 Year Rainfall Intensity (in./hr.) 7.1
Building 30,600 sf @ 0.92 28,152
/ Paved Areas 62,000 sf 0 0.92 57,040
/ Lawn & Landscaping 60,466 sf ® 0.44 26,605
153,066 111,797
Developed "C" Value = 111,797/153,066 = 0.73
JDeveloped
Runoff Coefficient 0.73
Time of Concentration (min.) 5
25 Year Rainfall Intensity (in./hr.) 8.5
/
/
/
/
Differential Runoff Rate (R) = 0.73(8.5)-0.55(7.1) = 2.30 in./hr
Simplified Volume Formula
Volume Required = R x A x Tc x 60
=2.30x3.51 x5x60
= 2,422 cubic foot
Volume Provided
36" RCP x 388' = 2,743 cubic foot
5' dia Inlets x 35' = 687 cubic foot
3,430 cubic foot
On -Site & Off -Site
Release 25 Year Undeveloped Flow
Acreage 6.92 Acres
Runoff Coeffecient 0.55
Time of Concentration 10 min.
25 Year Rainfall Intensity 7.1 in./hr.
Q = 0.55(7.1)(6.92) = 27.0 cfs
Use 18" RCP as Outlet
Q = C x A x (2gh) 1/2
Q = 0.6 x 1.77 x (2 x 32.2 x 9.85) /2
= 26.7 cfs < 27.0 cfs
!d A It 16ti "S A `.p_ z o
6 0�
?� REGI'TE11ED � �^
PR0FESS10N.AL765M�
ENGINEER" T
� A~o-
z
®�® No.5033
Tjy y, p�, �' a U o
ter' mz�
U U) z O
c a
LU O p
r�z
HG
30 0 30
Scale 1 "
= 30 ft
.o
GENERAL SITE UTILITY CONSTRUCTION NOTES,
1. SEE ARCHITECTURAL DRAWINGS FOR DETAILS GRADING AT
BUILDINGS, STEPS, WALKS, WALLS AND OTHER STRUCTURES.
2. FINISH CONTOURS AND GRADES SHOWN ARE FOR FINISHED
SURFACES, ALLOWANCES SHALL BE MADE FOR PAVEMENTS, SLABS,
TOPSOIL, SOD, ETC, UNIFORM PLANES AND SURFACES SHALL BE
SHAPED BETWEEN FINISHED SPOT ELEVATIONS AND/OR FINISH CONTOURS
SHOWN. MINIMUM PAVEMENT SLOPES SHALL BE 1%, MINIMUM FINISH
SLOPES ON GRASS OR SOD SURFACES SHALL BE 1%, MINIMUM
LONGITUDINAL CONCRETE CURB & GUTTER SLOPE SHALL BE 0.6%,
SPILLOUT CURB SHALL BE USED ON THE HIGH SIDE OF PAVEMENT AND
AT DISCHARGE POINTS.
3. THE CONTRACTOR SHALL CONTROL EROSION ON THE SITE. ALL
SLOPES SHALL BE FERTILIZED, SEEDED AND MULCHED (OR LANDSCAPED)
AS SOON AS POSSIBLE. THE CONTRACTOR SHALL FILE A NOTICE OF
INTENT WITH THE ARKANSAS DPC&E. THE SITE SHALL
BE GRADED TO MAINTAIN POSITIVE DRAINAGE DURING CONSTRUCTION,
WATER SHALL NOT BE ALLOWED TO POND.
4. ALL AREAS TO BE CUT OR FILLED SHALL BE CLEARED AND
GRUBBED. THE MAXIMUM FILL SLOPE SHALL BE 3:1. ALL FILLS
SHALL BE MADE IN 8" LIFTS AND COMPACTED, AT OPTIMUM MOISTURE
CONTENT TO 95% OF MODIFIED PROCTOR DENSITY (ASTM D-1557), AS
DETERMINED BY IN -PLACE DENSITY TESTS. BORROW AND FILL
MATERIAL SHALL BE SELECT CLAY SAND OR SANDY CLAY HAVING A
LIQUID LIMIT LESS THAN 40 OR OTHER APPROVED FILL. FILL SOILS
CLASSIFYING AS SC OR GC ACCORDING TO THE UNIFIED SOILS
CLASSIFICATION SYSTEM ARE CONSIDERED SUITABLE. SHALE MATERIAL
USED IN FILL SHALL BE COMPACTED AT 3% ABOVE OPTIMUM MOISTURE
CONTENT WITH A VIBRATORY SHEEPS FOOT COMPACTOR.
5. THE CONTRACTOR SHALL COORDINATE WITH EACH UTILITY COMPANY
PRIOR TO ANY EXCAVATION. ANY DAMAGE TO UTILITY LINES CAUSED
BY THE CONTRACTORS OPERATIONS SHALL BE REPAIRED AT THE
CONTRACTORS EXPENSE. THE CONTRACTOR SHALL VERIFY THE
HORIZONTAL AND VERTICAL ALIGNMENT OF EXISTING AND PROPOSED
STORM SEWER, SANITARY SEWER AND WATER LINES TO ENSURE THAT
THEY ARE INSTALLED WITH ADEQUATE COVER AND CLEARANCE . ALL
ROUGH GRADING SHALL BE COMPLETE BEFORE INSTALLATION OF STORM
SEWER, SANITARY SEWER AND APPURTENANCES, WATER MAINS, SERVICES
AND APPURTENANCES. ALL UTILITY TRENCHES SHALL BE BACKFILLED
AND COMPACTED WITH SELECT MATERIAL AS SPECIFIED IN NOTE #4
ABOVE.
6. THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE LAWS,
CODES AND ORDINANCES GOVERNING WORK OF THIS TYPE.
7. THE INSTALLATION OF ALL CULVERT PIPE TO BE IN ACCORDANCE
WITH AHTD SPECIFICATIONS.
8. ALL EXISTING IMPROVEMENTS WHICH INTERFERE WITH THE WORK,
AND ARE NOT TO BE SAVED SHALL BE REMOVED AND DISPOSED OF.
iMPROVFMFNTR IN THE RIGHT-OF-WAY WHICH ARE TO REMAIN SHALL BE
PROTECTED BY THE CONTRACTOR.
9. ALL REINFORCED CONCRETE PIPE (RCP) SHALL BE CLASS III WITH
BELL AND SPIGOT TYPE JOINTS. PIPE, MATERIAL AND INSTALLATION
SHALL BE IN CONFORMANCE WITH APPLICABLE ARKANSAS HIGHWAY AND
TRANSPORTATION DEPARTMENT (AHTD) STANDARD CONSTRUCTION
SPECIFICATIONS.
10. ALL CORRUGATED METAL PIPE SHALL MEET OR EXCEED AHTD
REQUIREMENTS FOR GAUGE AND CORRUGATION AND SHALL BE POLYMER
COATED IN ACCORDANCE WITH ASTM A-742 AND AASHTO M-246. THE
LAST 12" OF EACH LENGTH SHALL BE RECORRUGATED WITH ANNULAR
CORRUGATIONS TO ACCEPT CORRUGATED COUPLING BANDS.
11. ALL WATER MAINS AND SEWER MAINS AND THEIR APPURTENANCES
INCLUDING INSTALLATION, SHALL COMPLY WITH THE LATEST
CENTRAL ARKANSAS WATER AND LITTLE ROCK WASTEWATER UTILITY
SPECIFICATIONS. CONNECTIONS SHALL NOT BE MADE TO EXISTING LINES
UNTIL NEW CONSTRUCTION HAS BEEN TESTED AND APPROVED BY THE UTILITY.
12. THE CONTRACTORS ATTENTION IS SPECIFICALLY CALLED TO THE
LOCATION OF THE EXISTING IMPROVEMENTS.
THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR DAMAGING ANY
EXISTING IMPROVEMENTS WHICH ARE TO REMAIN.
PRIOR TO SUBMITTING HIS BID, THE CONTRACTOR SHALL REVIEW THE
PLANS AND SPECIFICATIONS. HE SHALT_ VISIT THE SITE AND INSPECT
THE CONDITION OF THE SITE AND THE ADJACENT IMPROVEMENTS.
ANY EXISTING UTILITIES THAT REQUIRE RELOCATION WILL BE THE
RESPONSIBILITIES OF THE CONTRACTOR AND NOT THE OWNER.
THE CONTRACTOR WILL HOLD THE OWNER HARMLESS FROM ANY
UNFORSEEN COSTS ASSOCIATED WITH THE STREET IMPROVEMENTS.
13. THE CONTRACTOR SHALL CALL "ONE -CALL" FOR LOCATION OF ALL
UTILITIES PRIOR TO COMMENCEMENT OF ANY EXCAVATION.
14. ANY EXCESS EXCAVATED MATERIAL, NOT REQUIRED FOR CONSTRUCTION
OF FILLS SHALL BE HAULED OFF SITE.
15. THE CONTRACTOR SHALL BE REQUIRED TO POST A MAINTENANCE BOND
WITH THE CITY OF LITTLE ROCK FOR THE PUBLIC IMPROVEMENTS ON KANIS ROAD.
THE BOND SHALL BE FOR ONE HALF THE COST OF IMPROVEMENTS FOR
A ONE YEAR PERIOD.