HomeMy WebLinkAboutZ-8311 Staff AnalysisFebruary 28, 2008
ITEM NO.: 6 FILE NO.: Z-8311
NAME: Chenal Adult Day Services Adult Day Care Center
— Conditional Use Permit
LOCATION: 805 Kirby Road
OWNER/APPLICANT: Claire Bailey/Lynda Sikes
PROPOSAL: A conditional use permit is requested to allow use of
the residential structure on this R-2 zoned tract as an
adult day care center.
SITE LOCATION:
The property is located on the east side of Kirby Road; approximately
1,000 feet north of Kanis Road.
2. COMPATIBILITY WITH NEIGHBORHOOD:
The property is located in an area that is principally single family in use
and zoning. Properties to the north, east and south are occupied by
varying types of single family residences on larger lots. The R-2 property
across Kirby Road to the west is undeveloped. An as -yet undeveloped
single family subdivision is proposed for the PRD zoned tract to the
southwest. More urban single family neighborhoods are located just to the
north and east. Two churches are located to the north.
This relatively small day care use could serve as a good transition
between the mixed office commercial development, which will occur at
some point to the south and the residential uses. The adult day care
center will not generate the type of outside activity typically associated
with a children's day care. The use should be relatively quiet and low
impact in nature.
All owners of properties located within 200 feet of the site, all residents
within 300 feet who could be identified and the Parkway Place
Neighborhood Association were notified of this request.
February 28, 2008
ITEM NO.: 6 (Cont.) FILE NO.: Z-83
3. ON SITE DRIVES AND PARKING:
The site currently has a standard, residential, two -car driveway, with
access off of Kirby Road. The daycare is proposed to have an enrollment
of 20 clients with 5 employees, requiring 7 on -site parking spaces. The
applicants propose to construct 2 spaces off of the driveway in front of the
house. The driveway is proposed to extend to the rear yard where an
additional 6 spaces are to be constructed. The applicants are requesting
a 2-year deferral of the requirement to pave the new parking area.
4. SCREENING AND BUFFERS:
Site plan must comply with the City's landscape and buffer ordinance
requirements.
Any new parking must comply with the zoning parking ordinance, buffer
ordinance, and the landscape ordinance. Currently, it appears the parking
area is being proposed in the required landscape and buffer area; revise.
The zoning buffer ordinance requires an eight foot wide land use buffer
along both the northern and southern property line next to the residentially
zoned properties. Seventy percent (70%) of this area is to remain
undisturbed. Any/all trees located within this area must be preserved.
The zoning buffer ordinance requires a nineteen foot wide (19') land use
buffer along the eastern property line next to the residentially zoned
property. Seventy percent (70%) of this area is to remain undisturbed.
Any/all trees located within this area must be preserved.
The zoning buffer ordinance requires an average nineteen foot wide (19')
street buffer and in no case less than half along the western property line
next to the street.
The property to the north, south and east is zoned residential, therefore, a
six (6) foot high opaque screen, either a wooden fence with its face side
directed outward, a wall, or dense evergreen plantings, is required along
the northern, southern, and eastern perimeters of the site.
5. PUBLIC WORKS COMMENTS:
1. Kirby Road is classified on the Master Street Plan as a collector street.
A dedication of right-of-way thirty (30) feet from centerline will be
required.
2
February 28, 2008
NO.: 6 (Cont.
FILE NO.: Z-8311
2. Due to the new driveway, provide a letter prepared by a registered
engineer certifying the sight distance at the intersection of Kirby Road
and the driveway complies with 2004 AASHTO Green Book standards.
6. UTILITY, FIRE DEPT. AND CATA COMMENTS:
Wastewater: Sewer not available to this property at this time. Little Rock
Wastewater is in the process of constructing sewer mains to serve this
area and project should be completed in 2008.
Entergy: No comment received.
Centerpoint Energy: No comment received.
AT&T (SBC): No comment received.
Water: Contact Central Arkansas Water if larger and/or additional water
meter(s) are required. If a larger and/or additional water meter(s) are
required, a Capitol Investment charge based on the size of
connection(s) will apply to this project in addition to normal charges. If
this development takes place, please contact Central Arkansas Water
to change this to a commercial class meter.
Fire Department: Fire hydrant may be required. Contact Captain Dennis
Free at Little Rock Fire Department; Phone # 918-3757.
County Planning: No Comments.
CATA: The site is not located on or near a CATA bus route.
SUBDIVISION COMMITTEE COMMENT: (FEBRUARY 7, 2008)
The applicants were present. Staff presented the item and noted additional
information was needed regarding fencing, signage and site lighting. The
applicants were advised to provide a site plan showing a properly designed
parking lot. The applicants were advised that the parking and drives would need
to be paved or a variance approved. Staff noted the bill of assurance submitted
with the application. Staff questioned if the bill of assurance was correct and
advised the applicants to do further research at the county.
Public Works, Landscape and Utility Comments were discussed. Public Works
staff stated the proposed circular driveway would not be allowed unless a
registered Engineer certified sight distance in compliance with AASHTO Green
Book standards.
February 28, 2008
ITEM NO.: 6 (Cont.
FILE NO.: Z-8311
The applicants were advised to respond to staff issues by February 13, 2008,
The Committee forwarded the item to the full Commission.
STAFF ANALYSIS:
The R-2 zoned, .92± acre tract located at 805 Kirby Road is occupied by a one-
story, brick and frame, single family residential structure. The applicants are
requesting approval of a conditional use permit to allow use of the structure as an
adult day care center. Eight parking spaces are proposed to be constructed on
the site; two in the front yard and six in the rear yard.
The day care is proposed to have an enrollment of 20 clients with 5 employees.
Days and hours of operation are proposed as Monday through Friday, 7:30 a.m.
to 5:30 p.m. The rear yard is currently enclosed with a 4-foot tall chain link fence.
Dense evergreen shrubs will be planted along the north, east and south
perimeters to provide screening. A small ground sign (4' tall, 30" X 26" in area)
will be placed in the front yard. Pole mounted security lights are proposed in
both the front and rear yards, at the parking areas.
The day care is currently operated in an office building on Hardin Road. The
facility is licensed by the Arkansas Office of Long -Term Care. The applicants
desire to relocate the facility to a location that will provide a home -like
environment and will allow their clients to enjoy the outdoors during those times
of year when the weather permits.
Staff is supportive of the proposed use. The property is located at the edge of a
residential neighborhood. Other institutional type uses are located to the north.
The property is not a small lot in a dense urban neighborhood. Adjacent
properties are similar in size or larger than this 1.0± acre tract, providing
adequate separation between uses. The relatively small day care will not
generate traffic to a degree that will impact the street or the neighborhood.
The applicant is requesting a two-year deferral of the paving requirement for the
new parking spaces. Staff can support the deferral for the parking in the rear
yard. The new spaces in front should be paved with opening of the day care.
The applicant did respond to issues raised at Subdivision Committee as noted in
the analysis above. A proposed circular driveway has been removed from the
plan. The fire department has determined the site is within required distance
from an existing fire hydrant. The applicant has visited with the utility agencies
and has addressed their comments. The 1918 bill of assurance for Asbury Acres
is mostly illegible but likely does not address use issues.
12
February 28, 2008
ITEM NO.: 6 Wont.
STAFF RECOMMENDATION:
FILE NO.: Z-8311
Staff recommends approval of the C.U.P. subject to compliance with the
comments and conditions outlined in Sections 4, 5 and 6 of the agenda staff
report.
Staff recommends approval of a two-year deferral of the paving requirement for
the new parking spaces located to the rear of the residence.
PLANNING COMMISSION ACTION: (FEBRUARY 28, 2008)
Jeff and Lynda Sikes were present, representing the application. There was one
(1) person present with concerns and one (1) person present in support. Staff
presented the item with a recommendation of approval.
The Sikes addressed the Commission in support of the application. Jeff Sikes
expressed a desire to move the day care use from its current location to have a
more home -like environment. Lynda Sikes described the proposed day care use.
She explained that there was a desire to have a day care location with yard
space for the clients. She noted that additional landscaping would be installed
around the parking area in the rear yard. She stated that the height of the
proposed sign could be reduced. She also explained that the proposed day care
use was a quiet, low-key use.
Commissioner Nunnley asked about the maximum number clients. Ms. Sikes
stated that the maximum would be 20 clients.
Ross Phillips addressed the Commission in support of the application.
Grant Cox addressed the Commission with concerns on behalf of the Parkway
Place Neighborhood Association. He noted that his main concern was with the
proposed use, if approved, leading to other future changes in the residential
neighborhood. He expressed concern with traffic in the area. He noted that the
proposed sign needed to be lower than four (4) feet.
Lynda Sikes amended the application to have a maximum sign height of three (3)
feet and to install screening shrubs along the west side of the rear parking lot
(between the parking and the street).
There was a motion to approve the application as amended by the applicant and
recommended by staff. The motion passed by a vote of 10 ayes, 0 nays and
1 absent. The application was approved.
5