HomeMy WebLinkAboutZ-8260 Staff AnalysisFILE NO.: Z-8260
NAME: Coulson Oil Company Short -form PCD
LOCATION: Located on the corner of Stagecoach and David O Dodd Roads
DEVELOPER:
Arkansas Fleet Fueling, LLC
Coulson Oil Company
1434 Pike Avenue
North Little Rock, AR 72114
Rl 1R\/FynR-
Brooks Surveying
20820Arch Street Pike
Hensley, AR 72065
AREA: 1.70+ acres
CURRENT ZONING
ALLOWED USES:
PROPOSED ZONING:
PROPOSED USE
NUMBER OF LOTS: 1
R-2, Single-family
Single-family Residential
PCD
FT. NEW STREET: 0 LF
Convenience Store with Gas Pumps
VARIANCESM/AIVERS REQUESTED: None request.
A. PROPOSAUREQUEST:
The applicant is seeking a rezoning of the site from R-2, Single-family to Planned
Commercial Development to recognize an existing convenience store with gas
pumps. The site contains the store with a separate canopy for the fuel islands.
Presently there are two drives located along Stagecoach Road and a single drive
from David O Dodd Road. There are no modifications proposed to the site with
the rezoning request.
FILE NO.: Z-8260 (Cont.) _
B. EXISTING CONDITIONS:
The site contains an existing convenience store which as been closed for some
time. The store was constructed prior to the site's annexation by the City. Uses
in the area include residential, commercial and an elementary school. To the
north along Stagecoach Road is also a convenience store with gas pumps
located near Lanehart Road. Further to the north new single-family homes are
being constructed in the Greenwood Acres Subdivision. Along David O Dodd
Road two new subdivisions are currently being developed in the Wood Creek
and Waters Edge Subdivisions.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has not received any comment from area residents. All
owners of property located within 200 feet of the proposed site, Southwest Little
Rock United for Progress, the Stagecoach Dodd Neighborhood Association and
all owners of property, who could be identified, located within 300 feet of the site
were notified of the Public Hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Stagecoach Road is classified on the Master Street Plan as a principal
arterial. If the facility is redeveloped or expanded in the future, the full
dedication of right-of-way to 55 feet from centerline will be required. The
canopy and the pump islands would have to be relocated out of the right-of-
way. Since the site is not redeveloping and no changes are being made
dedicate an additional 5 feet of right-of-way.
2. Driveway locations and widths do not meet the traffic access and circulation
requirements of Sections 30-43 and 31-210. If the facility is redeveloped or
expanded in the future, the driveway on East David O Dodd Road must be
removed and only one (1) driveway will be allowed on Stagecoach Road.
The width of driveway cannot exceed 36 feet.
3. A 20 foot radial dedication of right-of-way is required at the intersection of
Stagecoach Road and East David O Dodd Road.
4. Due to the proposed use of the property, the Master Street Plans specifies
that East David O Dodd Road for the frontage of this property must meet
commercial street standards. Dedicate right-of-way to 30 feet from centerline.
It is difficult to determine the existing right-of-way without a centerline of East
David O Dodd Road shown on the survey.
5. Obtain a franchise agreement from Public Works (Bennie Nicolo, 371-4818)
for the private improvements located in the right-of-way.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer available to this property.
2
FILE NO.: Z-8260 (Cont.
Entergy: No comment received.
Center -Point Ener : No comment received.
AT & T: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at
the time of request for water service must be met. Contact Central Arkansas
Water about reestablishing water service and if larger and/or additional water
meter(s) are required. Additional fire hydrant(s) may be required. Contact the
Little Rock Fire Department to obtain information regarding the required
placement of the hydrant(s) and contact Central Arkansas Water regarding
procedures for installation of the hydrant(s).
Fire Department: Place fire hydrants per code. Contact the Little Rock Fire
Department for additional information.
County Planning: No comment.
CATA: The site is not located on a dedicated CATA Bus Route.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division: This request is located in the 65th Street West Planning
District. The Land Use Plan shows Neighborhood Commercial for this property.
The applicant has applied for a rezoning from R-2 Single Family to Planned
Commercial Development to allow the existing convenience store to operate from
this site.
The request does not require a change to the Land Use Plan.
Master Street Plan: Stagecoach Road is shown as a Principal Arterial on the
Master Street Plan and East David O. Dodd is shown as a Local Street. These
streets may require dedication of right-of-way and may require street
improvements. The primary function of a Principal Arterial is to serve through
traffic and to connect major traffic generators or activity centers within urbanized
areas. Entrances and exits should be limited to minimize negative effects of
traffic and pedestrians since this is a Principal Arterial. The primary function of a
Local Street is to provide access to adjacent properties. Local Streets that are
abutted by non-residential zoning/use or more intensive zoning than duplexes
are considered as "Commercial Streets". These streets have a design standard
the same as a Collector.
Bicycle Plan: A Class II bike route is shown on Stagecoach Road. A Class II
bikeway is located on the street as either a five foot shoulder or six foot marked
bike lane. Additional paving and right of way may be required.
3
FILE NO.: Z-8260 (Cont.
City Recognized Neighborhood Action Plan: The applicant's property lies in the
area covered by the Pecan Lake/Stagecoach-Dodd/Westwood Neighborhood
Action Plan. The Zoning and Land Use goal states: "Discourage conversion of
R-2 properties along Stagecoach Road."
Landscape:
1. Redevelopment of the site will require compliance with the City's minimal
landscape and buffer ordinance requirements.
2. Any and all landscaping, fencing, striping, etc. should be in good condition or
repaired/replaced in conjunction with this request.
G. SUBDIVISION COMMITTEE COMMENT: (September 6, 2007)
The applicant was present. Staff presented an overview of the proposed
development stating there were few outstanding technical issues associated with
the request. Staff requested the applicant provide the location of the dumpster
and indicate if the hours of dumpster service would be limited to daylight hours.
Staff also requested the applicant provide the hours of operation for the proposed
facility.
Public Works comments were addressed. Staff stated right of way dedication
along Stagecoach Road and David O Dodd Road would be required at a lesser
standard than the Master Street Plan. Staff requested the applicant provide the
location of the tanks and any improvements to determine the right of way
required. There was a general discussion concerning a waiver of the right of way
dedication. Staff stated once the tank locations were determined, then a waiver
could be considered based on the location of the fuel tank basin.
Landscaping comments were noted. Staff stated all landscaping, fencing and
striping should be in good condition or repaired or replaced in conjunction with
the rezoning request.
Staff noted comments from the various other reporting departments and
agencies suggesting the applicant contact them directly for additional information
and clarification. There was no further discussion of the item. The Committee
then forwarded the item to the full Commission for final action.
H. ANALYSIS:
There were no technical issues associated with the request in need of
addressing raised at the September 6, 2007, Subdivision Committee meeting.
The request is to allow a rezoning of the site from R-2, Single-family to Planned
Commercial Development to recognize an existing convenience store with gas
pumps. The hours of operation are proposed from 5:00 am to 1:00 am seven
days per week.
M
FILE NO.: Z-8260 (Cont.
The site contains the store with a separate canopy for the fuel islands. Presently,
there are two drives located along Stagecoach Road and a single drive from
David O Dodd Road. The applicant has indicated right of way dedications will be
provided along the abutting streets. The right of way dedication along
Stagecoach Road will be a reduced right of way with the applicant dedicating five
feet. The reduced right of way dedication will take the new right of way line to the
edge of the existing fuel tank storage area. The right of way along David O Dodd
Road will be thirty feet from centerline as required per the Master Street Plan. A
twenty foot radial dedication will be provided at the intersection of the two
roadways.
There are no modifications proposed to the building or canopy located on the site
with the exception of cosmetic repairs. The applicant has indicated a dumpster
will be added to the site and the hours of service will be limited to 7:00 am to
9:00 pm. To staffs knowledge there are no remaining technical issues
associated with the request. Staff feels the rezoning of the site to recognize the
existing use is appropriate and should have minimal impact on the area.
STAFF RECOMMENDATIONS:
Staff recommends approval of the request subject to compliance with the
comments and conditions as outlined in paragraphs D, E and F of the agenda
staff report.
PLANNING COMMISSION ACTION: (SEPTEMBER 27, 2007)
The applicant was present. There were no registered objectors present. Staff
presented the item with a recommends of approval of the request subject to compliance
with the comments and conditions as outlined in paragraphs D, E and F of the agenda
staff report.
There was no further discussion of the item. The chair entertained a motion for
placement of the item on the consent agenda for approval. The motion carried by a
vote of 9 ayes, 0 noes, 1 absent and 1 open position.
5
September 27, 2007
ITEM NO.: 14 FILE NO.: Z-8260
NAME: Coulson Oil Company Short -form PCD
LOCATION: Located on the corner of Stagecoach and David O Dodd Roads
DEVELOPER:
Arkansas Fleet Fueling, LLC
Coulson Oil Company
1434 Pike Avenue
North Little Rock, AR 72114
SURVEYOR:
Brooks Surveying
20820Arch Street Pike
Hensley, AR 72065
AREA: 1.70+ acres
CURRENT ZONING
ALLOWED USES
PROPOSED ZONING
PROPOSED USE:
NUMBER OF LOTS: 1
R-2, Single-family
Single-family Residential
PCD
FT. NEW STREET: 0 LF
Convenience Store with Gas Pumps
VARIANCESNVAIVERS REQUESTED: None request.
A. PROPOSAL/REQUEST:
The applicant is seeking a rezoning of the site from R-2, Single-family to Planned
Commercial Development to recognize an existing convenience store with gas
pumps. The site contains the store with a separate canopy for the fuel islands.
Presently there are two drives located along Stagecoach Road and a single drive
from David O Dodd Road. There are no modifications proposed to the site with
the rezoning request.
September 27, 2007
SUBDIVISION
ITEM NO.: 14 (Cont.) FILE NO.: Z-8260
B. EXISTING CONDITIONS:
The site contains an existing convenience store which as been closed for some
time. The store was constructed prior to the site's annexation by the City. Uses
in the area include residential, commercial and an elementary school. To the
north along Stagecoach Road is also a convenience store with gas pumps
located near Lanehart Road. Further to the north new single-family homes are
being constructed in the Greenwood Acres Subdivision. Along David O Dodd
Road two new subdivisions are currently being developed in the Wood Creek
and Waters Edge Subdivisions.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has not received any comment from area residents. All
owners of property located within 200 feet of the proposed site, Southwest Little
Rock United for Progress, the Stagecoach Dodd Neighborhood Association and
all owners of property, who could be identified, located within 300 feet of the site
were notified of the Public Hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
Stagecoach Road is classified on the Master Street Plan as a principal
arterial. If the facility is redeveloped or expanded in the future, the full
dedication of right-of-way to 55 feet from centerline will be required. The
canopy and the pump islands would have to be relocated out of the right-of-
way. Since the site is not redeveloping and no changes are being made
dedicate an additional 5 feet of right-of-way.
2. Driveway locations and widths do not meet the traffic access and circulation
requirements of Sections 30-43 and 31-210. If the facility is redeveloped or
expanded in the future, the driveway on East David O Dodd Road must be
removed and only one (1) driveway will be allowed on Stagecoach Road.
The width of driveway cannot exceed 36 feet.
3. A 20 foot radial dedication of right-of-way is required at the intersection of
Stagecoach Road and East David O Dodd Road.
4. Due to the proposed use of the property, the Master Street Plans specifies
that East David O Dodd Road for the frontage of this property must meet
commercial street standards. Dedicate right-of-way to 30 feet from centerline.
It is difficult to determine the existing right-of-way without a centerline of East
David O Dodd Road shown on the survey.
5. Obtain a franchise agreement from Public Works (Bennie Nicolo, 371-4818)
for the private improvements located in the right-of-way.
2
September 27, 2007
SUBDIVISION
ITEM NO.: 94 (Cont.) FILE NO.: Z-8260
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer available to this property.
Entergy: No comment received.
Center -Point Energy: No comment received.
AT & T: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at
the time of request for water service must be met. Contact Central Arkansas
Water about reestablishing water service and if larger and/or additional water
meter(s) are required. Additional fire hydrant(s) may be required. Contact the
Little Rock Fire Department to obtain information regarding the required
placement of the hydrant(s) and contact Central Arkansas Water regarding
procedures for installation of the hydrant(s).
Fire Department: Place fire hydrants per code. Contact the Little Rock Fire
Department for additional information.
Counter Planning: No comment.
CATA: The site is not located on a dedicated CATA Bus Route.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division: This request is located in the 65th Street West Planning
District. The Land Use Plan shows Neighborhood Commercial for this property.
The applicant has applied for a rezoning from R-2 Single Family to Planned
Commercial Development to allow the existing convenience store to operate from
this site.
The request does not require a change to the Land Use Plan.
Master Street Plan: Stagecoach Road is shown as a Principal Arterial on the
Master Street Plan and East David O. Dodd is shown as a Local Street. These
streets may require dedication of right-of-way and may require street
improvements. The primary function of a Principal Arterial is to serve through
traffic and to connect major traffic generators or activity centers within urbanized
areas. Entrances and exits should be limited to minimize negative effects of
traffic and pedestrians since this is a Principal Arterial. The primary function of a
Local Street is to provide access to adjacent properties. Local Streets that are
abutted by non-residential zoning/use or more intensive zoning than duplexes
September 27, 2007
SUBDIVISION
ITEM NO.: 14 Cont. FILE NO.. Z-8260
are considered as "Commercial Streets". These streets have a design standard
the same as a Collector.
Bicycle Plan: A Class II bike route is shown on Stagecoach Road. A Class II
bikeway is located on the street as either a five foot shoulder or six foot marked
bike lane. Additional paving and right of way may be required.
City Recognized Neighborhood Action Plan: The applicant's property lies in the
area covered by the Pecan Lake/Stagecoach-Dodd/Westwood Neighborhood
Action Plan. The Zoning and Land Use goal states: "Discourage conversion of
R-2 properties along Stagecoach Road."
Landscape:
Redevelopment of the site will require compliance with the City's minimal
landscape and buffer ordinance requirements.
2. Any and all landscaping, fencing, striping, etc. should be in good condition or
repaired/replaced in conjunction with this request.
G. SUBDIVISION COMMITTEE COMMENT: (September 6, 2007)
The applicant was present. Staff presented an overview of the proposed
development stating there were few outstanding technical issues associated with
the request. Staff requested the applicant provide the location of the dumpster
and indicate if the hours of dumpster service would be limited to daylight hours.
Staff also requested the applicant provide the hours of operation for the proposed
facility.
Public Works comments were addressed. Staff stated right of way dedication
along Stagecoach Road and David O Dodd Road would be required at a lesser
standard than the Master Street Plan. Staff requested the applicant provide the
location of the tanks and any improvements to determine the right of way
required. There was a general discussion concerning a waiver of the right of way
dedication. Staff stated once the tank locations were determined, then a waiver
could be considered based on the location of the fuel tank basin.
Landscaping comments were noted. Staff stated all landscaping, fencing and
striping should be in good condition or repaired or replaced in conjunction with
the rezoning request.
Staff noted comments from the various other reporting departments and
agencies suggesting the applicant contact them directly for additional information
and clarification. There was no further discussion of the item. The Committee
then forwarded the item to the full Commission for final action.
rd
September 27, 2007
SUBDIVISION
ITEM NO.: 14 (Cont.
H. ANALYSIS:
FILE NO.: Z-8260
There were no technical issues associated with the request in need of
addressing raised at the September 6, 2007, Subdivision Committee meeting.
The request is to allow a rezoning of the site from R-2, Single-family to Planned
Commercial Development to recognize an existing convenience store with gas
pumps. The hours of operation are proposed from 5:00 am to 1:00 am seven
days per week.
The site contains the store with a separate canopy for the fuel islands. Presently,
there are two drives located along Stagecoach Road and a single drive from
David O Dodd Road. The applicant has indicated right of way dedications will be
provided along the abutting streets. The right of way dedication along
Stagecoach Road will be a reduced right of way with the applicant dedicating five
feet. The reduced right of way dedication will take the new right of way line to the
edge of the existing fuel tank storage area. The right of way along David O Dodd
Road will be thirty feet from centerline as required per the Master Street Plan. A
twenty foot radial dedication will be provided at the intersection of the two
roadways.
There are no modifications proposed to the building or canopy located on the site
with the exception of cosmetic repairs. The applicant has indicated a dumpster
will be added to the site and the hours of service will be limited to 7:00 am to
9:00 pm. To staff's knowledge there are no remaining technical issues
associated with the request. Staff feels the rezoning of the site to recognize the
existing use is appropriate and should have minimal impact on the area.
STAFF RECOMMENDATIONS:
Staff recommends approval of the request subject to compliance with the
comments and conditions as outlined in paragraphs D, E and F of the agenda
staff report.
PLANNING COMMISSION ACTION:
(SEPTEMBER 27, 2007)
The applicant was present. There were no registered objectors present. Staff
presented the item with a recommends of approval of the request subject to compliance
with the comments and conditions as outlined in paragraphs D, E and F of the agenda
staff report.
There was no further discussion of the item. The chair entertained a motion for
placement of the item on the consent agenda for approval. The motion carried by a
vote of 9 ayes, 0 noes, 1 absent and 1 open position.
5
ITEM NO.: 14.
NAME: Coulson Oil Company Short -form PCD
Z-8260
LOCATION: located on the corner of Stagecoach and David O Dodd Roads
Planning Staff Comments:
1. Provide notification of property owners located within 200-feet of the site, complete
with the certified abstract list, notice form with affidavit executed and proof of
mailing. The notice must be mailed no later than September 12, 2007. The Office of
Planning and Development must receive the proof of notice no later than September
21, 2007.
VariancelWaivers: None requested.
Public Works Conditions:
1. Stagecoach Road is classified on the Master Street Plan as a principal arterial. If the
facility is redeveloped or expanded in the future, the full dedication of right-of-way to
55 feet from centerline will be required. The canopy and the pump islands would
have to be relocated out of the right-of-way. Since the site is not redeveloping and
no changes are being made dedicate an additional 5 feet of right-of-way.
2. Driveway locations and widths do not meet the traffic access and circulation
requirements of Sections 30-43 and 31-210. If the facility is redeveloped or
expanded in the future, the driveway on East David O Dodd Road must be removed
and only one (1) driveway will be allowed on Stagecoach Road. The width of
driveway cannot exceed 36 feet.
3. A 20 foot radial dedication of right-of-way is required at the intersection of
Stagecoach Road and East David O Dodd Road.
4. Due to the proposed use of the property, the Master Street Plans specifies that East
David O Dodd Road for the frontage of this property must meet commercial street
standards. Dedicate right-of-way to 30 feet from centerline. It is difficult to
determine the existing right-of-way without a centerline of East David O Dodd Road
shown on the survey.
5. Obtain a franchise agreement from Public Works (Bennie Nicolo, 371-4818) for the
private improvements located in the right-of-way.
Utilities and Fire Department/County Planning:
Wastewater: Sewer available to this property.
Entergy: No comment received.
Center -Point Energy: No comment received.
AT & T: No comment received.
Item # 14.
Central Arkansas Water: All Central Arkansas Water requirements in effect at the
time of request for water service must be met. Contact Central Arkansas Water about
reestablishing water service and if larger and/or additional water meter(s) are required.
Additional fire hydrant(s) may be required. Contact the Little Rock Fire Department to
obtain information regarding the required placement of the hydrant(s) and contact
Central Arkansas Water regarding procedures for installation of the hydrant(s).
Fire Department: Place fire hydrants per code. Contact the Little Rock Fire
Department for additional information.
County Planning: No comment.
CATA: The site is not located on a dedicated CATA Bus Route.
Planning Division: This request is located in the 65th Street West Planning District. The
Land Use Plan shows Neighborhood Commercial for this property. The applicant has
applied for a rezoning from R-2 Single Family to Planned Commercial Development to
allow the existing convenience store to operate from this site.
The request does not require a change to the Land Use Plan.
Master Street Plan: Stagecoach Road is shown as a Principal Arterial on the Master
Street Plan and East David O. Dodd is shown as a Local Street. These streets may
require dedication of right-of-way and may require street improvements. The primary
function of a Principal Arterial is to serve through traffic and to connect major traffic
generators or activity centers within urbanized areas. Entrances and exits should be
limited to minimize negative effects of traffic and pedestrians since this is a Principal
Arterial. The primary function of a Local Street is to provide access to adjacent
properties. Local Streets that are abutted by non-residential zoning/use or more
intensive zoning than duplexes are considered as "Commercial Streets". These streets
have a design standard the same as a Collector.
Bicycle Plan: A Class II bike route is shown on Stagecoach Road. A Class II bikeway
is located on the street as either a five foot shoulder or six foot marked bike lane.
Additional paving and right of way may be required.
City Recognized Neighborhood Action Plan: The applicant's property lies in the area
covered by the Pecan Lake/Stagecoach-Dodd/Westwood Neighborhood Action Plan.
The Zoning and Land Use goal states: "Discourage conversion of R-2 properties along
Stagecoach Road."
Landscape:
1. Site plan must comply with the City's minimal
requirements.
2. Any and all landscaping, fencing, striping, etc.
repaired/replaced in conjunction with this request.
landscape and buffer ordinance
should be in good condition or
Item # 14.
Revised platlpfan� Submit four (4) copies of a revised preliminary plat/plan (to include
the additional information as noted above) to staff on Wednesday, September 12, 2007.
Item # 14.