HomeMy WebLinkAboutZ-8235 Staff AnalysisFILE NO.: Z-8235
NAME: The Village at Westbury Long -form PCD
LOCATION: Located on the Northwest corner of Briner Circle and Stagecoach Road
DEVELOPER:
Dreamland Development, LLC
27 Overlook Circle
Little Rock, AR 72207
�nir,iniFFR•
White Daters and Associates
24 Rahling Circle
Little Rock, AR 72223
AREA: 11.54 acres
CURRENT ZONING
ALLOWED USES:
PROPOSED ZONING
PROPOSED USE
NUMBER OF LOTS: 6
1-2, Light Industrial District
Light Industrial
PCD
FT. NEW STREET: 1,000 LF
0-3, General Office District and C-3, General Commercial
District uses
VARIANCESMAIVERS REQUESTED:
1. A variance from the Land Alteration Ordinance to allow advanced grading of the
entire site with the development of the first phase.
2. A variance from the storm water detention ordinance to allow in -lieu payment for
storm water detention.
A. PROPOSAUREQUEST:
The project is located at the northwest corner of Briner Circle and Stagecoach
Road near the County Line. Fourche Creek borders the property to the east and
north. The property contains approximately 11.5 acres and is presently zoned 1-2
Light Industrial District. The developer is proposing to subdivide the property into
FILE NO.: Z-8235 (Cont.
six (6) lots with a mix of various uses including 0-3, General Office District uses
and C-3, General Commercial District uses.
The developer is requesting a variance from the Land Alteration Ordinance to
allow advanced grading of the site. There is debris on the site that will need to
be cleaned up and a portion of the site falls in the 100-year floodplain. The
developer wishes to fill the entire site at one time. The developer is also
requesting an in -lieu contribution for the storm water detention requirement.
B. EXISTING CONDITIONS:
The site is located adjacent to the Pulaski/Saline County Line on the north side of
Stagecoach Road. There are a number of uses in the area including two large
manufactured home parks both located to the south of the site, beverage shops
and office and commercial uses. To the west of the site is a cemetery with a
wooded area behind the cemetery. Contained on the site is a small baseball field
and a non -operational self service carwash facility. The area to the north and
west of the site is the Fourche Creek. Immediately east of the site is City owned
property containing the Otter Creek Park.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has received several informational phone calls from area
residents. All owners of property located within 200-feet of the site, all residents,
who could be identified located within 300-feet of the site, the Otter Creek
Homeowners Association and Southwest Little Rock United for Progress were
notified of the Public Hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
Stagecoach Road is classified on the Master Street Plan as a minor arterial.
A dedication of right-of-way 45 feet from centerline will be required. Per the
Master Street Plan a right turn lane is required to be installed which will
require additional right-of-way dedication.
2. Per Little Rock Code, access driveways running parallel to the street shall
not create a four-way intersection within 75-feet of the future curb line of the
street.
3. With site development, provide the design of street conforming to the
Master Street Plan. Construct one-half street improvement to Stagecoach
Road including 5-foot sidewalks with the planned development. A right turn
lane is required to be installed with at least 150 feet of stacking and 100 foot
taper.
4. A grading permit in accordance with Section 29-186 (c) and (d) will be
required prior to any land clearing or grading activities at the site. Site
grading, and drainage plans will need to be submitted and approved prior to
the start of construction.
2
FILE NO.: Z-8235 (Cont.)
5. Provide a Sketch Grading and Drainage Plan per Section 29-186 (e).
Provide quantities of fill to be cut and filled and quantities of fill to be trucked
into the site.
6. Since Westburry Boulevard is a commercial street, sidewalks with
appropriate handicap ramps are required on both side in accordance with
Section 31-175 of the Little Rock Code and the Master Street Plan.
7. Storm water detention ordinance applies to this property. Staff is still
reviewing downstream drainage complaints for acceptance of in -lieu
payment for detention.
8. Turn around must be provided for a WB-30 vehicle attempting to enter
development.
9. Show development phase lines on revised plan.
10. In accordance with Section 31-210 (h)(12), access driveways running
parallel to the street shall not create a four-way intersection within 75 feet of
the future curb line of the street.
11. If disturbed area is one (1) or more acres, obtain a NPDES storm water
permit from the Arkansas Department of Environmental Quality prior to the
start of construction.
12. Obtain permits for improvements within State Highway right-of-way from
AHTD, District VI.
13_ With site development, provide the design of street conforming to the
Master Street Plan. Construct street improvement to Westburry Boulevard
including 5-foot sidewalks with the planned development. Provide striping
for center turn lane.
14. The Rahling Road extension is proposed to be located along the west
property line of the property. This part of the Rahling Road extension is
classified on the Master Street Plan as a principal arterial. Dedication of
right-of-way is required to 55 feet east of the west property line.
15. A 20 foot radial dedication of right-of-way is required at the future
intersection of proposed Rahling Extension and Stagecoach Road.
16. A special Grading Permit for Flood Hazard Areas will be required per
Section 8-283 prior to construction.
17. The minimum Finish Floor elevation of is required to be shown on plat and
grading plans. This finished floor elevation should be one (1) foot or more
above the base flood elevation and the structures built to those elevations.
Due to the inaccuracy of the FIRMs, the structures proposed in Zone X
should also be constructed to one (1) foot or more above the base flood
elevation.
18. In accordance with Section 31-176, floodway areas must be shown as
floodway easements or be dedicated to the public. In addition, a 25 foot
wide access easement is required adjacent to the floodway boundary.
3
FILE NO.: Z-8235 (Cont.
19. Any proposed alteration of the floodway will require flood map revisions.
Obtain conditional approval from Public Works and the Federal Emergency
Management Agency prior to start of work.
20. Street Improvement plans shall include signage and striping. Traffic
Engineering must approve completed plans prior to construction.
21. Plans of all work in right-of-way shall be submitted for approval prior to start
of work. Obtain barricade permit prior to doing any work in the right-of-way
from Traffic Engineering at (501) 379-1805 (Travis Herbner).
22. Streetlights are required by Section 31-403 of the Little Rock code. Provide
plans for approval to Traffic Engineering. Streetlights must be installed prior
to platting/certificate of occupancy. Contact Traffic Engineering at 379-1813
(Steve Philpott) for more information
23. Obtain permits prior to doing any street cuts or curb cuts. Obtain barricade
permit prior to doing any work in the right-of-way. Contact Traffic
Engineering at (501) 379-1805 (Travis Herbner) for more information.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: A sewer main extension is required, with easements. Capacity
Contribution Fee charge for all multi -family developments is required. Contact
Little Rock Wastewater Utility at 688-1414 for additional information.
Entergy: No comment received.
Center -Point Energ : Approved as submitted.
AT and T: No comment received.
Central Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for
water service must be met.
2. A Capital Investment Charge based on the size of the connection(s) to the
main in Stagecoach Road will apply to this project in addition to normal
charges.
3. A water main extension, additional fire hydrants and onsite private fire lines
will be required to serve this property. Approval of plans by Central Arkansas
Water, Arkansas Department of Health Engineering Division and Little Rock
Fire Department is required.
4. This development will have minor impact on the existing water distribution
system. Proposed water facilities will be sized to provide adequate pressure
and fire protection.
9
FILE NO.: Z-8235 (Cont.
Fire Department:
hydrants per code
information.
Maintain a 20-foot minimum access gate. Install and place fire
Contact the Little Rock Fire Department for additional
County Planning: No comment.
CATA: The site is not located on a dedicated CATA Bus Route.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division: This request is located in the Otter Creek Planning District.
The Land Use Plan shows Light Industrial for this property. The applicant has
applied for a rezoning from 1-2 Light Industrial to Planned Industrial District to
allow a development including office and commercial uses.
A land use plan amendment for a change to Mixed Office Commercial is a
separate item on this agenda (LU07-16-01).
Master Street Plan: Stagecoach Road is shown as a Minor Arterial on the
Master Street Plan. This street may require dedication of right-of-way and may
require street improvements. A Minor Arterial provides connections to and
through an urban area and their primary function is to provide short distance
travel within the urbanized area. Entrances and exits should be limited to
minimize negative effects of traffic and pedestrians on Stagecoach since it is a
Minor Arterial.
Bicycle Plan: A Class II bike route is shown along Stagecoach Road. A Class II
bikeway is located on the street as either a 5' shoulder or six foot marked bike
lane. Additional paving and right of way may be required.
City Recognized Neighborhood Action Plan: The applicant's property lies in the
area covered by the Otter Creek Crystal Valley Neighborhood Action Plan. The
Office and Commercial Development goal states, "To promote commercial and
office development that meets the needs of area residents for shopping and
services, maintains as much of the existing topography, trees, and green space
as possible, and enhances the primarily residential character of the community."
Landscape:
1. Site plan must comply with the City's minimal landscape and buffer
ordinance requirements.
2. The landscape ordinance requires a minimum of 8 % of the paved areas be
landscaped with interior islands of at least 7'/2 feet in width and 300 square
feet in area. The proposed plan does not currently reflect this minimum.
These islands should be evenly distributed throughout the site.
19
FILE NO.: Z-8235 (Cont.)
3, The zoning buffer ordinance requires a fifty foot (50) wide land use buffer
along the northern property line. Seventy percent of this area is to remain
undisturbed.
4. The zoning buffer ordinance requires an average forty-two foot (42) wide
street buffer along the southern property line. The southern section located
next to the residential area must be fifty foot (50) wide. Seventy percent of
this area is to remain undisturbed.
5. The zoning buffer ordinance requires a fifty foot (50) wide land use buffer
along the western property line. Seventy percent of this area is to remain
undisturbed.
6. There will be no land use buffer requirement along the east, due to the
dedication of the property to the City of Little Rock Parks and Recreation
Department.
7. A six (6) foot high opaque screen, either a wooden fence with its face side
directed outward, a wall, or dense evergreen plantings, is required along the
northern, southern, eastern, and western perimeters of the site. In the
locations next to residentially zoned properties. Credit towards fulfilling this
requirement can be given for existing trees and undergrowth that satisfies
this year -around requirement.
8. An automatic irrigation system to water landscaped areas will be required.
9. Prior to the issuance of a building permit, it will be necessary to provide an
approved landscape plan stamped with the seal of a Registered Landscape
Architect.
10. The City Beautiful Commission recommends preserving as many existing
trees as feasible on this tree covered site. Credit toward fulfilling
Landscape Ordinance requirements can be given when preserving trees of
six (6) inch caliper or larger.
G. SUBDIVISION COMMITTEE COMMENT: (June 14, 2007)
The applicant was present. Staff presented an overview of the proposed
development stating there were additional items necessary to complete the
review process. Staff stated the Master Street Plan indicated a principal arterial
located along the property's western boundary. Staff stated the required right of
way for the street was 110-feet. Staff questioned the proposed uses for the site.
Staff also questioned the proposed signage plan and requested the applicant
provide details of the proposed signage including locations, total height and total
area.
Public Works comments were addressed. Staff stated a grading permit would be
required prior to the development of the site. The applicant stated the
developers were requesting a variance to allow grading of the entire site with the
construction with the first phase of development. Staff questioned the specifics
of the fill necessary for development of the site. Staff also stated a right turn lane
FILE NO.: Z-8235 (Cont.
would be required with at least 150 feet of stacking and a 100 foot taper along
Stagecoach Road.
Landscaping comments were addressed. Staff stated interior landscaping of
parking areas would be required per the zoning ordinance. Staff also stated the
zoning buffer ordinance would require landscaping and screening along the
northern property line and the southern property line where adjacent to the
residentially zoned property. Staff also stated an automatic irrigation system to
water landscape areas would be required for each of the proposed lots.
Staff noted comments from the various other reporting departments and
agencies suggesting the applicant contact them directly for additional information
and clarification. There was no further discussion of the item. The Committee
then forwarded the item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised site plan to staff addressing most of the issues
raised at the June 14, 2007, Subdivision Committee meeting. The applicant has
removed the rear portion of the proposed development eliminating the area
proposed for multi -family and the area indicated for the principal arterial per the
Master Street Plan. The removal of this portion of the proposed development
area addresses a number of the Public Works and Landscaping comments.
The applicant is seeking approval of a site plan for the development of
approximately 11 acres with an office and commercial development. The site
plan indicates 0-3, General Office District uses and C-3, General Commercial
District permitted uses will be utilized within the development. The site is
proposed with six lots ranging in size from 0.67 acres to 5.67 acres.
The site plan indicates Lot 1 with 2.2 acres and is proposed with C-3, General
commercial District uses. The proposed building area is 23,258 square feet with
24.2 percent building coverage and 91 parking spaces. Lot 2 is proposed with
4.27 acres, 30,942 square feet of building area, 16.6 percent building coverage
171 parking spaces and 80 percent of the square footage utilized by C-3,
General Commercial District uses and 20 percent of the building with 0-3,
General Office District uses. Lot 3 is proposed for 0-3, General Office District
uses. The parcel is proposed containing 2.29 acres. The building is proposed
with 16,500 square feet for a 16.5 percent building coverage. There are
83 parking spaces proposed for this lot. Lot 4 is proposed containing 0.67 acres
and will utilize C-3, General Commercial District uses as allowable uses. The
building is proposed with 6,353 square feet for a maximum building coverage of
21.8 percent and 34 parking spaces are proposed. Lot 5 is proposed for C-3,
General Commercial District uses. The lot area proposed is 0.72 acres. The
maximum building area is 6,353 square feet for a building coverage of
20.3 percent. Lot 6 is proposed with 1.07 acres and a total building coverage of
10,000 square feet. C-3, General Commercial District uses are proposed for the
lot. Lot 6 is proposed with 38 parking spaces and a maximum building coverage
of 21.5 percent.
The site plan indicates the placement of a single ground mounted monument
sign on each of the proposed lots. The signage is proposed with a maximum
7
FILE NO.: Z-8235 (Cont.
height of six feet and a maximum sign area of 60-feet. A pylon development sign
is also proposed at the entrance to the development. The sign is proposed with
a maximum height of 25-feet and a maximum width of 12-feet. The sign is
proposed as a multi -tenant identification sign.
Staff is supportive of the proposed development and the proposed uses of the
site. The property is currently zoned 1-2, Light Industrial District which could
potentially develop with uses which are less conducive to the adjacent residential
homes located to the south, across Stagecoach Road. Through the Planned
Development process, the site is proposed to develop with a mixture of uses,
which will be more compatible and potentially impose a lesser impact on the
adjoining homes.
The applicant is seeking a variance from the Land Alteration Ordinance to allow
advanced grading of the site. The applicant has indicated the desire is to grade
the entire area with the development of the first phase of construction. The
applicant is also seeking a variance to allow an in -lieu contribution for the storm
water detention requirements. A sketch grading and drainage plan was not
provided to staff, cut and fill quantities were not provided and finished floor
elevations of structures in the floodplain were not provided. Without this
information staff cannot properly review the need for advanced grading of the
entire site and therefore cannot recommend advanced grading at this location.
Although staff is supportive of the rezoning application staff is not supportive of
the request for the land alteration variance request or the request for the in -lieu
payment for the required storm water detention since the applicant failed to
provide staff with sufficient information to complete the review process.
STAFF RECOMMENDATIONS:
Staff recommends denial of the request as filed.
PLANNING COMMISSION ACTION:
(JULY 5, 2007)
The applicant was present. There were no registered objectors present. Staff
presented the item stating the applicant had withdrawn the request for advanced
grading and has indicated they will work with staff concerning the storm water detention
ordinance requirements. Staff stated the applicant had addressed their concerns and
presented a recommendation of approval of the request subject to compliance with the
comments and conditions as outlined in paragraphs D, E and F of the agenda staff
report.
There was no further discussion of the item. The chair entertained a motion for
placement of the item on the consent agenda for approval. The motion carried by a
vote of 9 ayes, 0 noes, 1 absent and 1 vacant position.
July 5, 2007
ITEM NO.: 18.1 FILE NO.: Z-8235
NAME: The Village at Westbury Long -form PCD
LOCATION: Located on the Northwest corner of Briner Circle and Stagecoach Road
DEVELOPER:
Dreamland Development, LLC
27 Overlook Circle
Little Rock, AR 72207
FNC�INFFR-
White Daters and Associates
24 Rahling Circle
Little Rock, AR 72223
AREA: 11.54 acres
CURRENT ZONING:
NUMBER OF LOTS: 6
1-2, Light Industrial District
FT. NEW STREET: 1,000 LF
ALLOWED USES: Light Industrial
PROPOSED ZONING: PCD
PROPOSED USE: 0-3, General Office District and C-3, General Commercial
District uses
VARIANCESM/AIVERS REQUESTED:
1. A variance from the Land Alteration Ordinance to allow advanced grading of the
entire site with the development of the first phase.
2. A variance from the storm water detention ordinance to allow in -lieu payment for
storm water detention.
A. PROPOSAL/REQUEST.-
The project is located at the northwest corner of Briner Circle and Stagecoach
Road near the County Line. Fourche Creek borders the property to the east and
north. The property contains approximately 11.5 acres and is presently zoned 1-2
July 5, 2007
SUBDIVISION
ITEM NO.: 18.1 (Cont.
FILE NO.: Z-8235
Light Industrial District. The developer is proposing to subdivide the property into
six (6) lots with a mix of various uses including 0-3, General Office District uses
and C-3, General Commercial District uses.
The developer is requesting a variance from the Land Alteration Ordinance to
allow advanced grading of the site. There is debris on the site that will need to
be cleaned up and a portion of the site falls in the 100-year floodplain. The
developer wishes to fill the entire site at one time. The developer is also
requesting an in -lieu contribution for the storm water detention requirement.
B. EXISTING CONDITION
The site is located adjacent to the Pulaski/Saline County Line on the north side of
Stagecoach Road. There are a number of uses in the area including two large
manufactured home parks both located to the south of the site, beverage shops
and office and commercial uses. To the west of the site is a cemetery with a
wooded area behind the cemetery. Contained on the site is a small baseball field
and a non -operational self service carwash facility. The area to the north and
west of the site is the Fourche Creek. Immediately east of the site is City owned
property containing the Otter Creek Park.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has received several informational phone calls from area
residents. All owners of property located within 200-feet of the site, all residents,
who could be identified located within 300-feet of the site, the Otter Creek
Homeowners Association and Southwest Little Rock United for Progress were
notified of the Public Hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Stagecoach Road is classified on the Master Street Plan as a minor arterial.
A dedication of right-of-way 45 feet from centerline will be required. Per the
Master Street Plan a right turn lane is required to be installed which will
require additional right-of-way dedication.
2. Per Little Rock Code, access driveways running parallel to the street shall
not create a four-way intersection within 75-feet of the future curb line of the
street.
3. With site development, provide the design of street conforming to the
Master Street Plan. Construct one-half street improvement to Stagecoach
Road including 5-foot sidewalks with the planned development. A right turn
lane is required to be installed with at least 150 feet of stacking and 100 foot
taper.
2
July 5, 2007
SUBDIVISION
ITEM NO.: 18.1 (Cont.
FILE NO.: Z-8235
4. A grading permit in accordance with Section 29-186 (c) and (d) will be
required prior to any land clearing or grading activities at the site. Site
grading, and drainage plans will need to be submitted and approved prior to
the start of construction.
5. Provide a Sketch Grading and Drainage Plan per Section 29-186 (e).
Provide quantities of fill to be cut and filled and quantities of fill to be trucked
into the site.
6. Since Westburry Boulevard is a commercial street, sidewalks with
appropriate handicap ramps are required on both side in accordance with
Section 31-175 of the Little Rock Code and the Master Street Plan.
7. Storm water detention ordinance applies to this property. Staff is still
reviewing downstream drainage complaints for acceptance of in -lieu
payment for detention.
8. Turn around must be provided for a WB-30 vehicle attempting to enter
development.
9. Show development phase lines on revised plan.
10. In accordance with Section 31-210 (h)(12), access driveways running
parallel to the street shall not create a four-way intersection within 75 feet of
the future curb line of the street.
11. If disturbed area is one (1) or more acres, obtain a NPDES storm water
permit from the Arkansas Department of Environmental Quality prior to the
start of construction.
12. Obtain permits for improvements within State Highway right-of-way from
AHTD, District VI.
13. With site development, provide the design of street conforming to the
Master Street Plan. Construct street improvement to Westburry Boulevard
including 5-foot sidewalks with the planned development. Provide striping
for center turn lane.
14. The Rahling Road extension is proposed to be located along the west
property line of the property. This part of the Rahling Road extension is
classified on the Master Street Plan as a principal arterial. Dedication of
right-of-way is required to 55 feet east of the west property line.
15. A 20 foot radial dedication of right-of-way is required at the future
intersection of proposed Rahling Extension and Stagecoach Road.
16. A special Grading Permit for Flood Hazard Areas will be required per
Section 8-283 prior to construction.
17. The minimum Finish Floor elevation of is required to be shown on plat and
grading plans. This finished floor elevation should be one (1) foot or more
above the base flood elevation and the structures built to those elevations.
3
July 5, 2007
SUBDIVISION
ITEM NO.: 18.1 (Cont.
FILE NO.: Z-8235
Due to the inaccuracy of the FIRMs, the structures proposed in Zone X
should also be constructed to one (1) foot or more above the base flood
elevation.
18. In accordance with Section 31-176, floodway areas must be shown as
floodway easements or be dedicated to the public. In addition, a 25 foot
wide access easement is required adjacent to the floodway boundary.
19. Any proposed alteration of the floodway will require flood map revisions.
Obtain conditional approval from Public Works and the Federal Emergency
Management Agency prior to start of work.
20. Street Improvement plans shall include signage and striping. Traffic
Engineering must approve completed plans prior to construction.
21. Plans of all work in right-of-way shall be submitted for approval prior to start
of work. Obtain barricade permit prior to doing any work in the right-of-way
from Traffic Engineering at (501) 379-1805 (Travis Herbner).
22. Streetlights are required by Section 31-403 of the Little Rock code. Provide
plans for approval to Traffic Engineering. Streetlights must be installed prior
to platting/certificate of occupancy. Contact Traffic Engineering at 379-1813
(Steve Philpott) for more information
23. Obtain permits prior to doing any street cuts or curb cuts. Obtain barricade
permit prior to doing any work in the right-of-way. Contact Traffic
Engineering at (501) 379-1805 (Travis Herbner) for more information.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: A sewer main extension is required, with easements. Capacity
Contribution Fee charge for all multi -family developments is required. Contact
Little Rock Wastewater Utility at 688-1414 for additional information.
Entergy: No comment received.
Center -Point Engrg : Approved as submitted.
AT and T: No comment received.
Central Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for
water service must be met.
2. A Capital Investment Charge based on the size of the connection(s) to the
main in Stagecoach Road will apply to this project in addition to normal
charges.
2
July 5, 2007
SUBDIVISION
ITEM NO.: 18.1 (Cont.
FILE NO.:
3. A water main extension, additional fire hydrants and onsite private fire lines
will be required to serve this property. Approval of plans by Central Arkansas
Water, Arkansas Department of Health Engineering Division and Little Rock
Fire Department is required.
4. This development will have minor impact on the existing water distribution
system. Proposed water facilities will be sized to provide adequate pressure
and fire protection.
Fire Department: Maintain a 20-foot minimum access gate. Install and place fire
hydrants per code. Contact the Little Rock Fire Department for additional
information.
Countv Planning: No comment.
CATA: The site is not located on a dedicated CATA Bus Route.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division: This request is located in the Otter Creek Planning District.
The Land Use Plan shows Light Industrial for this property. The applicant has
applied for a rezoning from 1-2 Light Industrial to Planned Industrial District to
allow a development including office and commercial uses.
A land use plan amendment for a change to Mixed Office Commercial is a
separate item on this agenda (LU07-16-01).
Master Street Plan: Stagecoach Road is shown as a Minor Arterial on the
Master Street Plan. This street may require dedication of right-of-way and may
require street improvements. A Minor Arterial provides connections to and
through an urban area and their primary function is to provide short distance
travel within the urbanized area. Entrances and exits should be limited to
minimize negative effects of traffic and pedestrians on Stagecoach since it is a
Minor Arterial.
Bicycle Plan: A Class II bike route is shown along Stagecoach Road. A Class II
bikeway is located on the street as either a 5' shoulder or six foot marked bike
lane. Additional paving and right of way may be required.
City Recognized Neighborhood Action Plan: The applicant's property lies in the
area covered by the Otter Creek Crystal Valley Neighborhood Action Plan. The
Office and Commercial Development goal states, "To promote commercial and
office development that meets the needs of area residents for shopping and
services, maintains as much of the existing topography, trees, and green space
as possible, and enhances the primarily residential character of the community."
July 5, 2007
SUBDIVISION
ITEM NO.: 18.1 Cont. FILE NO.: Z-8235
Landscape:
1. Site plan must comply with the City's minimal landscape and buffer
ordinance requirements.
2. The landscape ordinance requires a minimum of 8 % of the paved areas be
landscaped with interior islands of at least 7'/z feet in width and 300 square
feet in area. The proposed plan does not currently reflect this minimum.
These islands should be evenly distributed throughout the site.
3. The zoning buffer ordinance requires a fifty foot (50) wide land use buffer
along the northern property line. Seventy percent of this area is to remain
undisturbed.
4. The zoning buffer ordinance requires an average forty-two foot (42) wide
street buffer along the southern property line. The southern section located
next to the residential area must be fifty foot (50) wide. Seventy percent of
this area is to remain undisturbed.
5. The zoning buffer ordinance requires a fifty foot (50) wide land use buffer
along the western property line. Seventy percent of this area is to remain
undisturbed.
6. There will be no land use buffer requirement along the east, due to the
dedication of the property to the City of Little Rock Parks and Recreation
Department.
7. A six (6) foot high opaque screen, either a wooden fence with its face side
directed outward, a wall, or dense evergreen plantings, is required along the
northern, southern, eastern, and western perimeters of the site. In the
locations next to residentially zoned properties. Credit towards fulfilling this
requirement can be given for existing trees and undergrowth that satisfies
this year -around requirement.
8. An automatic irrigation system to water landscaped areas will be required.
9. Prior to the issuance of a building permit, it will be necessary to provide an
approved landscape plan stamped with the seal of a Registered Landscape
Architect.
10. The City Beautiful Commission recommends preserving as many existing
trees as feasible on this tree covered site. Credit toward fulfilling
Landscape Ordinance requirements can be given when preserving trees of
six (6) inch caliper or larger.
G. SUBDIVISION COMMITTEE COMMENT:
(June 14, 2007)
The applicant was present. Staff presented an overview of the proposed
development stating there were additional items necessary to complete the
No
July 5, 2007
SUBDIVISION
EM NO.: 18.1 (Cont.
FILE NO.: Z-8235
review process. Staff stated the Master Street Plan indicated a principal arterial
located along the property's western boundary. Staff stated the required right of
way for the street was 110-feet. Staff questioned the proposed uses for the site.
Staff also questioned the proposed signage plan and requested the applicant
provide details of the proposed signage including locations, total height and total
area.
Public Works comments were addressed. Staff stated a grading permit would be
required prior to the development of the site. The applicant stated the
developers were requesting a variance to allow grading of the entire site with the
construction with the first phase of development. Staff questioned the specifics
of the fill necessary for development of the site. Staff also stated a right turn lane
would be required with at least 150 feet of stacking and a 100 foot taper along
Stagecoach Road.
Landscaping comments were addressed. Staff stated interior landscaping of
parking areas would be required per the zoning ordinance. Staff also stated the
zoning buffer ordinance would require landscaping and screening along the
northern property line and the southern property line where adjacent to the
residentially zoned property. Staff also stated an automatic irrigation system to
water landscape areas would be required for each of the proposed lots.
Staff noted comments from the various other reporting departments and
agencies suggesting the applicant contact them directly for additional information
and clarification. There was no further discussion of the item. The Committee
then forwarded the item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised site plan to staff addressing most of the issues
raised at the June 14, 2007, Subdivision Committee meeting. The applicant has
removed the rear portion of the proposed development eliminating the area
proposed for multi -family and the area indicated for the principal arterial per the
Master Street Plan. The removal of this portion of the proposed development
area addresses a number of the Public Works and Landscaping comments.
The applicant is seeking approval of a site plan for the development of
approximately 11 acres with an office and commercial development. The site
plan indicates 0-3, General Office District uses and C-3, General Commercial
District permitted uses will be utilized within the development. The site is
proposed with six lots ranging in size from 0.67 acres to 5.67 acres.
The site plan indicates Lot 1 with 2.2 acres and is proposed with C-3, General
commercial District uses. The proposed building area is 23,258 square feet with
24.2 percent building coverage and 91 parking spaces. Lot 2 is proposed with
4.27 acres, 30,942 square feet of building area, 16.6 percent building coverage
171 parking spaces and 80 percent of the square footage utilized by C-3,
General Commercial District uses and 20 percent of the building with 0-3,
7
July 5, 2007
SUBDIVISION
ITEM NO.: 18.1 (Cont.) FILE NO.: Z-8235
General Office District uses. Lot 3 is proposed for 0-3, General Office District
uses. The parcel is proposed containing 2.29 acres. The building is proposed
with 16,500 square feet for a 16.5 percent building coverage. There are
83 parking spaces proposed for this lot. Lot 4 is proposed containing 0.67 acres
and will utilize C-3, General Commercial District uses as allowable uses. The
building is proposed with 6,353 square feet for a maximum building coverage of
21.8 percent and 34 parking spaces are proposed. Lot 5 is proposed for C-3,
General Commercial District uses. The lot area proposed is 0.72 acres. The
maximum building area is 6,353 square feet for a building coverage of
20.3 percent. Lot 6 is proposed with 1.07 acres and a total building coverage of
10,000 square feet. C-3, General Commercial District uses are proposed for the
lot. Lot 6 is proposed with 38 parking spaces and a maximum building coverage
of 21.5 percent.
The site plan indicates the placement of a single ground mounted monument
sign on each of the proposed lots. The signage is proposed with a maximum
height of six feet and a maximum sign area of 60-feet. A pylon development sign
is also proposed at the entrance to the development. The sign is proposed with
a maximum height of 25-feet and a maximum width of 12-feet. The sign is
proposed as a multi -tenant identification sign.
Staff is supportive of the proposed development and the proposed uses of the
site. The property is currently zoned 1-2, Light Industrial District which could
potentially develop with uses which are less conducive to the adjacent residential
homes located to the south, across Stagecoach Road. Through the Planned
Development process, the site is proposed to develop with a mixture of uses,
which will be more compatible and potentially impose a lesser impact on the
adjoining homes.
The applicant is seeking a variance from the Land Alteration Ordinance to allow
advanced grading of the site. The applicant has indicated the desire is to grade
the entire area with the development of the first phase of construction. The
applicant is also seeking a variance to allow an in -lieu contribution for the storm
water detention requirements. A sketch grading and drainage plan was not
provided to staff, cut and fill quantities were not provided and finished floor
elevations of structures in the floodplain were not provided. Without this
information staff cannot properly review the need for advanced grading of the
entire site and therefore cannot recommend advanced grading at this location.
Although staff is supportive of the rezoning application staff is not supportive of
the request for the land alteration variance request or the request for the in -lieu
payment for the required storm water detention since the applicant failed to
provide staff with sufficient information to complete the review process.
STAFF RECOMMENDATIONS:
Staff recommends denial of the request as filed.
0
July 5, 2007
SUBDIVISION
ITEM NO18.1 (Cont.) FILE NO.: Z-8235
PLANNING COMMISSION ACTION: (JULY 5, 2007)
The applicant was present. There were no registered objectors present. Staff
presented the item stating the applicant had withdrawn the request for advanced
grading and has indicated they will work with staff concerning the storm water detention
ordinance requirements. Staff stated the applicant had addressed their concerns and
presented a recommendation of approval of the request subject to compliance with the
comments and conditions as outlined in paragraphs D, E and F of the agenda staff
report.
There was no further discussion of the item. The chair entertained a motion for
placement of the item on the consent agenda for approval. The motion carried by a
vote of 9 ayes, 0 noes, 1 absent and 1 vacant position.
0
ITEM NO.: 18.1.
NAME: The Village at Westbury Long -form PID
Z-8235
LOCATION: located on the Northwest corner of Briner Circle and Stagecoach Road
Planning Staff Comments_:
1. Provide notification of abutting property owners of the site, complete with the
certified abstract list, notice form with affidavit executed and proof of mailing. The
notice must be mailed no later than June 20, 2007. The Office of Planning and
Development must receive the proof of notice no later than June 28, 2007.
2. The Master Street Plan indicates a principal arterial along the western perimeter of
the site. The typical right of way for a principal arterial is 110-feet.
3. Correct the general note indicating the number of units related to the number of
bedrooms.
4. Provide details of any proposed signage for each of the office/commercial lots
including building signage.
5. Provide details of any proposed signage for the multi -family development.
6. Provide the location of the mail kiosk on the site plan.
7. Provide the total area of open space proposed for the multi -family development
portion of the site.
8. Provide the proposed building construction materials and the proposed building
elevations for the units.
9. Provide the means of garbage collection for the individual lots and the proposed
multi -family development. Provide the location of the proposed dumpsters if
applicable.
10. If dumpsters are proposed will the hours of service be limited to daylight hours?
11. Will the development be market rate or subsidized housing? Provide the percentage
of subsidized units if applicable.
12. Provide the amenities proposed within the clubhouse area of the multi -family
development.
13. Provide the proposed uses for the office/warehouse development portion of the
development.
14. Is fencing proposed? If so provide the location of the proposed fencing along with a
note indicating the proposed construction materials and the height of the proposed
fence.
15. Provide a phasing plan for the proposed development. Will the multi -family units all
be constructed in a single phase or will there be a number of phases? Will the
office/commercial buildings be constructed in multiple phases or a single phase?
16. Provide the total building square footage for each of the proposed uses on the
indicated lots. Provide the percentage of building coverage for each of the proposed
uses on the indicated lots.
Variance/Waivers: None requested.
Item # 18.1.
Public Works Conditions:
1. Stagecoach Road is classified on the Master Street Plan as a minor arterial. A
dedication of right-of-way 45 feet from centerline will be required. Per the Master
Street Plan a right turn lane is required to be installed which will require additional
right-of-way dedication.
2. With site development, provide the design of street conforming to the Master Street
Plan. Construct one-half street improvement to Stagecoach Road including 5-foot
sidewalks with the planned development. A right turn lane is required to be installed
with at least 150 feet of stacking and 100 foot taper.
3. A grading permit in accordance with Section 29-186 (c) and (d) will be required prior
to any land clearing or grading activities at the site. Site grading, and drainage plans
will need to be submitted and approved prior to the start of construction.
4. Provide a Sketch Grading and Drainage Plan per Section 29-186 (e). Provide
quantities of fill to be cut and filled and quantities of fill to be trucked into the site.
5. Since Westburry Boulevard is a commercial street, sidewalks with appropriate
handicap ramps are required on both side in accordance with Section 31-175 of the
Little Rock Code and the Master Street Plan.
6. Storm water detention ordinance applies to this property. Staff is still reviewing
downstream drainage complaints for acceptance of in -lieu payment for detention.
7. Turn around must be provided for a WB-30 vehicle attempting to enter development.
8. Show development phase lines on revised plan.
9. In accordance with Section 31-210 (h)(12), access driveways running parallel to the
street shall not create a four-way intersection within 75 feet of the future curb line of
the street.
10. If disturbed area is one (1) or more acres, obtain a NPDES storm water permit from
the Arkansas Department of Environmental Quality prior to the start of construction.
11.Obtain permits for improvements within State Highway right-of-way from AHTD,
District VI.
12. With site development, provide the design of street conforming to the Master Street
Plan. Construct street improvement to Westburry Boulevard including 5-foot
sidewalks with the planned development. Provide striping for center turn lane.
13. Driveway locations and widths do not meet the traffic access and circulation
requirements of Sections 30-43 and 31-210. The west driveway should align with
Briner Circle. The width of driveway must not exceed 36 feet.
14. The Rahling Road extension is proposed to be located along the west property line
of the property. This part of the Rahling Road extension is classified on the Master
Street Plan as a principal arterial. Dedication of right-of-way is required to 55 feet
east of the west property line.
15.A 20 foot radial dedication of right-of-way is required at the future intersection of
proposed Rahling Extension and Stagecoach Road.
16.A special Grading Permit for Flood Hazard Areas will be required per Section 8-283
prior to construction.
17. The minimum Finish Floor elevation of is required to be shown on plat and grading
plans. This finished floor elevation should be one (1) foot or more above the base
flood elevation and the structures built to those elevations. Due to the inaccuracy of
the FIRMs, the structures proposed in Zone X should also be constructed to one (1)
foot or more above the base flood elevation.
Item # 18.1.
18.In accordance with Section 31-176, floodway areas must be shown as floodway
easements or be dedicated to the public. In addition, a 25 foot wide access
easement is required adjacent to the floodway boundary.
19.Any proposed alteration of the floodway will require flood map revisions. Obtain
conditional approval from Public Works and the Federal Emergency Management
Agency prior to start of work.
20. Street Improvement plans shall include signage and striping. Traffic Engineering
must approve completed plans prior to construction.
21. Plans of all work in right-of-way shall be submitted for approval prior to start of work.
Obtain barricade permit prior to doing any work in the right-of-way from Traffic
Engineering at (501) 379-1805 (Travis Herbner).
22.Streetlights are required by Section 31-403 of the Little Rock code. Provide plans
for approval to Traffic Engineering. Streetlights must be installed prior to
platting/certificate of occupancy. Contact Traffic Engineering at 379-1813 (Steve
Philpott) for more information
23.Obtain permits prior to doing any street cuts or curb cuts. Obtain barricade permit
prior to doing any work in the right-of-way. Contact Traffic Engineering at (501) 379-
1805 (Travis Herbner) for more information.
Utilities and Fire Department/County Planning:
Wastewater: A sewer main extension is required, with easements. Capacity
Contribution Fee charge for all multi -family developments is required. Contact Little
Rock Wastewater Utility at 688-1414 for additional information.
Entergy: No comment received.
Center -Point Energy: Approved as submitted.
AT and T: No comment received.
Central Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for water
service must be met.
2. A Capital Investment Charge based on the size of the connection(s) to the main in
Stagecoach Road will apply to this project in addition to normal charges.
3. A water main extension, additional fire hydrants and onsite private fire lines will be
required to serve this property. Approval of plans by Central Arkansas Water,
Arkansas Department of Health Engineering Division and Little Rock Fire
Department is required.
4. This development will have minor impact on the existing water distribution system.
Proposed water facilities will be sized to provide adequate pressure and fire
protection.
Fire Department: Maintain a 20-foot minimum access gate. Install and place fire
hydrants per code. Contact the Little Rock Fire Department for additional information.
County Planning: No comment.
Item # 18.1.
CATA: The site is not located on a dedicated CATA Bus Route.
Planning Division: This request is located in the Otter Creek Planning District. The
Land Use Plan shows Light Industrial for this property. The applicant has applied for a
rezoning from 1-2 Light Industrial to Planned Industrial District to allow a development
including multi family, office, commercial and industrial uses.
A land use plan amendment for a change to Multi Family and Mixed Office Commercial
is a separate item on this agenda (LU07-16-01).
Master Street Plan: Stagecoach Road is shown as a Minor Arterial on the Master Street
Plan. This street may require dedication of right-of-way and may require street
improvements. A Minor Arterial provides connections to and through an urban area and
their primary function is to provide short distance travel within the urbanized area.
Entrances and exits should be limited to minimize negative effects of traffic and
pedestrians on Stagecoach since it is a Minor Arterial.
Bicycle Plan: A Class II bike route is shown along Stagecoach Road. A Class II
bikeway is located on the street as either a 5' shoulder or six foot marked bike lane.
Additional paving and right of way may be required.
City Recognized Neighborhood Action Plan: The applicant's property lies in the area
covered by the Otter Creek Crystal Valley Neighborhood Action Plan. The Office and
Commercial Development goal states, "To promote commercial and office development
that meets the needs of area residents for shopping and services, maintains as much of
the existing topography, trees, and green space as possible, and enhances the primarily
residential character of the community."
Landscape:
1. Site plan must comply with the City's minimal landscape and buffer ordinance
requirements.
2. The landscape ordinance requires a minimum of 8 % of the paved areas be
landscaped with interior islands of at least 7 Y2 feet in width and 300 square feet in
area. The proposed plan does not currently reflect this minimum. These islands
should be evenly distributed throughout the site.
3. The zoning buffer ordinance requires a fifty foot (50) wide land use buffer along the
northern property line. Seventy percent of this area is to remain undisturbed.
4. The zoning buffer ordinance requires an average forty-two foot (42) wide street
buffer along the southern property line. The southern section located next to the
residential area must be fifty foot (50) wide. Seventy percent of this area is to remain
undisturbed.
5. The zoning buffer ordinance requires a fifty foot (50) wide land use buffer along the
western property line. Seventy percent of this area is to remain undisturbed.
6. There will be no land use buffer requirement along the east, due to the dedication of
the property to the City of Little Rock Parks and Recreation Department.
7. A six (6) foot high opaque screen, either a wooden fence with its face side directed
outward, a wall, or dense evergreen plantings, is required along the northern,
Item # 18.1.
southern, eastern, and western perimeters of the site. In the locations next to
residentially zoned properties. Credit towards fulfilling this requirement can be given
for existing trees and undergrowth that satisfies this year -around requirement.
8. An automatic irrigation system to water landscaped areas will be required.
9. Prior to the issuance of a building permit, it will be necessary to provide an approved
landscape plan stamped with the seal of a Registered Landscape Architect.
10.The City Beautiful Commission recommends preserving as many existing trees as
feasible on this tree covered site. Credit toward fulfilling Landscape Ordinance
requirements can be given when preserving trees of six (6) inch caliper or larger.
Revised plat/plan: Submit four (4) copies of a revised preliminary plat (to include the
additional information as noted above) to staff on Wednesday, June 20, 2007.
Item # 18.1.