Loading...
HomeMy WebLinkAboutZ-8166 ApplicationLA SCM A CT a a �v N C3a a 0� Q C o� �a VCi pp¢ R4 R2 Existing Construction Trailer rls;�o - -� Q Q p o Q o000 "a r�nc:o . pa --- - ^ - WINDSOR RD p p'P Q I� ��0. N1 F6 I Area :a Vicinity Map i LJUlllll � � p CIE] PRD CJ ■ r J Case: Z-8166 N Location: 2 Dorado Beach Dr. Ward: 5 PD: 19 CT: 42.10 TRS: T2NR13W30 0 200 400 Feet EvMark Development, LLC Markus Evans Construction, LLC PO Box 241850 Little Rock, AR 72223 12/20/06 Monte Moore Little Rock Planning and Development 723 W. Markham Little Rock, AR 72201 Re: Temporary Construction Trailer at Hickory Grove subdivision Dear Monte, As way of introduction, we are real estate developers and residential contractors. Hickory Grove is a PRD and we intend to construct the majority of homes in Phase 1 and 2 of the project. We do not intend to construct homes in Phase 3. We are requesting to extend the time that our temporary construction trailer is placed in Hickory Grove. Our agreement with the City of Little Rock is that as soon as we plat a lot adjacent to the planned city road, Dorado Beach Dr., we will begin construction of the road. After the road is constructed we intend to move the construction trailer. We would like to invite you to our_ job site in order for you to view our project. You may reach me at 247-5332 or Bob Evans at 960-6062. Sincerely, c Jim Markus City of Little Rock Department of Planning and Development Planning 723 West Markham Street Zoning and Little Rock, Arkansas 72201-1334 Subdivision (501) 371-4790 Fax: (501) 399-3435 or 371-6863 EvMark Development, LLC Jim Markus P.O. Box 241850 Little Rock, AR 72223 Date: January 31, 2007 Dear Mr. Markus: Re: Case No. Z-8166 Location: 2 Dorado Beach Drive Issue: Time Extension for construction Trailer This is to advise you that in connection with your application case no. Z-8166 the following action was taken by the Board of Adjustment at its meeting on January 29, 2007. (a) Approved the application as revised. (b) X Approved the application with conditions. (c) Denied the application. (d) Deferred the application to the Meeting. (e) Withdrew the application. (f) X See attached Board of Adjustment minute record for conditions. (g) Other: If a variance application is approved by the Board of Adjustment, all permits necessary for the initiation of work shall be obtained within two (2) years from the date of approval, unless an extension of time is granted by the Board. Otherwise, the Board approval of the application shall be considered void. According to the City's Zoning Ordinance Section 36-70: "Appeals from the decision of the Board of Adjustment shall be filed with the appropriate court of jurisdiction. This filing must occur within thirty (30) calendar days of the action by the Board of Adjustment." If you have any questions, please call me at 371-4792. Sincerely, Monte Moore, Zoning and Code Enforcement Administrator Department of Planning and Development MM/vy EvMark Development, LLC Markus Evans Construction, LLC PO Box 241850 Little Rock, AR 72223 12/20/06 Monte Moore Little Rock Planning and Development 723 W. Markham Little Rock, AR 72201 Re: Temporary Construction Trailer at Hickory Grove subdivision Dear Monte, -�' -4- g g- k%66 As way of introduction, we are real estate developers and residential contractors. Hickory Grove is a PRD and we intend to construct the majority of homes in Phase 1 and 2 of the project. We do not intend to construct homes in Phase 3. We are requesting to extend the time that our temporary construction trailer is placed in Hickory Grove. Our agreement with the City of Little Rock is that as soon as we plat a lot adjacent to the planned city road, Dorado Beach Dr., we will begin construction of the road. After the road is constructed we intend to move the construction trailer. We would like to invite you to our job site in order for you to view our project. You may reach me at 247-5332 or Bob Evans at 960-6062. Sincerely, t Jim Markus