Loading...
HomeMy WebLinkAboutZ-8066 Map 3Building Classification and Footprint Dimensions Key Building Use Width Length Area Eave Height N 1" = 60' ,N 88°55'32" W — 1081.43' (ft,) (ft.) (sq.ft.) (ft.) 1 Operations/Maintenance 75 30 2,250 18 2 Blower/Generator 120 40 4,800 22 3 Headworks 65 65 4,225 22 4 Aeration Basin' 130 130 16,900 20 5 Clarifiers' 130 100 13,000 20 6 UV Disinfection 75 50 3,750 22 7 Sludge Storage 120 75 9,000 22 8 Solids Handling 140 80 11,200 24 9 Aeration Odor Control 60 100 6,000 22 PROPOSED METAL ROOFS SHALL BE OF COLORED — NON REFLECTIVE METAL. Total Structure Coverage 71,125 BUFFER AREAS ARE TO BE PROTECTED BY ORANGE — CONTRACTORS FENCING ERECTED PRIOR TO SITE WORK. ' The basins will be covered with a pre -cast concrete "T" with a membrane drainage system and soil to support vegetation DRIVEWAY WIDTHS ARE 20' UNLESS OTHERWISE NOTED. 8. DESIGNATED CONTRACTOR'S STORAGE AREA SHALL BE STABILIZED & PLANTED IN ACCORDANCE WITH CITY OF LITTLE x x 24' SECURITY GATE ENTRANCE r x R2 50' UNDISTURBED BUFFER (MIN) S 88°55'32" E — ?081.43' X x x x x x r 24' PAVED SURFACE SECURITY FENCE X x x —'8 WL 8 WL— 8 WL — 8 WL 8 WL 8 WL — 8 WL� 8 WL — 8 WL — 8 R1 — — — — L — — — — — — — — — II I 'SEE NOTE 7 —' III FUTURE I I FUTURE II w II FUTURE I I FUTURE I II m II R3 R2 8 WL 8 L WL WL 8 WL 8 R R4 1 Fr2 M FUTURE FUTURE —8 WL—8 WL—8 WL PAVED SURFACE 1 8 WL Iv J 3 au I is x --r— x x x I---_� X SID 500 I 50' EASEMENT R1 oC O W RIGHT OF WAY i - REMARKS PROJ FILE NAME: N 1" = 60' ,N 88°55'32" W — 1081.43' M R' X X X X X X X X X X R2 j1 z J Z o - KV LATTICE TOWER AP&L ROW 208' 9' 16' SID 500 \ 50' EASEMENT �� Within AP&L x 11.03 ACRES 20' WEST OF AP&L / ight—Of—Way S 88°26'42" E 1026.71' X x�--- X X �. X7.95' o x RIGHT OF WAY i - REMARKS PROJ FILE NAME: N 1" = 60' ,N 88°55'32" W — 1081.43' LITTLE ROCK O WASTEWATER UTILITY LITTLE MAUMELLE WASTEWATER TREATMENT FACILITY X X X X X X X X X X X X X X X X TYPICAL PARKING DETAIL x NTS 50' UNDIST,RBED � I BUFFER (MIN) DESIGNATED GENERAL NOTES cn x ` PROVIDED IN ACCORDANCE WITH CENTRAL ARKANSAS WATER AND ARKANSAS 9. PRIOR TO BUILDING PERMIT ISSUANCE LANDSCAPE PLAN SHALL BE SUBMITTED UNDER SEPARATE COVER. 1. BACKFLOW PREVENTION WILL BE REQUIREMENTS. 10. GRADING PERMIT SHALL BE SUBMITTED IN ACCORDANCE WITH SECTION 24-18E (C) & (D) PRIOR TO ANY LAND 2. DEPARTMENT OF HEALTH & HUMAN SERVICES THE NUMBER OF FIRE HYDRANTS AND LOCATIONS WILL BE COORDINATED WITH FIRE DEPAF.—MENT. DRWN CLEARING OR GRADING ACTIVITIES. BE SUBMITTED AND PRIOR TO START OF CONSTRUCTION. RO VED 3. SUBJECT PROPERTY DOES NOT LIE WITHIN DESIGNATED AS FLOODPLAIN ACCORDING TO FIFM COMMUNITY PANEL 12 SITENPDGRADINGS STORM ANDDRAINAGE ILL BSHALL PERMIT PLANS NED FROM ADEQ PRIOR CONS RUCTION. 150' x 300' NUMBER 050179 0253E, REVISED JULY 16, 1996 & ASSOCIATES, PLAT DATED 12-12-05. . 13. PER SECTION 29-189 (D) GROUPS OF TREES AND INDIVIDUAL TREES THAT ARE NOT REMOVED OR ARE LOCATED 4. BOUNDARY SURVEY WAS PERFORMED BY NTB WERE LOCATED BY TRANSCRIBING FROM RECORD NAPS. NO EXCAVATIONS WITHIN UNDISTURBED BUFFERS SHALL BE PROTECTED DURING CONSTRUCTION BY FENCING AND SHALL NOT BE USED 5. UTILITIES SHOWN ON THIS DRAWING WERE MADE TO CONFIRM SUB—SURFACE UTILITIES. NO GUARANTEE IS EXPRESSED OR 'MPLIED THAT ALL UTILITIES DETENTION FOR MATERIAL STORAGE OR OTHER PURPOSES. "DARK—SKY" HAVE BEEN SHOWN, OR THAT THOSE SHOWN ARE FULLY ACCURATE. 14. ONSITE LIGHTING SHALL BE IN COMPLIANCE WITH GUIDELINES; HONEVER, SUFFICIENT LIGHTING SHALL BE 6. BUFFER AREAS SHALL BE LANDSCAPED IN ACCORDANCE WITH THE CITY OF LITTLE ROCK SUBDIVISION & ZONING IMPLEMENTED FOR OSHA STANDARDS AS NEEDED FOR MAINTENANCE NEEDS. ORDINANCE SECTIONS 15-81 THROUGH 15-85 & CHAPTER 36, ARTICLE IX OR MAINTAIND IN UNDISTURBED 15. PROPOSED METAL ROOFS SHALL BE OF COLORED — NON REFLECTIVE METAL. 16. BUFFER AREAS ARE TO BE PROTECTED BY ORANGE — CONTRACTORS FENCING ERECTED PRIOR TO SITE WORK. 7. CONDITION ALL FUTURE BUILDING AREA SHALL BE LEFT UNDISTURBED TO THE MAXIMUM EXTENT PRAC TICALE 17. DRIVEWAY WIDTHS ARE 20' UNLESS OTHERWISE NOTED. 8. DESIGNATED CONTRACTOR'S STORAGE AREA SHALL BE STABILIZED & PLANTED IN ACCORDANCE WITH CITY OF LITTLE ROCK LANDSCAPE REQUIREMENTS. SEE NOTE 6. ECT NO 46096 S 88°26'42" E 1026.71' X x�--- X X �. X7.95' X X S 88°2642" E x UNDISTURBED I BUFFER AREA x I N x 88°26'-- „ X X X X 30?. 03 o x - REMARKS PROJ FILE NAME: N 1" = 60' Camp Dresser & McKee Inc. In Association with: consulting NRS Consultants engineenng construct or NTB Associates, Inc operations Oswald Engineering -TN Associates, LTD LITTLE ROCK O WASTEWATER UTILITY LITTLE MAUMELLE WASTEWATER TREATMENT FACILITY O DESIGNED 8Y: C61 DRAWN BY: SRu SHEET CHK'D BY: CPM CROSS CHK'D BY: CAI APPROVED BY: Cil DATE: APRIL 20D6 x � I DESIGNATED cn x ` CONTRACTOR Q STORAGE 30 0 60 REV. DATE DRWN AREA 150' x 300' (STORMWATER Q DETENTION 0 AREA) O I' 4.25 JIC IA East of Right—OV � X X S 88°2642" E x UNDISTURBED I BUFFER AREA x I N x 88°26'-- „ X X X X 30?. 03 NO. o x - REMARKS PROJ FILE NAME: N 1" = 60' Camp Dresser & McKee Inc. In Association with: consulting NRS Consultants engineenng construct or NTB Associates, Inc operations Oswald Engineering -TN Associates, LTD LITTLE ROCK O WASTEWATER UTILITY LITTLE MAUMELLE WASTEWATER TREATMENT FACILITY O DESIGNED 8Y: C61 DRAWN BY: SRu SHEET CHK'D BY: CPM CROSS CHK'D BY: CAI APPROVED BY: Cil DATE: APRIL 20D6 x � I x ` 30 0 60 REV. DATE DRWN CHKD NO. x 0 KRI CURVE TABLE R1= 80' R2= 19' R3= 25' R4= 80' RADIUS NOT SHOWN ARE 5' SITE PLAN -TREATMENT FACILITY FOR CONDITIONAL USE PERMIT SHEET NO. Z-Y-dG% LITTLE ROCK PLANNING COM,1I55ION APS ROVED, SUEJECT TO THE CONDITIONS A5 NOTED lid TIME PLANN'IN' CU ICN N:IPIUTE 'CORD 8 DATE:, - �V Y 06 JUN � 120 o x O O I O x � I x ` x 0 KRI CURVE TABLE R1= 80' R2= 19' R3= 25' R4= 80' RADIUS NOT SHOWN ARE 5' SITE PLAN -TREATMENT FACILITY FOR CONDITIONAL USE PERMIT SHEET NO. Z-Y-dG% LITTLE ROCK PLANNING COM,1I55ION APS ROVED, SUEJECT TO THE CONDITIONS A5 NOTED lid TIME PLANN'IN' CU ICN N:IPIUTE 'CORD 8 DATE:, - �V Y 06 JUN � 120