Loading...
HomeMy WebLinkAboutZ-8045 Map 3Ssi � GENERAL NOTES: BACKFLOW PREVENTION WILL BE PROVIDED IN ACCORDANCE WITH CENTRAL ARKANSAS WATER AND ARKANSAS DEPARTMENT OF HEALTH REQUIREMENTS. 2. THE NUMBER OF FIRE HYDRANTS AND LOCATIONS WILL BE COORDINATED WITH FIRE DEPARTMENT. 3. THE SUBJECT PROPERTY LIES WITHIN THE FLOODPLAIN, AND IS DESIGNATED ZONE X (AREAS DETERMINED TO BE OUTSIDE THE 500 YEAR FLOODPLAIN). AND ZONE AE (BASE FLOOD ELEVATIONS DETERMINED), ACCORDING TO FIRM PANEL 0501810104—F, DATED OCTOBER 19, 2001. 4. BOUNDARY SURVEY WAS PERFORMED BY AMI ENGINEERING, INC., PLAT DATED 3-10-06. 5. UTILITIES SHOWN ON THIS DRAWING WERE LOCATED BY TRANSCRIBING FROM RECORD MAPS. NO EXCAVATIONS WERE MADE TO CONFIRM SUB—SURFACE UTILITIES. NO GUARANTEE IS EXPRESSED OR IMPLIED THAT ALL UTILITIES HAVE BEEN SHOWN, OR THAT THOSE SHOWN ARE FULLY ACCURATE. 6. BUFFER AREAS SHALL BE LANDSCAPED IN ACCORDANCE WITH THE CITY OF LITTLE ROCK SUBDIVISION & ZONING ORDINANCE SECTIONS 15-81 THROUGH 15-85 & CHAPTER 36, ARTICLE IX NOBLE ADDITION ENDERSON SUBDIVISION NOBLE ADDITION 5 69-39 9'0 8' HIGH SECURITY FENCE AROUND PERIMETER 50' LANDSCAPED BUFFER IN ACCORDANCE WITH THE CITY OF LITTLE ROCK SUBDIVISION & ZONING ORDINANCE SCALE IN FEET 15 0 30 LITTLE ROCK PLANN;NG COt4lISSION APPR04ED, SUBJECT TO THE CONDITIONS AS NOTED IN THE P! "mrjrnic 1 � �- PROJECT NO. 47382 FILE NAME: � Camp Dresser &McKee Inc. consulting engineering construction operations LITTLE ROCK ® WASTEWATER UTILITY PEAK FLOW ATTENUATION FACILITIES PUMP STATION SITE PLAN SHEET N0. C -1.0 _1.o DESIGNED BY:AMB BY: SHEET CHK'D BY: AMB CROSS CHK'D BY: CAJ APPROVED BY: AMB DATE: MAY 2006 � ®DRAWN ONE INCH AT FULL SIZE IF NOT ONE INCH SCALE ACCORDINGLY NO. DATE DRWN CHKD REMARKS