HomeMy WebLinkAboutZ-8045 Map 11m
,i
/
GENERAL NOTES: ' , HENDE17SON SUBDIVISION
� � l
1. BACKFLOW PREVENTION WILL BE PROVIDED IN ACCORDANCE WITH
CENTRAL ARKANSAS WATER AND ARKANSAS DEPARTMENT OF HEALTH ONC MON
REQUIREMENTS.
2. THE NUMBER OF FIRE HYDRANTS AND LOCATIONS WILL BE COORDINATED 1 2 LOT
WITH FIRE DEPARTMENT. LOT
3. THE SUBJECT PROPERTY LIES WITHIN THE FLOODPLAIN, AND IS DESIGNATED
ZONE X (AREAS DETERMINED TO BE OUTSIDE THE 500 YEAR FLOODPLAIN). AND
ZONE AE (BASE FLOOD ELEVATIONS DETERMINED), ACCORDING TO FIRM PANEL */ 25p
0501810104-E, DATED OCTOBER 19, 2001.
4. BOUNDARY SURVEY WAS PERFORMED BY AMI ENGINEERING, INC., PLAT DATED 3-10-06. x E f'\ 251
�6 2 25z 25�
5. UTILITIES SHOWN ON THIS DRAWING WERE LOCATED BY TRANSCRIBING FROM 6 25� 255
RECORD MAPS. NO EXCAVATIONS WERE MADE TO CONFIRM SUB -SURFACE UTILITIES.25
NO GUARANTEE IS EXPRESSED OR IMPLIED THAT ALL UTILITIES HAVE BEEN SHOWN, 32 51 _
OR THAT THOSE SHOWN ARE FULLY ACCURATE.
AR -- 252 �� 56 256_
6. BUFFER AREAS SHALL BE LANDSCAPED IN ACCORDANCE WITH THE CITY OF LITTLE ROCK `�� �ZEg 252. — 256'
SUBDIVISION & ZONING ORDINANCE SECTIONS 15-81 THROUGH 15-85 & CHAPTER 36,
ARTICLE IX PNfl 11� J' 250
251
._ 255 254.._=.
E
____256
GENERATOR PAD
1
z /
PROP & CPP 2 25a
k
ITY ADDITION PPgA
SET ���� FUEL TANK PAD
c o A
LT)F�PMON ODOR CONTROL
S
I U
rn �
v PR BOLLARD —�
(TYP) `
o.* NP
v
^ 9 U P 5`b /
gLOCK� ANDEDTR2
SIGN LOCATION o , POP ---00\A RN /`_Z
PP
25.0' N 12'32'55" W� /
LOT � LOT � 5�
� 2
55 0'� S
60 -
0 3 i
p
C
A
� cn
0 1J RFBA
SS 6
T �Z 3
LO S�R�i� P�OPO LOT N 6 255 / S
5 9
35 / 2 M 283 3
� 251
m v CONNECT j v NINE
7 PROPOSED
2 _ - OPER(
J DGAP
In
SET KF_B K
i
OT 4
\ J %A
i
,
0
8' HIGH SECURITY FENCE
AROUND PERIMETER
/,-- 50'(MIN) LANDSCAPED BUFFER IN
ACCORDANCE WITH THE CITY OF LITTLE
ROCK SUBDIVISION & ZONING ORDINANCE
0
m
1 �
I �
m
FLOW METER VAULT
N
0
°D PUMP TEST VAULT
Ln
55`
a
N
SCALE IN FEET
15 0 30
CONFORMED
PROJECT NO. 8521-47382
FILE NAME: PF -11 -PS -PL _CB02
a��
®�®SSAr�'Op®�Cm
AUANSAS ®
REGISTERED
PR®FESSIONAL <
ENGINEER
�C, No. ®®
®�
®� dG 701®®®®
�m®c��®
Camp Dres r &McKee Inc.
-,
• .RS Consu/ton s AMl Engineering
- V Assoc o =s, -TD mOswold EngineeringCONTRACT
Little Rock
�� Wastewater
PEAK FLOW ATTENUATION FACILITIES
PUMP STATION, FORCE MAIN &EQUALIZATION BASIN
II
PEAK FLOW PUMP STATION
OVERALL SITE PLAN
I`w'
S' % p07
SHEET N0.
CB -2
rC�
CONFORMED
PROJECT NO. 8521-47382
FILE NAME: PF -11 -PS -PL _CB02
a��
®�®SSAr�'Op®�Cm
AUANSAS ®
REGISTERED
PR®FESSIONAL <
ENGINEER
�C, No. ®®
®�
®� dG 701®®®®
�m®c��®
Camp Dres r &McKee Inc.
-,
• .RS Consu/ton s AMl Engineering
- V Assoc o =s, -TD mOswold EngineeringCONTRACT
Little Rock
�� Wastewater
PEAK FLOW ATTENUATION FACILITIES
PUMP STATION, FORCE MAIN &EQUALIZATION BASIN
II
PEAK FLOW PUMP STATION
OVERALL SITE PLAN
I`w'
S' % p07
SHEET N0.
CB -2
DESIGNED BY: M. CROW
DRAWN BY: B. TAIL PLACIDOT4
SHEET cHK'D ev M. CROW
cRoss cHK'o Br, A. BENZING
APPROVED e C. JOHNSON
DATE: JULY 2007
ONE INCH
AT FULL SIZE
IF NOT ONE INCH
SCALE ACCORDINGLY
ISSUED AS BID
REV.
N0.
DATE
DRWN
CHKD
REMARKS