Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Z-8045 Map 1
GENERAL NOTES: 1. BACKFLOW PREVENTION WILL BE PROVIDED IN ACCORDANCE WITH CENTRAL ARKANSAS WATER AND ARKANSAS DEPARTMENT OF HEALTH REQUIREMENTS. 2. THE NUMBER OF FIRE HYDRANTS AND LOCATIONS WILL BE COORDINATED WITH FIRE DEPARTMENT. 3. THE SUBJECT PROPERTY LIES WITHIN THE FLOODPLAIN, AND IS DESIGNATED ZONE X (AREAS DETERMINED TO BE OUTSIDE THE 500 YEAR FLOODPLAIN). AND ZONE AE (BASE FLOOD ELEVATIONS DETERMINED), ACCORDING TO FIRM PANEL 0501810104—F, DATED OCTOBER 19, 2001. 4. BOUNDARY SURVEY WAS PERFORMED BY AMI ENGINEERING, INC., PLAT DATED 3-10-06. 5. UTILITIES SHOWN ON THIS DRAWING WERE LOCATED BY TRANSCRIBING FROM RECORD MAPS. NO EXCAVATIONS WERE MADE TO CONFIRM SUB—SURFACE UTILITIES. NO GUARANTEE IS EXPRESSED OR IMPLIED THAT ALL UTILITIES HAVE BEEN SHOWN, OR THAT THOSE SHOWN ARE FULLY ACCURATE. 6. BUFFER AREAS SHALL BE LANDSCAPED IN ACCORDANCE WITH THE CITY OF LITTLE ROCK SUBDIVISION & ZONING ORDINANCE SECTIONS 15-81 THROUGH 15-85 & CHAPTER 36, ARTICLE IX T' AOOITION Y jTr GATED ENTRANCE AND SIGN LOCATION 25.0' N 12.3255" W LOT 13 REgAP 1�2 PER'S PRO &GAP •` r` T `REgAR�� SF �� k x O O_x o 25, HENDERSON SUBDIVISION mud 255 —L3 256 N I CON PRO 6" 1 m ©0000 MPS��R 00 5,500 . ,ATOR PAD\ TANK PAD ODOR CONTROL - BOLLARD (TYP) S 1� ✓ � PP�`N 1 LOT 3 rr / L 1I 1 25fO/ PROPER UNE 69 390 5/ 263'93 S6, 8' HIGH SECURITY FENCE AROUND PERIMETER 50'(MIN) LANDSCAPED BUFFER IN ACCORDANCE WITH THE CITY OF LITTLE ROCK SUBDIVISION & ZONING ORDINANCE FLOW METER VAULT PUMP TEST VAULT RSG 254'" 1 N SCALE IN FEET 15 0 30 U 1� PROJECT NO. 8521-47382 FILE NAME: PF—II—PS—PL_C602 � ®®®sA �pT E pF ®® ®� ARKANSAS ® IIREGISTERED PROFESSIONAL ENGINEER g ®n N4. 10220 Op�I ®�� j P� ®G O ®® Camp Dresser &McKee Inc. -19 oe orons With: • NRS Consultants • AMI Engineering • FTN Associates, LTD e Oswcld Engineer; -,g �� Lithe Rock `►—J Wastewater PEAK FLOW ATTENUATION FACILITIES PUMP STATION, FORCE MAIN & EQUALIZATION BASIN CONTRACT Ii PEAK FLOW PUMP STATION OVERALL SITE PLAN SHEET NO. CB -2 DEsiGNED sY_ M. CROW DRAWN BY: B. TAILPLACIDO SHEET °" ° BY: M. cRow cRoss c KD By A. BENZING APPRovED By: JOHNSON PATE: JULY 2007 ONE INCH AT FULL SIZE IF NOT ONE INCH SCALE ACCORDINGLYC. ISSUED AS BID REV' NO. DATE DRWN CHKD REMARKS U