HomeMy WebLinkAboutZ-8037-A Staff AnalysisFILE NO.: Z -8037-A
NAME. John Barrow Appearance Center Short -form PCD and Right -of -Way
Abandonment for West 31 st Street
LOCATION: Located on the Northeast corner of 32nd Street and John Barrow Road
DEVELOPER:
Greg King — Riverfront Details
2420 Cantrell Road
Little Rock, AR 72202
ARCHITECT:
Caradine Companies Architecture
Attn. Fabian Marks
P.O. Box 190
Little Rock, AR 72203
SURVEYOR:
RCC Solutions LLC
124 North Market Street
Benton, AR 72015
AREA: 0.72 acres
CURRENT ZONIN
ALLOWED USES
PROPOSED ZONING
PROPOSED USE:
NUMBER OF LOTS: 1
PCD - Expired
FT. NEW STREET: 0 LF
Carwash — Detail shop, General and Professional Office
PCD
Carwash — Detail shop, General and Professional Office
VARIANCESMAIVERS REQUESTED:
1. A reduction in the required right-of-way dedication and paving width for West 32nd
Streets.
FILE NO.: Z -8037-A (Cont.
BACKGROUND:
Ordinance No. 19,565 adopted by the Little Rock Board of Directors on July 18, 2006,
rezoned the property from R-2, Single-family to PCD to allow the construction of a
single bay automatic carwash on the south end of the property and an L-shaped office
building with an indoor detailing shop on the north end of the property. The L-shaped
building was approved with four (4) bays with overhead doors. Two (2) bays would be
utilized for hand detailing of cars, the other two (2) bays would be for indoor storage of
cars which had been detailed. The L-shaped building would also contain the office for
the detailing operation along with 800 square feet of leasable area. The approval
allowed a waiver of the required land use buffer along the eastern perimeter of the site
and a variance to allow off site grading along the eastern perimeter. Two (2) vacuum
stations were approved along John Barrow Road. A single pole mounted sign 36 -feet in
height and 160 square feet in area was also approved. The approval allowed for a
deferral of the required street improvements to West 31St Street and a reduction in the
right of way dedication for West 32"0 Street. The development did not occur and the
PCD has expired.
A. PROPOSAL/REQUEST/APPLICANT'S STATEMENT:
The applicant is requesting to reestablish the previously approved PCD zoning
for the site. The proposal includes construction of an automatic carwash on the
south end of the property containing two (2) bays within a building containing
1,822 square feet of floor area. The site plan includes the placement of two (2)
vacuum stations located within the landscape area of West 32nd Street. The
northern portion of the site is proposed with an indoor detailing shop. The
building contains 2,155 square feet of floor area. The northern building will
contain four (4) bays with overhead doors. All four (4) bays will be utilized for
hand detailing and the storage of detailed cars. The northern building will also
contain the office for the detailing operation.
The request also includes the abandonment of the existing right of way for West
31St Street. The right of way appears to contain utilities which the developer does
not desire to relocate. The right of way will be retained as a utility and drainage
easement.
The request also includes a reduction in the required right of way dedication on
West 32nd Street. The Master Street Plan requires a dedication of 30 -feet from
centerline for commercial establishments. The applicant is requesting to
maintain the existing right of way of 25 -feet from centerline as was previously
approved.
B. EXISTING CONDITIONS:
The site is a gravel lot with a steep elevation change to the east. South of the
site is a commercial center containing a carwash and a strip retail center. To the
east and northeast are single-family homes located along West 32nd Street and
2
FILE NO.: Z -8037-A Cont.)
West 31St Street. West 31St Street does not exist adjacent to the site and West
32nd Street has been constructed to residential street standards. John Barrow
Road has been constructed as a four (4) lane road with a center turn lane
adjacent to the site.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has received several informational phone calls from area
residents. All property owners located within 200 -feet of the site along with the
John Barrow Neighborhood Association were notified of the public hearing.
D. ENGINEERING COMMENTS -
PUBLIC WORKS CONDITIONS:
1. Due to the proposed use of the property, the Master Street Plan specifies
that both 31St Street and 32nd Street for the frontage of this property must
meet commercial street standards. Dedicate right-of-way to 30 -feet from
centerline.
2. A 20 -foot radial dedication of right-of-way is required at the intersection of
31St Street and John Barrow Road.
3. Prior to construction of retaining walls, an engineer's certification of design
and plans must be submitted to Public Works for approval. After
construction, an as -built certification is required for construction of the
retaining wall.
4. Provide a letter prepared by a registered engineer certifying the sight
distance at the driveway intersection(s) comply with 2004 AASHTO Green
Book standards.
5. With site development, provide the design of street conforming to the
Master Street Plan. Construct one-half street improvement to 31St Street
including 5 -foot sidewalks with the planned development. The new back of
curb should be placed 18 -feet from centerline. At least 20 -feet of asphalt
should be provided.
6. If the existing ditch is proposed to be partially filled, drainage must be
provided for the property to the east.
7. A grading permit in accordance with Section 29-186 (c) and (d) will be
required prior to any land clearing or grading activities at the site. Other
than residential subdivisions, site grading and drainage plans must be
submitted and approved prior to the start of construction.
8. Repair or replace any curb and gutter or sidewalk that is damaged in the
public right-of-way prior to occupancy.
9. Stormwater detention ordinance applies to this property. Show the
proposed location for stormwater detention facilities on the plan.
FILE NO.: Z -8037-A
10. Traffic circulation on the interior of site is obstructed and creates turning
conflicts. Cars exiting wash bays cannot see cars entering the property.
11. If disturbed area is one (1) or more acres, obtain a NPDES stormwater
permit from the Arkansas Department of Environmental Quality prior to the
start of construction.
12. Driveway locations and widths do not meet the traffic access and circulation
requirements of Sections 30-43 and 31-210. Driveway spacing on John
Barrow Road is 300 -feet between driveways and intersections and 150 -feet
from the side property lines. The John Barrow Road Improvement project
shows a center median to be constructed about 150 -feet north of 32nd Street
and continuing past 31St Street. After construction, this property will not
have southbound left turn access to/from John Barrow Road.
13. In accordance with Section 31-210 (h)(12), access driveways running
parallel to the street shall not create a four-way intersection within 75 -feet of
the future curb line of the street.
14. Sidewalks with appropriate handicap ramps are required to be installed
along 32nd Street in accordance with Section 31-175 of the Little Rock Code
and the Master Street Plan.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNI
Wastewater: Sewer available to this property.
Entergy: Entergy does not object to the development. Three phase power exists
on the west side of John Barrow Road. Single phase power exists on the south
side of 32nd Street. There are no electrical facilities on the property now.
Contact Entergy, Bernard Neumeier, at 501.954.5158 for additional information.
Center -Point Energy: No comment received.
AT & T: No comment received.
Central Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for
water service must be met.
2. A water main extension will be needed to provide water service to this
property.
3. This development will have minor impact on the existing water distribution
system. Proposed water facilities will be sized to provide adequate
pressure and fire protection.
4. The Little Rock Fire Department needs to evaluate this site to determine
whether additional public and/or private fire hydrant(s) will be required. If
4
FILE NO.: Z -8037-A Cont.
additional fire hydrant(s) are required, they will be installed at the
Developer's expense.
5. Please submit plans for water facilities and/or fire protection system to
Central Arkansas Water for review. Plan revisions may be required after
additional review. Contact Central Arkansas Water regarding procedures
for installation of water facilities and/or fire service. Approval of plans by the
Arkansas Department of Health Engineering Division and the Little Rock
Fire Department is required.
6. A Capital Investment Charge based on the size of meter connection(s) will
apply to this project in addition to normal charges. This fee will apply to all
connections including metered connections off the private fire system.
7. If there are facilities that need to be adjusted and/or relocated, contact
Central Arkansas Water. That work would be done at the expense of the
developer.
8. Contact Central Arkansas Water if additional fire protection or metered
water service is required.
9. Due to the nature of this facility, installation of an approved reduced
pressure zone backflow preventer assembly (RPZA) is required on the
domestic water service. This assembly must be installed prior to the first
point of use. Central Arkansas Water requires that upon installation of the
RPZA, successful tests of the assembly must be completed by a Certified
Assembly Tester licensed by the State of Arkansas and approved by
Central Arkansas Water. The test results must be sent to Central Arkansas
Water's Cross Connection Section within ten days of installation and
annually thereafter. Contact the Cross Connection Section at 501.377.1226
if you would like to discuss backflow prevention requirements for this
project.
10. The facilities on-site will be private. When meters are planned off private
lines. Private facilities shall be installed to Central Arkansas Water's
material and construction specifications and installation will be inspected by
an engineer, licensed to practice in the State of Arkansas. Execution of
Customer Owned Line agreement is required.
11. Fire sprinkler systems which do not contain additives such as antifreeze
shall be isolated with a double detector check valve assembly. If additives
are used, a reduced pressure zone backflow preventer shall be required.
12. This development will have minor impact on the existing water distribution
system. Proposed water facilities will be sized to provide adequate
pressure and fire protection.
5
FILE NO.: Z -8037-A (Cont.
Fire Department: Maintain access. Fire hydrants per code. All drives must be
20 -feet in width. Fire apparatus, access. Contact the Little Rock Fire
Department for additional information
County Planning: No comment.
CATA: Site directly served by Route #9 West Cantrell — Bowman Road.
Parks and Recreation: No comment received.
F. ISSUES/TECHNICAL/DESIGN:
Building Code: Project is subject to full commercial plan review approval prior to
issuance of a building permit. For information on submittal requirements and the
review process, contact a commercial plans examiner: Curtis Richey at
501.371.4724; criche Iittlerock. or or Mark Alderfer at 501.371.4875;
m a Iderfe r[a) I ittlerock. o rq .
_Planning Division: This request is located in the Boyle Park Planning District.
The Land Use Plan shows Mixed Use (MX) for this property. This category
provides for a mixture of residential, office and commercial uses to occur. A
Planned Zoning District is required if the use is entirely office or commercial or if
the use is a mixture of the three. The applicant has applied for a rezoning from
PCD (Planned Commercial District) to PCD (Planned Commercial District) to
re-establish an expired PCD for auto related uses on the site. The application is
within the John Barrow Design Overlay District.
Master Street Plan: John Barrow Road is shown as a Minor Arterial and
32nd Street is shown as a Local Street on the Master Street Plan. A Minor
Arterial provides connections to and through an urban area and their primary
function is to provide short distance travel within the urbanized area. Entrances
and exits should be limited to minimize negative effects of traffic and pedestrians
on John Barrow Road since it is a Minor Arterial. The primary function of a Local
Street is to provide access to adjacent properties. Local Streets that are abutted
by non-residential zoning/use or more intensive zoning than duplexes are
considered as "Commercial Streets". A Collector design standard is used for
Commercial Streets. These streets may require dedication of right-of-way and
may require street improvements for entrances and exits to the site.
Bicycle Plan: A Class II Bike Lane is shown along John Barrow Road. Bike
Lanes provide a portion of the pavement for the sole use of bicycles.
Landscape. -
1 .
andscape:1. Site plan must comply with the City's landscape and buffer ordinance
requirements and the John Barrow Road Overlay District.
0
NO.: Z -8037-A (Cont.
2. Street buffers will be required at six (6) percent of the average depth of the
lot. The minimum dimension shall be one-half (Y2) the full width requirement
but in no case less than nine (9) feet. Easements cannot count toward
fulfilling this requirement. The plantings, existing and proposed, shall be as
provided within the City's landscape ordinance requirements.
3. A land use buffer will be required when an adjacent property has a
dissimilar use of a more restrictive nature. As a component of all land use
buffer requirements, opaque screening, whether a fence or other device, a
minimum of six (6) feet in height shall be required upon the property line
side of the buffer. A minimum of seventy (70) percent of the land use buffer
shall be undisturbed. Easements cannot count toward fulfilling this
requirement. The plantings, existing and proposed, shall be provided within
the landscape ordinance of the City, Section 15-81.
4. The property to the north and east is zoned R-2, Single-family therefore,
(6% of the average lot width) a minimum seventeen (17) foot buffer is
required on the north property line and a minimum nine (9) foot buffer is
required on the east property line.
5. A perimeter planting strip is required along any side of a vehicular use area
that abuts adjoining property. This strip shall be at least nine (9) feet wide.
Provide trees with an average linear spacing of not less than thirty (30) feet
within the perimeter planting strip. Provide three (3) shrubs or vines for
every thirty (30) linear feet of perimeter planting strip.
6. Eight percent (8%) of the vehicular use area must be designated for green
space; this green space needs to be evenly distributed throughout the
parking area(s). The minimum size of an interior landscape area shall be
one hundred fifty (150) square feet for developments with one hundred fifty
(150) or fewer parking spaces. Interior islands must be a minimum of seven
and one half (7 1/2) feet in width. Trees shall be included in the interior
landscape areas at the rate of one (1) tree for every twelve (12) parking
spaces.
7. Landscape areas shall be provided between the vehicular use area used for
public parking and the general vicinity of the building, excluding truck
loading or service areas not open to public parking. These areas shall be
equal to an equivalent planter strip three (3) feet wide along the vehicular
use area.
8. An irrigation system shall be required for developments of one (1) acre or
larger.
9. For developments of less than one (1) acre there shall be a water source
within seventy-five (75) feet of the plants to be irrigated.
10. The City Beautiful Commission recommends preserving as many existing
trees as feasible on this site. Credit toward fulfilling Landscape Ordinance
requirements can be given when preserving trees of six (6) inch caliper or
larger.
7
LE NO.: Z -8037-A (Cont.
G. SUBDIVISION COMMITTEE COMMENT: (July 16, 2014)
The applicant was present. Staff presented an overview of the development
stating there were a number of outstanding technical issues in need of
addressing related to the proposed site plan. Staff questioned the location of the
doors on the northern building, the proposed signage plan and the location of any
proposed dumpster facilities. Staff also requested the applicant provide the total
area covered by buildings, parking and areas to be designated as green space.
Public Works comments were addressed. Staff stated 31St and 32"d Streets
would require dedication and would require street improvements. Staff also
stated a 20 -foot radial dedication was required at the intersection of these two (2)
streets with John Barrow Road. Staff requested information concerning the
proposed construction of any retaining walls. Staff also requested the applicant
provide an engineer's certification of sight distance for the driveway intersections.
Landscaping comments were addressed. Staff stated the northern and eastern
perimeters were zoned residentially and would require the placement of
screening as well as an undisturbed buffer. Staff stated the parking areas would
require landscaping to comply with the landscape ordinance. Staff also stated an
automatic irrigation system was required to water landscaped areas.
Staff noted the comments from the various other agencies. There were no more
issues for discussion. The Committee then forwarded the item to the full
Commission for final action.
H. ANALYSIS:
The applicant submitted a revised site plan to staff addressing most of the
technical issues raised at the July 16, 2014, Subdivision Committee meeting.
The applicant has provided elevations for the proposed buildings, the proposed
signage plan and the location of the dumpster facilities. The applicant has also
provided the total area covered by buildings, parking and areas to be designated
as green space. The applicant has indicated the eastern perimeter will not be
disturbed and will remain in its current state. No retaining walls are proposed
along the sites eastern perimeter.
The site plan indicates the placement of a two (2) automatic manual wash facility
within the southern portion of the site. The building is proposed containing
1,822 square feet of gross floor space. The automatic carwash is proposed with
24-hour operations.
The site plan indicates the placement of two (2) vacuum stations along West 32"d
Street. The vacuum stations are proposed to be uncovered with no logo
identifying the business on the stations.
0
FILE NO.: Z -8037-A (Cont.
The northern building is proposed with two (2) overhead doors. The building is
proposed containing 2,155 square feet of gross floor area. Cars will enter from
the south side of the building and exit to the north. The building will be used for
detailing of cars and storage of detailed cars awaiting pick-up and an office for
the carwash owner/operator. The hours of operation for the detail business are
from 7 am to 6 pm daily.
The site plan indicates the placement of nine (9) on-site parking spaces. Based
on the typical requirements for a commercial business nine (9) parking spaces
would be required.
The buildings are proposed as split face block with vertical panels to aid in
breaking of the massing of the building. The site plan indicates there will be fixed
aluminum windows. The site lighting is proposed with 30 -foot tall poles and
1000 watt metal halide shielded downward lighting.
A six (6) foot screening fence is proposed along the northern and eastern
perimeters of the site. The site plan notes the fence will be placed with its
finished side facing outward. The site plan notes indicate no grading will occur
on the east side of the fence (where adjacent to residentially zoned property) and
the 20 -foot buffer will be maintained in its present natural state.
The revised plan also indicates wall signage on each building fronting John
Barrow Road consistent with building signage allowed in commercial zones or a
maximum of ten (10) percent of the fagade area. The site plan does not include
the placement of a ground sign on the site. The site is located within the John
Barrow Design Overlay District which allows one (1) free standing on premise
sign which must be a monument style sign no more than ten (10) feet in height
and consistent with other standards in Article X of Chapter 36 (sign).
The request includes a reduction of the required street construction to West 32nd
Street. West 32nd Street is constructed with curb, gutter and sidewalk. The
applicant has indicated the street currently dead -ends just east of this site and
the street services a limited number of residential units. Staff is supportive of the
requests for reduction of right of way and a reduction in the street widening
requirements on West 32nd Street.
The request includes the abandonment of West 31St Street along the northern
perimeter of the site. According to the applicant, the grades from east to west
along West 31St Street are extreme and there would be little benefit in connecting
the street to John Barrow Road. Each of the adjacent property owners will
receive one-half of the abandoned right of way. The right of way is being used
by wastewater with sewer extending through the right of way from the east then
running south along John Barrow Road. The right of way will be retained as a
utility and drainage easement.
9
FILE NO.: Z -8037-A (Cont.
The site plan also indicates the placement of a trash dumpster along the eastern
perimeter of the site. A note indicates the dumpster will be screened per the
current ordinance requirement with a wood fence a minimum of two feet above
the finished container height. The applicant has not agreed to limit the hours of
dumpster service. Staff recommends the hours of dumpster service be limited to
7 am to 7 pm weekdays.
Currently, vehicles using the driveway to access John Barrow Road will have full
access for both left turn and right turn movements. The City is developing a
conceptual plan to place a center landscape median in John Barrow Road and/or
a directional island in the center of the driveway. Once the plan is implemented
vehicles using the driveway on John Barrow Road will no longer have left turn
access to/and from the site. The applicant has modified the site plan to allow
access to the site once the improvements are installed.
Staff is supportive of the request. The applicant is seeking to reinstate a
previously approved PD -C for this site to allow the development of an automatic
carwash and a separate detail shop. The request for the reduction in right of way
for West 32nd Street is the same as was approved with the original application in
2006. There are no remaining outstanding technical issues associated with the
request. Staff feels the reinstatement of the previously approved PD -C to allow
the development as proposed is appropriate.
STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
comments and conditions as outlined in paragraphs D, E and F of the agenda
staff report.
Staff recommends approval of the applicant request for the abandonment of the
right of way for West 31 st Street subject to the area being retained as a utility and
drainage easement.
Staff recommends approval of the applicant's request to allow a reduction in the
required right of way dedication for West 32nd Street.
Staff recommends the hours of dumpster service be limited to 7 am to 7 pm
weekdays.
Staff recommends all detailing of vehicles occur only inside the enclosed
building.
PLANNING COMMISSION ACTION:
(AUGUST 7, 2014)
The applicant was not present. There were no registered objectors present. Staff
presented the item stating the applicant had failed to fully respond to comment raised at
10
FILE NO.: Z -8037-A [Cont.
the July 16, 2014, Subdivision Committee meeting. Staff presented a recommendation
of deferral of the item to the September 18, 2014, public hearing.
There was no further discussion of the item. The chair entertained a motion for
approval of the item as presented by staff. The motion carried by a vote of 9 ayes,
0 noes and 2 absent.
PLANNING COMMISSION ACTION: (SEPTEMBER 18, 2014)
The applicant was present. There were no registered objectors present. Staff
presented the item with a recommendation of approval of the request subject to
compliance with the comments and conditions as outlined in paragraphs D, E and F of
the agenda staff report. Staff presented a recommendation of approval of the applicant
request for the abandonment of the right of way for West 31St Street subject to the area
being retained as a utility and drainage easement. Staff presented a recommendation
of approval of the applicant's request to allow a reduction in the required right of way
dedication for West 32nd Street. Staff presented a recommendation the hours of
dumpster service be limited to 7 am to 7 pm weekdays and staff presented a
recommendation all detailing of vehicles occur only inside the enclosed building.
There was no further discussion. The Chair entertained a motion for approval of the
item as presented by staff. The motion was approved by a vote of 9 ayes, 0 noes and
2 absent.
11
ITEM NO.: 8.
NAME: John Barrow Appearance Center Short -form PCD
Z -8037-A
LOCATION: located on the Northeast corner of 32nd Street and John Barrow Road
Planning Staff Comments:
1. Provide notification of all property owners located within 200 -feet of the site including
the certified abstract list, notice form with affidavit executed and proof of mailing.
The notice must be mailed no later than July 23, 2014. The Office of Planning and
Development must receive the proof of notice no later than August 1, 2014.
2. Where are the doors for the building located on the north side of the property? What
is the concreted area located along the northern portion of the site?
3. Provide details of the proposed vacuum station. Will the station have a covered
canopy? Will there be a sign/logo on the canopy?
4. Provide details of any proposed fencing including any screening fencing located
and/or proposed for the site.
5. Does the request include the abandonment of right of way for West 31St Street?
6. Provide details of any proposed signage including ground and building signage.
Provide the location, the total height and total sign area.
7. Provide the total area covered by buildings, parking and to be designated as green
space.
8. Provide details of the proposed lease area and potential uses of this area.
9. Provide the location of any proposed dumpsters including a note concerning the
required screening.
10. Provide a note concerning the retaining wall height.
11. Provide details of the construction materials of the proposed carwash facility.
Variance/Waivers: (Previously requested variances and waivers)
1. A waiver of the required undisturbed buffer along the eastern perimeter of the site.
2. A deferral of the required street improvements to West 31St Street.
3. A reduction in the required right of way dedication and paving width for West 32�d
Streets.
4. A variance to allow off site grading along the eastern perimeter of the site.
Public Works Conditions:
1. Due to the proposed use of the property, the Master Street Plan specifies that both
31St Street and 32nd Street for the frontage of this property must meet commercial
street standards. Dedicate right-of-way to 30 -feet from centerline.
2. A 20 -foot radial dedication of right-of-way is required at the intersection of 31St Street
and John Barrow Road.
Item 4 8.
3. Prior to construction of retaining walls, an engineer's certification of design and plans
must be submitted to Public Works for approval. After construction, an as -built
certification is required for construction of the retaining wall.
4. Provide a letter prepared by a registered engineer certifying the sight distance at the
driveway intersection(s) comply with 2004 AASHTO Green Book standards.
5. With site development, provide the design of street conforming to the Master Street
Plan. Construct one-half street improvement to 31St Street including 5 -foot sidewalks
with the planned development. The new back of curb should be placed 18 -feet from
centerline. At least 20 -feet of asphalt should be provided.
6. If the existing ditch is proposed to be partially filled, drainage must be provided for
the property to the east.
7. A grading permit in accordance with Section 29-186 (c) and (d) will be required prior
to any land clearing or grading activities at the site. Other than residential
subdivisions, site grading and drainage plans must be submitted and approved prior
to the start of construction.
8. Repair or replace any curb and gutter or sidewalk that is damaged in the public right-
of-way prior to occupancy.
9. Stormwater detention ordinance applies to this property. Show the proposed
location for stormwater detention facilities on the plan.
10. Traffic circulation on the interior of site is obstructed and creates turning conflicts.
Cars exiting wash bays cannot see cars entering the property.
11. If disturbed area is one (1) or more acres, obtain a NPDES stormwater permit from
the Arkansas Department of Environmental Quality prior to the start of construction.
12. Driveway locations and widths do not meet the traffic access and circulation
requirements of Sections 30-43 and 31-210. Driveway spacing on John Barrow
Road is 300 -feet between driveways and intersections and 150 -feet from the side
property lines. The John Barrow Road Improvement project shows a center median
to be constructed about 150 -feet north of 32nd Street and continuing past 31St Street.
After construction, this property will not have southbound left turn access to/from
John Barrow Road.
13. In accordance with Section 31-210 (h)(12), access driveways running parallel to the
street shall not create a four-way intersection within 75 -feet of the future curb line of
the street.
14. Sidewalks with appropriate handicap ramps are required to be installed along 32nd
Street in accordance with Section 31-175 of the Little Rock Code and the Master
Street Plan.
Utilities and Fire Department/County Planning:
Wastewater: Sewer available to this property.
Entergy: Entergy does not object to the development. Three phase power exists on
the west side of John Barrow Road. Single phase power exists on the south side of
32nd Street. There are no electrical facilities on the property now. Contact Entergy,
Bernard Neumeier, at 501.954.5158 for additional information.
Center -Point Energy: No comment received.
Item # 8.
AT & T: No comment received.
Central Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for water
service must be met.
2. A water main extension will be needed to provide water service to this property.
3. This development will have minor impact on the existing water distribution system.
Proposed water facilities will be sized to provide adequate pressure and fire
protection.
4. The Little Rock Fire Department needs to evaluate this site to determine whether
additional public and/or private fire hydrant(s) will be required. If additional fire
hydrant(s) are required, they will be installed at the Developer's expense.
5. Please submit plans for water facilities and/or fire protection system to Central
Arkansas Water for review. Plan revisions may be required after additional review.
Contact Central Arkansas Water regarding procedures for installation of water
facilities and/or fire service. Approval of plans by the Arkansas Department of
Health Engineering Division and the Little Rock Fire Department is required.
6. A Capital Investment Charge based on the size of meter connection(s) will apply to
this project in addition to normal charges. This fee will apply to all connections
including metered connections off the private fire system.
7. If there are facilities that need to be adjusted and/or relocated, contact Central
Arkansas Water. That work would be done at the expense of the developer.
8. Contact Central Arkansas Water if additional fire protection or metered water service
is required.
9. Due to the nature of this facility, installation of an approved reduced pressure zone
backflow preventer assembly (RPZA) is required on the domestic water service.
This assembly must be installed prior to the first point of use. Central Arkansas
Water requires that upon installation of the RPZA, successful tests of the assembly
must be completed by a Certified Assembly Tester licensed by the State of Arkansas
and approved by Central Arkansas Water. The test results must be sent to Central
Arkansas Water's Cross Connection Section within ten days of installation and
annually thereafter. Contact the Cross Connection Section at 501.377.1226 if you
would like to discuss backflow prevention requirements for this project.
10. The facilities on-site will be private. When meters are planned off private lines.
Private facilities shall be installed to Central Arkansas Water's material and
construction specifications and installation will be inspected by an engineer, licensed
to practice in the State of Arkansas. Execution of Customer Owned Line agreement
is required.
11. Fire sprinkler systems which do not contain additives such as antifreeze shall be
isolated with a double detector check valve assembly. If additives are used, a
reduced pressure zone backflow preventer shall be required.
Item # 8.
12.This development will have minor impact on the existing water distribution system.
Proposed water facilities will be sized to provide adequate pressure and fire
protection.
Fire Department: Maintain access. Fire hydrants per code. All drives must be 20 -
feet in width. Fire apparatus, access. Contact the Little Rock Fire Department for
additional information
County Planning: No comment.
CATA: Site directly served by Route #9 West Cantrell — Bowman Road.
Parks and Recreation: No comment received.
Building Cade: Project is subject to full commercial plan review approval prior to
issuance of a building permit. For information on submittal requirements and the review
process, contact a commercial plans examiner: Curtis Richey at 501.371.4724;
&chey(a-), ttlercck.org or Mark Alderfer at 501.371.4875; malderfer littlerock.or .
Planning Division: This request is located in the Boyle Park Planning District. The Land
Use Plan shows Mixed Use (MX) for this property. This category provides for a mixture
of residential, office and commercial uses to occur. A Planned Zoning District is required
if the use is entirely office or commercial or if the use is a mixture of the three. The
applicant has applied for a rezoning from PCD (Planned Commercial District) to PCD
(Planned Commercial District) to re-establish an expired PCD for auto related uses on
the site. The application is within the John Barrow Design Overlay District.
Master Street Plan: John Barrow Road is shown as a Minor Arterial and 32nd Street is
shown as a Local Street on the Master Street Plan. A Minor Arterial provides
connections to and through an urban area and their primary function is to provide short
distance travel within the urbanized area. Entrances and exits should be limited to
minimize negative effects of traffic and pedestrians on John Barrow Road since it is a
Minor Arterial. The primary function of a Local Street is to provide access to adjacent
properties. Local Streets that are abutted by non-residential zoning/use or more
intensive zoning than duplexes are considered as "Commercial Streets". A Collector
design standard is used for Commercial Streets. These streets may require dedication
of right-of-way and may require street improvements for entrances and exits to the site.
Bicycle Plan: A Class II Bike Lane is shown along John Barrow Road. Bike Lanes
provide a portion of the pavement for the sole use of bicycles.
Item # 8.
Landscape -
1 .
andscape_
1. Site plan must comply with the City's landscape and buffer ordinance requirements
and the John Barrow Road Overlay District.
2. Street buffers will be required at six (6) percent of the average depth of the lot. The
minimum dimension shall be one-half (Y2) the full width requirement but in no case
less than nine (9) feet. Easements cannot count toward fulfilling this requirement.
The plantings, existing and proposed, shall be provided within the City's landscape
ordinance requirements.
3. A land use buffer will be required when an adjacent property has a dissimilar use of
a more restrictive nature. As a component of all land use buffer requirements,
opaque screening, whether a fence or other device, a minimum of six (6) feet in
height shall be required upon the property line side of the buffer. A minimum of
seventy (70) percent of the land use buffer shall be undisturbed. Easements cannot
count toward fulfilling this requirement. The plantings, existing and proposed, shall
be provided within the landscape ordinance of the City, Section 15-81.
4. The property to the north and east is zoned R-2, Single-family therefore, (6% of the
average lot width) a minimum seventeen (17) foot buffer is required on the north
property line and a minimum nine (9) foot buffer is required on the east property line.
5. A perimeter planting strip is required along any side of a vehicular use area that
abuts adjoining property. This strip shall be at least nine (9) feet wide. Provide trees
with an average linear spacing of not less than thirty (30) feet within the perimeter
planting strip. Provide three (3) shrubs or vines for every thirty (30) linear feet of
perimeter planting strip.
6. Eight percent (8%) of the vehicular use area must be designated for green space;
this green space needs to be evenly distributed throughout the parking area(s). The
minimum size of an interior landscape area shall be one hundred fifty (150) square
feet for developments with one hundred fifty (150) or fewer parking spaces. Interior
islands must be a minimum of seven and one half (7 1/2) feet in width. Trees shall
be included in the interior landscape areas at the rate of one (1) tree for every twelve
(12) parking spaces.
7. Landscape areas shall be provided between the vehicular use area used for public
parking and the general vicinity of the building, excluding truck loading or service
areas not open to public parking. These areas shall be equal to an equivalent planter
strip three (3) feet wide along the vehicular use area.
8. An irrigation system shall be required for developments of one (1) acre or larger.
9. For developments of less than one (1) acre there shall be a water source within
seventy-five (75) feet of the plants to be irrigated.
10.The City Beautiful Commission recommends preserving as many existing trees as
feasible on this site. Credit toward fulfilling Landscape Ordinance requirements can
be given when preserving trees of six (6) inch caliper or larger.
Revised plat/plan: Submit four (4) copies of a revised preliminary plat/plan (to include
the additional information as noted above) to staff on Wednesday, July 23, 2014.
Item 9 8.