Loading...
HomeMy WebLinkAboutZ-8022 Staff AnalysisMay 25, 2006 ITEM NO.: B NAME: LOCATION: OWNER/APPLICANT PROPOSAL: 1, SITE LOCATION: FILE NO.: Z-8022 Splash Car Wash —Conditional Use Permit 12700 Chenal Parkway Gene Cauley/White-Daters A conditional use permit is requested to allow for construction of a car wash on this C-3 zoned property. The lot is located on the north side of Chenal Parkway at its intersection with the west leg of Kanis Road; west of Kirk Road. 2. COMPATIBILITY WITH NEIGHBORHOOD: The site is located in a commercial node containing a variety of commercial uses and commercially zoned properties. Numerous commercial and office uses are located adjacent to the north. Undeveloped C-3 zoned properties are located to the east, south and west. Other uses include a PCD for a golf driving range, a grocery store, banks and automobile dealerships. The proposed use is compatible with uses in the area. All owners of property located within 200 feet of the site, all residents within 300 feet of the site who could be identified were notified. There is no neighborhood association in the area. 3. ON SITE DRIVES AND PARKING: Access to the site is via a shared driveway and access easement from the east side of the lot to the east or from an access easement and driveway to the north. The site is designed to facilitate one-way movement only through the car wash or to the ATM and vacuum islands. 4. SCREENING AND BUFFERS: A site plan must comply with the City's landscape and buffer ordinance requirements. An automatic irrigation system to water landscaped area will be required. Areas set aside appear to meet with minimum city requirements. May 25, 2006 ITEM NO.: B (Cont.) FILE NO.: Z-8022 5. PUBLIC WORKS COMMENTS: 1. Remove driveway between Lot 1 and Lot 2. Driveway will conflict with function of intersection and does not meet driveway spacing requirement from an intersection. Due to high volumes on Chenal Parkway and Kanis Road at this location, time cannot be taken from traffic movement on Chenal Parkway and Kanis Road for service to a couple of lots. 2. Sidewalks with appropriate handicap ramps are required in accordance with Section 31-175 of the Little Rock Code and the Master Street Plan. 3. All driveways shall be concrete aprons per City Ordinance. 4. Plans of all work in right-of-way shall be submitted for approval prior to start of work. Obtain barricade permit prior to doing any work in the right-of-way from Traffic Engineering at (501) 379-1817 (Derrick Bergfield). 5. A grading permit in accordance with Section 29-186 (c) & (d) will be required prior to any land clearing or grading activities at the site. Site grading, and drainage plans will need to be submitted and approved prior to the start of construction. 6. Storm water detention ordinance applies to this property. Show the proposed location for storm water detention facilities on the plan. 7. If disturbed area is 1 or more acres, obtain a NPDES storm water permit from the Arkansas Department of Environmental Quality prior to the start of construction. 6. UTILITY. FIRE DEPT. AND CATA COMMENTS: Wastewater: Sewer main extension required with easements if service is required for project. Entergy: No comments received. CenterPoint Energy: No comments received. Southwestern Bell: No comments received. Water: All Central Arkansas Water requirements in effect at the time of request for water service must be met. A Capital Investment 2 May 25, 2006 I�y.���1i•I�ai��[�Z.Ti�iw FILE NO.: Z-8022 Charge based on the size of connection(s) will apply to this project in addition to normal charges. This fee will apply to all connections including metered connections off the private fire system. Due to the nature of this facility, installation of an approved reduced pressure zone backflow preventer assembly (RPZA) is required on the domestic water service. This assembly must be installed prior to the first point of use. Central Arkansas Water (CAW) requires that upon installation of the RPZA, successful tests of the assembly must be completed by a Certified Assembly Tester licensed by the State of Arkansas and approved by CAW. The test results must be sent to CAW's Cross Connection Section within ten days of installation and annually thereafter. Contact Carroll Keatts at 377- 1226 if you would like to discuss backflow prevention requirements for this project. Care must be taken to protect the raw water facilities in the easement located on Parcel B. If there are facilities that need to be adjusted and/or relocated, contact Central Arkansas Water. That work would be done at the expense of the developer. Additional fire hydrant(s) will be required. Contact the Little Rock Fire Department to obtain information regarding the required placement of the hydrant(s) and contact Central Arkansas Water regarding procedures for installation of the hydrant(s). This development will have minor impact on the existing water distribution system. Proposed water facilities will be sized to provide adequate pressure and fire protection. Fire Department: Fire hydrant may be required. County Planning: No Comments. CATA: This site is not located on a CATA bus route. SUBDIVISION COMMITTEE COMMENT: (MARCH 23, 2006) The applicant was present. Staff presented the item and noted additional information was needed regarding signage, fencing, lighting and dumpster location. Public Works, Utility and Landscape Comments were presented. The majority of the discussion focused on the proposed driveway on the east side of the lot. Public Works staff noted that the driveway did not comply with ordinance requirements for spacing and created a potential traffic conflict. The applicant suggested the driveway might be a right -in only, with no exit. He was advised to discuss the issue with Public Works staff. The applicant was advised to respond to staff issues by March 29, 2006. The Committee forwarded the item to the full Commission. 3 May 25, 2006 ITEM NO.: B (Cont.) FILE NO.: Z-8022 STAFF ANALYSIS: A conditional use permit is requested to allow for construction of a carwash on this C-3 zoned, 1.08 acre tract. The development consists of a single building containing two automatic car wash bays, a mechanical room and one manual car wash bay, two vacuum islands; and an ATM machine. Access to the site is via shared driveways and access easements. There is no direct access from this lot to Chenal Parkway. The building is to be constructed of concrete block and glazed block with an EIFS and simulated stone veneer. The roof system is wood truss, 7/12 pitch with OSB decking and simulated slate shingles. Site lighting will be shielded downward and into the site. Hours of operation are 6:00 am — 10:00 pm, seven (7) days a week. An employee will be on-site two hours each day, Sunday — Thursdays and six hours on Fridays and Saturdays. Signage will consist of a single, ground - mounted sign which complies with the Chenal Overlay District standard of eight (8) feet in height and one hundred (100) square feet in area; and the "Splash" logo on the building facade. The building has street orientation on the south and west which would allow wall signs on these two facades. Two vacuum islands and an ATM are also proposed. No signage with the name of the facility is allowed on the vacuum islands. Staff does not support the proposed dumpster location. The dumpster needs to be located more to the north and away from the Parkway. As proposed, the dumpster has the appearance of being located between the building and the street. Staff also believes the dumpster enclosure/screening should be constructed of the same material as the building. To staff's knowledge, there are no other outstanding issues. The proposed car wash should be compatible with other uses in this commercial area. The applicant responded to issues raised at Subdivision Committee, as reflected in the analysis above. There is no Bill of Assurance issue. STAFF RECOMMENDATION: Staff recommends approval of the requested conditional use permit subject to compliance with the following conditions: 1. Compliance with the comments and conditions outlined in Sections 4, 5 and 6 of the agenda staff report. 2. Compliance with the Chenal Overlay District requirements regarding signage, site lighting and utilities. 4 May 25, 2006 ITEM NO.: B (Cont. I211='k :6ai,:11J0% 3. There is to be no signage on the vacuum islands denoting the name of the facility. 4. The dumpster is to be relocated to the north, away from the Parkway and screened with material that matches the building. 5. All site lighting is to be directed downward and into the site. STAFF REPORT: On April 4, 2006, the applicant requested deferral of this item to allow time to work with Public Works on driveway issues. Staff recommends deferral to the May 25, 2006 meeting. PLANNING COMMISSION ACTION: (APRIL 13, 2006) The applicant was present. There were no objectors present. Staff informed the Commission of the requested deferral. There was no further discussion. The item was placed on the Consent Agenda and deferred to the May 25, 2006 Agenda by a vote of 8 ayes, 0 noes and 3 absent. PLANNING COMMISSION ACTION: (MAY 25, 2006) The applicant was present. There were no objectors present. Staff presented the item and a recommendation of approval subject to compliance with the conditions outlined in the "Staff Recommendation" above. There was no further discussion. The item was placed on the Consent Agenda and approved as recommended by staff. The vote was 7 ayes, 0 noes and 4 absent. I.1