HomeMy WebLinkAboutZ-7919-A Staff AnalysisFILE NO.: Z -7919-A NAME: JAPB, LLC Marina -Condo Project Revised Long -form PCD LOCATION: Located North of 3�d Street and East of Bond Street DEVELOPER: JAPB, LLC John Burkhalter Managing Member 26 Collins Industrial North Little Rock, AR 72113 FNC;INFFR- The Holloway Firm 200 Cassey Drive Maumelle, AR 72113 AREA: 11.3 acres CURRENT ZONIN ALLOWED USES PROPOSED ZONING PROPOSED USE NUMBER OF LOTS: 1 PCD FT. NEW STREET: 0 LF Mixed Use Development, Commercial, Marina and Residential Revised PCD Mixed Use Development, Commercial, Marina and Residential VARIAN CESANAIVERS REQUESTED: 1. A variance from the Land Alteration Ordinance to allow advanced grading of the site. 2. A waiver of the storm water detention ordinance requirements. BACKGROUND: Ordinance No. 19,425 adopted by the Little Rock Board of Directors on November 1, 2005, rezoned the site from R-4, Two-family District to PCD. The applicant proposed to construct a mixed used development containing apartments, commercial, a marina and a public boat launch ramp. The apartments would occupy 4.5 acres; the restaurant, public launch ramp, and marina, 5.0 acres; the retail facility 1.5 acres; and the surface parking areas would occupy 1.67 acres. FILE NO.: Z -7919-A Cont. The approved site plan included 206 -covered slips for both public and private access for dockage, storage and launching. The applicant indicated amenities including a ship's store, fueling facility, pubic launch ramp and boardwalk. There were uncovered slips and transient moorage that would support 336 boats. A. PROPOSAL/REQUEST: The project now consists of a condominium/marina project developed in four phases. The initial phase will begin in 2008 with completion of the project in 2014. The Master Plan for the site indicates two developments planned for the site. The condominium development and the marina, each stands alone. The condominium development consists of 268 residential units, 250 residential storage units and 700 parking spaces. The development site is south of the floodway line on the property where the existing elevation is approximately 252.00. The 100 -year flood elevation at the site is 252.00. Three buildings are planned for the condominium development with building number being a two story structure that will be used as the development office for each separate development. The development office will be used for the marketing selling, leasing, construction and maintenance of the condominium development and will also be used for management of the condominium development after the condominium buildings are completed. Building number 2 and 3 will each be ten story buildings. The first three floors of each will be utilized for parking. The remaining seven floors will be a mixed use of residential condominiums/apartments, and office uses. The condominium development will reflect a Mediterranean Architectural style that utilizes environmental friendly LEED Certified green construction. The development will be a gated community with 24 hour security. The marina development consists of 13 docks which contain 450 watercraft slips. The development lies north of the floodway line to the edge of the southern navigation channel line in the Arkansas River. Two boat basins are to be built for the marina development. Boat basin numbers 1 and 2 will have a manmade floating wave break protecting the harbor from wave entry and river debris. The marina development will be a full service facility that includes: marine fuel, transient boat dockage, a neighborhood market complete with grocery, tackle, bait, hardware, laundry and shower facilities, full service restaurant, fishing pier and public walking promenades. Covered and uncovered boat slips will be provided for boats ranging in size from personal water crafts to yachts of 130 feet in length. Shore service for the boat slips will include dockside lighting, fresh water, outlets for single and three phase electricity, slop -side pump out stations and boat cleaning. The floodway property will include pavement for unloading and parking. The marina development will reflect a Mediterranean Architecture style that utilizes environmental friendly LEED Certified green construction similar to the condominium development. FILE NO.: Z -7919-A (Cont. The developer has indicated the desire to develop the City owned property adjacent to the west including a public boat launch ramp, park and playground area and the river trail system with both bike and pedestrian access. The phasing of the marina -condo project has been shown on a phased development plan. The initial phases begin at the west end of the property. Waterlines for fire flow along with other utilities systems need to extend all the way from the west to the east end of the property. The earthwork must be completed to final grade on the south side of the floodway first, in order that other phases of development may proceed without tearing up the initial phase and successive phases by the weight of heavy trucks traveling across the construction areas. The applicant is seeking a variance from the Land Alteration Ordinance to allow advanced grading of the site with the construction of the first building. The developer is also requesting a waiver of the storm water detention ordinance requirement. The runoff from the marina -condo project will run into the Arkansas River which will be totally unaffected by any detention that might be accomplished on the site. B. EXISTING CONDITIONS: The site is vacant and was recently cleared. The Arkansas River is located to the north of the site and single-family homes on smaller lots are located to the south of the site. To the east of the site is the FOP meeting facility and further east of the site is the Pulaski County Health Building. C. NEIGHBORHOOD COMMENTS - As of this writing, staff has received one informational phone call from an area resident. The East Little Rock Neighborhood Association and the Hanger Hill Neighborhood Association, along with all property owners located within 200 -feet of the site and all residents who could be identified located within 300 feet of the site were notified of the public hearing. D. ENGINEERING COMMENTS: PUBLIC WORKS CONDITIONS: The proposed site is within the adopted regulatory floodway. The proposed alteration or encroachments of the floodway will require flood map revisions and conditional approval from Public Works and the Federal Emergency Management Agency prior to the issuance of City permits for the start of work in the floodway. 3 FILE NO.: Z -7919-A (Cont. 2. Alteration of the water course or encroachment within the floodway and flowage easements of the Arkansas River will require approval from the Little Rock District of the US Army Corps of Engineers prior to the issuance of City permits and the start of work in the floodway. 3. Alteration or use of the levee will require approval from the Little Rock Levee District prior to start of work. 4. The floodway delineation is not shown on the plan as depicted on the effective FIRM. Due to the date of beginning construction, the preliminary FIRMs dated September 21, 2007 should be shown on the site plan. Contact Vince Floriani in Civil Engineering for an electronic file of the new floodway delineation at 371-4817. 5. Per Section 36-341 no structure shall be closer than twenty-five (25) feet to any established floodway line. The storage or processing aboveground and the storage belowground of material and fuel which is flammable or explosive or which could other wise be injurious to human, animal or plant life in time of flood shall be unlawful. Floodways shall be kept free of structural involvement including fences, open storage of materials and equipment, vehicle parking and other impediments to the free flow of floodwater. 6. The proposed land use would classify 2nd Street on the Master Street Plan as a commercial street. Dedicate right-of-way to 30 feet from centerline. 7. With site development, provide the design of the street conforming to the Master Street Plan. Construct street improvement to 2"d Street including 5 -foot sidewalks with the planned development. 8. A special Grading Permit for Flood Hazard Areas will be required per Section 8-283 prior to construction in the floodway. 9. A concrete driveway should be located at the end of 2nd Street. An 80 foot diameter cul de sac and 100 foot diameter right-of-way should be provided for vehicles to turnaround on public property. 10. Repair or replace any curb and gutter or sidewalk that is damaged in the public right-of-way prior to occupancy. 11. Plans of all work in right-of-way shall be submitted for approval prior to start of work. Obtain barricade permit prior to doing any work in the right-of-way from Traffic Engineering at (501) 379-1805 (Travis Herbner). 12. Private access is proposed for these lots. In accordance with Section 31-207, private streets must be designed and constructed to the same standards as public streets. A minimum access easement width of 45 feet is required and street width of 24 feet from back of curb to back of curb. 13. A grading permit in accordance with Section 29-186 (c) and (d) will be required prior to any land clearing or grading activities at the site. Site grading, and drainage plans will need to be submitted and approved prior to the start of construction. A variance is required to be issued for grading of S FILE NO.: Z -7919-A [Cont. the area for the proposed condominium buildings since only the office is being constructed at this time. 14. If disturbed area is one (1) or more acres, obtain a NPDES storm water permit from the Arkansas Department of Environmental Quality prior to the start of construction. 15. Streetlights are required by Section 31-403 of the Little Rock code. Provide plans for approval to Traffic Engineering. Streetlights must be installed prior to platting or certificate of occupancy. Contact Traffic Engineer 379-1813 (Steve Philpott) for more information. 16. Obtain permits prior to doing any street cuts or curb cuts. Obtain barricade permit prior to doing any work in the right-of-way. Contact Traffic Engineering at (501) 379-1805 (Travis Herbner) for more information. 17. The proposed park designed should be reviewed by the Little Rock Parks Department. Contact Mark Webre at 371-6851 for additional assistance. 18. Is any construction including utility work proposed in the floodway? E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING: Wastewater: Existing Sewer Outfall located on site. No construction within 25 -feet of existing outfall without written authorization from Little Rock Wastewater. Entergy: Approved as submitted. . Center -Point Energy: No comment received. AT & T: No comment received. Central Arkansas Water: All Central Arkansas Water requirements in effect at the time of request for water service must be met. The facilities on-site will be private. When meters are planned off private lines, private facilities shall be installed to Central Arkansas Water's material and construction specifications and installation will be inspected by an engineer, licensed to practice in the State of Arkansas. Execution of Customer Owned Line Agreement is required. This development will have minor impact on the existing water distribution system. Proposed water facilities will be sized to provide adequate pressure and fire protection. Fire Department: Install and place fire hydrants per code. Contact the Little Rock Fire Department for additional information concerning Fire Department Connections. County Planning: No comment. CATA: The site is not located on a dedicated CATA Bus Route. FILE NO.: Z -7919-A f Cont. F. ISSUES/TECHNICAL/DESIGN: Planning Division: This request is located in the East Little Rock Planning District. The Land Use Plan shows Mixed Use and Parks and Open Space for this property. The applicant has applied for a revised Long form PCD. The request does not require a change to the Land Use Plan Master Street Plan: Bond is shown as a Collector and East 3rd is shown as a Local Street. These streets may require dedication of right-of-way and may require street improvements for entrances and exits to the site. The primary function of a Collector Street is to provide a connection from Local Streets to Arterials. The primary function of a Local Street is to provide access to adjacent properties. Local Streets which are abutted by non-residential zoning/use or more intensive zoning than duplexes are considered as "Commercial Streets". These streets have a design standard the same as a Collector. Bicycle Plan: A Class I bike route is shown proposed along the south shore of the Arkansas River just north of this site. A Class I bikeway is built separate from or alongside a road. Additional paving and right of way may be required. Neighborhood Action Plan: This area is not covered by a City of Little Rock Neighborhood Action Plan. Parks and Recreation: Little Rock Parks and Recreation Department has been approached by the applicant to develop river access for boating and fishing activities, a park area and a section of the Arkansas River Trail. The City owns park property that will enable the applicant to perform access to boating and fishing and the park area. In order to comply with State law, a Request for Proposals will be issued to see if any other parties would be interested in assisting the City of Little Rock in developing this project. The applicant has requested that the City locate the Arkansas River Trail along the levee and would help contribute funds towards its development. Staff has not approached the levee owners or determined the scope of work for this request. However, if it is found to be feasible, then staff is supportive of this request Landscape: 1. Site plan must comply with the City's minimal landscape and buffer ordinance requirements. 2. All interior islands are to be a minimum of three hundred (300) square foot in area and to be evenly distributed throughout the site. 3. Street trees are required along 2 d Street. 0 FILE NO.: Z -7919-A (Cont. 4. A franchise agreement must be obtained with the City of Little Rock Public Works department for the street trees prior to the issuance of a building permit. 5. Coordination with the City of Little Rock, Parks and Recreation Department is required in conjunction with this proposal. 6. An automatic irrigation system to water landscaped areas will be required. 7. Prior to the issuance of a building permit, it will be necessary to provide an approved landscape plan stamped with the seal of a Registered Landscape Architect. 8. The City Beautiful Commission recommends preserving as many existing trees as feasible on this site. Credit toward fulfilling Landscape Ordinance requirements can be given when preserving trees of six (6) inch caliper or larger. G. SUBDIVISION COMMITTEE COMMENT: (October 18, 2007) The applicant was present. Staff presented an overview of the proposed development stating there were a number of issues related to the site plan in need of addressing prior to the item being considered by the Commission. Staff stated the site plan indicated the utilization of City owned property which the applicant did not have control of. Staff also stated the site plan did not include elements of the Master Parks Plan including the bike trail or the walking trail. Staff questioned the potential office and commercial uses identified on the site plan. Staff also requested the applicant provide the location of the proposed fuel storage. Public Works comments were addressed. Staff stated the site was within the regulatory floodway. Staff also stated the floodway delineation was not shown on the plat as depicted on the effective FIRM dated September 21, 2007. Staff stated the land use would classify East 2nd Street as a commercial street and a right of way dedication to 30 -feet from centerline would be required. Staff also stated a grading permit would be required prior to any clearing or filling on the site. Landscaping comments were addressed. Staff stated street trees would be required along East 2nd Street. Staff also stated parking lot islands should be a minimum of 300 square feet and evenly distributed through out the site. Staff noted comments from the various other reporting departments and agencies suggesting the applicant contact them directly for additional information and clarification. There was no further discussion of the item. The Committee then forwarded the item to the full Commission for final action. 7 FILE NO.: Z -7919-A Cont.) H. ANALYSIS: The applicant submitted a revised site plan to staff addressing a number of the issues raised at the October 18, 2007, Subdivision Committee meeting. The revised plan continues to indicate development of the City owned property, indicates the proposed office and commercial uses and indicates the location of the fuel tanks. The applicant has also indicated they will work with City staff to locate the pedestrian and bike trails as indicated on the City's Master Parks Plan. The applicant has also indicated a RFP or PRQ will be secured with the City prior to development of the City owned property. Construction of the facilities on City owned property will begin upon approval from the City and all regulatory agencies. The fuel storage area is located outside the floodplain and outside the floodway. The dumpster facilities will be limited to accommodate the pubic part of the improvements separately from the private part. All dumpster locations have been identified outside the floodway. The development will likely be one to two floors of tower devoted to executive offices, and retail will also be located on the floating marina facilities such as a restaurant, general retail and convenience store. Dock services will also be provided for fuel and the restocking of typical supplies. Other retail shops will be available at the marina for miscellaneous and aquatic activities. Typically all retail activities will be enclosed retail activities. Fencing is proposed as wrought iron type construction and will generally follow the south property line from the gate leading to the private marina slips and the condominium development to the eastern boundary. The maximum fence height proposed is eight feet. The maximum building height proposed is 120 -feet with an architectural tower extending an additional 30 -feet. The applicant is requesting a waiver of the required storm water detention requirements. The site is located adjacent to the Arkansas River and providing detention would not service the overall needs or the intention of the storm drainage detention policy. The applicant is also seeking a variance from the Land Alteration Ordinance to allow advanced grading of the site. The applicant is seeking to fill the entire site with the construction of the Phase I building. The applicant has indicated the Phase I development will include filling the floodway to a 253.5 foot elevation, installation of utilities, construction of 2nd Street Extension, construction of a 2 -story office building, landscape and tree planting, underground sprinkler system and construction of the harbor master building and office. This portion of the development is scheduled for construction during 2007 and 2008. According to the applicant the variance is necessary to limit the truck traffic to the site and limit the repetitive heavy loads across 2Rd Street with every expansion or phase. The second phase consists of construction of the river channel wave break, (boat basin #1), construction of boat slips, construction of the fuel islands and construction of the first condo tower. This phase of development is proposed to take place in 2008 and 2009. The third phase will include construction of the 9 FILE NO.: Z -7919-A Cont. river channel wave break (boat basin #2), construction of boat slips and construction of the restaurant. This phase is slated for 2010 — 2011. The final phase will take place in 2012 — 2014 and consists of construction of the 2"a condo tower, construction of additional retail on the boat dock and the completion of all the remaining portions of the development. The site plan indicates four commercial buildings with a building footprint totaling 30,400 square feet and three residential/office buildings with a building footprint totaling 57,600 square feet. The development contains 11.3 acres with 8.83 acres available as common usable open space area. The development will contain 268 residential units, 250 residential storage units and 700 parking spaces. The applicant is seeking a variance from the zoning ordinance to allow parking within the fioodway. According to the applicant the Arkansas River does not experience flash flooding. The river rises at a slow rate and is controlled by the Arkansas Corp of Engineers. The development will provide gates to secure the parking areas located within the fioodway which will be secured during the event of a flood and upon notification by the Corp of Engineers. Although, staff is generally supportive of the request there are concerns related to developing in the fioodway and issues recently raised by the airport. Staff continues to study these issues. STAFF RECOMMENDATIONS: Staff recommendation is forthcoming. PLANNING COMMISSION ACTION: (NOVEMBER 8, 2007) The applicant was present. There were no registered objectors present. Staff presented the item stating the applicant had resolved staffs concerns related to the floodway and the previously identified airport concerns. Staff stated the airport was offering conditions for approval in addition to the City comments and conditions. Staff stated according to the airport due to the proximity and use of the proposed development, certain measures were recommended to minimize any impact, singular or cumulative, to Little Rock National Airport and should be addressed. The following are conditions of approval related to the airport: 1. The notices of the development shall be filed with Federal Aviation Administration by submitting FAA form 7460-1, Notice of Proposed Construction or Alteration. Little Rock National Airport will object to the development if the FAA determines such development will have an effect on instrument approach procedures at the Little Rock National Airport. 2. JAPB, LLC shall provide an Avigation Easement to Little Rock National Airport at no cost to the airport. 3. The development should provide construction methods to sound attenuate any interior residential and hotel rooms to achieve an interior sound level of 45 db or less with the windows closed and the doors shut. 9 FILE NO.: Z -7919-A (Cont. Staff also presented a recommendation of approval of the request subject to compliance with the comments and conditions as outlined in paragraphs D, E and F of the agenda staff report. Staff presented a recommendation of approval of the applicant's request for a variance to the Land Alteration Ordinance to allow advanced grading of the site. There was no further discussion of the item. The chair entertained a motion for placement of the item on the consent agenda for approval. The motion carried by a vote of 10 ayes, 1 noes and 0 absent. 10 November 8, 2007 ITEM NO.: 22 FILE NO.: Z -7919-A NAME: JAPB, LLC Marina -Condo Project Revised Long -form PCD LOCATION: Located North of 3rd Street and East of Bond Street DEVELOPER: JAPB, LLC John Burkhalter Managing Member 26 Collins Industrial North Little Rock, AR 72113 ENGINEER: The Holloway Firm 200 Cassey Drive Maumelle, AR 72113 AREA: 11.3 acres CURRENT ZONING ALLOWED USES: PROPOSED ZONING ROPOSED USE NUMBER OF LOTS: 1 PCD FT. NEW STREET: 0 LF Mixed Use Development, Commercial, Marina and Residential Revised PCD Mixed Use Development, Commercial, Marina and Residential VARIANCES/WAIVERS REQUESTED: 1. A variance from the Land Alteration Ordinance to allow advanced grading of the site. 2. A waiver of the storm water detention ordinance requirements. BACKGROUND: Ordinance No. 19,425 adopted by the Little Rock Board of Directors on November 1, 2005, rezoned the site from R-4, Two-family District to PCD. The applicant proposed to construct a mixed used development containing apartments, commercial, a marina and a public boat launch ramp. The apartments would occupy 4.5 acres; the restaurant, November 8, 2007 SUBDIVISION ITEM NO.: 22 (Cont.) FILE NO.: Z -7919-A public launch ramp, and marina, 5.0 acres; the retail facility 1.5 acres; and the surface parking areas would occupy 1.67 acres. The approved site plan included 206 -covered slips for both public and private access for dockage, storage and launching. The applicant indicated amenities including a ship's store, fueling facility, pubic launch ramp and boardwalk. There were uncovered slips and transient moorage that would support 336 boats. A. PROPOSAL/REQUEST: The project now consists of a condominium/marina project developed in four phases. The initial phase will begin in 2008 with completion of the project in 2014. The Master Plan for the site indicates two developments planned for the site. The condominium development and the marina, each stands alone. The condominium development consists of 268 residential units, 250 residential storage units and 700 parking spaces. The development site is south of the floodway line on the property where the existing elevation is approximately 252.00. The 100 -year flood elevation at the site is 252.00. Three buildings are planned for the condominium development with building number being a two story structure that will be used as the development office for each separate development. The development office will be used for the marketing selling, leasing, construction and maintenance of the condominium development and will also be used for management of the condominium development after the condominium buildings are completed. Building number 2 and 3 will each be ten story buildings. The first three floors of each will be utilized for parking. The remaining seven floors will be a mixed use of residential condominiums/apartments, and office uses. The condominium development will reflect a Mediterranean Architectural style that utilizes environmental friendly LEED Certified green construction. The development will be a gated community with 24 hour security. The marina development consists of 13 docks which contain 450 watercraft slips. The development lies north of the floodway line to the edge of the southern navigation channel line in the Arkansas River. Two boat basins are to be built for the marina development. Boat basin numbers 1 and 2 will have a manmade floating wave break protecting the harbor from wave entry and river debris. The marina development will be a full service facility that includes: marine fuel, transient boat dockage, a neighborhood market complete with grocery, tackle, bait, hardware, laundry and shower facilities, full service restaurant, fishing pier and public walking promenades. Covered and uncovered boat slips will be provided for boats ranging in size from personal water crafts to yachts of 130 feet in length. Shore service for the boat slips will include dockside lighting, fresh water, outlets for single and three phase electricity, slop -side pump out stations and boat cleaning. The floodway property will include pavement for unloading E November 8, 2007 SUBDIVISION ITEM NO.: 22 (Cont. FILE NO.: Z -7919-A and parking. The marina development will reflect a Mediterranean Architecture style that utilizes environmental friendly LEED Certified green construction similar to the condominium development. The developer has indicated the desire to develop the City owned property adjacent to the west including a public boat launch ramp, park and playground area and the river trail system with both bike and pedestrian access. The phasing of the marina -condo project has been shown on a phased development plan. The initial phases begin at the west end of the property. Waterlines for fire flow along with other utilities systems need to extend all the way from the west to the east end of the property. The earthwork must be completed to final grade on the south side of the floodway first, in order that other phases of development may proceed without tearing up the initial phase and successive phases by the weight of heavy trucks traveling across the construction areas. The applicant is seeking a variance from the Land Alteration Ordinance to allow advanced grading of the site with the construction of the first building. The developer is also requesting a waiver of the storm water detention ordinance requirement. The runoff from the marina -condo project will run into the Arkansas River which will be totally unaffected by any detention that might be accomplished on the site. B. EXISTING CONDITIONS: The site is vacant and was recently cleared. The Arkansas River is located to the north of the site and single-family homes on smaller lots are located to the south of the site. To the east of the site is the FOP meeting facility and further east of the site is the Pulaski County Health Building. C. NEIGHBORHOOD COMMENTS: As of this writing, staff has received one informational phone call from an area resident. The East Little Rock Neighborhood Association and the Hanger Hill Neighborhood Association, along with all property owners located within 200 -feet of the site and all residents who could be identified located within 300 feet of the site were notified of the public hearing. D. ENGINEERING COMMENTS: PUBLIC WORKS CONDITIONS: 1. The proposed site is within the adopted regulatory floodway. The proposed alteration or encroachments of the floodway will require flood map revisions 3 November 8, 2007 SUBDIVISION ITEM NO.: 22(Cont.)FILE NO.: Z-791 9-A and conditional approval from Public Works and the Federal Emergency Management Agency prior to the issuance of City permits for the start of work in the floodway. 2. Alteration of the water course or encroachment within the floodway and flowage easements of the Arkansas River will require approval from the Little Rock District of the US Army Corps of Engineers prior to the issuance of City permits and the start of work in the floodway. 3. Alteration or use of the levee will require approval from the Little Rock Levee District prior to start of work. 4. The floodway delineation is not shown on the plan as depicted on the effective FIRM. Due to the date of beginning construction, the preliminary FIRMs dated September 21, 2007 should be shown on the site plan. Contact Vince Floriani in Civil Engineering for an electronic file of the new floodway delineation at 371-4817. 5. Per Section 36-341 no structure shall be closer than twenty-five (25) feet to any established floodway line. The storage or processing aboveground and the storage belowground of material and fuel which is flammable or explosive or which could other wise be injurious to human, animal or plant life in time of flood shall be unlawful. Floodways shall be kept free of structural involvement including fences, open storage of materials and equipment, vehicle parking and other impediments to the free flow of floodwater. 6. The proposed land use would classify 2"d Street on the Master Street Plan as a commercial street. Dedicate right-of-way to 30 feet from centerline. 7. With site development, provide the design of the street conforming to the Master Street Plan. Construct street improvement to 2"d Street including 5 -foot sidewalks with the planned development. 8. A special Grading Permit for Flood Hazard Areas will be required per Section 8-283 prior to construction in the floodway. 9. A concrete driveway should be located at the end of 2nd Street. An 80 foot diameter cul de sac and 100 foot diameter right-of-way should be provided for vehicles to turnaround on public property. 10. Repair or replace any curb and gutter or sidewalk that is damaged in the public right-of-way prior to occupancy. 11. Plans of all work in right-of-way shall be submitted for approval prior to start of work. Obtain barricade permit prior to doing any work in the right-of-way from Traffic Engineering at (501) 379-1805 (Travis Herbner). Il November 8, 2007 SUBDIVISION ITEM NO.: 22 (Cont. 219=10NWAY sS1104a1 12. Private access is proposed for these lots. In accordance with Section 31-207, private streets must be designed and constructed to the same standards as public streets. A minimum access easement width of 45 feet is required and street width of 24 feet from back of curb to back of curb. 13. A grading permit in accordance with Section 29-186 (c) and (d) will be required prior to any land clearing or grading activities at the site. Site grading, and drainage plans will need to be submitted and approved prior to the start of construction. A variance is required to be issued for grading of the area for the proposed condominium buildings since only the office is being constructed at this time. 14. If disturbed area is one (1) or more acres, obtain a NPDES storm water permit from the Arkansas Department of Environmental Quality prior to the start of construction. 15. Streetlights are required by Section 31-403 of the Little Rock code. Provide plans for approval to Traffic Engineering. Streetlights must be installed prior to platting or certificate of occupancy. Contact Traffic Engineer 379-1813 (Steve Philpott) for more information. 16. Obtain permits prior to doing any street cuts or curb cuts. Obtain barricade permit prior to doing any work in the right-of-way. Contact Traffic Engineering at (501) 379-1805 (Travis Herbner) for more information. 17. The proposed park designed should be reviewed by the Little Rock Parks Department. Contact Mark Webre at 371-6851 for additional assistance. 18. Is any construction including utility work proposed in the floodway? E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING: Wastewater: Existing Sewer Outfall located on site. No construction within 25 -feet of existing outfall without written authorization from Little Rock Wastewater. Entergy. Approved as submitted. . Center -Point Energy: No comment received. AT & T: No comment received. Central Arkansas Water: All Central Arkansas Water requirements in effect at the time of request for water service must be met. The facilities on-site will be private. When meters are planned off private lines, private facilities shall be installed to Central Arkansas Water's material and construction specifications and installation will be inspected by an engineer, licensed to practice in the State of Arkansas. Execution of Customer Owned Line Agreement is required. This l• November 8, 2007 SUBDIVISION ITEM NO.: 22 (Cont. FILE NO.: Z -7919-A development will have minor impact on the existing water distribution system. Proposed water facilities will be sized to provide adequate pressure and fire protection. Fire Department: Install and place fire hydrants per code. Contact the Little Rock Fire Department for additional information concerning Fire Department Connections. County Planning: No comment. CATA: The site is not located on a dedicated CATA Bus Route. F. ISSUES/TECHNICAL/DESIGN: Planning Division: This request is located in the East Little Rock Planning District. The Land Use Plan shows Mixed Use and Parks and Open Space for this property. The applicant has applied for a revised Long form PCD. The request does not require a change to the Land Use Plan. Master Street Plan: Bond is shown as a Collector and East 3rd is shown as a Local Street. These streets may require dedication of right-of-way and may require street improvements for entrances and exits to the site. The primary function of a Collector Street is to provide a connection from Local Streets to Arterials. The primary function of a Local Street is to provide access to adjacent properties. Local Streets which are abutted by non-residential zoning/use or more intensive zoning than duplexes are considered as "Commercial Streets". These streets have a design standard the same as a Collector. Bicycle Plan: A Class I bike route is shown proposed along the south shore of the Arkansas River just north of this site. A Class I bikeway is built separate from or alongside a road. Additional paving and right of way may be required. Neighborhood Action Plan: This area is not covered by a City of Little Rock Neighborhood Action Plan. Parks and Recreation: Little Rock Parks and Recreation Department has been approached by the applicant to develop river access for boating and fishing activities, a park area and a section of the Arkansas River Trail. The City owns park property that will enable the applicant to perform access to boating and fishing and the park area. In order to comply with State law, a Request for Proposals will be issued to see if any other parties would be interested in assisting the City of Little Rock in developing this project. 9 November 8, 2007 SUBDIVISION ITEM NO.: 22 (Cont. FILE NO.: Z -7919-A The applicant has requested that the City locate the Arkansas River Trail along the levee and would help contribute funds towards its development. Staff has not approached the levee owners or determined the scope of work for this request. However, if it is found to be feasible, then staff is supportive of this request Landscape. 1. Site plan must comply with the City's minimal landscape and buffer ordinance requirements. 2. All interior islands are to be a minimum of three hundred (300) square foot in area and to be evenly distributed throughout the site. 3. Street trees are required along 2nd Street. 4. A franchise agreement must be obtained with the City of Little Rock Public Works department for the street trees prior to the issuance of a building permit. 5. Coordination with the City of Little Rock, Parks and Recreation Department is required in conjunction with this proposal. 6. An automatic irrigation system to water landscaped areas will be required. 7. Prior to the issuance of a building permit, it will be necessary to provide an approved landscape plan stamped with the seal of a Registered Landscape Architect. 8. The City Beautiful Commission recommends preserving as many existing trees as feasible on this site. Credit toward fulfilling Landscape Ordinance requirements can be given when preserving trees of six (6) inch caliper or larger. G. SUBDIVISION COMMITTEE COMMENT: (October 18, 2007) The applicant was present. Staff presented an overview of the proposed development stating there were a number of issues related to the site plan in need of addressing prior to the item being considered by the Commission. Staff stated the site plan indicated the utilization of City owned property which the applicant did not have control of. Staff also stated the site plan did not include elements of the Master Parks Plan including the bike trail or the walking trail. Staff questioned the potential office and commercial uses identified on the site plan. Staff also requested the applicant provide the location of the proposed fuel storage. Public Works comments were addressed. Staff stated the site was within the regulatory floodway. Staff also stated the floodway delineation was not shown on the plat as depicted on the effective FIRM dated September 21, 2007. Staff 7 November 8, 2007 UBDIVISION ITEM NO.: 22 (Cont. FILE NO.: Z -7919-A stated the land use would classify East 2nd Street as a commercial street and a right of way dedication to 30 -feet from centerline would be required. Staff also stated a grading permit would be required prior to any clearing or filling on the site. Landscaping comments were addressed. Staff stated street trees would be required along East 2nd Street. Staff also stated parking lot islands should be a minimum of 300 square feet and evenly distributed through out the site. Staff noted comments from the various other reporting departments and agencies suggesting the applicant contact them directly for additional information and clarification. There was no further discussion of the item. The Committee then forwarded the item to the full Commission for final action. H. ANALYSIS: The applicant submitted a revised site plan to staff addressing a number of the issues raised at the October 18, 2007, Subdivision Committee meeting. The revised plan continues to indicate development of the City owned property, indicates the proposed office and commercial uses and indicates the location of the fuel tanks. The applicant has also indicated they will work with City staff to locate the pedestrian and bike trails as indicated on the City's Master Parks Plan. The applicant has also indicated a RFP or PRQ will be secured with the City prior to development of the City owned property. Construction of the facilities on City owned property will begin upon approval from the City and all regulatory agencies. The fuel storage area is located outside the floodplain and outside the floodway. The dumpster facilities will be limited to accommodate the pubic part of the improvements separately from the private part. All dumpster locations have been identified outside the floodway. The development will likely be one to two floors of tower devoted to executive offices, and retail will also be located on the floating marina facilities such as a restaurant, general retail and convenience store. Dock services will also be provided for fuel and the restocking of typical supplies. Other retail shops will be available at the marina for miscellaneous and aquatic activities. Typically all retail activities will be enclosed retail activities. Fencing is proposed as wrought iron type construction and will generally follow the south property line from the gate leading to the private marina slips and the condominium development to the eastern boundary. The maximum fence height proposed is eight feet. The maximum building height proposed is 120 -feet with an architectural tower extending an additional 30 -feet. November 8, 2007 SUBDIVISION ITEM NO.: 22 Cont. FILE NO.: 2-7919-A The applicant is requesting a waiver of the required storm water detention requirements. The site is located adjacent to the Arkansas River and providing detention would not service the overall needs or the intention of the storm drainage detention policy. The applicant is also seeking a variance from the Land Alteration Ordinance to allow advanced grading of the site. The applicant is seeking to fill the entire site with the construction of the Phase I building. The applicant has indicated the Phase I development will include filling the floodway to a 253.5 foot elevation, installation of utilities, construction of 2nd Street Extension, construction of a 2 -story office building, landscape and tree planting, underground sprinkler system and construction of the harbor master building and office. This portion of the development is scheduled for construction during 2007 and 2008. According to the applicant the variance is necessary to limit the truck traffic to the site and limit the repetitive heavy loads across 2nd Street with every expansion or phase. The second phase consists of construction of the river channel wave break, (boat basin #1), construction of boat slips, construction of the fuel islands and construction of the first condo tower. This phase of development is proposed to take place in 2008 and 2009. The third phase will include construction of the river channel wave break (boat basin #2), construction of boat slips and construction of the restaurant. This phase is slated for 2010 — 2011. The final phase will take place in 2012 — 2014 and consists of construction of the 2nd condo tower, construction of additional retail on the boat dock and the completion of all the remaining portions of the development. The site plan indicates four commercial buildings with a building footprint totaling 30,400 square feet and three residential/office buildings with a building footprint totaling 57,600 square feet. The development contains 11.3 acres with 8.83 acres available as common usable open space area. The development will contain 268 residential units, 250 residential storage units and 700 parking spaces. The applicant is seeking a variance from the zoning ordinance to allow parking within the floodway. According to the applicant the Arkansas River does not experience flash flooding. The river rises at a slow rate and is controlled by the Arkansas Corp of Engineers. The development will provide gates to secure the parking areas located within the floodway which will be secured during the event of a flood and upon notification by the Corp of Engineers. Although, staff is generally supportive of the request there are concerns related to developing in the floodway and issues recently raised by the airport. Staff continues to study these issues. STAFF RECOMMENDATIONS: Staff recommendation is forthcoming. PLANNING COMMISSION ACTION: (NOVEMBER 8, 2007) The applicant was present. There were no registered objectors present. Staff presented the item stating the applicant had resolved staff s concerns related to the IJ November 8, 2007 SUBDIVISION 1111111111MUMU OMMI[Gne Ali FILE NO.: Z -7919-A floodway and the previously identified airport concerns. Staff stated the airport was offering conditions for approval in addition to the City comments and conditions. Staff stated according to the airport due to the proximity and use of the proposed development, certain measures were recommended to minimize any impact, singular or cumulative, to Little Rock National Airport and should be addressed. The following are conditions of approval related to the airport: 1. The notices of the development shall be filed with Federal Aviation Administration by submitting FAA form 7460-1, Notice of Proposed Construction or Alteration. Little Rock National Airport will object to the development if the FAA determines such development will have an effect on instrument approach procedures at the Little Rock National Airport. 2. JAPB, LLC shall provide an Avigation Easement to Little Rock National Airport at no cost to the airport. 3. The development should provide construction methods to sound attenuate any interior residential and hotel rooms to achieve an interior sound level of 45 db or less with the windows closed and the doors shut. Staff also presented a recommendation of approval of the request subject to compliance with the comments and conditions as outlined in paragraphs D, E and F of the agenda staff report. Staff presented a recommendation of approval of the applicant's request for a variance to the Land Alteration Ordinance to allow advanced grading of the site. There was no further discussion of the item. The chair entertained a motion for placement of the item on the consent agenda for approval. The motion carried by a vote of 10 ayes, 1 noes and 0 absent. 10 ITEM NO.: 22. Z-791 9-A NAME: JAPB, LLC Marina -Condo Project Revised Long -form PCD LOCATION: located North of 3rd Street and East of Bond Street Plannina Staff Comments: 1. Provide notification of all property owners located within 200 -feet of the site, complete with the certified abstract list, notice form with affidavit executed and proof of mailing. The notice must be mailed no later than October 24, 2007. The Office of Planning and Development must receive the proof of notice no later than November 2, 2007. 2. The site plan includes City of Little Rock property which has not been approved for development. Seek assistance from the Little Rock Parks Department for the process of securing a RFP or RFQ to allow development of the area. 3. The site plan does not indicate the City's Master Parks Plan items such as the Bike Trail or the Walking Trail. 4. Provide the location of the fuel storage. 5. Provide the location of any proposed dumpster facilities. Will the hours of service of the dumpster be limited? If so provide a note on the site plan indicating the hours of service. 6. Provide details of any proposed fencing including location and construction material. 7. The site plan indicates a variance from the zoning ordinance to allow parking within the floodway. 8. Identify the commercial and office uses proposed. 9. Provide the maximum building height proposed for the structures. Variance[Waivers: None requested. Public Works Conditions: 1. The proposed site is within the adopted regulatory floodway. The proposed alteration or encroachments of the floodway will require flood map revisions and conditional approval from Public Works and the Federal Emergency Management Agency prior to the issuance of City permits for the start of work in the floodway. 2. Alteration of the water course or encroachment within the floodway and flowage easements of the Arkansas River will require approval from the Little Rock District of the US Army Corps of Engineers prior to the issuance of City permits and the start of work in the floodway. 3. Alteration or use of the levee will require approval from the Little Rock Levee District prior to start of work. 4. The floodway delineation is not shown on the plan as depicted on the effective FIRM. Due to the date of beginning construction, the preliminary FIRMs dated September 21, 2007 should be shown on the site plan. Contact Vince Floriani in Item # 22 Civil Engineering for an electronic file of the new floodway delineation at 371-4817. 5. Per Section 36-341 no structure shall be closer than twenty-five (25) feet to any established floodway line. The storage or processing aboveground and the storage belowground of material and fuel which is flammable or explosive or which could other wise be injurious to human, animal or plant life in time of flood shall be unlawful. Floodways shall be kept free of structural involvement including fences, open storage of materials and equipment, vehicle parking and other impediments to the free flow of floodwater. 6. The proposed land use would classify 2nd Street on the Master Street Plan as a commercial street. Dedicate right-of-way to 30 feet from centerline. 7. With site development, provide the design of the street conforming to the Master Street Plan. Construct street improvement to 2"d Street including 5 -foot sidewalks with the planned development. 8. A special Grading Permit for Flood Hazard Areas will be required per Section 8-283 prior to construction in the floodway. 9. A concrete driveway should be located at the end of 2"d Street. An 80 foot diameter cul de sac and 100 foot diameter right-of-way should be provided for vehicles to turnaround on public property. 10. Repair or replace any curb and gutter or sidewalk that is damaged in the public right- of-way prior to occupancy. 11. Plans of all work in right-of-way shall be submitted for approval prior to start of work. Obtain barricade permit prior to doing any work in the right-of-way from Traffic Engineering at (501) 379-1805 (Travis Herbner). 12.Private access is proposed for these lots. In accordance with Section 31-207, private streets must be designed and constructed to the same standards as public streets. A minimum access easement width of 45 feet is required and street width of 24 feet from back of curb to back of curb. 13.A grading permit in accordance with Section 29-186 (c) and (d) will be required prior to any land clearing or grading activities at the site. Site grading, and drainage plans will need to be submitted and approved prior to the start of construction. A variance is required to be issued for grading of the area for the proposed condominium buildings since only the office is being constructed at this time. 14. If disturbed area is one (1) or more acres, obtain a NPDES storm water permit from the Arkansas Department of Environmental Quality prior to the start of construction. 15.Streetlights are required by Section 31-403 of the Little Rock code. Provide plans for approval to Traffic Engineering. Streetlights must be installed prior to platting or certificate of occupancy. Contact Traffic Engineer 379-1813 (Steve Philpott) for more information. 16.Obtain permits prior to doing any street cuts or curb cuts. Obtain barricade permit prior to doing any work in the right-of-way. Contact Traffic Engineering at (501) 379- 1805 (Travis Herbner) for more information. 17. The proposed park designed should be reviewed by the Little Rock Parks Department. Contact Mark Webre at 371-6851 for additional assistance. 18. Is any construction including utility work proposed in the floodway? Utilities and Fire Department/County Planning: Wastewater: Existing Sewer Outfall located on site. No construction within 25 -feet of existing outfall without written authorization from Little Rock Wastewater. Item # 22 Entergy: No comment received. Center -Point Energy: No comment received. AT & T: No comment received. Central Arkansas Water: All Central Arkansas Water requirements in effect at the time of request for water service must be met. The facilities on-site will be private. When meters are planned off private lines, private facilities shall be installed to Central Arkansas Water's material and construction specifications and installation will be inspected by an engineer, licensed to practice in the State of Arkansas. Execution of Customer Owned Line Agreement is required. This development will have minor impact on the existing water distribution system. Proposed water facilities will be sized to provide adequate pressure and fire protection. Fire Department: Install and place fire hydrants per code. Contact the Little Rock Fire Department for additional information concerning Fire Department Connections. County Planning: No comment. CATH: The site is not located on a dedicated CATA Bus Route. Planning Division: This request is located in the East Little Rock Planning District. The Land Use Plan shows Mixed Use and Parks and Open Space for this property. The applicant has applied for a revised Long form PCD. The request does not require a change to the Land Use Plan. Master Street Plan: Bond is shown as a Collector and East 3`d is shown as a Local Street. These streets may require dedication of right-of-way and may require street improvements for entrances and exits to the site. The primary function of a Collector Street is to provide a connection from Local Streets to Arterials. The primary function of a Local Street is to provide access to adjacent properties. Local Streets which are abutted by non-residential zoning/use or more intensive zoning than duplexes are considered as "Commercial Streets". These streets have a design standard the same as a Collector. Bicycle Plan: A Class I bike route is shown proposed along the south shore of the Arkansas River just north of this site. A Class I bikeway is built separate from or alongside a road. Additional paving and right of way may be required. Neighborhood Action Plan: This area is not covered by a City of Little Rock Neighborhood Action Plan. Parks and Recreation: Little Rock Parks and Recreation Department has been approached by the applicant to develop river access for boating and fishing activities, a park area and a section of the Arkansas River Trail. The City owns park property that will enable the applicant to perform access to boating and fishing and the park area. In Item # 22 order to comply with State law, a Request for Proposals will be issued to see if any other parties would be interested in assisting the City of Little Rock in developing this project. The applicant has requested that the City locate the Arkansas River Trail along the levee and would help contribute funds towards its development. Staff has not approached the levee owners or determined the scope of work for this request. However, if it is found to be feasible, then staff is supportive of this request Landscape: 1. Site plan must comply with the City's minimal landscape and buffer ordinance requirements. 2. All interior islands are to be a minimum of three hundred (300) square foot in area and to be evenly distributed throughout the site. 3. Street trees are required along 2" Street, 4. A franchise agreement must be obtained with the City of Little Rock Public Works department for the street trees prior to the issuance of a building permit. 5. Coordination with the City of Little Rock, Parks and Recreation Department is required in conjunction with this proposal. 6. An automatic irrigation system to water landscaped areas will be required. 7. Prior to the issuance of a building permit, it will be necessary to provide an approved landscape plan stamped with the seal of a Registered Landscape Architect. 8. The City Beautiful Commission recommends preserving as many existing trees as feasible on this site. Credit toward fulfilling Landscape Ordinance requirements can be given when preserving trees of six (6) inch caliper or larger. Revised plat/plan: Submit four (4) copies of a revised preliminary plat/plan (to include the additional information as noted above) to staff on Wednesday, October 24, 2007. Item # 22