HomeMy WebLinkAboutZ-7918 Staff AnalysisNovember 10, 2005
ITEM NO.: F.1 FILE NO.: Z-7918
NAME: Crystal Valley Crossing Long -form PCD
LOCATION: 8424 Stagecoach Road
DEVELOPER:
WM Fitzs
8424 Stagecoach Road
Little Rock, AR 72210
ENGINEER:
McGetrick and McGetrick Engineers
10 Otter Creek parkway, Suite A
Little Rock, AR 72210
AREA: 9 acres
CURRENT ZONING:
ALLOWED USES
PROPOSED ZONING
PROPOSED USE:
NUMBER OF LOTS: 2 FT. NEW STREET: 0 LF
C-2, Shopping Center District and R-2, Single-family District
Shopping Center District and Single-family
PCD
C-3, General Commercial District uses
VARIAN CESM/AIVERS REQUESTED: None requested.
The applicant submitted a letter dated September 14, 2005, requesting this item be
deferred to the November 10, 2005, public hearing. Staff is supportive of the applicant's
deferral request.
PLANNING COMMISSION ACTION:
(SEPTEMBER 29, 2005)
The applicant was present representing the request. There were no registered
objectors present. Staff presented the item indicating the applicant had submitted a
request dated September 14, 2005, requesting this item be deferred to the November
10, 2005, public hearing. Staff stated they were supportive of the applicant's deferral
request.
November 10, 2005
SUBDIVISION
ITEM NO.: F.1 FILE NO.: Z-7918
There was no further discussion of the item. The chair entertained a motion for
placement of the item on the Consent Agenda for deferral. The motion carried by a vote
of 10 ayes, 0 noes and 1 absent.
A. PROPOSAL/REQUEST:
The applicant is proposing the rezoning of the site located at 8424 Stagecoach
Road from C-2 and R-2 to PCD to allow the development of Crystal Valley
Crossing, a neighborhood shopping center. The applicant has indicated the
development will be divided into two parcels. Lot 1 containing seven acres will
be developed with an `L' shaped shopping center with four buildings totaling
56,000 square feet for C-3 uses. Lot 2, containing two acres is to be used for
future office development of an office and/or a branch bank.
The applicant has indicated buildings are to be steel with brick or masonry walls
with dryvit facades in earth tone colors. Store fronts are to be bronze aluminum
frames with insulated tinted glass suitable for most C-3 users. The applicant has
indicated all parking lot lights are to be subdued low pressure sodium at 24 -feet
height or less with trees and landscaping per code. The applicant has also
stated all lights are to be inward facing, away from streets or buffer zones.
The applicant has stated Crystal Valley Road is to be widened and improved
along the shopping center side with drive cuts located per city recommendations.
The applicant has indicated the existing home located on proposed Lot 2 will
remain on the site as will the existing office building. The applicant has stated
the property owner will continue to live in the home and the office will be rented
to a general or professional office user. Upon development of proposed Lot 2,
the existing home will be removed and the office will remain during construction,
then removed upon completion of construction. The applicant has indicated each
parcel will have one sign on Stagecoach Road in accordance with typical City
ordinance requirements.
B. EXISTING CONDITIONS:
The site contains an existing single-family home with an office building formerly
occupied by Bill Fitz auto sales. Currently Mr. Fitz's Auto Sales is located to the
south of the site and he utilizes the existing site as storage and parking of his
inventory. The remainder of the site is wooded, abutting a single-family
subdivision to the north and west of the site. East of the site, across Crystal
Valley Road, is a church and north of the church is a PD -0 approved for a dentist
office. Southeast of the site is a large tract of vacant property, a portion of which
is located in the floodway.
2
November 10, 2005
SUBDIVISION
ITEM NO.: F.1 FILE NO.: Z-7918
C. NEIGHBORHOOD COMMENTS:
As of this writing staff has received several informational phone calls from area
residents, many indicating opposition to the proposed development. The Crystal
Valley Neighborhood Association, Southwest Little Rock United for Progress,
along with all property owners located within 200 -feet of the site and all residents
who could be identified located within 300 feet of the site were notified of the
public hearing.
D. ENGINEERING COMMENTS:
Public Works Conditions:
1. Crystal Valley Road is classified on the Master Street Plan as a minor
arterial. A dedication of right-of-way 45 feet from centerline will be required.,
2. With site development, provide design of both abutting streets conforming to
the Master Street Plan. Construct one-half street improvement to the street
including 5 -foot sidewalks with planned development. An additional right
turn lane on Crystal Valley at the intersection is not required.
3. All driveways shall be concrete aprons per City Ordinance. The Stagecoach
driveway must continue straight into the site, and not impede traffic
movements by abruptly bending.
4. Repair or replace any curb and gutter or sidewalk that is damaged in the
public right-of-way prior to occupancy.
5. Obtain permits for improvements within State Highway right-of-way from
AHTD, District VI.
6. A grading permit in accordance with Section 29-186 (c) and (d) will be
required prior to any land clearing or grading activities at the site. Site
grading, and drainage plans will need to be submitted and approved prior to
the start of construction.
7. Storm water detention ordinance applies to this property. The project would
qualify for a contribution in -lieu of construction at the time of the building
permit.
8. Obtain a NPDES storm water permit from the Arkansas Department of
Environmental Quality prior to the start of construction.
9. A special Grading Permit for Flood Hazard Areas will be required per
Section 8-283 prior to construction.
10. The minimum Finish Floor elevation of 291.0 is required to be shown on plat
and grading plans.
11. Prepare a letter of pending development addressing streetlights as required
by Section 31-403 of the Little Rock code. Contact Traffic Engineering at
(501) 379-1813 (Steve Philpott) for more information regarding street light
requirements.
3
November 10, 2005
UBDIVISION
ITEM NO.: F.1
FILE NO.: Z-7918
12., On site striping and signage plans should be forwarded to Public Works,
Traffic Engineering for approval with the site development package. This
applies to both Crystal Valley and Stagecoach Roads.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer available, not adversely affected.
Entergy: A 20 -foot easement is required around the perimeter of the site.
Contact Entergy at 954-5158 for additional information.
Center -Point Energy: Approved as submitted.
SBC: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at
the time of request for water service must be met. A Capital Investment Charge
based on the size of connection(s) will apply to this project in addition to normal
charges. This fee will apply to all connections including metered connections off
the private fire system. The facilities on-site will be private. When meters are
planned off private lines, private facilities shall be installed to Central Arkansas
Water's material and construction specifications and installation will be inspected
by an engineer, licensed to practice in the State of Arkansas. Execution of
Customer Owned Line Agreement is required. Additional fire hydrant(s) will be
required. Contact the Little Rock Fire Department to obtain information regarding
the required placement of the hydrant(s) and contact Central Arkansas Water
regarding procedures for installation of the hydrant(s). This development will
have minor impact on the existing water distribution system. Proposed water
facilities will be sized to provide adequate pressure and fire protection.
Fire Department: Install fire hydrants per code. Contact the Little Rock Fire
Department at 918-3700 for additional information.
County Planning: No comment.
CATA: The site is not located adjacent to a dedicated CATA Bus Route.
F. ISSUES/TECHNICAUDESIGN:
Planning Division: This request is located in the Crystal Valley Planning District.
The Land Use Plan shows Commercial and Single Family for this property. The
applicant has applied for a rezoning from C-2 and R-2 to PCD to allow for
construction of a commercial strip center. A land use plan amendment for a
change to Commercial is a separate item on this agenda. (LU05-17-02)
51
November 10, 2005
SUBDIVISION
NO.: F.1 _FILE NO.: Z-7918
Master Street Plan: Stagecoach Road is shown as a Principal Arterial on the
Master Street Plan and Crystal Valley Road is shown as a Minor Arterial. The
primary function of a Principal Arterial is to serve through traffic and to connect
major traffic generators or activity centers within urbanized areas. The purpose
of a Minor Arterial is to provide connections to and through an urban area. The
Master Street Plan indicates a future expansion of Crystal Valley Road creating a
link to David O. Dodd Road. The connection to David O. Dodd Road will make
this part of Crystal Valley Road the terminus of a major north south arterial.
Entrances and exits to the site should be limited since it is located at the
intersection of two arterials. Both streets may require dedication of right-of-way
and may require street improvements.
Bicycle Plan: A Class II bikeway is developed on Stagecoach Road. A Class II
bikeway is located on the street as either a 5' shoulder or six foot marked bike
lane. A Class I bikeway is shown on Crystal Valley Road and is not currently
developed. A Class I bikeway is built separate from or alongside a road.
Additional paving and right of way may be required to facilitate the Class
bikeway.
City Recognized Neighborhood Action Plan: The applicant's property lies in the
area covered by the Otter Creek - Crystal Valley Neighborhood Action Plan. The
Office and Commercial development goal listed an objective maintaining as
much of the existing topography, trees, and green space as possible. Three
relevant action statements encourage the use of Planned Zoning Districts for
new business developments, encourages intense uses to be located at the
peripheral of the study area, and discouraging intense uses at the heart of the
study area. The plan defines the heart of the study area as the section of
Stagecoach Road roughly between Otter Creek and Baseline Roads and the
proposed development would not be in the heart of the study area.
Landscape:
1. Compliance with the City's Landscape and Buffer ordinances is required.
2. A thirty-nine foot (39) wide land use buffer is required to separate this
proposed development from the residential property on the northern and
southern perimeters of the site. Currently, the southern perimeter is not
meeting this minimum requirement. Seventy percent (70%) of these buffers
are to remain undisturbed.
3. A six (6) foot high opaque screen, either a wooden fence with its face side
directed outward, a wall, or dense evergreen plantings, is required along the
northern, southern, and western perimeters of the site. Credit towards
fulfilling this requirement can be given for existing trees and undergrowth that
satisfies this year -around requirement.
4. An automatic irrigation system to water landscaped areas will be required.
5
November 10, 2005
UBDIVISION
ITEM NO.: F.1
LE NO.: Z-7918
5. Prior to the issuance of a building permit, it will be necessary to provide an
approved landscape plan stamped with the seal of a Registered Landscape
Architect.
6. The City Beautiful Commission recommends preserving as many existing
trees as feasible on this tree -covered site. Credit toward fulfilling Landscape
Ordinance requirements can be given when preserving trees of six (6) inch
caliper or larger.
G. SUBDIVISION COMMITTEE COMMENT: (September 8, 2005)
Mr. Pat McGetrick was present representing the request. Staff presented an
overview of the proposed development indicating there were additional items
necessary to complete the review process. Staff stated there were concerns with
the indicated buffer and the placement of dumpsters on the site. Staff stated the
development abutted a single-family subdivision and it was important to protect
the adjoining property owners. Staff also questioned proposed signage, lighting
and maximum building height.
Public Works comments were addressed. Staff stated an additional lane would
be required along Stagecoach Road. Mr. McGetrick stated Stagecoach Road
was currently five lanes. Staff stated five lanes were sufficient to meet the needs
of the Master Street Plan. Staff stated an on site striping, and signage plan
should be forwarded to Public Works Traffic Engineering for approval of the site
development package. Staff stated there were concerns with the current
driveway alignment and configuration. Staff noted the storm water detention
ordinance would apply to the proposed development.
Landscaping comments were addressed. Staff stated the proposed southern
buffer was not adequate to meet the minimum ordinance requirement for
separation of commercial and residential properties. Staff noted seventy percent
of the buffer area was to remain undisturbed. Staff also stated screening would
be required where adjacent to residentially zoned or used properties.
Staff noted comments from the various other reporting departments and
agencies suggesting the applicant contact them individually for further
clarification. There was no further discussion of the item and the committee then
forwarded the item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised site plan to staff addressing most of the issues
raised at the September 8, 2005, Subdivision Committee meeting. The applicant
has indicated signage, lighting and building height in the general notes section of
the proposed site plan. The applicant has also relocated the dumpster on the
site plan as requested by staff. The applicant has proposed an additional buffer
0
November 10, 2005
SUBDIVISION
ITEM NO.: F.1
FILE NO.: Z-7918
area to the north and west of the proposed development. The applicant has
noted landscaping and buffering along the southern perimeter of the site as
requested by staff. The applicant is requesting the southern perimeter buffer be
allowed to be undisturbed.
The applicant is proposing the rezoning of the site from C-2 and R-2 to PCD to
allow the development of a neighborhood shopping center. The applicant has
indicated the development will be divided into two parcels. Lot 1, containing
seven acres an 'L' shaped shopping center with four buildings totaling
56,422 square feet will be developed with C-3 uses. Lot 2, containing two acres
is to be used for office and/or a branch bank. The applicant has indicated
181 parking spaces on Lot 1 and C-3 uses as allowable uses for the site. Lot 1
would typically require the placement of 188 paring spaces based on the typically
minimum parking require for a commercial development. Future development of
Lot 2 will require amending the PCD for the specific development.
The applicant has indicated Crystal Valley Road is to be widened and improved
along the shopping center side with drive cuts located per city recommendations.
The existing home located on proposed Lot 2 will remain on the site as will the
existing office building. The property owner will continue to live in the home and
the office will be rented to a general or professional office user. Upon
development of proposed Lot 2, the existing home will be removed and the office
will remain during construction, then removed upon completion of construction.
Each parcel will have one sign on Stagecoach Road in accordance with typical
City ordinance requirements.
The applicant has indicated a minimum buffer along the northern and western
perimeters of the site of 60 -feet where the site abuts a single-family subdivision.
The applicant has also proposed an 80 -foot building setback in these areas.
Staff has concerns with the indicated buffer and building setback since the
applicant has indicated a service drive around the rear of the buildings. Staff
feels the drive may be acceptable if sufficient separation and proper fencing is
put in place to act as both a visual and sound barrier to the adjoining residents.
The applicant is proposing the placement of a 2 -foot to 4 -foot retaining wall with a
wood fence located on the top of the retaining wall up to eight feet in height.
Although staff is supportive of many aspects of the development staff is not
supportive of the application as filed. Staff is not supportive of the proposed
buffering and building setback. Staff would recommend the applicant provide an
80 -foot buffer and a 100 -foot building setback. Staff would also recommend the
applicant provide a permanent fence or wall around the service drive to protect
the adjoining homes.
VA
November 10, 2005
SUBDIVISION
ITEM{ NO.: F.1(Cont.)FILE NO.: Z-7918
STAFF RECOMMENDATION:
Staff recommends denial of the request as filed_
PLANNING COMMISSION ACTION: (NOVEMBER 10, 2005)
The applicant was present representing the request. There were no registered
objectors present. Staff presented the item stating the applicant submitted a request
dated November 8, 2005, requesting the item be withdrawn from consideration without
prejudice. Staff stated the withdrawal request would require a waiver of the By-laws
due to the late withdrawal request on the part of the applicant. Staff stated they were
supportive of the By-law waiver for the withdrawal request.
There was no further discussion of the item. A motion was made to approve the By-law
waiver for the late withdrawal request. The motion carried by a vote of 9 ayes, 0 noes
and 2 absent. The Chair entertained a motion for placement of the item on the Consent
Agenda for Withdrawal. The motion carried by a vote of 9 ayes, 0 noes and 2 absent.
0
ITEM NO.: 12,
NAME: Crystal Valley Crossing Long -form PCD
LOCATION: located at 8424 Stagecoach Road
FILE NO.: -Z-7918
Planning Staff Comments:
1. Provide notification of property owners located within 200 -feet of the site, complete
with the certified abstract list, notice form with affidavit executed and proof of
mailing.
2. Provide the days and hours of operation for the proposed development.
3. The applicant has indicated a maximum building height of 25 -feet in the general
notes section of the site plan. Will the buildings be single -story?
4. Any additional site lighting must be low level and directional, directed inward away
from the residentially zoned property located to the north and west.
5. Provide details of the proposed screening to be utilized along the rear of the site
adjacent to the single-family homes.
6. The indicated dumpsters are located near the single-family homes. Provide a note
concerning the required screening and provide the limits of hours of dumpster
service, if applicable.
7. The site plan indicates a total of 206 on-site parking spaces. The developer has
indicated commercial uses as allowable uses for the site. Based on the typically
minimum parking required for a commercial development 188 parking spaces would
typically be required.
8. Staff feels the activity located in the rear of the buildings is unnecessary. Staff feels
the buildings may be adequately serviced from the front eliminating the need for rear
drives and dumpster locations.
9. Provide details of the proposed signage including height, area and location.
10. Provide details of the activities to take place on Lot 2. The cover letter indicates the
current owner will continue to live in the residence and the existing office building will
continue to be utilized as an office use. This has not been indicated on the site plan.
VariancelWaivers: None requested.
\4
Public Works Conditions:
1. Crystal Valley Road is classified on the Master Street Plan as a minor arterial. A
dedication of right-of-way 45 feet from centerline will be required.
2. With site development, provide design of both abutting streets conforming to the
Master Street Plan. Construct one-half street improvement to the street including 5 -
foot sidewalks with planned development. An additional right turn lane on Crystal
Valley at the intersection is not required. Stagecoach is a special 4 -lane street with
bike lanes that requires an additional left turn lane, at both the intersection and at the
entrance to the project. Widening to provide for the turn lane is required.' Provide
design for widening and striping on Stagecoach.
3. All driveways shall be concrete aprons per City Ordinance. The Stagecoach
driveway must continue straight into the site, and not impede traffic movements by
abruptly bending.
4. Repair or replace any curb and gutter or sidewalk that is damaged in the public right-
of-way prior to occupancy.
5. Obtain permits for improvements within State Highway right-of-way from AHTD,
District VI.
6. A grading permit in accordance with Section 29-186 (c) and (d) will be required prior
to any land clearing or grading activities at the site. Site grading, and drainage plans
will need to be submitted and approved prior to the start of construction.
7. Storm water detention ordinance applies to this property. The project would qualify
for a contribution in -lieu of construction at the time of the building permit.
8. Obtain a NPDES storm water permit from the Arkansas Department of
Environmental Quality prior to the start of construction.
9. A special Grading Permit for Flood Hazard Areas will be required per Section 8-283
prior to construction.
10.The minimum Finish Floor elevation of 291.0 is required to be shown on plat and
grading plans.
11. Prepare a letter of pending development addressing streetlights as required by
Section 31-403 of the Little Rock code. Contact Traffic Engineering at (501) 379-
1813 (Steve Philpott) for more information regarding street light requirements.
12.On site striping and signage plans should be forwarded to Public Works, Traffic
Engineering for approval with the site development package. This applies to both
Crystal Valley and Stagecoach Roads.
Utilities and Fire Department/County Planning:
Wastewater: Sewer available, not adversely affected.
Entergy: A 20 -foot easement is required around the perimeter of the site. Contact
Entergy at 954-5158 for additional information.
Center -Point Energy- Approved as submitted.
SBC: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at the time
of request for water service must be met. A Capital Investment Charge based on the
size of connection(s) will apply to this project in addition to normal charges. This fee will
apply to all connections including metered connections off the private fire system. The
facilities on-site will be private. When meters are planned off private lines, private
facilities shall be installed to Central Arkansas Water's material and construction
specifications and installation will be inspected by an engineer, licensed to practice in
the State of Arkansas. Execution of Customer Owned Line Agreement is required.
Additional fire hydrant(s) will be required. Contact the Little Rock Fire Department to
obtain information regarding the required placement of the hydrant(s) and contact
Central Arkansas Water regarding procedures for installation of the hydrant(s). This
development will have minor impact on the existing water distribution system. Proposed
water facilities will be sized to provide adequate pressure and fire protection.
Fire Department: Install fire hydrants per code. Contact the Little Rock Fire
Department at 918-3700 for additional information.
Countv Planning: No comment.
CATA: No comment received.
Planning Division: This request is located in the Crystal Valley Planning District. The
Land Use Plan shows Commercial and Single Family for this property. The applicant
has applied for a rezoning from C-2 and R-2 to PCD to allow for construction of a
commercial strip center. A land use plan amendment for a change to Commercial is a
separate item on this agenda. (LU05-17-02)
Master Street Plan: Stagecoach Road is shown as a Principal Arterial on the Master
Street Plan and Crystal Valley Road is shown as a Minor Arterial. The primary function
of a Principal Arterial is to serve through traffic and to connect major traffic generators
or activity centers within urbanized areas. The purpose of a Minor Arterial is to provide
connections to and through an urban area. The Master Street Plan indicates a future
expansion of Crystal Valley Road creating a link to David O. Dodd Road. The
connection to David O. Dodd Road will make this part of Crystal Valley Road the
terminus of a major north south arterial. Entrances and exits to the site should be
limited since it is located at the intersection of two arterials. Both streets may require
dedication of right-of-way and may require street improvements.
Bicycle Plan: A Class II bikeway is developed on Stagecoach Road. A Class II bikeway
is located on the street as either a 5' shoulder or six foot marked bike lane. A Class I
bikeway is shown on Crystal Valley Road and is not currently developed. A Class I
bikeway is built separate from or alongside a road. Additional paving and right of way
may be required to facilitate the Class I bikeway.
City Recognized Neighborhood Action Plan: The applicant's property lies in the area
covered by the Otter Creek - Crystal Valley Neighborhood Action Plan. The Office and
Commercial development goal listed an objective maintaining as much of the existing
topography, trees, and green space as possible. Three relevant action statements
encourage the use of Planned Zoning Districts for new business developments,
encourages intense uses to be located at the peripheral of the study area, and
discouraging intense uses at the heart of the study area_ The plan defines the heart of
the study area as the section of Stagecoach Road roughly between Otter Creek and
Baseline Roads and the proposed development would not be in the heart of the study
area.
Landscape: A thirty-nine foot (39) wide land use buffer is required to separate this
proposed development from the residential property on the northern and southern
perimeters of the site. Currently, the southern perimeter is not meeting this minimum
requirement. Seventy percent (70%) of these buffers are to remain undisturbed.
A six (6) foot high opaque screen, either a wooden fence with its face side directed
outward, a wall, or dense evergreen plantings, is required along the northern, southern,
and western perimeters of the site. Credit towards fulfilling this requirement can be
given for existing trees and undergrowth that satisfies this year -around requirement.
An automatic irrigation system to water landscaped areas will be required.
Prior to the issuance of a building permit, it will be necessary to provide an approved
landscape plan stamped with the seal of a Registered Landscape Architect.
The City Beautiful Commission recommends preserving as many existing trees as
feasible on this tree -covered site. Credit toward fulfilling Landscape Ordinance
requirements can be given when preserving trees of six (6) inch caliper or larger.
Revised plat/plan: Submit four (4) copies of a revised preliminary plan (to include the