HomeMy WebLinkAboutZ-7876 Staff AnalysisFILE NO.: Z-7876
NAME: Parrott Bay Pools Short -form PCD
LOCATION: Located on the Southwest corner of Sibley Hole Road and 1-430
DEVELOPER:
Parrott Bay Pools LLC
2020 Canal Point
Little Rock, AR 72202
ENGINEER-
McGetrick and McGetrick Engineers
10 Otter Creek Parkway, Suite A
Little Rock, AR 72210
AREA: 0.82 acres
CURRENT ZONING:
ALLOWED USES:
PROPOSED ZONING:
PROPOSED USE:
NUMBER OF LOTS: 1
R-2, Single-family
Single-family Residential
PCD
FT. NEW STREET: 0 LF
Swimming Pool Sales and Outdoor Display
VARIANCESMAIVERS REQUESTED: A waiver of the required street improvements
to Sibley Hole Road.
A. PROPOSAL/REQUEST:
The applicant is proposing the rezoning of this site from R-2, Single-family to
PCD to allow the outdoor display and sales of swimming pools. The applicant
has indicated a building will be constructed on the site containing 4000 square
feet and ten parking spaces. The applicant has indicated the days and hours of
operation will be from 8:00 am to 5:30 pm Monday through Saturday.
The applicant is seeking a waiver of the boundary street ordinance requirements
for Sibley Hole Road.
FILE NO.: Z-7876 Cont.
B. EXISTING CONDITIONS:
The site is a vacant cleared site. To the south of the site is a property zoned
PCD currently being used as a plant nursery. To the north and west of the site is
public right of way for 1-430. East of the site is a large tract vacant C-2 zoned
property.
Sibley Hole Road is a narrow unimproved road dead -ending south of this site.
C. NEIGHBORHOOD COMMENTS:
The Crystal Valley Neighborhood Association, Southwest Little Rock United for
Progress, all property owners located within 200 -feet of the site and all residents,
who could be identified, located within 300 feet of the site were notified of the
public hearing. As of this writing staff has not received any comment from area
residents.
D. ENGINEERING COMMENTS:
Public Works Conditions:
1. A special Grading Permit for Flood Hazard Areas will be required per Section
8-283 prior to construction.
2. The minimum Finish Floor elevation of > 283.5 feet is required to be shown
on plat and grading plans.
3. With site development, provide design of street conforming to the Master
Street Plan. Construct one-half street improvement to the street including 5 -
foot sidewalk with the planned development.
4. Storm water detention ordinance applies to this property. The project would
qualify for a contribution in -lieu of construction at the time of the building
permit.
5. A grading permit in accordance with Section 29-186 (c) and (d) will be
required prior to any land clearing or grading activities at the site. Site
grading, and drainage plans will need to be submitted and approved prior to
the start of construction.
6. Plans of all work in right-of-way shall be submitted for approval prior to start
of work. Obtain barricade permit prior to doing any work in the right-of-way
from Traffic Engineering at (501) 379-1817 (Derrick Bergfield).
7. All driveways shall be concrete aprons per City Ordinance.
8. Show all 100 -year floodplain delineation.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer main extension required, with easements, if service is
required for the project. Contact the Little Rock Wastewater Utility at 688-1414
for additional information.
2
FILE NO.: Z-7876
Entergy: No comment received.
Center -Point Energy: Approved as submitted.
SBC: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at
the time of request for water service must be met. Additional fire hydrant(s) will
be required. Contact the Little Rock Fire Department to obtain information
regarding the required placement of the hydrant(s) and contact Central Arkansas
Water regarding procedures for installation of the hydrant(s). Contact Central
Arkansas Water at 377-1225 for additional information.
Fire Department: Place fire hydrants per code. Contact the Little Rock Fire
Department at 918-3700.
County Planning: No comment.
CATA: The site is not located on a dedicated CATA bus route.
F. ISSUES/TECHNICAUDESIGN:
Planning Division: This request is located in the Otter Creek Planning District.
The Land Use Plan shows Commercial for this property. The applicant has
applied for a change from R-2 (Single Family District) to PCD (Planned
Commercial Development) to allow the outdoor display and sale of pools. The
request does not require a change to the Land Use Plan.
Master Street Plan: Sibley Hole Road is shown as a Local Commercial Street on
the Master Street Plan. Local Commercial Streets provide access to adjacent
properties and are constructed at Collector Street Standards. Sibley Hole Road
may require dedication of right-of-way and may require street improvements.
City Recognized Neighborhood Action Plan: The property under review is
located in an area covered by the Stagecoach Dodd Neighborhood Action Plan.
The Zoning and Land Use goal is to, "maintain and encourage single-family and
low density residential developments in the residential area of the neighborhood,
while encouraging responsible non-residential development in area currently
reserved for such uses on the Future Land Use Plan." This application is in an
area shown as Commercial on the Future Land Use Plan.
Landscape: The plan submitted does not provide the 9 -foot wide on-site
landscape buffer east of the proposed parking area required by the Zoning and
Landscape Ordinances. Variances from the Landscape Ordinance require City
Beautiful Commission approval.
3
FILE NO.: 2-7876 Cont.
G. SUBDIVISION COMMITTEE COMMENT: (June 16, 2005)
Mr. Pat McGetrick was present representing the request. Staff presented an
overview of the proposed development indicating there were additional items
necessary to complete the review process. Staff questioned if there would be
any signage located on the site. Staff also stated a note concerning the
proposed dumpster screening would be required.
Public Works comments were addressed. Staff stated street improvements to
Sibley Hole Road would be required per the Master Street Plan. Mr. McGetrick
stated the road currently ended just south of the site. Mr. McGetrick stated right
of way was not an issue but he would request a waiver of the required street
improvements.
Landscaping comments were addressed. Staff stated the indicated site plan did
not allow the minimum landscape strip along the eastern property line.
Mr. McGetrick stated the issue would be resolved.
Staff suggested Mr. McGetrick contact individual agencies with questions
concerning their comments. There was no further discussion of the item. The
committee then forwarded the item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised site plan addressing most of the issues raised
at the June 16, 2005, Subdivision Committee meeting. The applicant has
indicated the days and hours of operation from 8:00 am to 5:30 pm Monday
through Saturday. The applicant has also indicated a single pylon sign located
near the southwest corner of the site consistent with signage allowed in
commercial zones or a maximum of thirty-six feet in height and one hundred sixty
square feet in area. The applicant has indicated there will be three employees of
the business.
The applicant has indicated a building will be constructed on the site containing
4,000 square feet and ten parking spaces. The typical minimum parking required
for a commercial establishment based on the indicated square footage would be
thirteen parking spaces. Although the parking indicated is not sufficient to meet
the typical minimum parking required for a commercial business staff feels the
indicated parking is adequate to serve the proposed use of the site.
The applicant is requesting a waiver of the required street improvements to
Sibley Hole Road. The applicant has indicated the road dead -ends just south of
this site. The applicant has indicated dedication of right of way sufficient to meet
Master Street Plan requirements. Staff is supportive of the waiver request for the
proposed development. Staff feels the proposed use of the site will not generate
a great deal of traffic that would require boundary street improvements. Should
0
FILE NO.: Z-7876
Sibley Hole Road connect in the future and the site redevelops staff feels the
street improvements more critical at that time.
Staff is supportive of the proposed rezoning request. The applicant is requesting
a rezoning of this site from R-2, Single-family to PCD to allow the outdoor display
and sales of swimming pools. The site is shown as Commercial on the City's
Future Land Use Plan and there are commercially zoned properties to the south
and east of the site. Staff does not feel the placement of this activity on the site
will have any adverse impact on the adjoining properties.
STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
conditions outlined in paragraphs D, E and F of the above staff report.
Staff recommends approval of the waiver of the required street improvements to
Sibley Hole Road.
PLANNING COMMISSION ACTION:
(JULY 7, 2005)
The applicant was present. There were no registered objectors present. Staff
presented a recommendation of approval of the request subject to compliance with the
conditions outlined in paragraphs D, E and F of the agenda staff report. Staff also
presented a recommendation of approval of the waiver of the required street
improvements to Sibley Hole Road as related to the current rezoning request.
There was no further discussion of the item. The chair entertained a motion for
placement of the item for inclusion on the consent agenda for approval. The motion
carried by a vote of 11 ayes, 0 noes and 0 absent.
July 7, 2005
ITEM NO.: 29 FILE NO.: Z-7876
NAME: Parrott Bay Pools Short -form PCD
LOCATION: Located on the Southwest corner of Sibley Hole Road and 1-430
DEVELOPER:
Parrott Bay Pools LLC
2020 Canal Point
Little Rock, AR 72202
ENGINEER-
McGetrick and McGetrick Engineers
10 Otter Creek Parkway, Suite A
Little Rock, AR 72210
AREA: 0.82 acres
CURRENT ZONING:
NUMBER OF LOTS: 1
R-2, Single-family
FT. NEW STREET: 0 LF
ALLOWED USES: Single-family Residential
PROPOSED ZONING: PCD
PROPOSED USE: Swimming Pool Sales and Outdoor Display
VARIANCESMAIVERS REQUESTED: A waiver of the required street improvements
to Sibley Hole Road.
A. PROPOSAUREQUEST:
The applicant is proposing the rezoning of this site from R-2, Single-family to
PCD to allow the outdoor display and sales of swimming pools. The applicant
has indicated a building will be constructed on the site containing 4000 square
feet and ten parking spaces. The applicant has indicated the days and hours of
operation will be from 8:00 am to 5:30 pm Monday through Saturday.
The applicant is seeking a waiver of the boundary street ordinance requirements
for Sibley Hole Road.
July 7, 2005
SUBDIVISION
ITEM NO.: 29 (Cont.) . FILE NO.: Z-7876
B. EXISTING CONDITIONS:
The site is a vacant cleared site. To the south of the site is a property zoned
PCD currently being used as a plant nursery. To the north and west of the site is
public right of way for 1-430. East of the site is a large tract vacant C-2 zoned
property.
Sibley Hole Road is a narrow unimproved road dead -ending south of this site.
C. NEIGHBORHOOD COMMENTS:
The Crystal Valley Neighborhood Association, Southwest Little Rock United for
Progress, all property owners located within 200 -feet of the site and all residents,
who could be identified, located within 300 feet of the site were notified of the
public hearing. As of this writing staff has not received any comment from area
residents.
D. ENGINEERING COMMENTS:
Public Works Conditions:
1. A special Grading Permit for Flood Hazard Areas will be required per Section
8-283 prior to construction.
2. The minimum Finish Floor elevation of > 283.5 feet is required to be shown
on plat and grading plans.
3. With site development, provide design of street conforming to the Master
Street Plan. Construct one-half street improvement to the street including 5 -
foot sidewalk with the planned development.
4. Storm water detention ordinance applies to this property. The project would
qualify for a contribution in -lieu of construction at the time of the building
permit.
5. A grading permit in accordance with Section 29-186 (c) and (d) will be
required prior to any land clearing or grading activities at the site. Site
grading, and drainage plans will need to be submitted and approved prior to
the start of construction.
6. Plans of all work in right-of-way shall be submitted for approval prior to start
of work. Obtain barricade permit prior to doing any work in the right-of-way
from Traffic Engineering at (501) 379-1817 (Derrick Bergfield).
7. All driveways shall be concrete aprons per City Ordinance.
8. Show all 100 -year floodplain delineation.
2
July 7, 2005
SUBDIVISION
ITEM NO.: 29(Cont.)FILE NO.: Z-7876
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer main extension required, with easements, if service is
required for the project. Contact the Little Rock Wastewater Utility at 688-1414
for additional information.
Entergy: No comment received.
Center -Point Energy: Approved as submitted.
SBC: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at
the time of request for water service must be met. Additional fire hydrant(s) will
be required. Contact the Little Rock Fire Department to obtain information
regarding the required placement of the hydrant(s) and contact Central Arkansas
Water regarding procedures for installation of the hydrant(s). Contact Central
Arkansas Water at 377-1225 for additional information.
Fire Department: Place fire hydrants per code. Contact the Little Rock Fire
Department at 918-3700.
County Planning: No comment.
CATA: The site is not located on a dedicated CATA bus route.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division: This request is located in the Otter Creek Planning District.
The Land Use Plan shows Commercial for this property. The applicant has
applied for a change from R-2 (Single Family District) to PCD (Planned
Commercial Development) to allow the outdoor display and sale of pools. The
request does not require a change to the Land Use Plan.
Master Street Plan: Sibley Hole Road is shown as a Local Commercial Street on
the Master Street Plan. Local Commercial Streets provide access to adjacent
properties and are constructed at Collector Street Standards. Sibley Hole Road
may require dedication of right-of-way and may require street improvements.
City Reco nixed Neighborhood Action Plan: The property under review is
located in an area covered by the Stagecoach Dodd Neighborhood Action Plan.
The Zoning and Land Use goal is to, "maintain and encourage single-family and
low density residential developments in the residential area of the neighborhood,
while encouraging responsible non-residential development in area currently
3
July 7, 2005
SUBDIVISION
ITEM NO.: 29 (Cont.) FILE NO.: Z-7876
reserved for such uses on the Future Land Use Plan." This application is in an
area shown as Commercial on the Future Land Use Plan.
Landscape: The plan submitted does not provide the 9 -foot wide on-site
landscape buffer east of the proposed parking area required by the Zoning and
Landscape Ordinances. Variances from the Landscape Ordinance require City
Beautiful Commission approval.
G. SUBDIVISION COMMITTEE COMMENT: (June 16, 2005)
Mr. Pat McGetrick was present representing the request. Staff presented an
overview of the proposed development indicating there were additional items
necessary to complete the review process. Staff questioned if there would be
any signage located on the site. Staff also stated a note concerning the
proposed dumpster screening would be required.
Public Works comments were addressed. Staff stated street improvements to
Sibley Hole Road would be required per the Master Street Plan: Mr. McGetrick
stated the road currently ended just south of the site. Mr. McGetrick stated right
of way was not an issue but he would request a waiver of the required street
improvements.
Landscaping comments were addressed. Staff stated the indicated site plan did
not allow the minimum landscape strip along the eastern property line.
Mr. McGetrick stated the issue would be resolved.
Staff suggested Mr. McGetrick contact individual agencies with questions
concerning their comments. There was no further discussion of the item. The
committee then forwarded the item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised site plan addressing most of the issues raised
at the June 16, 2005, Subdivision Committee meeting. The applicant has
indicated the days and hours of operation from 8:00 am to 5:30 pm Monday
through Saturday. The applicant has also indicated a single pylon sign located
near the southwest corner of the site consistent with signage allowed in
commercial zones or a maximum of thirty-six feet in height and one hundred sixty
square feet in area. The applicant has indicated there will be three employees of
the business.
The applicant has indicated a building will be constructed on the site containing
4,000 square feet and ten parking spaces. The typical minimum parking required
for a commercial establishment based on the indicated square footage would be
thirteen parking spaces. Although the parking indicated is not sufficient to meet
4
July 7, 2005
SUBDIVISION
I LE NO.: Z-7876
the typical minimum parking required for a commercial business staff feels the
indicated parking is adequate to serve the proposed use of the site.
The applicant is requesting a waiver of the required street improvements to
Sibley Hole Road. The applicant has indicated the road dead -ends just south of
this site. The applicant has indicated dedication of right of way sufficient to meet
Master Street Plan requirements. Staff is supportive of the waiver request for the
proposed development. Staff feels the proposed use of the site will not generate
a great deal of traffic that would require boundary street improvements. Should
Sibley Hole Road connect in the future and the site redevelops staff feels the
street improvements more critical at that time.
Staff is supportive of the proposed rezoning request. The applicant is requesting
a rezoning of this site from R-2, Single-family to PCD to allow the outdoor display
and sales of swimming pools. The site is shown as Commercial on the City's
Future Land Use Plan and there are commercially zoned properties to the south
and east of the site. Staff does not feel the placement of this activity on the site
will have any adverse impact on the adjoining properties.
STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
conditions outlined in paragraphs D, E and F of the above staff report.
Staff recommends approval of the waiver of the required street improvements to
Sibley Hole Road.
PLANNING COMMISSION ACTION: (JULY 7, 2005)
The applicant was present. There were no registered objectors present. Staff
presented a recommendation of approval of the request subject to compliance with the
conditions outlined in paragraphs D, E and F of the agenda staff report. Staff also
presented a recommendation of approval of the waiver of the required street
improvements to Sibley Hole Road as related to the current rezoning request.
There was no further discussion of the item. The chair entertained a motion for
placement of the item for inclusion on the consent agenda for approval. The motion
carried by a vote of 11 ayes, 0 noes and 0 absent.
5
ITEM NO.: 29 FILE NO.: Z-7876
NAME- Parrott Bay Pools Short -form PCD
LOCATION: located on the Southwest corner of Sibley Hole Road and 1-430
Planning Staff Comments: l j
1. Provide notification of property owners located within 200 -'feet of the site, complete
with the certified abstract list, notice form with affidavit executed and proof of
mailing.
2. Provide details of any proposed signage including height/area/location.
3. The site plan includes the placement of 10 parking spaces. The ordinance would
typically require 13 parking spaces for a commercial use.
4. Provide a note concerning the proposed dumpster screening. The dumpster has
been located adjacent to the roadway. Typically dumpsters are not allowed adjacent
to the roadway.
5. The applicant has indicated the days and hours of operation will be from 8:00 am to
5:30 pm Monday through Friday. Staff questions the indicated hours since most
pool store are open seven days per week during the summer months.
6. The general note section of the site plan indicates the site is currently zoned C-2.
This is incorrect. The site is currently zoned R-2, Single-family.
Variance[Waivers: None requested.
Public Works Conditions:
1. A special Grading Permit for Flood Hazard Areas will be required per Section 8-283
prior to construction.
2. The minimum Finish Floor elevation of > 283.5 feet is required to be shown on plat
and grading plans.
3. With site development, provide design of street conforming to the Master Street
Plan. Construct one-half street improvement to the street including 5 -foot sidewalk
with the planned development.
4. Storm water detention ordinance applies to this property. The project would qualify
for a contribution in -lieu of construction at the time of the building permit.
5. A grading permit in accordance with Section 29-186 (c) and (d) will be required prior
to any land clearing or grading activities at the site. Site grading, and drainage
plans will need to be submitted and approved prior to the start of construction.
6. Plans of all work in right-of-way shall be submitted for approval prior to start of work.
Obtain barricade permit prior to doing any work in the right-of-way from Traffic
Engineering at (501) 379-1817 (Derrick Bergfield).
7. All driveways shall be concrete aprons per City Ordinance.
8. Show all 100 -year floodplain delineation.
Utilities and Fire Department/County Planning:
Wastewater: Sewer main extension required, with easements, if service is required for
the project. Contact the Little Rock Wastewater Utility at 688-1414 for additional
information.
Entergy: No comment received.
Center -Point Energy: Approved as submitted.
SBC: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at the time
of request for water service must be met. Additional fire hydrant(s) will be required.
Contact the Little Rock Fire Department to obtain information regarding the required
placement of the hydrant(s) and contact Central Arkansas Water regarding procedures
for installation of the hydrant(s). Contact Central Arkansas Water at 377-1225 for
additional information.
Fire Department: Place fire hydrants per code. Contact the Little Rock Fire Department
at 918-3700.
County Planning: No comment.
CATA: The site is not located on a dedicated CATA bus route_
Planning Division: This request is located in the Otter Creek Planning District. The
Land Use Plan shows Commercial for this property. The applicant has applied for a
change from R-2 (Single Family District) to PCD (Planned Commercial Development) to
allow the outdoor display and sale of pools. The request does not require a change to
the Land Use Plan.
Master Street Plan: Sibley Hole Road is shown as a Local Commercial Street
on the Master Street Plan. Local Commercial Streets provide access to adjacent
properties and are constructed at Collector Street Standards. Sibley Hole Road may
require dedication of right-of-way and may require street improvements.
City Recognized Neighborhood Action Plan: The property under review is located in
an area covered by the Stagecoach Dodd Neighborhood Action Plan. The Zoning and
Land Use goal is to, "maintain and encourage single-family and low density residential
developments in the residential area of the neighborhood, while encouraging
responsible non-residential development in area currently reserved for such uses on the
Future Land Use Plan." This application is in an area shown as Commercial on the
Future Land Use Plan.
Landscape: The plan submitted does not provide the 9 -foot wide on-site landscape
buffer east of the proposed parking area required by the Zoning and Landscape
Ordinances. Variances from the Landscape Ordinance require City Beautiful
Commission approval.
Revised plat/plan Submit four (4) copies of a revised preliminary plan (to include the
additional information as noted above) to staff on Wednesday, June 22, 2005.