HomeMy WebLinkAboutZ-7875-D Staff Analysis111114=1[6a ".YM91
NAME: Taylor Park Lot 57A - 57C Revised Long -form POD
LOCATION: Located on the Southwest corner of Kanis Road and Taylor Park
Boulevard
DEVELOPER:
Graham Smith Construction LLC
13503 Kanis Road
Little Rock, AR 72211
ENGINEER:
White-Daters and Associates
24 Rahling Circle
Little Rock, AR 72223
AREA: 1.68 acres
CURRENT ZONING
NUMBER OF LOTS: 1
Z•O
FT. NEW STREET: 0 LF
ALLOWED USES: Single-family residential attached and detached and Office as
allowed per the 0-3, General Office Zoning District
PROPOSED ZONING
PROPOSED USE:
0
Single-family for Lots 57A — 57C
VARIANCES/WAIVERS REQUESTED: None requested.
BACKGROUND:
The Planning Commission reviewed a request and recommended approval for Taylor
Park Long -form POD at their July 7, 2005, public hearing. The site plan included the
development of 22.9 acres containing a mixed-use development including office and
residential uses. The property fronting along Kanis Road would allow 0-3, General
Office District uses with the remainder of the site being developed with attached and
detached single-family residences. Ordinance No. 19,388 adopted by the Little Rock
Board of Directors on August 30, 2005, rezoned the site from R-2, Single-family to POD
establishing Taylor Park Long -form POD.
FILE NO.: Z -7875-D (Cont.
Ordinance No. 19,635 adopted by the Little Rock Board of Directors on
November 21, 2006, allowed a revision to the POD by allowing the height and area of
the subdivision identification sign to be increased.
On February 25, 2010, the Planning Commission denied a request to allow the property
owner located at 2 Chapman Lane to maintain a wood deck and a pergola surrounded
with a six-foot wood fence which had been constructed without a permit and across a
platted building line and within a ten (10) foot utility easement. The denial request was
not appealed to the Board of Directors. The property owner has decreased the height
of the fence, removed the pergola beyond the building line and is to raise the grade of
the lot around the deck to comply with typical ordinance standards for single-family
development.
Ordinance No. 20,317 adopted by the Little Rock Board of Directors on
September 21, 2010 allowed the construction of the 2nd Phase of the subdivision. The
approval allowed two (2) office buildings each containing 3,375 square feet and a
shared parking lot located along Kanis Road. The parking was proposed with a single
access point to Taylor Park Boulevard. The development also contained the
construction of two single-family homes on the east side of Taylor Park Boulevard and
five single-family homes on the west side of Taylor Park Boulevard. The single-family
homes have been constructed. The office buildings have not been developed.
A. PROPOSAL/REQUEST/APPLICANT'S STATEMENT:
The property contains 0.44 acres and is at the southwest corner of Kanis Road
and Taylor Park Boulevard. The property has a previously approved site plan to
allow the development of two (2) office buildings each containing 3,375 square
feet and a shared parking lot. The applicant has indicated the office market is
not as strong in this area as the residential market and he is now proposing to
construct three single-family homes on the site. The building envelopes,
construction materials and amenities of the homes will be similar to the homes
previously developed in the subdivision.
In addition the developer is proposing to construction of a six (6) foot brick fence
with eight (8) foot columns along Kanis Road. The wall will include an area for a
subdivision identification sign.
The Kanis Road improvements as required by the Master Street Plan have been
constructed and the required right of way dedication was provided with a
previous approval.
B. EXISTING CONDITIONS:
The property proposed for development is presently a vacant tract with a
scattering of trees. The Taylor Park Subdivision has developed with single-family
homes both attached and detached. It appears the majority of the attached units
have been constructed and only a few lots remain for the detached single-family
4
FILE NO.: Z -7875-D (Cont.
homes. The office portion of the development along Kanis Road has not been
initiated.
Street improvements to Kanis Road were completed with the first Phase of the
Taylor Park Subdivision. Taylor Park Boulevard has also been constructed with
a sidewalk along the eastern side.
The area has not changed much since the original approval. The area remains
single-family with homes located on large lots. The area to the south is
developing as the Woodlands Edge Subdivision. To the west of this site a new
street, Woodlands Edge Trail, has been constructed from Kanis Road to the
south accessing the Woodlands Edge Subdivision. This area is zoned PCD for
future development of office and commercial uses. The area to the north
includes two properties zoned as planned developments for office uses and a
third property to the northeast is also zoned for office use. The remaining area is
single-family homes located on large lots or parcels.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has received several informational phone calls from area
residents. All property owners located within 200 -feet of the site along with the
Parkway Place Property Owners Association, the Spring Valley Manor Property
Owners Association, the Villages of Wellington Property Owners Association and
the Woodlands Edge Community Association were notified of the public hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Repair or replace any curb and gutter or sidewalk that is damaged in the
public right-of-way prior to occupancy.
2. The existing sidewalk should be placed within a sidewalk easement.
3. In accordance with Section 32-8, no obstruction to visibility shall be located
within a triangular area 50 feet back from the intersecting right-of-way line
(or intersecting tangent lines for radial dedications) at the intersection of
Taylor Park Boulevard with Kanis Road.
4. Prior to construction of retaining walls, an engineer's certification of design
and plans must be submitted to Public Works for approval. After construction,
an as -built certification is required for construction of the retaining wall.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer main extension is required with easements to serve Lots
57B and 57C. Contact Little Rock Wastewater Utility for additional information.
3
FILE NO.: Z -7875-D (Cont.
Entergy: Entergy has underground facilities running along the front of this
property. Contact Entergy for service when ready. Existing facilities need to
remain where they are currently located.
Center -Point Energy: No comment received.
AT & T: No comment received.
Central Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for
water service must be met.
2. Contact Central Arkansas Water regarding the size and location of the water
meter.
3. If there are facilities that need to be adjusted and/or relocated, contact Central
Arkansas Water. That work would be done at the expense of the developer.
4. Contact Central Arkansas Water if additional fire protection or metered water
service is required.
5. The Little Rock Fire Department needs to evaluate this site to determine
whether additional public or private fire hydrant(s) will be required. If
additional fire hydrant(s) are required, they will be installed at the Developer's
expense.
6. Due to the nature of this facility, installation of an approved reduced pressure
zone backflow preventer assembly (RPZA) is required on the domestic water
service. This assembly must be installed prior to the first point of use.
Central Arkansas Water requires that upon installation of the RPZA,
successful tests of the assembly must be completed by a Certified Assembly
Tester licensed by the State of Arkansas and approved by Central Arkansas
Water. The test results must be sent to Central Arkansas Water's Cross
Connection Section within ten days of installation and annually thereafter.
Contact the Cross Connection Section at 377-1226 if you would like to
discuss backflow prevention requirements for this project.
7. The facilities on-site will be private. When meters are planned off private
lines, private facilities shall be installed to Central Arkansas Water's material
and construction specifications and installation will be inspected by an
engineer, licensed to practice in the State of Arkansas. Execution of
Customer Owned Line Agreement is required.
Fire Department: Place fire hydrant(s) per code. Maintain access. Contact the
Little Rock Fire Department for additional information.
Building Codes: The required fire separation distance (building to property line)
prescribed by the building code terminates at five (5) feet. Buildings are allowed
to be closer than five (5) feet if they have properly constructed fire walls which
provide the requisite one (1) hour fire resistance rating. When buildings are five
12
FILE NO.: Z -7875-D (Cont.
(5) feet or more from the property line, the requirement no longer applies to the
wall itself, only the projections such as eaves or overhangs.
Openings such as doors and windows are limited when the exterior wall is
three (3) feet from the property line, and are prohibited when the exterior wall is
less than three (3) feet from the line. There is no restriction on openings when
the exterior wall is more than three (3) feet from the property line.
Contact the City of Little Rock Building Codes at 371-4832 for additional details.
County Planning: No comment.
CATA: Approved as submitted. Over 1.5 miles from nearest bus route.
Parks and Recreation: No comment received.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division: This request is located in the Ellis Mountain Planning District.
The Land Use Plan shows Suburban Office (SO) for this property. The suburban
office category shall provide for low intensity development of office or office parks
in close proximity to lower density residential areas to assure compatibility. A
Planned Zoning District is required. The applicant has applied for a rezoning from
POD (Planned Office District) to POD (Planned Office District) to allow for some
of the area previous reserved for office use to be developed as three
single-family homes.
Master Street Plan- Kanis Road is a Minor Arterial and Taylor Park Road is a
Local Street on the Master Street Plan. A Minor Arterial provides connections to
and through an urban area and their primary function is to provide short distance
travel within the urbanized area. Entrances and exits should be limited to
minimize negative effects of traffic and pedestrians on Kanis Road since it is a
Minor Arterial. The primary function of a Local Street is to provide access to
adjacent properties. Local Streets that are abutted by non-residential zoning/use
or more intensive zoning than duplexes are considered as "Commercial Streets".
A Collector design standard is used for Commercial Streets. These streets may
require dedication of right-of-way and may require street improvements for
entrances and exits to the site.
Bicycle Plan: There are no bike routes shown in the immediate vicinity.
Landscape: No comment.
5
FILE NO.: Z -7875-D (Cont.
G. SUBDIVISION COMMITTEE COMMENT: (August 1, 2013)
The applicant was present representing the request. Staff presented an
overview of the development stating there were additional items necessary to
compete the review process. Staff stated the typical building line adjacent to an
arterial street was 35 -feet. Staff questioned any interior fencing proposed with
the development, if accessory structures would be allowed and if the buildable
areas indicated on the plat were for the principal structure as well as any
accessory structures.
Public Works comments were addressed. Staff stated the existing sidewalk
should be placed within a sidewalk easement. Staff also stated any retaining
walls would require an engineer's certification for design prior to construction.
Staff noted comments from the other reporting departments and agencies
suggesting the applicant contact them individually for additional clarification.
There was no further discussion of the item. The Committee then forwarded the
item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised site plan to staff addressing a number of the
issues raised at the August 1, 2013, Subdivision Committee meeting. The
applicant is proposing building the three (3) houses that will be added to the
Taylor Park Subdivision will be single level, all brick homes ranging from
1600-1850 square feet. The roof pitch, style of house, and quality will be similar
to the other existing detached houses in the subdivision. The construction of the
proposed houses will comply with the Bill of Assurance already in place for the
existing subdivision.
The plan indicates the placement of a six foot (6) wood privacy fences within the
rear yard areas and along the western perimeter of the development area. The
applicant has indicated accessory building and structures will meet the standards
listed in the Taylor Park Phase 1 Bill of Assurance.
The home proposed for Lot 57C is indicated with a 20 -foot building setback along
the northern perimeter, adjacent to Kanis Road. The subdivision ordinance
typically requires a 35 -foot building line adjacent to an arterial street. The plan
also indicates the placement of a 20 -foot front yard and rear yard setback and
5 -foot side yard setback. The zoning ordinance would typically require the
placement of a 25 -foot front setback along a residential street and a 25 -foot rear
yard setback. The side yards are to be indicated at ten percent (10%) of the lot
width, not to exceed 8 -feet. The lots are indicated with a lot width of 50 -feet and
a lot area of 5,815 square feet (Lots 57A and 57B). The ordinance typically
requires corner lots to have a minimum lot width of 75 -feet. The corner lot is
indicated at 67.5 feet.
L
19 IN: 101 Is] IMAWI MDWIft•Tif1
The site plan indicates the placement of a 10 -foot no vehicular access easement
along Kanis Road as typically required by the subdivision ordinance. Also
located along Kanis Road is a 6 -foot brick fence with 8 -foot tall columns. The
fence has been placed outside the sight triangle for the intersection of Kanis
Road and Taylor Park Boulevard. The fence will also have a subdivision
identification sign placed on the face. The sign area has not been indicated.
Staff recommends the lettering be limited to the sign area approved on
November 21, 2006.
Staff is supportive of the request. The developer has indicated the new homes
will be constructed of the same material and quality as the existing detached
single-family homes in the subdivision. Staff does not feel revising the plan to
allow three (3) additional single-family homes in -lieu of two (2) office buildings will
significantly impact the overall development.
STAFF RECOMMENDATION -
Staff recommends approval of the request subject to compliance with the
comments and conditions as outlined in paragraphs D, E and F of the agenda
staff report.
PLANNING COMMISSION ACTION:
(AUGUST 22, 2013)
The applicant was present. There were no registered objectors present. Staff
presented the item with a recommendation of approval of the request subject to
compliance with the comments and conditions as outlined in paragraphs D, E and F of
the agenda staff report.
There was no further discussion of the item. The Chair entertained a motion of approval
of the item as presented by staff. The motion carried by a vote of 8 ayes, 0 noes and
3 absent.
111
ITEM NO.: 9, Z -7875-D
NAME: Taylor Park Lot 57A - 57C Revised Long -form POD
LOCATION: located on the Southwest corner of Kanis Road and Taylor Park Boulevard
Planning Staff Comments:
1. Provide notification of the abutting property owners including the certified abstract
list, notice form with affidavit executed and proof of mailing. The notice must be
mailed no later than August 7, 2013. The Office of Planning and Development must
receive the proof of notice no later than August 16, 2013.
2. Indicate on the site plan and on the final plat a no right of vehicular access easement
along Kanis Road.
3. Are interior fences proposed with the new construction or by the future
homeowners? Include a note on the site plan including the total height and
construction material to allow fencing to occur.
4. Will the name of the subdivision be included on the proposed wall? If so provide the
sign area proposed.
5. Provide the proposed square footages of the homes. Provide the proposed
construction materials. Provide the maximum building height and the number of
stories of the proposed structures.
6. Provide the proposed construction materials for the homes.
7. Are accessory structures allowed, including outbuildings and swimming pools as a
part of the Bill of Assurance? If these are desired include a note on the proposed
site plan to allow accessory structures per the R-2, Single-family zoning district.
8. Are the building lines indicated for the principal structure? If accessory structures
are allowed will they be allowed within the rear yard building setback?
9. The Subdivision Ordinance typically requires the placement of a 35 -foot building
setback line adjacent to arterial streets. The plat is indicated with a 20 -foot building
line along Kanis Road.
Variance/Waivers:
None requested.
Public Works Conditions:
1. Repair or replace any curb and gutter or sidewalk that is damaged in the public right-
of-way prior to occupancy.
2. The existing sidewalk should be placed within a sidewalk easement.
3. In accordance with Section 32-8, no obstruction to visibility shall be located within a
triangular area 50 feet back from the intersecting right-of-way line (or intersecting
tangent lines for radial dedications) at the intersection of Taylor Park Boulevard with
Kanis Road.
4. Prior to construction of retaining walls, an engineer's certification of design and plans
must be submitted to Public Works for approval. After construction, an as -built
certification is required for construction of the retaining wall.
Item # 9.
Utilities and Fire Department/County Planning:
Wastewater: Sewer main extension is required with easements to serve Lots 57B and
57C. Contact Little Rock Wastewater Utility for additional information.
Entergy: Entergy has underground facilities running along the front of this property.
Contact Entergy for service when ready. Existing facilities need to remain where they
are currently located.
Center -Point Energy: No comment received.
AT & T: No comment received.
Central Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for water
service must be met.
2. Contact Central Arkansas Water regarding the size and location of the water meter.
3. If there are facilities that need to be adjusted and/or relocated, contact Central
Arkansas Water. That work would be done at the expense of the developer.
4. Contact Central Arkansas Water if additional fire protection or metered water service
is required.
5. The Little Rock Fire Department needs to evaluate this site to determine whether
additional public or private fire hydrant(s) will be required. If additional fire hydrant(s)
are required, they will be installed at the Developer's expense.
6. Due to the nature of this facility, installation of an approved reduced pressure zone
backflow preventer assembly (RPZA) is required on the domestic water service.
This assembly must be installed prior to the first point of use. Central Arkansas
Water requires that upon installation of the RPZA, successful tests of the assembly
must be completed by a Certified Assembly Tester licensed by the State of Arkansas
and approved by Central Arkansas Water. The test results must be sent to Central
Arkansas Water's Cross Connection Section within ten days of installation and
annually thereafter. Contact the Cross Connection Section at 377-1226 if you would
like to discuss backflow prevention requirements for this project.
7. The facilities on-site will be private. When meters are planned off private lines,
private facilities shall be installed to Central Arkansas Water's material and
construction specifications and installation will be inspected by an engineer, licensed
to practice in the State of Arkansas. Execution of Customer Owned Line Agreement
is required.
Fire Department: Place fire hydrant(s) per code. Maintain access. Contact the Little
Rock Fire Department for additional information.
Building Codes: The required fire separation distance (building to property line)
prescribed by the building code terminates at five (5) feet. Buildings are allowed to be
closer than five (5) feet if they have properly constructed fire walls which provide the
requisite one (1) hour fire resistance rating. When buildings are five (5) feet or more
from the property line, the requirement no longer applies to the wall itself, only the
projections such as eaves or overhangs.
Item # 9.
Openings such as doors and windows are limited when the exterior wall is three (3) feet
from the property line, and are prohibited when the exterior wall is less than three (3)
feet from the line. There is no restriction on openings when the exterior wall is more
than three (3) feet from the property line.
Contact the City of Little Rock Building Codes at 371-4832 for additional details.
County Planning: No comment.
CATA: Approved as submitted. Over 1.5 miles from nearest bus route.
Parks and Recreation: No comment received.
Planning Division: This request is located in the Ellis Mountain Planning District. The
Land Use Plan shows Suburban Office (SO) for this property. The suburban office
category shall provide for low intensity development of office or office parks in close
proximity to lower density residential areas to assure compatibility. A Planned Zoning
District is required. The applicant has applied for a rezoning from POD (Planned Office
District) to POD (Planned Office District) to allow for some of the area previous reserved
for office use to be developed as three single-family homes.
Master Street Plan: Kanis Road is a Minor Arterial and Taylor Park Road is a Local
Street on the Master Street Plan. A Minor Arterial provides connections to and through
an urban area and their primary function is to provide short distance travel within the
urbanized area. Entrances and exits should be limited to minimize negative effects of
traffic and pedestrians on Kanis Road since it is a Minor Arterial. The primary function
of a Local Street is to provide access to adjacent properties. Local Streets that are
abutted by non-residential zoning/use or more intensive zoning than duplexes are
considered as "Commercial Streets". A Collector design standard is used for
Commercial Streets. These streets may require dedication of right-of-way and may
require street improvements for entrances and exits to the site.
Bicycle Plan: There are no bike routes shown in the immediate vicinity
Landscape. No comment.
Revised plat/plan: Submit four (4) copies of a revised preliminary plat/plan (to include
the additional information as noted above) to staff on Wednesday, August 7, 2013.
Item # 9.