HomeMy WebLinkAboutZ-7842 Staff AnalysisFII F NO - 7-7842
NAME: Carter Baseline Road Long -form PCD
LOCATION: Located North of Baseline Road, just West of Herrick Lane
DEVELOPER:
Mark Carter
23201 Interstate 30
Bryant, AR 72022
ENGINEER:
Global Surveying
Kelton Price P.E.
217 West Second Street
Little Rock, AR 72201
AREA: 34.31 acres
CURRENT ZONING:
ALLOWED USES
PROPOSED ZONING
PROPOSED USE:
NUMBER OF LOTS: 1
R-2, Single-family
Single-family Residential
PCD
FT. NEW STREET: 0 LF
C-3, General Commercial District uses
VARIANCESMAIVERS REQUESTED: None requested.
A. PROPOSAUREQUEST:
The applicant proposes the rezoning of the site from R-2, Single-family to PCD to
allow the development of the site with 74,000 square feet of retail space with C-3,
General Commercial District uses as allowable uses for the site. The applicant
has excluded liquor sales and sexually oriented businesses from the listing of
allowable uses for the site. The proposed site plan includes the placement of
360 parking spaces on the site. The applicant has indicated future lot lines on
the proposed site plan to allow the sale of individual parcels in the future.
The applicant has indicated the dumpsters will be serviced between the hours of
7:00 am to 6:00 pm. The applicant has indicated a single sign which will comply
FILE NO.: Z-7842 Cont.
with the maximum signage allowed in commercial zones.
B. EXISTING CONDITIONS:
The site is vacant and has previously been filled in some areas. There are
single-family homes located to the east and northeast of the site and a floodway
is located to the west of the site. Further west of the site is a property zoned PID
currently being used as an auto salvage yard. To the south of the site, across
Baseline Road, is vacant property and southeast of the site is an area of single-
family residences in a manufactured home park.
Baseline Road is a two lane State Highway with open ditches for drainage.
There are no sidewalks in place in this area.
C. NEIGHBORHOOD COMMENTS:
Southwest Little Rock United for Progress, all owners of property located within
200 -feet of the site and all residents, who could be identified, located within
300 -feet of the site were notified of the public hearing. As of this writing, staff has
received several informational phone calls from area residents.
D. ENGINEERING COMMENTS:
1. Baseline Road is classified on the Master Street Plan as a principal arterial.
Dedication of right-of-way 55 -feet from centerline will be required.
2. With site development, provide design of street conforming to the Master
Street Plan. Construct one-half street improvement to the street including 5 -
foot sidewalks with the planned development.
3. Plans for all work in the right-of-way shall be submitted for approval prior to
the start of work. Obtain barricade permit prior to doing any work in the right-
of-way from Traffic Engineering (501) 379-1817. Also obtain permits for
improvements within State Highway right-of-way from AHTD, District Vl.
4. Storm water detention ordinance applies to this property.
5. A grading permit in accordance with Section 29-186(c) and (d) will be
required prior to any future land clearing, filling or grading activities at the site.
Site grading and drainage plans will need to be submitted and approved prior
to the start of construction.
6. A special Grading Permit for Flood Hazard Areas will be required per Section
8-283 prior to construction. The minimum Finish Floor elevation of 281 is
required to be shown on the plat grading plans and construction plans.
7. In accordance with Section 31-176, floodway areas must be shown as
floodway easements or be dedicated to the public. In addition, a 25 -foot wide
access easement is required adjacent to the floodway boundary.
8. Driveway locations and widths do not meet the traffic access and circulation
requirements of Sections 30-43 and 31-210. Center the main driveway on
Childress Drive. One additional driveway would be allowed on Baseline Road
to the west spaced 300 -feet from Childress Drive. The width of driveway
must not exceed 36 -feet.
2
FILE NO.: Z-7842 Cont.
E.
F
9. In accordance with Section 31-210(h)(12), access driveways running parallel
to the street shall not create a four-way intersection within 75 -feet of the
future curb line of the street. Contact Traffic Engineering at (501) 379-1816
for additional information.
UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer main extension required, with easements, if service is
required for the project. Contact Little Rock Wastewater Utility at 688-1414 for
additional details.
Entergy: No comment received.
Center -Point Energy: Approved as submitted.
SBC: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at
the time of request for water service must be met. A water main extension,
easement and additional fire hydrant(s) will be required in order to provide
service to this property. This development will have minor impact on the existing
water distribution system. Proposed water facilities will be sized to provide
adequate pressure and fire protection.
Fire Department: Place fire hydrants per code. Contact the Little Rock Fire
Department for additional information.
County Planning: No comment.
CATA: The site is not located on a dedicated CATA bus route.
ISS U ESITECHNICALIDESIG N:
Planning Division: This request is located in the Geyer Springs West Planning
District. The Land Use Plan shows Single Family for this property. The applicant
has applied for a rezoning from R-2 (Single Family Residence District) to PCD
(Planned Commercial Development for the creation of a multiple lot plat and the
construction of multiple outbuildings containing C-3 (General Commercial) uses.
A land use plan amendment for a change to Mixed Use is a separate item on this
agenda. File No. LU 05-15-02.
Bicycle Plan: A Class III bikeway is shown on Baseline Road adjacent to the
property. A Class III bikeway is a signed route on a street shared with traffic. No
additional paving or right-of-way is required. Class III bicycle route signage may
be required.
Master Street Plan: Baseline Road is shown as a Principal Arterial on the Master
Street Plan and is built as a two lane rural road in front of the site. The primary
41
FILE NO.: Z-7842 (Cont.
function of a Principal Arterial is to serve through traffic and to connect major
traffic generators or activity centers within urbanized areas. Entrances and exits
to the proposed site should be limited since Baseline Road is a Principal Arterial.
Baseline Road may require dedication of right-of-way and half -street
improvements.
Cit Reca nixed Nei hborhood Action Plan: The property under review is
located in an area covered by the West 65�h Street Neighborhood Action Plan.
The Land use and Zoning goal states two objectives relevant to this case. The
first objective: "Promote protection of natural areas through development and
zoning initiatives," with an action statement of "ensure that significant
environmental features and functions are preserved." Development of this site
should not harm the adjacent Fourche Creek and nearby wetlands. The second
Land use and Zoning objective is "protect the residential integrity of
neighborhoods by maintaining adequate separation between residential and non-
residential uses," with an action statement "monitor rezoning requests before
they are present to the Planning Commission/Board of Directors." The
neighborhood should be actively involved in the design process since it is
immediately adjacent to a single family neighborhood. The applicant has applied
for a PCD, which could result in more defined zoning controls and adequate
separation of uses. The Infrastructure goal, to implement an adequate
infrastructure, has one objective related to this case: "Identify and construct
neighborhood curbs, gutters, and sidewalks where needed." Various action
statements support the construction of minor and principal arterials to standards.
Since this application is along an unimproved section of a major arterial half
street improvements would need to be made.
Landscape: The proposed width of the street buffer along Baseline Road is less
than the 32 -foot average required. Additionally, the proposed eastern land use
buffer width is less than 38 -foot average required.
Areas set aside for interior landscaping appear to be less than the 8 -percent
(3,862 square feet) required by the landscape ordinance by 1,594 square feet. A
variance from this requirement would require City Beautiful Commission
approval.
A 6 -foot high opaque screen, either a wooden fence with its face side directed
outward, a wall or dense evergreen plantings, is required along the eastern
perimeter of this development.
An irrigation system to water landscaped areas will be required.
Prior to a building permit being issued, it will be necessary to provide landscape
plans stamped with the seal of a Registered Landscape Architect.
4
FILE NO.: Z-7842 (Cont_
G. SUBDIVISION COMMITTEE COMMENT: (May 5, 2005)
Mr. Kelton Price and Mr. Carter were present representing the request. Staff
presented an overview of the proposed request indicating there were additional
items necessary to complete the review process. Staff questioned the design of
the buildings and the circulation of the proposed development. Staff stated they
had concerns with the circulation proposed. Staff also questioned the proposed
screening for the indicated mini -warehouse portion of the development. Staff
stated the mini -warehouses were located adjacent to single-family homes and
indicated proper mechanisms would be required to ensure the homes were not
impacted. Mr. Price stated the developer was considering a revision to this
portion of the site to develop the area with C-3, General Commercial District
activities.
Public Works comments were addressed. Staff stated street improvements
would be required. Staff stated two and one-half lanes would be required along
Baseline Road. Staff also stated a special grading permit would be required prior
to development.
Landscaping comments were addressed. Staff stated the indicted street buffer
did not meet the minimum ordinance requirements. Staff also stated landscape
islands should be grouped to allow for a minimum of 300 square feet in area.
There was no further discussion of the item. The Committee then forwarded the
item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised site plan to staff addressing most of the issues
raised at the May 5, 2005, Subdivision Committee meeting. The applicant has
removed the mini -warehouse portion of the development indicating six buildings
on the rear portion of the site; one building containing 40,000 square feet and five
buildings containing 50,000 square feet of retail space. The applicant has
indicated the development adjacent to Baseline Road with ten buildings each
containing 4,000 square feet. The applicant has indicated future lot lines on the
proposed preliminary site plan to allow the creation of 17 individual lots for future
sale of individual buildings. The applicant has also indicated a cross access and
utility easement along the indicated drives. The applicant has indicated they are
not willing to dedicate the floodway to the city but has indicated a floodway
easement as requested by staff.
The proposed site plan includes the placement of 360 parking spaces to serve
the development. The typical minimum parking required for the development as
proposed would be 328 parking spaces. Staff has concerns with a few of the
indicated parking spaces. There are parking spaces proposed along the access
drive serving the rear of the property. The ordinance indicates a service drive is
to function as a street and typically does not allow parking to back into the
5
NO.: Z-784(Cont.)
service drive. In addition there is a row of parking behind a building located
adjacent to the floodway, which does not allow for proper maneuvering room.
The applicant has indicated the placement of dumpsters on the site. The
applicant has indicated the dumpsters will be shared to limit the number of
dumpsters required on the site. The applicant has also indicated the dumpster
hours will be limited to 7:00 am to 6:00 pm.
The applicant has indicated one development sign will be located on the site.
The applicant has indicated the sign will be a maximum of 36 -feet in height and
160 square feet in area.
The applicant has redesigned the driveway locations to comply with staff's
comments. The applicant has indicated the main entrance drive to align with
Childers Drive located to the south of the site. The western drive is located near
the floodway. Staff is supportive of the placement of the western drive.
The applicant has increased the street buffer to meet the minimum ordinance
requirement. The indicated site plan does not allow for landscape islands to be a
minimum of 300 square feet in area. Staff is not supportive of the allowing the
reduced landscape islands.
Although staff is supportive of allowing the development of the front portion of the
site as proposed by the applicant, staff is not supportive of the rear portion of the
development. Staff is not supportive of the applicant's request. In staff's opinion
the indicated site plan does not allow for protection of the single-family homes
located to the east. The site plan includes the placement of an 80 -foot landscape
strip along the eastern perimeter of the site and a 6 -foot wooden fence. The site
plan also indicates a service drive and two dumpster locations in this area. In
staff's opinion there should not be activities taking place behind these buildings.
Staff feels all the activities should be maintained within the development to offer
protection to the adjoining homes. Staff feels it is inappropriate to allow intense
commercial development on the rear portion of the site.
Staff is supportive of allowing the development of the rear portion of the site with
some level of activity but staff would recommend the rear portion of the
development be limited to office/showroom/warehouse activities with retail sales
and not allowing activity in the rear of the buildings located adjacent to the single-
family residences. Staff feels with limiting the development of the rear portion of
the site with these activities and eliminating the activity in the rear of the building
this will offer protection to the single-family homes located adjacent to the
eastern perimeter of the site.
STAFF RECOMMENDATION:
Staff recommends denial of the request.
FILE NO.: Z-7842 Cont.
PLANNING COMMISSION ACTION: (MAY 26, 2005)
The applicant was present. There were no registered objectors present. Staff presented
the item with a recommendation of approval of the request subject to compliance with
the conditions outlined in paragraphs D, E and F of the staff report.
There was no further discussion of the item. The chair entertained a motion to place the
item for inclusion on the consent agenda for approval. The motion carried by a vote of
10 ayes, 0 noes and 1 absent.
7
May 26, 2005
ITEM NO.: 21.1 FILE NO.: Z-7842
NAME: Carter Baseline Road Long -form PCD
LOCATION: Located North of Baseline Road, just West of Herrick Lane
DEVELOPER:
Mark Carter
23201 Interstate 30
Bryant, AR 72022
ENGINEER:
Global Surveying
Kelton Price P.E.
217 West Second Street
Little Rock, AR 72201
AREA: 34.31 acres
CURRENT ZONING
ALLOWED USES:
PROPOSED ZONING:
PROPOSED USE
NUMBER OF LOTS: 1
R-2, Single-family
Single-family Residential
PCD
FT. NEW STREET: 0 LF
C-3, General Commercial District uses
VARIANCESNVAIVERS REQUESTED: None requested.
A. PROPOSAUREQUEST:
The applicant proposes the rezoning of the site from R-2, Single-family to PCD to
allow the development of the site with 74,000 square feet of retail space with C-3,
General Commercial District uses as allowable uses for the site. The applicant
has excluded liquor sales and sexually oriented businesses from the listing of
allowable uses for the site. The proposed site plan includes the placement of
360 parking spaces on the site. The applicant has indicated future lot lines on
the proposed site plan to allow the sale of individual parcels in the future.
May 26, 2005
SUBDIVISION
ITEM NO.: 21.1 (Cont.) FILE NO.: Z-7842
The applicant has indicated the dumpsters will be serviced between the hours of
7:00 am to 6:00 pm. The applicant has indicated a single sign which will comply
with the maximum signage allowed in commercial zones.
B. EXISTING CONDITIONS:
The site is vacant and has previously been filled in some areas. There are
single-family homes located to the east and northeast of the site and a floodway
is located to the west of the site. Further west of the site is a property zoned PID
currently being used as an auto salvage yard. To the south of the site, across
Baseline Road, is vacant property and southeast of the site is an area of single-
family residences in a manufactured home park.
Baseline Road is a two lane State Highway with open ditches for drainage.
There are no sidewalks in place in this area.
C. NEIGHBORHOOD COMMENTS:
Southwest Little Rock United for Progress, all owners of property located within
200 -feet of the site and all residents, who could be identified, located within
300 -feet of the site were notified of the public hearing. As of this writing, staff has
received several informational phone calls from area residents.
D. ENGINEERING COMMENTS:
1. Baseline Road is classified on the Master Street Plan as a principal arterial.
Dedication of right-of-way 55 -feet from centerline will be required.
2. With site development, provide design of street conforming to the Master
Street Plan. Construct one-half street improvement to the street including 5 -
foot sidewalks with the planned development.
3. Plans for all work in the right-of-way shall be submitted for approval prior to
the start of work. Obtain barricade permit prior to doing any work in the right-
of-way from Traffic Engineering (501) 379-1817. Also obtain permits for
improvements within State Highway right-of-way from AHTD, District VI.
4. Storm water detention ordinance applies to this property.
5. A grading permit in accordance with Section 29-186(c) and (d) will be
required prior to any future land clearing, filling or grading activities at the site.
Site grading and drainage plans will need to be submitted and approved prior
to the start of construction.
6. A special Grading Permit for Flood Hazard Areas will be required per Section
8-283 prior to construction. The minimum Finish Floor elevation of 281 is
required to be shown on the plat grading plans and construction plans.
2
May 26, 2005
SUBDIVISION
ITEM NO.: 21.1 Cont. FILE NO.: Z-7842
7. In accordance with Section 31-176, floodway areas must be shown as
floodway easements or be dedicated to the public. In addition, a 25 -foot wide
access easement is required adjacent to the floodway boundary.
8. Driveway locations and widths do not meet the traffic access and circulation
requirements of Sections 30-43 and 31-210. Center the main driveway on
Childress Drive. One additional driveway would be allowed on Baseline Road
to the west spaced 300 -feet from Childress Drive. The width of driveway
must not exceed 36 -feet.
9. In accordance with Section 31-210(h)(12), access driveways running parallel
to the street shall not create a four-way intersection within 75 -feet of the
future curb line of the street. Contact Traffic Engineering at (501) 379-1816
for additional information.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer main extension required, with easements, if service is
required for the project. Contact Little Rock Wastewater Utility at 688-1414 for
additional details.
Entergy: No comment received.
Center -Point Energv: Approved as submitted.
SBC: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at
the time of request for water service must be met. A water main extension,
easement and additional fire hydrant(s) will be required in order to provide
service to this property. This development will have minor impact on the existing
water distribution system. Proposed water facilities will be sized to provide
adequate pressure and fire protection.
Fire Department: Place fire hydrants per code. Contact the Little Rock Fire
Department for additional information.
County Planning: No comment.
CATA: The site is not located on a dedicated CATA bus route.
F. ISSUES/TECHNICAUDESIGN:
Planning Division: This request is located in the Geyer Springs West Planning
District. The Land Use Plan shows Single Family for this property. The applicant
has applied for a rezoning from R-2 (Single Family Residence District) to PCD
3
May 26, 2005
SUBDIVISION
ITEM NO.: 21.1 (Cont.) FILE NO.: Z-7842
(Planned Commercial Development for the creation of a multiple lot plat and the
construction of multiple outbuildings containing C-3 (General Commercial) uses.
A land use plan amendment for a change to Mixed Use is a separate item on this
agenda. File No. LU 05-15-02.
Bicycle Plan: A Class III bikeway is shown on Baseline Road adjacent to the
property. A Class III bikeway is a signed route on a street shared with traffic. No
additional paving or right-of-way is required. Class III bicycle route signage may
be required.
Master Street Plan: Baseline Road is shown as a Principal Arterial on the Master
Street Plan and is built as a two lane rural road in front of the site. The primary
function of a Principal Arterial is to serve through traffic and to connect major
traffic generators or activity centers within urbanized areas. Entrances and exits
to the proposed site should be limited since Baseline Road is a Principal Arterial.
Baseline Road may require dedication of right-of-way and half -street
improvements.
City Recognized Neighborhood Action Plan: The property under review is
located in an area covered by theWe is 65 Street Neighborhood Action Plan.
The Land use and Zoning goal states two objectives relevant to this case. The
first objective: "Promote protection of natural areas through development and
zoning initiatives," with an action statement of "ensure that significant
environmental features and functions are preserved." Development of this site
should not harm the adjacent Fourche Creek and nearby wetlands. The second
Land use and Zoning objective is "protect the residential integrity of
neighborhoods by maintaining adequate separation between residential and non-
residential uses," with an action statement "monitor rezoning requests before
they are present to the Planning Commission/Board of Directors." The
neighborhood should be actively involved in the design process since it is
immediately adjacent to a single family neighborhood. The applicant has applied
for a PCD, which could result in more defined zoning controls and adequate
separation of uses. The Infrastructure goal, to implement an adequate
infrastructure, has one objective related to this case: "Identify and construct
neighborhood curbs, gutters, and sidewalks where needed." Various action
statements support the construction of minor and principal arterials to standards.
Since this application is along an unimproved section of a major arterial half
street improvements would need to be made.
Landscape: The proposed width of the street buffer along Baseline Road is less
than the 32 -foot average required. Additionally, the proposed eastern land use
buffer width is less than 38 -foot average required.
Areas set aside for interior landscaping appear to be less than the 8 -percent
(3,862 square feet) required by the landscape ordinance by 1,594 square feet. A
2
May 26, 2005
SUBDIVISION
ITEM NO.: 21.1(Cont.)FILE NO.: Z-7842
variance from this requirement would require City Beautiful Commission
approval.
A 6 -foot high opaque screen, either a wooden fence with its face side directed
outward, a wall or dense evergreen plantings, is required along the eastern
perimeter of this development.
An irrigation system to water landscaped areas will be required.
Prior to a building permit being issued, it will be necessary to provide landscape
plans stamped with the seal of a Registered Landscape Architect.
G. SUBDIVISION COMMITTEE COMMENT: (May 5, 2005)
Mr. Kelton Price and Mr. Carter were present representing the request. Staff
presented an overview of the proposed request indicating there were additional
items necessary to complete the review process. Staff questioned the design of
the buildings and the circulation of the proposed development. Staff stated they
had concerns with the circulation proposed. Staff also questioned the proposed
screening for the indicated mini -warehouse portion of the development. Staff
stated the mini -warehouses were located adjacent to single-family homes and
indicated proper mechanisms would be required to ensure the homes were not
impacted. Mr. Price stated the developer was considering a revision to this
portion of the site to develop the area with C-3, General Commercial District
activities.
Public Works comments were addressed. Staff stated street improvements
would be required. Staff stated two and one-half lanes would be required along
Baseline Road. Staff also stated a special grading permit would be required prior
to development.
Landscaping comments were addressed. Staff stated the indicted street buffer
did not meet the minimum ordinance requirements. Staff also stated landscape
islands should be grouped to allow for a minimum of 300 square feet in area.
There was no further discussion of the item. The Committee then forwarded the
item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised site plan to staff addressing most of the issues
raised at the May 5, 2005, Subdivision Committee meeting. The applicant has
removed the mini -warehouse portion of the development indicating six buildings
on the rear portion of the site; one building containing 40,000 square feet and five
buildings containing 50,000 square feet of retail space. The applicant has
5
May 26, 2005
SUBDIVISION
ITEM NO.: 21.1 (Cont.) FILE NO.: Z-7842
indicated the development adjacent to Baseline Road with ten buildings each
containing 4,000 square feet. The applicant has indicated future lot lines on the
proposed preliminary site plan to allow the creation of 17 individual lots for future
sale of individual buildings. The applicant has also indicated a cross access and
utility easement along the indicated drives. The applicant has indicated they are
not willing to dedicate the floodway to the city but has indicated a floodway
easement as requested by staff.
The proposed site plan includes the placement of 360 parking spaces to serve
the development. The typical minimum parking required for the development as
proposed would be 328 parking spaces. Staff has concerns with a few of the
indicated parking spaces. There are parking spaces proposed along the access
drive serving the rear of the property. The ordinance indicates a service drive is
to function as a street and typically does not allow parking to back into the
service drive. In addition there is a row of parking behind a building located
adjacent to the floodway, which does not allow for proper maneuvering room.
The applicant has indicated the placement of dumpsters on the site. The
applicant has indicated the dumpsters will be shared to limit the number of
dumpsters required on the site. The applicant has also indicated the dumpster
hours will be limited to 7:00 am to 6:00 pm.
The applicant has indicated one development sign will be located on the site.
The applicant has indicated the sign will be a maximum of 36 -feet in height and
160 square feet in area.
The applicant has redesigned the driveway locations to comply with staff's
comments. The applicant has indicated the main entrance drive to align with
Childers Drive located to the south of the site. The western drive is located near
the floodway. Staff is supportive of the placement of the western drive.
The applicant has increased the street buffer to meet the minimum ordinance
requirement. The indicated site plan does not allow for landscape islands to be a
minimum of 300 square feet in area. Staff is not supportive of the allowing the
reduced landscape islands.
Although staff is supportive of allowing the development of the front portion of the
site as proposed by the applicant, staff is not supportive of the rear portion of the
development. Staff is not supportive of the applicant's request. In staff's opinion
the indicated site plan does not allow for protection of the single-family homes
located to the east. The site plan includes the placement of an 80 -foot landscape
strip along the eastern perimeter of the site and a 6 -foot wooden fence. The site
plan also indicates a service drive and two dumpster locations in this area. In
staff's opinion there should not be activities taking place behind these buildings.
Staff feels all the activities should be maintained within the development to offer
May 26, 2005
SUBDIVISION
ITEM NO.: 21.1 Cont. FILE NO.: Z-7842
protection to the adjoining homes. Staff feels it is inappropriate to allow intense
commercial development on the rear portion of the site.
Staff is supportive of allowing the development of the rear portion of the site with
some level of activity but staff would recommend the rear portion of the
development be limited to office/showroom/warehouse activities with retail sales
and not allowing activity in the rear of the buildings located adjacent to the single-
family residences. Staff feels with limiting the development of the rear portion of
the site with these activities and eliminating the activity in the rear of the building
this will offer protection to the single-family homes located adjacent to the
eastern perimeter of the site.
STAFF RECOMMENDATION:
Staff recommends denial of the request.
PLANNING COMMISSION ACTION: (MAY 26, 2005)
The applicant was present. There were no registered objectors present. Staff presented
the item with a recommendation of approval of the request subject to compliance with
the conditions outlined in paragraphs D, E and F of the staff report.
There was no further discussion of the item. The chair entertained a motion to place the
item for inclusion on the consent agenda for approval. The motion carried by a vote of
10 ayes, 0 noes and 1 absent.
7
ITEM NO.: 21
FILE NO.: Z-7842
NAME: Carter Baseline Road Long -form PCD
LOCATION: located North of Baseline Road, just West of Herrick Lane
Planning Staff Comments:
1. Provide notification of property owners located within 200 feet of the site, complete
with the certified abstract list, notice form with affidavit executed and proof of
mailing.
2. The indicated design of the site appears to have conflicts with traffic movement and
circulation. Redesign the site with parallel buildings to allow for access and
circulation within the development.
3. Provide details of proposed screening to be located along the eastern and northern
property lines. The proposed mini -warehouse abuts single-family homes. What
measures are being proposed to protect these residents.
4. Will there be a dumpster located on the site? If so provide the location of the
proposed dumpster (s) along with a note concerning the required screening.
5. Will there be signage located on the site both free standing and building signage? If
so provide details of proposed signage including height/area/location.
Variance/Waivers:
Public Works Conditions:
1. Baseline Road is classified on the Master Street Plan as a principal arterial.
Dedication of right-of-way 55 -feet from centerline will be required.
2. With site development, provide design of street conforming to the Master Street
Plan. Construct one-half street improvement to the street including 5 -foot sidewalks
with the planned development.
3. Plans for all work in the right-of-way shall be submitted for approval prior to the start
of work. Obtain barricade permit prior to doing any work in the right-of-way from
Traffic Engineering (501) 379-1817. Also obtain permits from improvements within
State Highway right-of-way from AHTD, District VI.
4. Storm water detention ordinance applies to this property.
5. A grading permit in accordance with Section 29-186(c) and (d) will be required prior
to any future land clearing, filling or grading activities at the site. Site grading and
drainage plans will need to be submitted and approved prior to the start of
construction.
6. A special Grading Permit for Flood Hazard Areas will be required per Section 8-283
prior to construction. The minimum Finish Floor elevation of 281 is required to be
shown on the plat grading plans and construction plans.
7. In accordance with Section 31-176, floodway areas must be shown as floodway
easements or be dedicated to the public. In addition, a 25 -foot wide access
easement is required adjacent to the floodway boundary.
8. Driveway locations and widths do not meet the traffic access and circulation
requirements of Sections 30-43 and 31-210. Center the main driveway on Childress
Drive. One additional driveway would be allowed on Baseline Road to the west
spaced 300 -feet from Childress Drive. The width of driveway must not exceed 36 -
feet.
9. In accordance with Section 31-210(h)(12), access driveways running parallel to the
street shall not create a four-way intersection within 75 -feet of the future curb line of
the street. Contact Traffic Engineering at (501) 379-1816 for additional information.
Utilities and Fire Department/County Planning:
Wastewater: Sewer main extension required, with easements, if service is required for
the project. Contact Little Rock Wastewater Utility at 688-1414 for additional details.
Entergy: No comment received.
Center -Point Energy: Approved as submitted.
SBC: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at the time
of request for water service must be met. A water main extension, easement and
additional fire hydrant(s) will be required in order to provide service to this property. This
development will have minor impact on the existing water distribution system. Proposed
water facilities will be sized to provide adequate pressure and fire protection.
Fire Department: Place fire hydrants per code. Contact the Little Rock Fire
Department for additional information.
County Planning: No comment.
CATH:
Planning Division:
Landscape: The proposed width of the street buffer along Baseline Road is less than
the 32 -foot average required. Additionally, the proposed eastern land use buffer width
is less than 38 -foot average required.
Areas set aside for interior landscaping appear to be less than the 8 -percent (3,862
square feet) required by the landscape ordinance by 1,594 square feet. A variance
from this requirement would require City Beautiful Commission approval.
A 6 -foot high opaque screen, either a wooden fence with its face side directed outward,
a wall or dense evergreen plantings, is required along the eastern perimeter of this
development.
An irrigation system to water landscaped areas will be required.
Prior to a building permit being issued, it will be necessary to provide landscape plans
stamped with the seal of a Registered Landscape Architect.
Revised plat/plan: Submit four (4) copies of a revised preliminary plan (to include the
additional information as noted above) to staff on Wednesday, May 11, 2005.