HomeMy WebLinkAboutZ-7837-A Staff AnalysisSeptember 14, 2006
ITEM NO.: H FILE
NAME: Fairhills Circle Revised Short -form PD -R
LOCATION: located on the Southeast corner of West Markham Street and Fairhills Circle
DEVELOPER:
Rodney Chandler
P.O. Box 22021
Little Rock, AR 72221
FNGINFFR,
Central Arkansas Surveying
Autumn Road
Little Rock, AR 72211
AREA: 0.45 acres
CURRENT ZONING: PD -R
NUMBER OF LOTS: 2 FT. NEW STREET: 0 LF
ALLOWED USES: Single-family residential
PROPOSED ZONING: Revised PD -R
PROPOSED USE: Townhouse development — 4 units
VARIANCESNVAIVERS REQUESTED: None requested.
BACKGROUND:
The Little Rock Board of Directors adopted Ordinance No. 19,357 on August 1, 2005,
establishing Fairhills Circle Short -form PD -R. The applicant proposed the development of
this site with two patio homes through a Planned Residential Development. The applicant
indicated each of the homes would be contained on individual lots with a shared driveway
through a cross access easement extending from Fairhills Circle. The applicant indicated
each of the homes would contain a minimum of 1,600 square feet of heated and cooled
space and be constructed of brick or brick and siding fronts with siding on the sides and
rears. The applicant indicated each of the units would have a two car garage, three
bedrooms, two or two and one half baths and each of the units would have usable living
space outdoors. Fencing was proposed along the southern property line as well as a
retaining wall with a maximum height of six feet.
September 14, 2006
SUBDIVISION
ITEM NO.: H. Z -7837-A
A. PROPOSAUREQUEST:
The applicant is now proposing a revision to the previously approved PD -R to allow
the development of four units on the site. Fair Hills Court is a planned residential
development that will blend the traditional architecture with 21St Century construction to
consist of four (4) town homes. The proposed homes will consist of two (2) bedrooms,
great room, one full and one half bathroom, dining area and kitchen. All the homes will
have a traditional exterior with accent decor. Interior amenities will include travertine
tile, carpet, hardwood flooring, granite the kitchen counter tops, marble bathrooms,
crown moldings and recessed can lighting.
Exterior features include masonry, with structural accents and details such as brick on
all four sides, precast keystones, brick quoins, transom windows, architectural roof
shingles, landscaped lawns and automatic sprinkler systems. Roof pitch elevations
will be a minimum of 6/12 to enhance the aesthetics of the development and blend in
with neighboring homes. The homes will have a minimum front set back of 25 feet
from West Markham Street and 15 feet of set back in the rear with wooden privacy
fencing planned for the east and south sides of the development. Additionally, trees to
the south and north will remain as to create a natural landscaped green space around
the development thus providing additional privacy for residents and surrounding
homes.
The approximate square footage of the homes is 1,150 square feet of heated and
cooled space. The development is proposed to attract single professionals and
couples. The homes are anticipated to lease for $1,200.00 per month. The entrance
to the development will be from Fairhills Circle and accent lighting and extensive
landscaping with substantial green space is planned to promote an appealing
environment that compliments the neighborhood and promotes increased property
values. Additionally, all lawn and common areas within Fair Hills Court will be
maintained by the developer. The common maintenance of the property reinforces the
quality that has been planned, and will continue to be stressed throughout the
residential development.
B. EXISTING CONDITIONS:
The site is located near the West Markham/Mississippi Avenue intersection. The area
is predominately single-family with a church located at the southeast corner of
Mississippi Avenue and West Markham Street and an elementary school located on
West Markham west of the site. Fairhills Circle is a narrow residential street with five
homes located on the cul-de-sac.
r.
September 14, 2006
SUBDIVISION
ITEM Na.: H. Z -7837-A
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has received several informational phone calls from area
residents. The Briarwood Neighborhood Association, all owners of property
located within 200 feet of the site and all residents, who could be identified, located
within 300 feet of the site were notified of the public hearing.
D. ENGINEERING COMMENTS:
Public Works:
1. Markham Street is classified on the Master Street Plan as a minor arterial with
special standards. A dedication of right-of-way 40 feet from centerline will be
required (special reduced standard for Markham Street is 70 feet with 80 feet
near intersections).
2. A 20 foot radial dedication of right-of-way is required at the intersection of
Markham Street and Fairhills Circle.
3. Signage cannot be located within right-of-way.
4. Due to excess terrain, provide grading and drainage plan showing existing and
proposed contours. Provide heights of walls, building pad elevations, and
slopes. Wall heights cannot exceed 15 feet and slopes must be 3:1 or flatter.
5. Fairhills Circle is classified on the Master Street Plan as a residential street. A
dedication of right-of-way 25 feet from centerline will be required.
6. A grading permit in accordance with Section 29-186 (c) and (d) will be required
prior to any land clearing or grading activities at the site. Site grading, and
drainage plans will need to be submitted and approved prior to the start of
construction.
7. Landscape island should be removed due to access problems in and out of
development. Several of the parking spaces have no room for vehicle backing
movements. The two (2) parking spaces on the north should be removed due
to backing problems. Parking should be redesigned and could require driveway
to be relocated.
8. Repair or replace any curb and gutter or sidewalk that is damaged in the public
right-of-way prior to occupancy.
9. Plans of all work in right-of-way shall be submitted for approval prior to start of
work. Obtain barricade permit prior to doing any work in the right-of-way from
Traffic Engineering at (501) 379-1817 (Derrick Bergfield).
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer main extension required, with easements. Contact Little Rock
Wastewater Utility at 688-1414 for additional information.
3
September 14, 2006
SUBDIVISION
ITEM NO.: H.
Entergy: No comment received.
Center -Point Energy: No comment received.
AT & T: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at the time
of request for water service must be met. A Capital Investment Charge based on the size
of the connection(s) will apply to this project in addition to normal charges. This
development will have minor impact on the existing water distribution system. Proposed
water facilities will be sized to provide adequate pressure and fire protection. Contact
Central Arkansas Water at 377-1225 for additional information.
Fire Department: Install fire hydrants per code. Contact the Little Rock Fire
Department at 918-3700 for additional information.
Count Plannin : No comment.
CATA:.The site is located on CATA Bus Route #5 — the West Markham Route.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division: This request is located in the West Little Rock Planning District.
The Land Use Plan shows Single Family for this property. The applicant has applied
for a rezoning from R-2 (Single Family District) to PD -R (Planned Development -
Residential) for construction of two duplex units on the lots. Because of the small
scale of this project staff believes an amendment to the Land Use Plan is not
applicable at this time.
Bi -cycle Plan: Existing or proposed Class I, II, or III bikeways are not in the immediate
vicinity of the development.
Master Street Plan: Fairhills Circle is shown as a Local Street and West Markham
Street is shown as a Minor Arterial on the Master Street Plan. The primary function of
a Local Street is to provide access to adjacent properties and the purpose of a Minor
Arterial is to provide connections to and through an urban area. This site is near the
Mississippi Street -Markham Street intersection, which is oftentimes congested during
peak travel times. In the event of approval of this application staff feels that access to
the duplexes should be off of Fairhills Circle, the Local Street, to minimize impact on
Markham Street, a Minor Arterial. West Markham Street and Fairhills Circle may
require dedication of right-of-way, may require street and sidewalk improvements.
51
September 14, 2006
SUBDIVISION
ITEM NO.: H. Z -7837-A
City Recognized Neighborhood Action Plan: The applicant's property lies in the area
covered by the Briarwood Neighborhood Action Plan. The Land Use and Zoning goal
is "To maintain the character of homes in the Briarwood Neighborhood," with an action
statement, "Identify rental property in the neighborhood to maintain the character of
the neighborhood." This neighborhood action plan indicates a concern for rental
property in the neighborhood. This proposal would construct two new duplexes, which
may or may not result in rental units.
Landscape:
1. Compliance with the City's Landscape and Buffer Ordinances is required.
2. The two separate parking spaces currently encroach into the minimum 9 foot wide
street buffer and the minimum 9 foot wide landscape strip. The City Beautiful
Commission must approve a variance.
3. The proposed structures encroach into the 9 foot wide land use buffer along the
eastern perimeter of the site. Seventy percent (70%) of this buffer is to remain
undisturbed. Easements cannot count towards meeting this minimum requirement.
4. The southern perimeter is also required to have a minimum 9 foot wide land use
buffer. Seventy percent (70%) of this buffer is to remain undisturbed.
5. A six foot high opaque screen, either a wooden fence with its face side directed
outward, a wall or dense evergreen planting, is required along the southern and the
eastern perimeters next to the residentially zoned property.
6. It appears the maneuvering area within the parking lot could be reduced allowing
for more green space on the site.
G. SUBDIVISION COMMITTEE COMMENT: (July 13, 2006)
Mr. Rodney Chandler was present representing the request. Staff stated the
developers were requesting to revise a previously approved PD -R to allow the
development of two (2) duplex units on the site which contained one half acre and two
(2) lots. Staff stated there were a number of outstanding issues associated with the
request. Staff questioned the need for a development sign. Mr. Chandler stated he
would remove the sign request from the application. Staff also stated the trash pick-up
location would need to be coordinated with the Public Works Department to ensure the
site was accessible for collection. Staff questioned if any decks, porches or patios
were proposed. Staff also noted the location of all proposed fencing was required on
the site plan. Staff requested the applicant provide elevations and construction
materials proposed.
Public Works comments were addressed. Staff stated a 20 -foot radial dedication was
required at the intersection of Fairhills Circle and West Markham Street. Staff also
stated dedications would be required on West Markham and Fairhills Circle. Staff
5
September 14, 2006
SUBDIVISION
ITEM NO.: H.
Z -7837-A
stated the two (2) parking spaces on the north should be removed due to backing
problems within the proposed parking area.
Landscaping comments were addressed. Staff stated the two parking spaces
interfered with the required street buffer. Mr. Chandler stated the parking spaces
would be removed from the revised site plan. Staff noted the eastern perimeter did not
meet the minimum land use buffer requirement of nine feet. Staff stated easements
could not count toward meeting this minimum requirement.
Staff noted comments from the various other reporting departments and agencies
suggesting the applicant contact them directly for additional information and
clarification. There was no further discussion of the item. The Committee then
forwarded the item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised site plan to staff addressing most of the issues
raised at the July 13, 2006, Subdivision Committee meeting. The applicant has noted
the location of the proposed fencing, provided elevations and the construction
materials. A radial dedication has been included on the proposed site plan as
requested by the Public Works Department. The revised site plan also indicates the
placement of the required land use buffer along the eastern perimeter.
The site plan indicates the site contains a total of 15,892 square feet (0.36 acres) with
a total building coverage of 4,637 square feet (34.2%) and a total landscaped area of
8,015 square feet (47.8%). The Planned Zoning District Ordinance requires a
minimum of ten to fifteen percent of the site area be designated as common usable
open space and a minimum of 500 square feet of usable private open space per unit.
The site plan includes private patio areas for each of the units separated with a six foot
wooden fence. The indicated common and private open space are adequate to meet
the typical minimum requirements of the ordinance.
The site plan indicates the placement of a six foot wood fence along the eastern and
southern perimeters of the site to provide screening for the adjoining single-family
homes. A 19 -foot building setback has been indicated along the eastern perimeter
and a 20 -foot building setback along the southern perimeter to allow an adequate land
use buffer to the adjoining homes. The applicant has also indicated Leeland Cypress
trees will be planted on the south side of the development to provide additional privacy
for residents and the surrounding homes.
The site plan indicates the placement of eight on site parking spaces. The
development is proposed with a total of four units. Based on the typical minimum
parking required for a multi -family development six parking spaces would typically be
C*I
September 14, 2006
SUBDIVISION
1111:1181
required. The indicated parking is adequate to meet the typical minimum parking
required.
The applicant has provided building elevations which appear as a two story
Brownstone architecture. The roof is proposed with a 6/12 elevation with architectural
shingles. The construction materials proposed are brick on all four sides, precast
keystones, brick quoins and, transom windows.
Staff is not supportive of the proposed development. Staff is not supportive of the
density, parking court and the massing of the structures. The area is designated as
Single Family on the City's Future Land Use Plan. The developer is proposing the
placement of duplex units on two previously platted lots with a surface parking area in
front of the buildings to serve the units. In staff's opinion the development as
proposed does not give the appearance of a single-family development but more of a
multi -family development.
STAFF RECOMMENDATIONS:
Staff recommends denial of the request.
PLANNING COMMISSION ACTION: (August 3, 2006)
The applicant was present representing the request. There were no registered
objectors present. Staff presented the item indicating the applicant had submitted a
request dated August 2, 2006, requesting the item be deferred to the September 14,
2006, public hearing. Staff stated the deferral request would require a By-law waiver
with regard to the late deferral request date. Staff stated they were supportive of the
deferral request.
There was no further discussion of the item. The Chair entertained a motion for
approval of the By-law waiver with regard to the late deferral request. The motion
carried by a vote of 9 ayes, 0 noes and 2 absent. The Chair entertained a motion for
placement of the item on the Consent Agenda for Deferral. The motion carried by a
vote of 9 ayes, 0 noes and 2 absent.
STAFF UPDATE:
The applicant submitted a revised site plan to staff indicating the development of the
site with three residential units as opposed to four units. The applicant is now
proposing the construction of a duplex unit and a single-family structure. Staff
continues to not support the proposed development. The development was previously
approved for the contruction of two units both single-family. Staff feels this type
development is the most appropriate development for the site. As was previously
7
September 14, 2006
SUBDIVISION
ITEM NO.: H.
Z -7837-A
approved the development resulted in a density of 4.4 units per acre and the current
proposal results in a density of 6.6 units per acre. Staff does not feel this an
appropriate location for a development with the proposed density, which is similar to
the Low Density Residential classification of the City's Future Land Use Plan. Staff
feels the proposed development is out of character with the existing development
pattern in the area and the development is inconsistent with the City's Future Land
Use Plan. In addition although one of the units has been removed from the proposed
site plan, the site plan still remains with a surface parking area in front of the buildings
continuing to give the appearance of a multi -family development.
PLANNING COMMISSION ACTION: (September 14, 2006)
The applicant was not present. Staff presented the item stating the applicant had submitted a
request on September 11, 2006, requesting the item be withdrawn from consideration without
prejudice. Staff stated the withdrawal request would require a waiver of the Commission's
By-laws with regard to the time frame for the withdrawal request.
There was no further discussion of the item. The Chair entertained a motion for the By-law
waiver. The motion carried by a vote of 10 ayes, 0 noes and 1 absent. The Chair
entertained a motion for placement of the item on the Consent Agenda for Withdrawal. The
motion carried by a vote of 10 ayes, 0 noes and 1 absent.
ITEM NO.: 13.
NAME: Fairhills Circle Revised Short -form PD -R
Z -7837-A
LOCATION: located on the Southeast corner of West Markham Street and Fairhills
Circle
Planninq Staff Comments:
1. Provide notification of abutting property owners of the site, complete with the
certified abstract list, notice form with affidavit executed and proof of mailing. The
notice must be mailed no later than July 19, 2006. The Office of Planning and
Development must receive the proof of notice no later than July 28, 2006.
2. Provide a cover letter and the application package for the request.
3. Provide details of the proposed sign (height/area).
4. Remove the trash pick-up outside the right-of-way.
5. The previous approval indicated a retaining wall and fence. Will a retaining wall be
installed on the site? Provide details of the total height of the wall and fence
proposed.
6. Will there be any decks porches or patios constructed? Will there be any fencing to
separate the proposed outdoor living areas of the units. If so indicated the location
on the proposed site plan.
7. Provide the total square footage of the units proposed.
8. Provide building elevations for the structures. Provide construction materials
proposed for the units.
9. Provide the total building coverage of the proposed structure in the general notes
section of the proposed site plan.
10. Provide the total area designated for landscaped in the general notes section of the
site plan.
11. The PZD Ordinance requires a minimum of 10 to 15 percent of the site area be
designated as common usable open space and single-family, duplex, zero lot line
and townhouse developments shall have a minimum of 500 square feet of usable
private open space per unit. Provide details of the total square footages and
designate areas indicating compliance.
Variance/Waivers:
Public Works Conditions:
1. Markham Street is classified on the Master Street Plan as a minor arterial with
special standards. A dedication of right-of-way 40 feet from centerline will be
required (special reduced standard for Markham Street is 70 feet with 80 feet
near intersections).
2. A 20 foot radial dedication of right-of-way is required at the intersection of
Item # 13
Markham Street and Fairhills Circle.
3. Signage cannot be located within right-of-way.
4. Due to excess terrain, provide grading and drainage plan showing existing and
proposed contours. Provide heights of walls, building pad elevations, and
slopes. Wall heights cannot exceed 15 feet and slopes must be 3:1 or flatter.
5. Fairhills Circle is classified on the Master Street Plan as a residential street. A
dedication of right-of-way 25 feet from centerline will be required.
6. A grading permit in accordance with Section 29-186 (c) and (d) will be required
prior to any land clearing or grading activities at the site. Site grading, and
drainage plans will need to be submitted and approved prior to the start of
construction.
7. Landscape island should be removed due to access problems in and out of
development. Several of the parking spaces have no room for vehicle backing
movements. The two (2) parking spaces on the north should be removed due to
backing problems. Parking should be redesigned and could require driveway to
be relocated.
8. Repair or replace any curb and gutter or sidewalk that is damaged in the public
right-of-way prior to occupancy.
9. Plans of all work in right-of-way shall be submitted for approval prior to start of
work. Obtain barricade permit prior to doing any work in the right-of-way from
Traffic Engineering at (501) 379-1817 (Derrick Bergfield).
Utilities and Fire Department/County Planning:
Wastewater: Sewer main extension required, with easements. Contact Little Rock
Wastewater Utility at 688-1414 for additional information.
Entergy
Center -Point Energy:
SBC:
Central Arkansas Water: All Central Arkansas Water requirements in effect at the
time of request for water service must be met. A Capital Investment Charge based on
the size of the connection(s) will apply to this project in addition to normal charges. This
development will have minor impact on the existing water distribution system. Proposed
water facilities will be sized to provide adequate pressure and fire protection. Contact
Central Arkansas Water at 377-1225 for additional information.
Fire Department: Install fire hydrants per code. Contact the Little Rock Fire
Department at 918-3700 for additional information.
County Planning: No comment.
CATA: The site is located on CATA Bus Route #5 — the West Markham Route.
Planning_Division: This request is located in the West Little Rock Planning District. The
Land Use Plan shows Single Family for this property. The applicant has applied for a
Item # 13
rezoning from R-2 (Single Family District) to PD -R (Planned Development -Residential)
for construction of two duplex units on the lots. Because of the small scale of this
project staff believes an amendment to the Land Use Plan is not applicable at this time.
Bicycle Plan: Existing or proposed Class I, II, or III bikeways are not in the immediate
vicinity of the development.
Master Street Plan: Fairhills Circle is shown as a Local Street and West Markham
Street is shown as a Minor Arterial on the Master Street Plan. The primary function of a
Local Street is to provide access to adjacent properties and the purpose of a Minor
Arterial is to provide connections to and through an urban area. This site is near the
Mississippi Street -Markham Street intersection, which is oftentimes congested during
peak travel times. In the event of approval of this application staff feels that access to
the duplexes should be off of Fairhills Circle, the Local Street, to minimize impact on
Markham Street, a Minor Arterial. West Markham Street and Fairhills Circle may
require dedication of right-of-way, may require street and sidewalk improvements.
City Recognized Neighborhood Action Plan: The applicant's property lies in the area
covered by the Briarwood Neighborhood Action Plan. The Land Use and Zoning goal is
"To maintain the character of homes in the Briarwood Neighborhood," with an action
statement, "Identify rental property in the neighborhood to maintain the character of the
neighborhood." This neighborhood action plan indicates a concern for rental property in
the neighborhood. This proposal would construct two new duplexes, which may or may
not result in rental units.
Landscape:
1. Compliance with the City's Landscape and Buffer Ordinances is required.
2. The two separate parking spaces currently encroach into the minimum 9 foot
wide street buffer and the minimum 9 foot wide landscape strip. The City
Beautiful Commission must approve a variance.
3. The proposed structures encroach into the 9 foot wide land use buffer along the
eastern perimeter of the site. Seventy percent (70%) of this buffer is to remain
undisturbed. Easements cannot count towards meeting this minimum
requirement.
4. The southern perimeter is also required to have a minimum 9 foot wide land use
buffer. Seventy percent (70%) of this buffer is to remain undisturbed.
5. A six foot high opaque screen, either a wooden fence with its face side directed
outward, a wall or dense evergreen planting, is required along the southern and
the eastern perimeters next to the residentially zoned property.
6. It appears the maneuvering area within the parking lot could be reduced allowing
for more green space on the site.
Revised plat/plan: Submit four (4) copies of a revised preliminary plat (to include the
additional information as noted above) to staff on Wednesday, July 19, 2006.
Item # 13
ITEM NO.: 13. Z -7837-A
NAME: Fairhills Circle Revised Short -form PD -R
LOCATION: located on the Southeast corner of West Markham Street and Fairhills
Circle
Planning Staff Comments:
✓ 1. Provide notification of abutting property owners of the site, complete with the
certified abstract list, notice form with affidavit executed and proof of mailing. The
notice must be mailed no later than July 19, 2006. The Office of Planning and =
Development must receive the proof of notice no later than July 28, 2006.
2. Provide a cover letter and the application package for the request.
3. Provide details of the proposed sign (height/area). NIA
Remove the trash pick-up outside the right-of-way.
The previous approval indicated a retaining wall and fence. ' a r"_, r wall be
installed on the site? Provide details of the total heir" ' S` he I .---._id fence
proposed.a WA�N 4f -f4'4 A4--b)
Will there b any decks polches or patios constructed? Will there be any fencing to
separate the proposed outdoor living areas of the units. If so indicated the location
on the proposed site plan.
Provide the total square footage of the units proposed.
`8/ Provide building elevations for the structures. Provide construction materials
proposed for the units.
Provide the total building coverage of the proposed structure in the general notes
section of the proposed site plan.
`Provide the total area designated for landscaped in the general notes section of the
site plan.
11. The PZD Ordinance requires a minimum of 10 to 15 percent of the site area be
designated as common usable open space and single-family, duplex, zero lot line
and townhouse developments shall have a minimum of 500 square feet of usable
private open space per unit. Provide details of the total square footages and
designate areas indicating compliance. Ce.�
Variance/Waivers:
'ublic Works Conditions:
1. Markham Street is classified on the Master Street Plan as a minor arterial with
special standards. A dedication of right-of-way 40 feet from centerline will be
required (special reduced standard for Markham Street is 70 feet with 80 feet
near intersections).
2. A 20 foot radial dedication of right-of-way is required at the intersection of
Item # 13
Markham Street and Fairhills Circle.
Signage cannot be located within right-of-way.
4. Due to excess terrain, provide grading and drainage plan showing existing and
proposed contours. Provide heights of walls, building pad elevations, and
slopes. Wall heights cannot exceed 15 feet and slopes must be 3:1 or flatter.
5. Fairhills Circle is classified on the Master Street Plan as a residential street. A
dedication of right-of-way 25 feet from centerline will be required.
6. A grading permit in accordance with Section 29-186 (c) and (d) will be required
prior to any land clearing or grading activities at the site. Site grading, and
drainage plans will need to be submitted and approved prior to the start of
construction.
Landscape island should be removed due to access problems in and out of
development. Several of the parking spaces have no room for vehicle backing
movements. The two (2) parking spaces on the north should be removed due to
backing problems. Parking should be redesigned and could require driveway to
be relocated.
8. Repair or replace any curb and gutter or sidewalk that is damaged in the public
right-of-way prior to occupancy.
9. Plans of all work in right-of-way shall be submitted for approval prior to start of
work. Obtain barricade permit prior to doing any work in the right-of-way from
Traffic Engineering at (501) 379-1817 (Derrick Bergfield).
Utilities and Fire Department/County Planning:
Wastewater: Sewer main extension required, with easements. Contact Little Rock
Wastewater Utility at 688-1414 for additional information.
Entergy
Center -Point Energy:
SBC:
Central Arkansas Water: All Central Arkansas Water requirements in effect at the
time of request for water service must be met. A Capital Investment Charge based on
the size of the connection(s) will apply to this project in addition to normal charges. This
development will have minor impact on the existing water distribution system. Proposed
water facilities will be sized to provide adequate pressure and fire protection. Contact
Central Arkansas Water at 377-1225 for additional information.
Fire Department: Install fire hydrants per code. Contact the Little Rock Fire
Department at 918-3700 for additional information.
County Planning: No comment.
CATA: The site is located on CATA Bus Route #5 — the West Markham Route.
Planning Division: This request is located in the West Little Rock Planning District. The
Land Use Plan shows Single Family for this property. The applicant has applied for a
Item # 13