HomeMy WebLinkAboutZ-7811 Staff AnalysisITEM NO.: 9
NAME: Thomas Long -form PD -R
FILE NO.: Z-7811
LOCATION: located on the North side of Cantrell Road at the West end of Mooser Lane
Planning Staff Comments:
Provide notification of property owners located within 200 -feet of the site, complete
with the certified abstract list, notice form with affidavit executed and proof of
mailing.
2. Provide a corrected survey of the property.
3. Will utilities be extended to the site? Will
site?
Variance/Waivers: None requested.
Public Works Conditions:
there be a restroom facility located on the
A special Grading Permit for Flood Hazard Areas will be required per Section 8-283
prior to construction.
Utilities and Fire Department/County Planning:
Wastewater: Sewer available, not adversely affected.
Entergy: No comment received.
Center -Point Enercv: No comment received.
SBC: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at the time
of request for water service must be met. A Capital Investment Charge based on the
size of the meter connection(s) will apply to this project in addition to normal charges.
Contact Central Arkansas Water regarding the size and location of the water meter. Due
to the nature of this facility, installation of an approved reduced pressure zone backflow
preventer assembly (RPZA) may be required on the domestic water service. This
assembly must be installed prior to the first point of use. Central Arkansas Water (CAW)
requires that upon installation of the RPZA, successful tests of the assembly must be
completed by a Certified Assembly Tester licensed by the State of Arkansas and
approved by CAW. The test results must be sent to CAW's Cross Connection Section
within ten days of installation and annually thereafter. Contact Carroll Keatts at 377-
1226 if you would like to discuss backflow prevention requirements for this project.
Fire _Department: Place fire hydrants per code. Contact the Little Rock Fire
Department at 918-3700 for additional information.
County Planning: No comment.
CATA: The site is not located on a CATA bus route.
Plannina Division:
Landscape: No comment.
Revised plat/plan: Submit four (4) copies of a revised preliminary plan (to include the
additional information as noted above) to staff on Wednesday, March 30, 2005.
April 14, 2005
ITEM NO.: 9 FILE NO.: Z-7811
NAME: Thomas Long -form PD -R
LOCATION: Located on the North side of Cantrell Road at the West end of
Mooser Lane
DEVELOPER:
Jerry Thomas
39 Quercus
Little Rock, AR 72223
ENGINEER:
Robert Holloway
200 Casey Drive
Maumelle, AR 72113
AREA: 33 acres
CURRENT ZONING:
ALLOWED USES:
PROPOSED ZONING
PROPOSED USE:
NUMBER OF LOTS: 1
R-2, Single-family
Single-family residential
-B -
FT. NEW STREET: 0 LF
A barn without the presence of a principal structure
VARIANCESMAIVERS REQUESTED: None requested.
A. PROPOSAUREQUEST:
The applicant is proposing the rezoning of this 33 acre tract from R-2, Single-
family to PD -R to allow the construction of a barn to house livestock and his
personal mowing equipment on the site. The applicant does not live on the site
nor is there a principal residence on the site, which necessitates the need for a
rezoning request. The applicant has indicated the building will be set at 60 -feet
from the western property line and approximately 350 -feet from Taylor Loop
Creek. There is an existing low water bridge on the site, which will provide
access to the new building.
April 14, 2005
SUBDIVISION
ITEM NO.: 9 (Cont.) FILE NO.: Z-7811
B. EXISTING CONDITIONS:
The site is vacant pastureland with a scattering of trees. Taylor Loop Creek
crosses the property and a large portion of the property lies within the 100 year
floodplain. There is a railroad line located to the north of the site and a single-
family subdivision is located to the south of the site. Access to the site is from
Mooser Lane, a narrow road, which services very few homes.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has received several informational phone calls from area
residents. The Walton Heights/Candlewood Neighborhood Association, all
property owners located within 200 -feet of the site and all residents, who could
be identified, located within 300 -feet of the site were notified of the public
hearing.
D. ENGINEERING COMMENTS:
1. A special Grading Permit for Flood Hazard Areas will be required per Section
8-283 prior to construction.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLAN
Wastewater: Sewer available, not adversely affected.
Entergy: No comment received.
Center -Point Energy: ApPrQyed as submitted.
SBC: No cdm_ment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at
the time of request for water service must be met. A Capital Investment Charge
based on the size of the meter connection(s) will apply to this project in addition
to normal charges. Contact Central Arkansas Water regarding the size and
location of the water meter. Due to the nature of this facility, installation of an
approved reduced pressure zone backflow preventer assembly (RPZA) may be
required on the domestic water service. This assembly must be installed prior to
the first point of use. Central Arkansas Water (CAW) requires that upon
installation of the RPZA, successful tests of the assembly must be completed by
a Certified Assembly Tester licensed by the State of Arkansas and approved by
CAW. The test results must be sent to CAW's Cross Connection Section within
2
April 14, 2005
SUBDIVISION
ITEM NO.: 9 Cont. FILE NO.: Z-7811
ten days of installation and annually thereafter. Contact Carroll Keatts at
377-1226 if you would like to discuss backflow prevention requirements for this
project.
Fire Department: Place fire hydrants per code. Contact the Little Rock Fire
Department at 918-3700 for additional information.
County Planning: No comment.
CATA: The site is not located on a CATA bus route.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division: This request is located in the River Mountain Planning
District. The Land Use Plan shows Single Family for this property. The applicant
has applied for a PDR (Planned Development -Residential) for construction of a
barn.
The request does not require a change to the Land Use Plan.
Master Street Plan: Mooser Lane is shown as a Local Street on the Master
Street Plan. The primary function of a Local Street is to provide access to
adjacent properties. Mooser Lane will require dedication of right-of-way.
Bicycle Plan: A Class I bikeway is shown following Taylor Loop Creek through
the property. A Class I bikeway is built separate from or alongside a road.
Since this Class I bikeway is part of Little Rock's regional trail system dedication
of right of way may be required.
City Recognized Neighborhood Action Plan: The property under review is not
located in an area covered by a City of Little Rock recognized neighborhood
action plan.
Landscape: No comment.
G. SUBDIVISION COMMITTEE COMMENT: (March 24, 2005)
The applicant was not present. Staff presented the item indicating there were
few outstanding issues associated with the proposed request. Staff stated they
would contact the applicant directly to complete the technical review. There was
no further discussion of the item. The Committee then forwarded the item to the
full Commission for final action.
3
April 14, 2005
SUBDIVISION
ITEM NO.: 9 (Cont.
H. ANALYSIS:
FILE NO.: Z-7811
There were few outstanding issues associated with the proposed request
remaining from the March 24, 2005, Subdivision Committee meeting. The
applicant has indicated the proposed barn facility will not have restroom facilities
or an electrical connection.
The applicant is proposing the rezoning of this 33 acre tract from R-2,
Single-family to PD -R to allow the construction of a barn to house livestock and
his personal mowing equipment. The applicant does not live on the site nor is
there a principal residence on the site, which necessitates the need for a
rezoning request. The applicant has indicated the building will be set at 60 -feet
from the western property line and approximately 350 -feet from Taylor Loop
Creek. There is an existing low water bridge on the site, which will provide
access to the new building. Staff is supportive of the applicant's request. Staff
does not feel the proposed development of the barn without a principal structure
on the site will have any adverse impact on the adjoining properties. To staff's
knowledge there are no outstanding issues associated with the proposed
request.
I. STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
conditions outlined in paragraphs D, E and F of the above staff report.
PLANNING COMMISSION ACTION: (APRIL 14, 2005)
The applicant was present representing the request. There were no registered
objectors present. Staff presented the item with a recommendation of approval of the
request subject to compliance with the conditions outlined in paragraphs D, E and F of
the above report.
There was no further discussion of the item. The Chair entertained a motion to place
the item on the Consent Agenda for Approval. The motion carried by a vote of 11 ayes,
0 noes and 0 absent.
El
.: Z-7811
NAME: Thomas Long -form PD -R
LOCATION: Located on the North side of Cantrell Road at the West end of
Mooser Lane
DEVELOPER:
Jerry Thomas
39 Quercus
Little Rock, AR 72223
ENGINEER:
Robert Holloway
200 Casey Drive
Maumelle, AR 72113
AREA: 33 acres
CURRENT ZONING:
ALLOWED USES:
PROPOSED ZONING
PROPOSED USE
NUMBER OF LOTS: 1
R-2, Single-family
Single-family residential
FT. NEW STREET: 0 LF
A barn without the presence of a principal structure
VARIAN C ESNVAIVERS REQUESTED: None requested.
A. PROPOSAL/REQUEST:
The applicant is proposing the rezoning of this 33 acre tract from R-2, Single-
family to PD -R to allow the construction of a barn to house livestock and his
personal mowing equipment on the site. The applicant does not live on the site
nor is there a principal residence on the site, which necessitates the need for a
rezoning request. The applicant has indicated the building will be set at 60 -feet
from the western property line and approximately 350 -feet from Taylor Loop
Creek. There is an existing low water bridge on the site, which will provide
access to the new building.
FILE NO.: Z-7811
B. EXISTING CONDITIONS:
The site is vacant pastureland with a scattering of trees. Taylor Loop Creek
crosses the property and a large portion of the property lies within the 100 year
floodplain. There is a railroad line located to the north of the site and a single-
family subdivision is located to the south of the site. Access to the site is from
Mooser Lane, a narrow road, which services very few homes.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has received several informational phone calls from area
residents. The Walton Heights/Candlewood Neighborhood Association, all
property owners located within 200 -feet of the site and all residents, who could
be identified, located within 300 -feet of the site were notified of the public
hearing.
D. ENGINEERING COMMENTS:
1. A special Grading Permit for Flood Hazard Areas will be required per Section
8-283 prior to construction.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer available, not adversely affected.
Entergy: No comment received.
Center -Point Energy: Approved as submitted.
SBC: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at
the time of request for water service must be met. A Capital Investment Charge
based on the size of the meter connection(s) will apply to this project in addition
to normal charges. Contact Central Arkansas Water regarding the size and
location of the water meter. Due to the nature of this facility, installation of an
approved reduced pressure zone backflow preventer assembly (RPZA) may be
required on the domestic water service. This assembly must be installed prior to
the first point of use. Central Arkansas Water (CAW) requires that upon
installation of the RPZA, successful tests of the assembly must be completed by
a Certified Assembly Tester licensed by the State of Arkansas and approved by
CAW. The test results must be sent to CAW's Cross Connection Section within
ten days of installation and annually thereafter. Contact Carroll Keatts at
377-1226 if you would like to discuss backflow prevention requirements for this
project.
OA,
FILE NO.: Z-7811 (Cont.
F
G
x
Fire Department: Place fire hydrants per code. Contact the Little Rock Fare
Department at 918-3700 for additional information.
County Planning: No comment.
CATA: The site is not located on a CATA bus route.
ISSUES/TECHNICAL/DESIGN:
Planning Division: This request is located in the River Mountain Planning
District. The Land Use Plan shows Single Family for this property. The applicant
has applied for a PDR (Planned Development -Residential) for construction of a
barn.
The request does not require a change to the Land Use Plan. .
Master Street Plan: Mooser Lane is shown as a Local Street on the Master
Street Plan. The primary function of a Local Street is to provide access to
adjacent properties. Mooser Lane will require dedication of right-of-way.
Bic cle Plan: A Class I bikeway is shown following Taylor Loop Creek through
the property. A Class I bikeway is built separate from or alongside a road.
Since this Class I bikeway is part of Little Rock's regional trail system dedication
of right of way may be required.
City Recognized Neighborhood Action Plan: The property under review is not
located in an area covered by a City of Little Rock recognized neighborhood
action plan.
Landscape: No comment.
SUBDIVISION COMMITTEE COMMENT:
(March 24, 2005)
The applicant was not present. Staff presented the item indicating there were
few outstanding issues associated with the proposed request. Staff stated they
would contact the applicant directly to complete the technical review. There was
no further discussion of the item. The Committee then forwarded the item to the
full Commission for final action.
ANALYSIS -
There were few outstanding issues associated with the proposed request
remaining from the March 24, 2005, Subdivision Committee meeting. The
applicant has indicated the proposed barn facility will not have restroom facilities
or an electrical connection.
3
FILE NO.: Z-7811
The applicant is proposing the rezoning of this 33 acre tract from R-2,
Single-family to PD -R to allow the construction of a barn to house livestock and
his personal mowing equipment. The applicant does not live on the site nor is
there a principal residence on the site, which necessitates the need for a
rezoning request. The applicant has indicated the building will be set at 60 -feet
from the western property line and approximately 350 -feet from Taylor Loop
Creek. There is an existing low water bridge on the site, which will provide
access to the new building. Staff is supportive of the applicant's request. Staff
does not feel the proposed development of the barn without a principal structure
on the site will have any adverse impact on the adjoining properties. To staff's
knowledge there are no outstanding issues associated with the proposed
request.
I. STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
conditions outlined in paragraphs D, E and F of the above staff report.
PLANNING COMMISSION ACTION:
(APRIL 14, 2005)
The applicant was present representing the request. There were no registered
objectors present. Staff presented the item with a recommendation of approval of the
request subject to compliance with the conditions outlined in paragraphs D, E and F of
the above report.
There was no further discussion of the item. The Chair entertained a motion to place
the item on the Consent Agenda for Approval. The motion carried by a vote of 11 ayes,
0 noes and 0 absent.
2