HomeMy WebLinkAboutZ-7789 Map 2•
—"
— -
V77A�IVH� ==s—® — ---'------- —®�—o—sma�sa®@gym—®eass�e.a=.1s61
- m �aga_aa
DEED 466.00' MEAS. 464.6 "N87'41'48"W I
II
14.
I n
III
--/---- / i O• / p i Jc9
o /� �// /o
°
/
/ // Off/ 0000,/o
MENS p Ip
I / / ogizvo / / . '
000ll
�0p CCVEy4 /i / /
IV
/I J
?► I .
1200'sF
/ O % /_ / �►� /
+ / / / / / �4Rk/Ng /
j/2:/SRI/
Ic
o II / f, / / /�
/ / Y LLJw
� 1 / / / FRvlc 1 / f` , /_ / � / / I � i
/ <
I/ / / / / / gpl / / // // / / E / / I / <
00
C3�'�'
Ld
w i / / j / / / / I Exls4NG
o /II( /// / / // ////!✓ // II � SKI �(3��a�/� / ��
es
o
/ / n / / / �f4 'I
��; // // // l
Go
loo
sa
_ 1I
/ �.iS 2• / / 9I0 �YO / F'+
/ II /
II I 1 .I 1 1• ,.. l / 7
— --- —
cl
.� o
1 - --- � 4 6.gD�_S87 1'4�" /I / �``--I%� —(,^.� _j_—I'�"—�--r-
t
n— n\ n n r n �_ A:.—s :n • A _--7_� n � n ^ n n9—n n ` n fE'C7P1 dATdR I�7Vd
—f—G—n/— —n PnI
'J.
W. ROOSEVELT -� +--- - -
70' RA'V
- P I
I
SITE PLAN
GENERAL NOTES REGARDING NEGOTIATED CHANGES
1. PROVIDE PRE-ENGINEERED RIGID FRAMES IN LIEU OF GLU-LAM AND STEEL STRUCTURE. REFER TO PRE-ENGINEERED SHOP DRAWINGS AS
. PREPARED BY WHIRLWIND STEEL BUILDINGS FOR STRUCTURAL FRAMING INFORMATION.
2: PREFINISHFD METAL SIDING TO BE PROVIDED BY METAL BUILDING MANUFACTUERER, COLORS AS SELECTED BY OWNER FROM MANUFACTURER'S
STAND ARDS...REFER TO PRE-ENGINEERED SHOP DRAWINGS AS PREPARED BY WHIRLWIND STEEL BUILDINGS FOR INFORMATION.
3. PREFINISHFD STANDING SEAM METAL ROOFING SHALL BE PROVIDED BY METAL BUILDING MANUFACTUERER, COLORS AS SELECTED BY OWNER
FROM MANUFACTURER'S STANDARDS. REFER TO PRE-ENGINEERED SHOP DRAWINGS AS PREPARED BY WHIRLWIND STEEL BUILDINGS FOR
INFORMATION.
4. ALL WOOD FRAMING IN DOCUMENTS SHALL BE REPLACED WITH METAL STUDS UNLESS NOTED OTHERWISE. 2X6 WOOD STUDS SHALL BECOME 6"
METAL STUDS, 2X4 WOOD STUDS SHALL BECOME 3-5/8" METAL STUDS.
BOLLARD
RE:4/6100
I
2" (P &ALV. FENCE
POSTS a 6'-0" O.G.
Ix6 GEDAR WOOD
SLATS TO FACE OUT.
2x6'5 GEDAR/REDWOOD
u
6" (P 5GHEOULF 40
STEEL PIPE FILLED WITH
CONCRETE - POME TOP - PAINT
PROVIDE 8"(D PIPE
DUMP5TER PADS
2-K4 REINFORCING BARS
INSERT HORIZONTALLY
EACH WAY THROUGH STEEL
PIPE AT 6" BELOW GRADE.
1/2" EXP. JT. AND SEALANT
GONG.5LAB
�o x>
`6x6 10/10 WWM
��C?LL,41Rt� aETr�iL
I 30 O
4
FOOTING
DVJ
� E
co
I.
04 C9
N 'ppp�p
�
l3 • C'4
�0�N
I�:
I
I
I
I
i
'` [
I.
I �
I
I
I
I 3
t
4
c-ioa.
7
I
L
I
i -J
C
BOLLARD
RE:4/6100
I
2" (P &ALV. FENCE
POSTS a 6'-0" O.G.
Ix6 GEDAR WOOD
SLATS TO FACE OUT.
2x6'5 GEDAR/REDWOOD
u
6" (P 5GHEOULF 40
STEEL PIPE FILLED WITH
CONCRETE - POME TOP - PAINT
PROVIDE 8"(D PIPE
DUMP5TER PADS
2-K4 REINFORCING BARS
INSERT HORIZONTALLY
EACH WAY THROUGH STEEL
PIPE AT 6" BELOW GRADE.
1/2" EXP. JT. AND SEALANT
GONG.5LAB
�o x>
`6x6 10/10 WWM
��C?LL,41Rt� aETr�iL
I 30 O
4
FOOTING
DVJ
� E
co
04 C9
N 'ppp�p
�
l3 • C'4
�0�N
,g
yip
• Oto h
'` [
' 2
4
TIEL_
51TE PLAN
iAm 06 APRIL 2008
TVISION DATE rM
12 DEC, 2005
'ROJEGT NO, 04021
iHEET No
C=100