Loading...
HomeMy WebLinkAboutZ-7783-D Map 20- 0 1140,Y-/\ To 0� R q DDd 0 lop tlev.= �ua.zz Inv. Elev.= 303.82' W 0 Co�pret \ \ e \ W gprD�t GqS \ M 0 \ AREA OF MONTESSORI SCHOOL SITE: 1.137 ACRES cp• \ TOTAL AREA TO DEFAIN: 2,20 ACRES I:n I� la _a o = Im M IN Q=CN, C=0.44, 1=8.4 IN/HR., A=2.20 ACRES LANDSCAPE AREA I/ VOLUME AND SUMMARY OF RUNOFF: 0(25)(POST-DEVELOPED): I I rrt I I o m I (6,512 S.F. 'DUSTING' AND 4,200 S.F. PROPOSED) TOTAL VOLUME OF SOUTH POND: 7,328 CU. FT. IE - I TOTAL POST -DEVELOPED Q(25) RUNOFF: 12.20 C.F.S. (20,443 S.F. 'EXISTING' AND 12,172 S.F. PROPOSED) I O $ I CD CID �O F 6 I N LANDSCAPE AREA I U I \\ TOTAL IOO)RELEASE FROM DETENTION: 4.00 C.F.S. 1.46 \ -306\ �STORMWATER I I 4) I I I o (SOUTH POND) I I 0(25)(POST-DEVELOPED): (0.66)(8.4)(2.20)=12.20 C.F.S. 11-- --307306-}J/ OFFSITE RUN-OFF WILL PASS THROUGH THE SOUTH POND. \ I � X � I � c � o .5 O I ; I � � z° > I 0 0 L O� IN S ionCtyby .10 649 49 f oen1 1& eRoBp�y-. 6 fpfeo41/6S,004t/ tiL�fdOphe 7E , dr \ ea W v mph \36, \ ee \ 0'4p \ wOfe 70) O \ Gqs 011f �a \ '04,q k' 32� I 4 0 qs e \ tes of 8 (A e 'Vote {� O f 6°note \ \ �.r anea GqS � �J T RMW ER \ DETENTION AREA \ Gq \ ,oma NORTH GgSS 07 11 708 30j 308 308 3/0 3// 3/? Gc� h O LANDSCAPE EA ,3 O g 00 n s° °pG e qs ASPHkT PAVEMENT \ __ __ _ __ 9 309 063 I I I O ASPHALT PAVEMENT 12. \ 310 I \ \ _ \ I a r 700, CO, r PROPOSED BUILDING 4213 S.F. FIFE 311 E0. C Oti,C�F/F B 00 "iD�,y4lk ASPHALT PAVEMENT STORMWATER \\ \\ DETENTION AREA (SOUTH POND) V) \ \ ! M 0 \ AREA OF MONTESSORI SCHOOL SITE: 1.137 ACRES cp• \ TOTAL AREA TO DEFAIN: 2,20 ACRES I:n 0(25)(PRE-DEVELOPED)': la _a o = Im M IN Q=CN, C=0.44, 1=8.4 IN/HR., A=2.20 ACRES LANDSCAPE AREA I/ VOLUME AND SUMMARY OF RUNOFF: 0(25)(POST-DEVELOPED): I I rrt I I o m I (6,512 S.F. 'DUSTING' AND 4,200 S.F. PROPOSED) TOTAL VOLUME OF SOUTH POND: 7,328 CU. FT. IE - I TOTAL POST -DEVELOPED Q(25) RUNOFF: 12.20 C.F.S. (20,443 S.F. 'EXISTING' AND 12,172 S.F. PROPOSED) I O $ I CD CID �O F 6 I N LANDSCAPE AREA I U I (1.0)(0.93)=0.93 TOTAL IOO)RELEASE FROM DETENTION: 4.00 C.F.S. 1.46 \ -306\ �STORMWATER I I Lu I I I o (SOUTH POND) I I 0(25)(POST-DEVELOPED): (0.66)(8.4)(2.20)=12.20 C.F.S. 11-- --307306-}J/ 0 4 MAG,N LIA TERRACE C I 14,41 wES CHESTER SllRDIVtS w 48 z Wal rke't)s 2 17820 C �! CANT ELL_L.t0 F., sU6.1 12. I45r. J 40� JJ 14 11 u 1 411 9 „� ` ` � 4 ,4.'25 141 :Iy ,1 1:; 14+1;17 14114 c-1 d4 „11. 27 zz [•.1 14 4 14122 LL } 17 PROJECT LOCATION SITE INFORMATION 1. 1.063 ACRES 2. GROSS S.F. OF BUILDING: 4,000 S.F. 3. PARKING SPACE: 9' x 18.5' DRIVE AISLE 24' 4. PROPOSED USE: DENTAL CLINIC PARKING COUNT PROVIDED: REGULAR 9' x 18.5': 24 HANDICAPPED: 1 25 REQUIRED PARKING: 12 SITE AREAS TOTAL AREA = 46,304 SQUARE FEET BUILDING AREA = 4,000 SQUARE FEET 8.64% PARKING AREA = 10,685 SQUARE FEET 23.1% LANDSCAPE AREA = 29,852 SQUARE FEET 68.3% PROPOSED ZONING: P.Z.D. PRELIMINARY STORM WATER RUN-OFF/DETENTION CALCULATIONS AREA OF PCD PROPERTY: 1.063 ACRES DESCRIPTION OF PROPOSED FACIUIIES: AREA OF MONTESSORI SCHOOL SITE: 1.137 ACRES STORM WATER WILL BE DETAINED IN A SURFACE PONDS, TOTAL AREA TO DEFAIN: 2,20 ACRES ONE ON THE NORTH THAT WILL COLLECT THE FRONT PARKING 0(25)(PRE-DEVELOPED)': AREA AND ONE ON THE SOUTH THAT WILL COLLECT THE REAR (*PRIOR TO MONTESSORI SCHOOL DEVELOPMENT) PARKING AND THE EXISTING RUN OFF FROM THE EXISTING C(25): 0.44 (TABLE 2.1, LR DRAINAGE MANUAL) SCHOE[ENnON WILL SERVE THEIDOSTING MONTESSORI SCHOOLL. THE TOTAL VOLUMEOAND THE PROPOSED Q=CN, C=0.44, 1=8.4 IN/HR., A=2.20 ACRES DENTAL CLINIC. 0(25)(PRE-DEVELOPED): (0.44)(8.4)(2.20)=8.13 C.F.S. VOLUME AND SUMMARY OF RUNOFF: 0(25)(POST-DEVELOPED): Q(25)(PRE)=(0.44)(8.4)(2.20)=8.13 C.F.S. (ALLOWABLE) C(25, WEIGHTED) Q(25)(POST)=(0.66)(8.4)(2.20)=12.20 C.F.S. PROPOSED BUILDING AREA: 10,712 S.F. = 0.25 AC. TOTAL VOLUME OF NORTH POND: 1,373 CU. FT. TOTAL VOLUME OF SOUTH POND: 5,955 CU. FT. (6,512 S.F. 'DUSTING' AND 4,200 S.F. PROPOSED) TOTAL VOLUME OF SOUTH POND: 7,328 CU. FT. PROPOSED PAVB M/PARKING AREA: 32,615 S.F. = 0.75 AC. TOTAL POST -DEVELOPED Q(25) RUNOFF: 12.20 C.F.S. (20,443 S.F. 'EXISTING' AND 12,172 S.F. PROPOSED) TOTAL UNDETAINED: 2.41 C.F.S. $5) TOTAL 0 25)RELEASE FROM DIETENNON: 3.70 C.F.S. TOTu PROPOSED IMPERVIOUS AREA 1.00 ACRES 6.11 C.F.S. < 8.13 C.F.S. 25 YR WSEL: 307.62, 307.40 AREAS: (1.2)(0.44)=0.53 TOTAL POST -DEVELOPED 0(100) RUNOFF: 15.10 C.F.S. U TOTAL 0(25) UNDIETAINED: 2.95 C.F.S. (1.0)(0.93)=0.93 TOTAL IOO)RELEASE FROM DETENTION: 4.00 C.F.S. 1.46 6.95 C.F.S. < 10.07 C.F.S. 100 YR WSEL• 307.87, 307.72 C(WEIGHTED): 1.46/2.20=0.66 OFF-SITE STORM WATER FROM THE EAST (4.73 AC.): 0411, C=0.66, 1=8.4 IN/HR., A=2.20 ACRES0(25)=(0.44)(8.4)(4.73)=17.48 C.F.S. 0(25)(POST-DEVELOPED): (0.66)(8.4)(2.20)=12.20 C.F.S. 0(100)=(0.50)(10.2)(4.73)=24.12 C.F.S. OFFSITE RUN-OFF WILL PASS THROUGH THE SOUTH POND. N.T.S. GENERAL NOTES 1. THE LOCATION OF THE EXISTING WATER AND GAS UTILITIES ARE BASED ON RECORDS FROM SAID UTILITY COMPANIES AND ARE HORIZONTALLY FIELD LOCATED ONLY. THE CONTRACTORS SHALL BE RESPONSIBLE FOR DETERMINING ACTUAL LOCATION. 2. CONTRACTOR TO UNCOVER AND MARK UTILITY LINES BEFORE CONSTRUCTION. 3. CONTRACTOR SHALL BEAR ALL RESPONSIBILITY AND COST OF REPAIR OR REPLACEMENT OF EXISTING UTILITIES, DAMAGED OR INTERRUPTED AS A RESULT OF THIS CONSTRUCTION PROJECT. 4. CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER AND THE OWNER OF ANY DAMAGED OR INTERRUPTED UTILITIES IMMEDIATELY. 5. ALL SEWER LINES AND APPURTENANCES SHALL BE INSTALLED IN ACCORDANCE WITH THE LOCAL MUNICIPAL REQUIREMENTS. 6. ALL WATER LINES AND APPURTENANCES SHALL BE INSTALLED IN ACCORDANCE TO THE LOCAL MUNICIPAL REQUIREMENTS. 7. CONTRACTOR SHALL NOTIFY PROJECT ENGINEER PRIOR TO BEGINNING WORK. 8. ALL AREAS WITHIN THE PARKING LOT ARE TO RECEIVE A GRAVEL BASE TO PROVIDE EROSION CONTROL IF WORK IS NOT PROGRESSING IN AN ORDERLY MANNER. A RATE OF 135 TONS/ACRE IS TO BE APPLIED WITHIN TWO WEEKS OF FINAL GRADING. APPLIED WITHIN TWO WEEKS OF FINAL GRADING. 9. ALL AREAS NOT WITHIN THE PARKING LOT ARE TO RECEIVE LOOSE STRAW TO PROVIDE EROSION CONTROL IF WORK IS NOT PROGRESSING IN AN ORDERLY MANNER. A RATE OF 1.5 TONS/ACRE IS TO BE APPLIED WITHIN TWO WEEKS OF FINAL GRADING. 10. AFTER NEW INLETS ARE CONSTRUCTED, STRAW BALES AND GRAVEL FILTER BERMS ARE TO BE PLACED TO ALLOW FLOW THROUGH THE BERM 11. CONTRACTOR WILL CONTROL AND PREVENT OFF-SITE TRACKING OF CONSTRUCTION RUNOFF AND SEDIMENT TO ADJACENT PROPERTY AND PUBLIC ROADS, 12. CONTRACTOR IS TO PROTECT EXISTING STORM DRAINAGE SYSTEMS ACCORDING TO PROTECTION ILLUSTRATIONS PROVIDED. 13. ALL DIMENSIONS ARE TO BACK OF CURB UNLESS OTHERWISE NOTED. 14, PAINT HANDICAP PARKING BUMPER CURBS AND SLOPED PORTIONS OF SIDEWALKS HANDICAP BLUE. 15. BOUNDARY & TOPOGRAPHIC SURVEY BY OTHERS 16. SUBJECT PROPERTY ZONED PCD 17, ALL BUILDING DIMENSION TIES ARE TO THE FOUNDATION SLAB AND ARE PERPENDICULAR TO THE PROPERTY LINE. SEE THE ARCHITECT'S FOUNDATION PLAN FOR SLAB DIMENSIONS. Know what's below. Call before you dig. 20 10 0 20 40 SCALE OWNERSHIP OF DOCUMENTS THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICES, IS THE PROPERTY OF HALFF ASSOCIATES, INC., AND IS NOT TO BE USED, IN WHOLE OR PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF HALFF ASSOCIATES, INC. SAFETY NOTICE TO CONTRACTOR IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE CONTRACTOR WILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS OF THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. THE DUTY OF THE ENGINEER TO CONDUCT CONSTRUCTION REVIEW OF THE CONTRACTOR'S PERFORMANCE IS NOT INTENDED TO INCLUDE REVIEW OF THE ADEQUACY OF THE CONTRACTOR'S SAFETY MEASURES, IN, OR NEAR THE CONSTRUCTION SITE. ENGINEER'S NOTICE TO CONTRACTOR THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES OR STRUCTURES SHOWN ON THESE DRAWINGS WERE OBTAINED BY A SEARCH OF THE AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE THERE ARE NO EXISTING UTILITIES EXCEPT AS SHOWN ON THESE DRAWINGS AND WE ASSUME NO RESPONSIBILITY AS TO THE ACCURACY OF THEIR DEPICTED LOCATION ON THESE DRAWINGS. THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE UTILITY LINES SHOWN, AND ALL OTHER LINES NOT OF RECORD OR NOT SHOWN ON THESE DRAWINGS BY VERIFICATION OF THEIR LOCATION IN THE FIELD PRIOR TO THE INITIATION OF THE ACTUAL PORTION OF THEIR WORK. VJ W C0 N UCU Q L Q W J o U� J PE R 47- l NOV 0 8 2011 BY: ................... ..... OF AUT,S C\\ HALFF ~ ASSOCIATES y1 LIJ U INC. 2 #1470 rL Project No.: P33524.001 Issued: 11/08/17 Drawn By: Checked By: Scale: 1"=20' Sheet Title PCD SITE PLAN PCD Sheet Number c 0 Q U c � o .5 O z° R 47- l NOV 0 8 2011 BY: ................... ..... OF AUT,S C\\ HALFF ~ ASSOCIATES y1 LIJ U INC. 2 #1470 rL Project No.: P33524.001 Issued: 11/08/17 Drawn By: Checked By: Scale: 1"=20' Sheet Title PCD SITE PLAN PCD Sheet Number