Loading...
HomeMy WebLinkAboutZ-7783-D Map 1M 19 0 �401 �Ij\ To R 4 R0001 M -A \ 9S uqS GIS ,l\ Op LIev.= Ov0.« Inv. Elev.= 303.82' L0 Conorete 0 \ \ \ hl gOro� 7 t'IS F4 S LOnP R,�, 1%0 4s'06 wontre�i C;fy/S we w/Cor�ores 087E Sp°°dtCi�•�O�nosd�c o Cotter 4 5 GV 'nAh �O DIP /(S7, qS \ Vote 7 r0 GqS s„edd / G S 04, 0 w d27t 46 4,........� S j, 32" Oak 40 \SIS �(s tes of (q (see No ly O bongo^e d Gos (tne\\ \ GIS T RIM W ER 7 9e e8 GIS \ \ N to DETENTION AREA ry7 GqS o� NORTH POND 9 70 i l 308 30j 308 30 3 r \ GIS o LANDSCAPE EA O GryS GqS 0 9900, on 9pope GqS Y ASPHALT 309 erp PAVEMENT / SUBJECT PROP S 48,325 SQ. FT. + - N I.OB3 Acres + - I LANDSCAP % II�I NEW INLET % W N 17 z I I M 1 I O ASPHALT I m ❑ PAVEMENT I vi 12. 310 I I� I ff0. IOp. C°NCR e�� Set ® o h �� PROPOSED IN BUILDING 16 0 4213 S.F. 1111 rzrl IN IFFE 311.00 70 LANDSCAPE AREA 340' I o I ml I I so. I CO�yC� S70 I 00• 4l7( I r^ ho I I E $ o C6 m to ASPHALT I N PAVEMENT LANDSCAPE AREA I ry$ I \ 308- -307, 08--307 ^� I STONTION R DETENTION AREA \\ (SOUTH POND) - - - - -- - - 15TORMWATERTER I w DETENTION ARFA ' I os / (SOUTH POND)- 07 - 4 i `47 \ ---,_. 1i _ r -AN TF{EL L_L.;Iu.. 46 � �\ 14-11 v .14915 A... > 19 J 1442'. 37 171.i4 «/ > - 95 T 32 i r 71 330 �.. 2G, , 14991 ,4114 ) \ % �' i .a i4,iN we 4 w -7 _ PROJECT LOCATION ARTA OF PCD PROPERTY: 1.063 ACRES CSITE INFORMATION STORM WATER WILL BE DETAINED IN A SURFACE PONDS, TOIIL. AREA TO DETAIN: 2.20 ACRES 1. 1.063 ACRES 2. GROSS S.F. OF BUILDING: 4,000 S.F. 3. PARKING SPACE: 9' x 18.5' DRIVE AISLE 24' 4. PROPOSED USE: DENTAL CLINIC 0(25)(PRE-DEVELOPED)': AREA AND ONE ON THE SOUTH THAT WILL COLLECT THE REAR ('PRIOR TO MONTESSORI SCHOOL DEVELOPMENT) PARKING AND THE EXISTING RUN OFF FROM THE EXISTING C(25): 0.44 (TABLE 2.1, LR DRAINAGE MANUAL) PARKING COUNT Q=CUL, C=0.44, 1=8.4 IN/HR., A=2.20 ACRES DENTAL CUNIC. 0(25)(PRE-DEVELOPED): (0.44)(8.4)(2.20)=8.13 C.F.S. f1470 PROVIDED: REQUIRED REGULAR 9' x 18.5': 24 HANDICAPPED: 1 25 PARKING: 12 Q(2i)(POST-DEVELOPED): Q(25)(PRE)=(0.44)(8.4)(2.20)=8.13 C.F.S. (ALLOWABLE) C(25, WEIGHTED) Q(25)(POST)=(0.66)(8.4)(2.20)=12.20 C.F.S. SITE AREAS PR(POSED BUILDING AREA 10,712 S.F. = 0.25 AC. TOTAL VOLUME OF SOUTH POND: 5,955 CU. FT. 6,:12 S.F. "EXISTING' AND 4,200 S.F. PROPOSED ( ") TOTAL VOLUME OF SOUTH POND: 7,328 CU. FT. TOTAL AREA = 46,304 SQUARE FEET BUILDING AREA = 4,000 SQUARE FEET 8.64% PARKING AREA = 10,685 SQUARE FEET 23.1% LANDSCAPE AREA = 29,852 SQUARE FEET 68.3% TOTAL POST -DEVELOPED 0(25) RUNOFF: 12.20 C.F.S. (20443 S.F. "EXISTING" AND 12,172 S.F. PROPOSED) PROPOSED ZONING: P.Z.D. TOTAL Q 25 RELEASE FROM DETENNON: 3.70 C.F.S. TOTAL PROPOSED IMPERVIOUS AREA: 1.00 ACRES 6.11 C.F.S. < 8.13 C.F.S. 25 YR WSEL: 307.62, 307.40 U TOTAL POST -DEVELOPED Q(100) RUNOFF: 15.10 C.F.S. ARIAS: (1.2 (0.44)=0.53 TOTAL 0(25) UNDETAINED: 2.95 C.F.S. (1.0)(0.93)=0.93 TOTAL Q(IDO)RELEASE FROM DETENTION: 4.00 C.F.S. 1.46 6.95 C.F.S. < 10.07 C.F.S. 100 YR WSEL: 307.87, 307.72 C(PEIGHTED): 1.46/2.20=0.66 Q=Uk C=0.66, I=8.4 IN/HR., A=2.20 ACRESQ(25)=(0.44)(8.4)(4.73)=17.48 OFF-SITE STORM WATER FROM THE EAST (4.73 AC,I: C.F.S. Q(7)(POST-DEVELOPED): (0.66)(8.4)(2.20)=12.20 C.F.S. Q(100)=(0.50)(10.2)(4.73)=24.12 C.F.S. OFFSITE RUN-OFF WILL PASS THROUGH THE SOUTH POND. � I c � I0 o ❑ N 3 o . 0 z I 0 r a S LOnP R,�, 1%0 4s'06 wontre�i C;fy/S we w/Cor�ores 087E Sp°°dtCi�•�O�nosd�c o Cotter 4 5 GV 'nAh �O DIP /(S7, qS \ Vote 7 r0 GqS s„edd / G S 04, 0 w d27t 46 4,........� S j, 32" Oak 40 \SIS �(s tes of (q (see No ly O bongo^e d Gos (tne\\ \ GIS T RIM W ER 7 9e e8 GIS \ \ N to DETENTION AREA ry7 GqS o� NORTH POND 9 70 i l 308 30j 308 30 3 r \ GIS o LANDSCAPE EA O GryS GqS 0 9900, on 9pope GqS Y ASPHALT 309 erp PAVEMENT / SUBJECT PROP S 48,325 SQ. FT. + - N I.OB3 Acres + - I LANDSCAP % II�I NEW INLET % W N 17 z I I M 1 I O ASPHALT I m ❑ PAVEMENT I vi 12. 310 I I� I ff0. IOp. C°NCR e�� Set ® o h �� PROPOSED IN BUILDING 16 0 4213 S.F. 1111 rzrl IN IFFE 311.00 70 LANDSCAPE AREA 340' I o I ml I I so. I CO�yC� S70 I 00• 4l7( I r^ ho I I E $ o C6 m to ASPHALT I N PAVEMENT LANDSCAPE AREA I ry$ I \ 308- -307, 08--307 ^� I STONTION R DETENTION AREA \\ (SOUTH POND) - - - - -- - - 15TORMWATERTER I w DETENTION ARFA ' I os / (SOUTH POND)- 07 - 4 i `47 \ ---,_. 1i _ r -AN TF{EL L_L.;Iu.. 46 � �\ 14-11 v .14915 A... > 19 J 1442'. 37 171.i4 «/ > - 95 T 32 i r 71 330 �.. 2G, , 14991 ,4114 ) \ % �' i .a i4,iN we 4 w -7 _ PROJECT LOCATION PRELIMINARY STORM WATER RUN-OFF/DETENTION CALCULATIONS ARTA OF PCD PROPERTY: 1.063 ACRES CSITE INFORMATION STORM WATER WILL BE DETAINED IN A SURFACE PONDS, TOIIL. AREA TO DETAIN: 2.20 ACRES 1. 1.063 ACRES 2. GROSS S.F. OF BUILDING: 4,000 S.F. 3. PARKING SPACE: 9' x 18.5' DRIVE AISLE 24' 4. PROPOSED USE: DENTAL CLINIC 0(25)(PRE-DEVELOPED)': AREA AND ONE ON THE SOUTH THAT WILL COLLECT THE REAR ('PRIOR TO MONTESSORI SCHOOL DEVELOPMENT) PARKING AND THE EXISTING RUN OFF FROM THE EXISTING C(25): 0.44 (TABLE 2.1, LR DRAINAGE MANUAL) PARKING COUNT Q=CUL, C=0.44, 1=8.4 IN/HR., A=2.20 ACRES DENTAL CUNIC. 0(25)(PRE-DEVELOPED): (0.44)(8.4)(2.20)=8.13 C.F.S. f1470 PROVIDED: REQUIRED REGULAR 9' x 18.5': 24 HANDICAPPED: 1 25 PARKING: 12 Q(2i)(POST-DEVELOPED): Q(25)(PRE)=(0.44)(8.4)(2.20)=8.13 C.F.S. (ALLOWABLE) C(25, WEIGHTED) Q(25)(POST)=(0.66)(8.4)(2.20)=12.20 C.F.S. SITE AREAS PR(POSED BUILDING AREA 10,712 S.F. = 0.25 AC. TOTAL VOLUME OF SOUTH POND: 5,955 CU. FT. 6,:12 S.F. "EXISTING' AND 4,200 S.F. PROPOSED ( ") TOTAL VOLUME OF SOUTH POND: 7,328 CU. FT. TOTAL AREA = 46,304 SQUARE FEET BUILDING AREA = 4,000 SQUARE FEET 8.64% PARKING AREA = 10,685 SQUARE FEET 23.1% LANDSCAPE AREA = 29,852 SQUARE FEET 68.3% TOTAL POST -DEVELOPED 0(25) RUNOFF: 12.20 C.F.S. (20443 S.F. "EXISTING" AND 12,172 S.F. PROPOSED) PROPOSED ZONING: P.Z.D. PRELIMINARY STORM WATER RUN-OFF/DETENTION CALCULATIONS ARTA OF PCD PROPERTY: 1.063 ACRES DESCRIPTION OF PROPOSED FACILITIES: ARTA OF MONTESSORI SCHOOL SITE: 1.137 ACRES STORM WATER WILL BE DETAINED IN A SURFACE PONDS, TOIIL. AREA TO DETAIN: 2.20 ACRES ONE ON THE NORTH THAT WILL COLLECT THE FRONT PARKING 0(25)(PRE-DEVELOPED)': AREA AND ONE ON THE SOUTH THAT WILL COLLECT THE REAR ('PRIOR TO MONTESSORI SCHOOL DEVELOPMENT) PARKING AND THE EXISTING RUN OFF FROM THE EXISTING C(25): 0.44 (TABLE 2.1, LR DRAINAGE MANUAL) SCHOOL. THE TOTAL ON WILL SERVESTHEI EXISTING ONTESS RI SCHOOLUMEOAND THDETEETIPROPOSED Q=CUL, C=0.44, 1=8.4 IN/HR., A=2.20 ACRES DENTAL CUNIC. 0(25)(PRE-DEVELOPED): (0.44)(8.4)(2.20)=8.13 C.F.S. f1470 wW_ 3wdu VOLUME AND SUMMARY OF RUNOFF: Q(2i)(POST-DEVELOPED): Q(25)(PRE)=(0.44)(8.4)(2.20)=8.13 C.F.S. (ALLOWABLE) C(25, WEIGHTED) Q(25)(POST)=(0.66)(8.4)(2.20)=12.20 C.F.S. TOTAL VOLUME OF NORTH POND: 1,373 CU. FT. PR(POSED BUILDING AREA 10,712 S.F. = 0.25 AC. TOTAL VOLUME OF SOUTH POND: 5,955 CU. FT. 6,:12 S.F. "EXISTING' AND 4,200 S.F. PROPOSED ( ") TOTAL VOLUME OF SOUTH POND: 7,328 CU. FT. PR(POSED PAVEMENT/PARKING AREA: 32,615 S.F. = 0.75 AC. TOTAL POST -DEVELOPED 0(25) RUNOFF: 12.20 C.F.S. (20443 S.F. "EXISTING" AND 12,172 S.F. PROPOSED) TOTAL Q 25 UNDETAINED: 2.41 C.F.S. TOTAL Q 25 RELEASE FROM DETENNON: 3.70 C.F.S. TOTAL PROPOSED IMPERVIOUS AREA: 1.00 ACRES 6.11 C.F.S. < 8.13 C.F.S. 25 YR WSEL: 307.62, 307.40 U TOTAL POST -DEVELOPED Q(100) RUNOFF: 15.10 C.F.S. ARIAS: (1.2 (0.44)=0.53 TOTAL 0(25) UNDETAINED: 2.95 C.F.S. (1.0)(0.93)=0.93 TOTAL Q(IDO)RELEASE FROM DETENTION: 4.00 C.F.S. 1.46 6.95 C.F.S. < 10.07 C.F.S. 100 YR WSEL: 307.87, 307.72 C(PEIGHTED): 1.46/2.20=0.66 Q=Uk C=0.66, I=8.4 IN/HR., A=2.20 ACRESQ(25)=(0.44)(8.4)(4.73)=17.48 OFF-SITE STORM WATER FROM THE EAST (4.73 AC,I: C.F.S. Q(7)(POST-DEVELOPED): (0.66)(8.4)(2.20)=12.20 C.F.S. Q(100)=(0.50)(10.2)(4.73)=24.12 C.F.S. OFFSITE RUN-OFF WILL PASS THROUGH THE SOUTH POND. NI.T.S. GENERAL NOTES 1. THE LOCATION OF THE EXISTING WATER AND GAS UTILITIES ARE BASED ON RECORDS FROM SAID UTILITY COMPANIES AND ARE HORIZONTALLY FIELD LOCATED ONLY. THE CONTRACTORS SHALL BE RESPONSIBLE FOR DETERMINING ACTUAL LOCATION. 2. CONTRACTOR TO UNCOVER AND MARK UTILITY LINES BEFORE CONSTRUCTION. 3. CONTRACTOR SHALL BEAR ALL RESPONSIBILITY AND COST OF REPAIR OR REPLACEMENT OF EXISTING UTILITIES, DAMAGED OR INTERRUPTED AS A RESULT OF THIS CONSTRUCTION PROJECT. 4. CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER AND THE OWNER OF ANY DAMAGED OR INTERRUPTED UTILITIES IMMEDIATELY. 5. ALL SEWER UNES AND APPURTENANCES SHALL BE INSTALLED IN ACCORDANCE WITH THE LOCAL MUNICIPAL REQUIREMENTS. 6. ALL WATER LINES AND APPURTENANCES SHALL BE INSTALLED IN ACCORDANCE TO THE LOCAL MUNICIPAL REQUIREMENTS. 7. CONTRACTOR SHALL NOTIFY PROJECT ENGINEER PRIOR TO BEGINNING WORK. 8. ALL AREAS WITHIN THE PARKING LOT ARE TO RECEIVE A GRAVEL BASE TO PROVIDE EROSION CONTROL IF WORK IS NOT PROGRESSING IN AN ORDERLY MANNER. A RATE OF 135 TONS/ACRE IS TO BE APPUED WITHIN TWO WEEKS OF FINAL GRADING. APPLIED WITHIN TWO WEEKS OF FINAL GRADING. 9. ALL AREAS NOT WITHIN THE PARKING LOT ARE TO RECEIVE LOOSE STRAW TO PROVIDE EROSION CONTROL IF WORK IS NOT PROGRESSING IN AN ORDERLY MANNER. A RATE OF 1.5 TONS/ACRE IS TO BE APPLIED WITHIN TWO WEEKS OF FINAL GRADING. 10. AFTER NEW INLETS ARE CONSTRUCTED, STRAW BALES AND GRAVEL FILTER BERMS ARE TO BE PLACED TO ALLOW FLOW THROUGH THE BERM 11. CONTRACTOR WILL CONTROL AND PREVENT OFF-SITE TRACKING OF CONSTRUCTION RUNOFF AND SEDIMENT TO ADJACENT PROPERTY AND PUBLIC ROADS. 12. CONTRACTOR IS TO PROTECT EXISTING STORM DRAINAGE SYSTEMS ACCORDING TO PROTECTION ILLUSTRATIONS PROVIDED. 13. ALL DIMENSIONS ARE TO BACK OF CURB UNLESS OTHERWISE NOTED. 14. PAINT HANDICAP PARKING BUMPER CURBS AND SLOPED PORTIONS OF SIDEWALKS HANDICAP BLUE. 15. BOUNDARY & TOPOGRAPHIC SURVEY BY OTHERS 16. SUBJECT PROPERTY ZONED PCD 17, ALL BUILDING DIMENSION TIES ARE TO THE FOUNDATION SLAB AND ARE PERPENDICULAR TO THE PROPERTY LINE. SEE THE ARCHITECT'S FOUNDATION PLAN FOR SLAB DIMENSIONS. 0 Knovv what's below. Call before you dig. 20 10 0 20 40 SCALE OWNERSHIP OF DOCUMENTS THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICES, IS THE PROPERTY OF HALFF ASSOCIATES, INC., AND IS NOT TO BE USED, IN WHOLE OR PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF HALFF ASSOCIATES, INC. SAFETY NOTICE TO CONTRACTOR IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE CONTRACTOR WILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS OF THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. THE DUN OF THE ENGINEER TO CONDUCT CONSTRUCTION REVIEW OF THE CONTRACTOR'S PERFORMANCE IS NOT INTENDED TO INCLUDE REVIEW OF THE ADEQUACY OF THE CONTRACTOR'S SAFETY MEASURES, IN, OR NEAR THE CONSTRUCTION SITE. ENGINEER'S NOTICE TO CONTRACTOR THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES OR STRUCTURES SHOWN ON THESE DRAWINGS WERE OBTAINED BY A SEARCH OF THE AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE THERE ARE NO EXISTING UTILITIES EXCEPT AS SHOWN ON THESE DRAWINGS AND WE ASSUME NO RESPONSIBILITY AS TO THE ACCURACY OF THEIR DEPICTED LOCATION ON THESE DRAWINGS. THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE UTILITY LINES SHOWN, AND ALL OTHER LINES NOT OF RECORD OR NOT SHOWN ON THESE DRAWINGS BY VERIFICATION OF THEIR LOCATION IN THE FIELD PRIOR TO THE INITIATION OF THE ACTUAL PORTION OF THEIR WORK. V N m L w N F Nw V N L HALFF 0 f' ASSOCIATES W < J Nom f1470 wW_ 3wdu gk J G R.F,or, . NOV 0 S 2017 N m L w N F 0� V N L HALFF 0 f' ASSOCIATES U < Q Nom f1470 wW_ 3wdu gk F MEN MEN ONE R.F,or, . NOV 0 S 2017 c 0� V HALFF 0 f' ASSOCIATES U INC. Z. 3 9,.x f1470 2 a Q U N c � o ❑ N o . z R.F,or, . NOV 0 S 2017 Project No.: P33524.001 Issued: 11/08/17 Drawn By: Checked By: Scale: 1"=20' Sheet Title PCD SITE PLAN PCD Sheet Number AU.T,yz 0� V HALFF f' ASSOCIATES U INC. Z. 3 9,.x f1470 2 a Project No.: P33524.001 Issued: 11/08/17 Drawn By: Checked By: Scale: 1"=20' Sheet Title PCD SITE PLAN PCD Sheet Number