HomeMy WebLinkAboutZ-7780-B Staff AnalysisJuly 11, 2013
ITEM NO.: D FILE NO.: Z -7780-B
NAME: Little Rock Quarries Long -form PID
LOCATION: Located at 16220 Lawson Road
DEVELOPER:
LRQ, LLC
16220 Lawson Road
Little Rock, AR 72210
SURVEYOR-
Shoffner Surveying and Mapping
Wm. Corbitt R. Shoffner
35 Burkwood Drive
Little Rock, AR 72211
AREA: 25.8 acres
CURRENT ZONING
ALLOWED USES:
PROPOSED ZONING:
NUMBER OF LOTS: 1
R-2, Single-family
Single-family residential
D
FT. NEW STREET: 0 LF
PROPOSED USE: Asphalt plant, materials storage, service and maintenance buildings
VARIANCES/WAIVERS REQUESTED: None requested.
BACKGROUN
On January 10, 2013, the Little Rock Planning Commission reviewed a request for
rezoning of 25.83 acres from R-2, Single-family to Mining. The applicant requested this
portion of the rezoning request be held and not forwarded to the Board of Directors so
the applicant could pursue a rezoning to PID.
A. PROPOSAL/REQUEST/APPLICANT'S STATEMENT:
Little Rock Quarries owns and operates the quarry located at 16220 Lawson
Road. The original long term goal was to develop the quarry as well as build an
asphalt plant within the original foot print and zoning of the quarry area located to
July 11, 2013
SUBDIVISION
ITEM NO.: D Cont. FILE NO.: Z -7780-B
the east of this property and currently zoned 1-3. Within the last year Little Rock
Quarries purchased this property containing 25 acres to allow for material
storage and to build a pond downstream of the existing quarry site for water
supply. During tree review process for the rezoning to Mining staff informed the
applicant of the location of the proposed Rahling Road Extension and requested
the applicant deed to the City the required right of way. After the right of way
was plotted on the survey the applicant realized the impact of the future roadway
on the remaining property and caused them to reevaluate the future use
of the property. According to the applicant the dedication will result in the
loss of 2.5 to 3 acres. The applicant then determined a request to rezone the site
to PID would be more appropriate for the intended future uses of the property.
The applicant is seeking approval of the PID to allow the creation of a site plan
for future development. The plan includes the construction of an asphalt plant
within the site and three buildings to be used for maintenance and storage of
equipment. The short-term plans include the use of the property as a storage
area for materials mined from the applicant's adjacent mining operation. The
proposed site plan also includes an area for detention.
B. EXISTING CONDITIONS:
The property contains a single-family residence and a barn located near the
center of the property. The majority of the property is pastureland, as a horse
farm was located on the property. There is a creek and pond along the west
property line, with portions of the property being wooded. The overall property
has varying degrees of slope. The property to the north is undeveloped and
zoned Mining. The area to the west is a large lot single-family subdivision. The
area to the south is zoned 1-2 and 0-2. The area to the east is the applicant's
existing mining operation.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has received one letter of opposition from an area
resident. All property owners located within 200 -feet of the site along with the
Crystal Valley Neighborhood Association, the Plantation Acres Neighborhood
Association and Southwest Little Rock United for Progress were notified of the
public hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. The West Loop Road is classified on the Master Street Plan as a principal
arterial. Dedication of right-of-way to 110 feet will be required for that portion
2
July 11, 2013
SUBDIVISION
ITEM NO.: D (Cont.
FILE NO_: Z -7780-B
of the subject property on both side of the proposed street. Dedication of
right-of-way to 55 feet from centerline will be required for that portion of the
subject property on one side of the proposed street.
2. Show floodplain and floodway delineations on preliminary development
plan.
3. In accordance with Section 31-176, floodway areas must be shown as
floodway easements or be dedicated to the public. In addition, a 25 foot
wide access easement is required adjacent to the floodway boundary.
4. Stormwater detention ordinance applies to this property. Show the
proposed location for stormwater detention facilities on the plan.
5. Lawson Road is classified on the Master Street Plan as a minor arterial. A
dedication of right-of-way 45 feet from centerline will be required.
6. With site development, provide design of street conforming to the Master
Street Plan. Construct one-half street improvement to Lawson Road
including 5 -foot sidewalks with the planned development.
7. If disturbed area is 1 or more acres, obtain a NPDES stormwater permit
from the Arkansas Department of Environmental Quality prior to the start of
construction.
8. With site development, provide the design of street conforming to the
Master Street Plan. Construct one-half street improvement to the West
Loop Road including 5 -foot sidewalks with the planned development.
9. Driveway locations and widths do not meet the traffic access and circulation
requirements of Sections 30-43 and 31-210. Driveway spacing on a major
arterial street is 300 feet. The width of driveways must not exceed 36 feet.
The locations and number of driveways may vary due to sight distance and
street design if the road is elevated near the south end of the property.
10. Obtain a franchise agreement from Public Works (Bennie Nicolo, 371-4818)
for any temporary private improvements or temporary material storage
located in the right-of-way.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNI
Wastewater: Outside the service boundary. No comment.
Entergy: Any existing power lines serving existing and remaining customers will
need to remain in place. Easements for new service will be established at the
time of request for service.
Center -Point Energy: No comment received.
3
July 11, 2013
SUBDIVISION
ITEM NO.: D Cont. FILE NO.: Z -7780-B
AT & T: No comment received.
Central Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for
water service must be met.
2. Contact Central Arkansas Water regarding the size and location of water
meter.
3. If there are facilities that need to be adjusted or relocated, contact Central
Arkansas Water. That work would be done at the expense of the developer.
4. Contact Central Arkansas Water if additional fire protection or metered water
service is required.
5. The Little Rock Fire Department needs to evaluate this site to determine
whether additional public and/or private fire hydrant(s) will be required. If
additional fire hydrant(s) are required, they will be installed at the Developer's
expense.
6. Due to the nature of this facility, installation of an approved reduced pressure
zone backflow preventer assembly (RPZA) is required on the domestic water
service. This assembly must be installed prior to the first point of use.
Central Arkansas Water requires that upon installation of the RPZA,
successful tests of the assembly must be completed by a Certified Assembly
Tester licensed by the State of Arkansas and approved by Central Arkansas
Water. The test results must be sent to Central Arkansas Water's Cross
Connection Section within ten days of installation and annually thereafter.
Contact the Cross Connection Section at 377-1226 if you would like to
discuss backflow prevention requirements for this project.
7. A short water main extension may be needed to provide water service to this
property.
8. The facilities on-site will be private. When meters are planned off private
lines, private facilities shall be installed to Central Arkansas Water's material
and construction specifications and installation will be inspected by an
engineer, licensed to practice in the State of Arkansas. Execution of
Customer Owned Line Agreement is required.
Fire Department: Place fire hydrant(s) per code. Maintain access. Contact the
Little Rock Fire Department for additional information.
County Planning:
1. West Loop Road right of way dedication should be 120 -feet not 110 -feet.
4
July 11, 2013
SUBDIVISION
ITEM NO.: D (Cont.) FILE NO.: Z -7780-B
2. Applicant appears to be dedicating more right of way than required along
Lawson Road. Dimension is difficult to read. Please clarify.
3. Obtain Arkansas Department of Health approval for all new private sewer
systems.
4. Provide design information for all private drives.
5. Are new lots/tracts/easements being created in this development? PID
shows lines between the various use areas but no bearings/distances.
6. Show state plane coordinates for two property corners.
7. Comply with City of Little Rock requirements for street improvements along
Lawson Road frontage.
8. Change "purposed" to "purposes" in west loop dedication notes.
9. Submit finalized grading, storm drainage and sediment control plans to
Pulaski County approval.
10. Obtain driveway permits from Public Works for any new drives constructed
off Lawson Road.
11. Obtain approval letter from volunteer fire department.
CATA: The site is not located on a dedicated CATA Bus Route.
Parks and Recreation: No comment received.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division: This request is located in the Ellis Mountain Planning
District. The Land Use Plan shows Light Industrial (LI) for this property. The
Light Industrial category provides for light warehouse, distribution or storage
uses, and/or other industrial uses that are developed in a well-designed
"park like" setting. The applicant has applied for a rezoning from R-2 (Single
Family District) to PID (Planned Industrial District) to allow for the development of
an asphalt plant on this site.
Master Street Plan: The proposed West Loop is shown as a Principal Arterial
and Lawson Road is shown as a Minor Arterial on the Master Street Plan. A
Principal Arterial is to serve through traffic and to connect major traffic generators
or activity centers within the urbanized area. A Minor Arterial provides
connections to and through an urban area and their primary function is to provide
short distance travel within the urbanized area. Entrances and exits should be
limited to minimize negative effects of traffic and pedestrians on the West Loop
since it is a Principal Arterial and Lawson Road since it is a Minor Arterial. These
l•1
July 11, 2013
SUBDIVISION
ITEM NO.: D (Cont.
FILE NO.: Z -7780 -
streets may require dedication of right-of-way and may require street
improvements for entrances and exits to the site.
Bicycle Plan: A Class i Bike Path is shown along the 'Jest Loop. A Bike Path is
to be a paved path physically separate for the use of bicycles. Additional
right-of-way or/and easement is recommended. Nine -foot paths are
recommended to allow for pedestrian use as well (replacing the sidewalk). And a
Class II Bike Lanes are shown along Lawson Road. Bike Lanes provide a
portion of the pavement for the sole use of bicycles.
Landscape:
1. The site plan must comply with the City's landscape and buffer ordinance
requirements.
2. The City Beautiful Commission recommends preserving as many existing
trees as feasible on this site. Credit toward fulfilling Landscape Ordinance
requirements can be given when preserving trees of six (6) inch caliper or
larger.
G. SUBDIVISION COMMITTEE COMMENT: (May 8, 2013)
The applicant was not present. Staff presented an overview of the development
stating there were no outstanding issues associated with the request. There was
no further discussion of the item. The Committee then forwarded the item to the
full Commission for final action.
H. ANALYSIS:
There were no outstanding technical issues in need of addressing raised at the
May 8, 2013, Subdivision Committee meeting. The applicant is seeking approval
of the PID to allow the creation of a site plan for future development. The plan
includes the construction of an asphalt plant within the site and three buildings to
be used for maintenance and storage of equipment. The short-term plans
include the use of the property as a storage area for materials mined from the
applicant's adjacent mining operation. The site plan also includes an area for
detention to be used in the mining operation.
The applicant has acquired this 25 acres which is adjacent to their existing
mining operation to allow for material storage and to build a pond downstream of
the existing quarry site for water supply. The applicant submitted a request to
rezone the property from R-2, Single-family to Mining which was approved by the
Planning Commission on January 10, 2013. During the rezoning review for the
N
July 11, 2013
SUBDIVISION
ITEM NO.: D (Cont.
FILE NO.: Z -7780-B
Mining zoning staff informed the applicant of the location of the proposed Rahling
Road Extension and requested the applicant deed to the City the required right of
way for the street based on the Master Street Plan requirements. After the right
r u a� a�. + I' -....J i + F 4L +.
of way was plowed on he survey uie applicant IeaIiGCU she impac� o. u�� future
roadway on the remaining property which caused them to reevaluate the future
use of the property. According to the applicant the dedication will result in the
loss of 2.5 to 3 acres. Based on this the applicant decided to not construct the
asphalt plant on the adjacent 1-3, Industrial zoned property and request a
rezoning for this site to allow the proposed asphalt plant to be constructed within
this property. With the rezoning the applicant is also proposing to place building
envelopes on the site plan for future construction. The applicant has indicated
the buildings will be used for maintenance and storage of equipment and a future
office site to serve the mining operation.
Staff is supportive of the request. The area contains a mixture of uses and
zoning. Mining zoned property is located to the north. A mining operation and a
mixture of industrial uses are located to the east, along the north side of Lawson
Road. Undeveloped 0-2 zoned property is located to the south and southwest of
Lawson Road. 1-2 zoned property is also located to the south across Lawson
Road. Single-family residences on large lots and undeveloped R-2 zoned
property are located to the west. The future West Loop as designated by the
Master Street Plan will cross the southwest portion of this property. The 120 -foot
wide street right of way will separate the majority of this site from the residential
properties to the west. The City's Future Land Use Plan designates this property
as Light Industrial. Staff does not feel the rezoning to PID will adversely impact
the adjacent properties or the general area.
STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
comments and conditions as outlined in paragraphs D, E and F of the agenda
staff report.
PLANNING COMMISSION ACTION:
(MAY 30, 2013)
The applicant was present. There were a number of registered objectors present.
Chairman Rector informed the applicant when there were eight or fewer Commissioners
present the applicant was offered the right of deferral to a later meeting date. Chairman
Rector questioned the applicant if he desired to defer to the July 11, 2013, public
hearing.
7
July 11, 2013
SUBDIVISION
ITEM NO.: D (Cont.) FILE NO.: Z -7780-B
The applicant stated they did wish to defer the item to the July 11, 2013, public hearing.
There was no further discussion of the item. The Chair entertained a motion for
approval of the deferral request. T he motion carried by a vote of 8 ayes, 0 noes,
2 absent and 1 open position.
STAFF UPDATE:
The item was deferred from the May 30, 2013, public hearing due to the number of
Commissioners present at the meeting. During the past few weeks the applicant and
staff have met concerning staff's recommendation concerning the required street
improvements to a future arterial indicated on the Master Street Plan located along the
applicant's western boundary and the improvements to Lawson Road. The applicant is
requesting a waiver of the required street construction to the abutting streets.
The Master Street Plan shows a future principal arterial street to pass thru this property
from the north and connect with Lawson Road. As conditions of approval, the Master
Street Plan requires right-of-way dedications and boundary street improvements to
Lawson Road and the future principal arterial street. Since the future principal arterial
street dissects this property, the applicant is required full street construction on the
northern portion of the future principal arterial street. One half street construction is
required on the southern portion which connects with Lawson Road and crosses the
regulatory floodway of McHenry Creek. This portion of the street will be required to be
elevated and bridged over the McHenry Creek floodway. One half street construction is
required on the northern half of Lawson Road. The existing McHenry Creek bridge is
located adjacent to the subject property.
Due to unusual circumstances associated with the construction of the future principal
arterial and Lawson Road, staff recommends a waiver of the required boundary street
improvements to Lawson Road and the future principal arterial street subject to
right-of-way being dedicated as required by the Master Street Plan. Staff recommends
the waiver due to the following:
1. The property is located approximately 2.5 miles from the CLR corporate limits with
no new development occurring in the area;
2. The northern portion of the future principal arterial street does not connect to any
existing street or developed property;
3. By constructing only one half of the street, the southern portion of the future principal
arterial street cannot connect with Lawson Road with this portion being bridged or
elevated-
July 11, 2013
SUBDIVISION
ITEM NO.: D (Cont.) FILE NO.: Z -7780-B
4. The residential properties to the west cannot take direct access to the future
principal arterial street due to the regulatory floodway is located between the
residential properties and the future principal arterial street;
5. The applicant is not eligible to provide a payment to the CLR in -lieu of construction
due to the property being outside of the CLR corporate limits; and
6. The portion of Lawson Road to be widened is within the regulatory floodway;
7. The estimated cost of boundary street improvements is $2.07M which far exceeds
the cost of locating a $1.1 M asphalt facility to this property.
At the time a new or revised development plan is proposed, the development or
redevelopment of the Little Rock Quarries property will be subject to compliance with
Chapter 30, Boundary Street Improvements Ordinance.
PLANNING COMMISSION ACTION: (JULY 11, 2013)
The applicant was present. There were registered objectors present. Staff presented
the item stating during the past few weeks they and the applicant had met concerning
staffs recommendation of the required street improvements to a future arterial indicated
on the Master Street Plan located along the applicant's western boundary and the
improvements to Lawson Road. Staff stated the applicant was requesting a waiver of
the required street construction to the abutting streets. Staff stated they were
supportive of the waiver request. Staff stated to their knowledge there were no
remaining outstanding technical issues associated with the request. Staff presented a
recommendation of approval of the request subject to compliance with the comments
and conditions as outlined in paragraphs D, E and F of the agenda staff report. Staff
also presented a recommendation of approval of the waiver request of the required
street construction to Lawson Road and the proposed future arterial along the western
boundary.
Mr. Michael Lasiter addressed the Commission on the merits of his request. He stated
the asphalt plant was highly regulated and he had secured all permits from the various
State agencies. He stated the number of trucks would not significantly increase with the
development of the asphalt plant. He stated the plant would be monitored by ADEQ for
both water and air pollution. He stated there was also a self-monitoring system which
was reported to the various State agencies.
Ms. Janet Lanza addressed the Commission in opposition of the request. She
presented the Commission with a power point presentation showing the location of her
subdivision, Plantation Acres, and the relationship of the proposed rezoning request to
the area around the site. She stated this area of the County was developed with homes
located on larae lots primarily from 2.5 to 5 acres. She stated within the area there
July 11, 2013
SUBDIVISION
ITEM NO.: D
FILE NO.: Z -7780-B
were no streetlights and no sewer. She stated the streets had no shoulders and deep
ditches. She stated Plantation Acres contained 76 homes and 135 adult residents. She
stated the consensus was the area did not want the rezoning to allow the asphalt plant.
Mr. Walter Jones addressed the Commission in opposition of the request. He stated a
concern of the residents was the increase in traffic and safety. He stated within this
area of Lawson Road there had been five (5) major accidents in the recent past. He
stated within the general area there was a church and a daycare center. He stated
during rush hour traffic a review was made and in one hour there were 15 trucks turning
into the asphalt site and 10 trucks exiting the asphalt plant site. He stated with the lack
of shoulders and the deep ditches for drainage to allow additional truck traffic would be
dangerous.
Ms. Lanza stated the proposal was to change a large area of single-family to an
industrial use. She stated there would be an increase in traffic in the fact that raw
materials would be brought in and the finished product leaving the site. She provided
the Commission with areas within the United States which had indicated there was a
decrease in property values once an asphalt plant was constructed adjacent to
residential lots and homes. She stated in conclusion there were four (4) points she
desired to make. The asphalt plant would increase accidents, change the nature of a
larger residential area, possibly decrease quality of live (traffic, possible odor, health
issues), possibly decrease property values and certainly not enhance the quality of life
for the area residents.
Mr. Walter O'Neal addressed the Commission in opposition of the request. He stated
the properties were not separated by the floodway. He stated the ownership of the lots
within the adjoining subdivision crossed the creek and abutted this property. He stated
his company developed the abutting subdivision which was a middle upscale gated
subdivision. He stated the development had been slow to start but lot sales had picked
up in the past few years. He stated the lots currently looked over a horse farm and with
the approval of the zoning the lots would then look over an asphalt plant.
Ms. Beth Kuhnert addressed the Commission in opposition of the request. She stated
the original request was to store aggregate on this site from the owner's adjacent mining
operation. She stated there was to be no blasting on this site. She stated the proposed
outer loop was not a buffer for the adjacent homes. She stated before the residents
purchased their homes they reviewed the Future Land Use Plan which indicated this
area as residential. She stated although the applicant had all the proper permits there
would be noise and odor. She stated there were concerns of health hazards the asphalt
plant would potentially generate. She requested the Commission not allow the
construction of an asphalt plant in her back yard. She stated she was sure they did not
want an asphalt plant in their own back yard.
10
July 11, 2013
SUBDIVISION
ITEM NO.: D (Cont.
FILE NO.: Z -7780-B
Larry Kuca addressed the Commission in opposition of the request. He stated he was a
partner in developing the adjacent residential subdivision. He stated the subdivision
was there first. He stated by placing the asphalt plant in the area would impact the
potential growth for the area and would kill property values.
Ms. Ann Gooding addressed the Commission in opposition of the request. She stated
she had moved to the area from the south part of the state. She stated her home was
the first home built in the adjacent subdivision. She stated when they moved to the area
they awoke to the screams of eagles. She stated the area was a natural area with a
great deal of wildlife. She stated the company was regulated by various agencies but
accidents did happen. She stated she would hate for the creek to be destroyed by an
accident.
Ms. Sarah Yates addressed the Commission in opposition of the request. She stated
her family had purchase a lot within the abutting subdivision. She stated she did not
want her son to grow up next to an asphalt plant. She stated if the developer wished to
compensate the area property owners for their loss in property values then they might
consider the request.
Elaine Burks addressed the Commission in opposition of the request. She stated the
infrastructure of Lawson Road was not constructed for the increase in truck traffic. She
stated the road was dangerous with open ditches for drainage. She stated Lawson
Road did flood. She stated trucks bringing in material would make the roads more
dangerous. She stated the property was zoned R-2, Single-family. She requested the
Commission defer the request until the infrastructure for Lawson Road was in place.
Ms. Ruth Bell addressed the Commission in opposition of the request. She stated the
League of Women Voters did not support the request because of the heavy traffic the
asphalt plant would generate. She stated the material brought in and the increase in
traffic would be dangerous.
Mr. Michael Lasiter addressed the Commission on the merits of his request. He stated
he respected the concerns of the residents. He stated this was not a bait and switch on
his part. He stated once the City determined the location of the proposed arterial street
the development potential of this site was limited. He stated he could build the plant on
the adjacent 1-3 zoned property. He stated Hugh Taylor Road was now closed and with
the closing of Hugh Taylor his company had eliminated one driveway location.
There was a general discussion concerning the existing zoning, the allowable uses, the
buffers proposed and required and the future arterial. Staff stated the applicant owned
a portion of the adjacent 1-3 zoned property which would allow construction of an
asphalt plant. Staff stated there would be buffers but the buffers would be more a
distance buffer than a visual buffer. The Commission questioned Mr. Lasiter concerning
11
July 11, 2013
SUBDIVISION
IIWA101 rem DW10T•TiR
FILE NO.: Z -7780-B
the material to be used in the production. Mr. Lasiter stated there would be oil brought
to the site. He stated the aggregate would come from the adjacent mining.
The Commission discussed among ong they i selves if an asphalt plant was constructed
would it be better on Lawson Road or 400 to 500 feet off the road. A general statement
was made the residents would see the plant no matter where the plant was placed.
A motion was made to approve the request as presented by staff including all staff
recommendations and comments. The motion failed by a vote of 1 aye, 8 noes and
2 absent.
12
ITEM NO.: 14. Z -7780-B
NAME: Little Rock Quarries Long -form PID
LOCATION: located at 16220 Lawson Road
Planning Staff Comments:
1. Provide notification of property owners located within 200 -feet of the site including
the certified abstract list, notice form with affidavit executed and proof of mailing.
The notice must be mailed no later than May 15, 2013. The Office of Planning and
Development must receive the proof of notice no later than May 24, 2013.
2. The plan indicates the short-term use of the property with material storage for the
adjacent mining. The mid-range plan includes the construction of an asphalt plant.
Long range plans include the construction of office and maintenance buildings to be
used by the owner.
3. Does the request include the creation of multiple lots for future development?
4. At what point will the street be constructed, the future West Loop?
Variance/Waivers-
Public Works Conditions:
1. The West Loop Road is classified on the Master Street Plan as a principal arterial.
Dedication of right-of-way to 110 feet will be required for that portion of the subject
property on both side of the proposed street. Dedication of right-of-way to 55 feet
from centerline will be required for that portion of the subject property on one side of
the proposed street.
2. Show floodplain and floodway delineations on preliminary development plan.
3. In accordance with Section 31-176, floodway areas must be shown as floodway
easements or be dedicated to the public. In addition, a 25 foot wide access
easement is required adjacent to the floodway boundary.
4. Stormwater detention ordinance applies to this property. Show the proposed
location for stormwater detention facilities on the plan.
5. Lawson Road is classified on the Master Street Plan as a minor arterial. A
dedication of right-of-way 45 feet from centerline will be required.
6. With site development, provide design of street conforming to the Master Street
Plan. Construct one-half street improvement to Lawson Road including 5 -foot
sidewalks with the planned development.
7. If disturbed area is 1 or more acres, obtain a NPDES stormwater permit from the
Arkansas Department of Environmental Quality prior to the start of construction.
8. With site development, provide the design of street conforming to the Master Street
Plan. Construct one-half street improvement to the West Loop Road including 5400t
sidewalks with the planned development.
9. Driveway locations and widths do ` not meet the traffic access and circulation
Item # 14.
requirements of Sections 30-43 and 31-210. Driveway spacing on a major arterial
street is 300 feet. The width of driveways must not exceed 36 feet. The locations
and number of driveways may vary due to sight distance and street design if the
road is elevated near the south end of the property.
10. Obtain a franchise agreement from Public Works (Bennie Nicolo, 371-4818) for any
temporary private improvements or temporary material storage located in the right-
of-way.
Utilities and Fire Department/County Planning:
Wastewater: Outside the service boundary. No comment.
Entergy: Any existing power lines serving existing and remaining customers will
need to remain in place. Easements for new service will be established at the time of
request for service.
Center -Point Energy: No comment received.
AT & T: No comment received.
Central Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for water
service must be met.
2. Contact Central Arkansas Water regarding the size and location of water meter.
3. If there are facilities that need to be adjusted or relocated, contact Central Arkansas
Water. That work would be done at the expense of the developer.
4. Contact Central Arkansas Water if additional fire protection or metered water service
is required.
5. The Little Rock Fire Department needs to evaluate this site to determine whether
additional public and/or private fire hydrant(s) will be required. If additional fire
hydrant(s) are required, they will be installed at the Developer's expense.
6. Due to the nature of this facility, installation of an approved reduced pressure zone
backflow preventer assembly (RPZA) is required on the domestic water service.
This assembly must be installed prior to the first point of use. Central Arkansas
Water requires that upon installation of the RPZA, successful tests of the assembly
must be completed by a Certified Assembly Tester licensed by the State of Arkansas
and approved by Central Arkansas Water. The test results must be sent to Central
Arkansas Water's Cross Connection Section within ten days of installation and
annually thereafter. Contact the Cross Connection Section at 377-1226 if you would
like to discuss backflow prevention requirements for this project.
7. A short water main extension may be needed to provide water service to this
property.
8. The facilities on-site will be private. When meters are planned off private lines,
private facilities shall be installed to Central Arkansas Water's material and
construction specifications and installation will be inspected by an engineer, licensed
to practice in the State of Arkansas. Execution of Customer Owned Line Agreement
is required.
Item # 14.
Fire Department: Place fire hydrant(s)..per code. Maintain access. Contact the Little
Rock Fire Department for additional information.
Counly Plannin :
1. West Loop Road right of way dedication should be 120 -feet not 110 -feet.
2. Applicant appears to be dedicating more right of way than required along Lawson
Road. Dimension is difficult to read. Please clarify.
3. Obtain Arkansas Department of Health approval for all new private sewer systems.
4. Provide design information for all private drives.
5. Are new lots/tracts/easements being created in this development? PID shows lines
between the various use areas but no bearings/distances.
6. Show state plane coordinates for two property corners.
7. Comply with City of Little Rock requirements for street improvements along Lawson
Road frontage.
8. Change "purposed" to "purposes" in west loop dedication notes.
9. Submit finalized grading, storm drainage and sediment control plans to Pulaski
County approval.
10.Obtain driveway permits from Public Works for any new drives constructed off
Lawson Road.
11. Obtain approval letter from volunteer fire department.
CATA: The site is not located on a dedicated CATA Bus Route.
Parks and Recreation: No comment received.
Planning Division: This request is located in the Ellis Mountain Planning District. The
Land Use Plan shows Light Industrial (LI) for this property. The Light Industrial category
provides for light warehouse, distribution or storage uses, and/or other industrial uses
that are developed in a well-designed "park like" setting. The applicant has applied for a
rezoning from R-2 (Single Family District) to PID (Planned Industrial District) to allow for
the development of an asphalt plant on this site.
Master Street Plan: The proposed West Loop is shown as a Principal Arterial and
Lawson Road is shown as a Minor Arterial on the Master Street Plan. A Principal
Arterial is to serve through traffic and to connect major traffic generators or activity
centers within the urbanized area. A Minor Arterial provides connections to and
through an urban area and their primary function is to provide short distance travel
within the urbanized area. Entrances and exits should be limited to minimize negative
effects of traffic and pedestrians on the; West Loop since it is a Principal Arterial and
Lawson Road since it is a Minor Arterial. These streets may require dedication of right-
of-way and may require street improvements for entrances and exits to the site.
Bicycle Plan: A Class I Bike Path is shown along the West Loop. A Bike Path is to be a
paved path physically separate for the use of bicycles. Additional right-of-way or and
easement is recommended. Nine -foot paths are recommended to allow for pedestrian
use as well (replacing the sidewalk). And a Class II Bike Lanes are shown along
Lawson Road. Bike Lanes provide a portion of the pavement for the sole use of
bicycles.
Item # 14.
Landscape:
1. The site plan must comply with the City's landscape and buffer ordinance
requirements.
2. The City Beautiful Commission recommends preserving as many existing trees as
feasible on this site. Credit toward fulfilling Landscape Ordinance requirements can
be given when preserving trees of six;(6) inch caliper or larger.
Revised plat//plan: Submit four (4) copies of a revised preliminary plat/plan (to include
the additional information as noted above) to staff on Wednesday, May 15, 2013.
Item # 14.