HomeMy WebLinkAboutZ-7758 Staff AnalysisFebruary 3, 2005
ITEM NO.: H
NAME:
LOCATION:
OWNER/APPLICANT:
Pinnacle Valley Sports Center —
Conditional Use Permit
8700 Pinnacle Valley Road
Michael Nelson/Kristian Nelson
FILE NO.: Z-7758
PROPOSAL: A conditional use permit is requested to allow for
development of a private recreation area containing
multiple ball fields on this R-2 zoned property.
1. SITE LOCATION:
The property is located on the west side of Pinnacle Valley Road; across
from Beck Road and south of the Corps of Engineers Maumelle Park.
2. COMPATIBILITY WITH NEIGHBORHOOD.
The area is characterized by a scattering of single family homes on large
tracts and large areas of undeveloped property and pasture. There are
three parks in the overall area; including Pinnacle Mountain State Park,
the Corps of Engineers Maumelle Park and the City of Little Rock's Two
Rivers Park. Staff is supportive of this concept and believes the proposed
use could be appropriate for this area. Technical issues such as access,
parking and buffers must be resolved.
All owners of property located within 200 feet of the site, all residents within
300 feet who could be identified and the River Valley P.O.A. were notified of
this request.
3. ON SITE DRIVES AND PARKING:
The site plan shows a single, boulevard -type entry from Pinnacle Valley
Road. A 277 space paved parking lot is proposed to be developed in two
phases. 177 spaces are shown in phase I and 100 spaces in phase II.
The plan includes 4 football fields, 3 baseball fields and 1 soccer field.
The City Parks Department estimates that 42 parking spaces should be
provided per field. The 8 fields would require a total of 336 parking
spaces. Programs on the site will need to be scheduled so that all fields
are not in use at the same time. If this is done, the proposed parking
should be sufficient for the use.
February 3, 2005
ITEM NO.: H (Cont.) FILE NO.: Z-7758
4. SCREENING AND BUFFERS:
Compliance with the City's Landscape and Buffer Ordinances is required_
The overall width of the proposed land use and street buffers meet with
ordinance requirements. The width of the undisturbed part of the land
buffers is required to never be less than 9 -feet. Two small sections of the
proposed jogging trail appear to intrude into this minimum width
requirement along the northern and southern perimeter. A minimum of
seventy percent of the land use buffer area is required to remain in its
natural state.
In order to receive credit toward fulfilling the eight percent interior
landscaping requirement, interior islands must be at least 7'/2 feet in width
and 300 square feet in area. Additionally, interior landscaping must be
generally distributed throughout the on-site paved areas.
A six (6) foot high opaque screen, either a wooden fence with its face side
directed outward, a wall, or dense evergreen plantings, is required where
adjacent to residential properties.
An irrigation system to water landscaped areas will be required.
Prior to a building permit being issued, it will be necessary to provide
approved landscape plans stamped with the seal of a Registered
Landscape Architect.
5. PUBLIC WORKS COMMENTS:
Pinnacle Valley Road is classified on the Master Street Plan as a
minor arterial. A dedication of right-of-way 45 feet from centerline will
be required.
2. With site development, provide design of street conforming to the
Master Street Plan. Construct one -additional lane to serve as a turn
lane and a 5 -foot sidewalks with planned development.
3. This site is outside the corporate limits but within the planning
boundary. No grading permits or stormwater detention is required.
4. Driveway locations and widths do not meet the traffic access and
circulation requirements of Sections 30-43 and 31-210. For an arterial
street, driveways should be spaced 150 feet from the property
boundary and 300 feet center to center. The width of driveway must
not exceed 36 feet. Island area should be removed.
2
February 3, 2005
ITEM NO.: H (Cont.)
6. UTILITY, FIRE DEPT. AND CATA COMMENTS:
Wastewater: Outside service boundary, no comments.
Entergy: No Comments received.
CenterPoint Energy: No Comments received.
Southwestern Bell: No Comments received.
FILE NO.: Z-7758
Water: All Central Arkansas Water requirements in effect at the time of
request for water service must be met. The facilities on-site will be
private. When meters are planned off private lines, private facilities
shall be installed to Central Arkansas Water's material and
construction specifications and installation will be inspected by an
engineer, licensed to practice in the State of Arkansas. Execution of
Customer Owned Line Agreement is required.
A Capital Investment Charge based on the size of the meter
connection(s) will apply to this project in addition to normal charges.
This fee will apply to all meter connections including any metered
connections off the private fire system.
Additional fire hydrant(s) will be required. Contact the Fire Department
having jurisdiction to obtain information regarding the required
placement of the hydrant(s) and contact Central Arkansas Water
regarding procedures for installation of the hydrant(s).
Approval of the City of Little Rock will be required prior to service to
this facility.
This development will have minor impact on the existing water
distribution system. Proposed water facilities will be sized to provide
adequate pressure and fire protection.
Fire Department: Place fire hydrants per code. Provide approval from
local Volunteer Fire Department, which serves this area.
County Planning: Not approved as submitted.
CATA: The site is not located on a CATA bus route.
3
February 3, 2005
ITEM NO.: H (Cont.)
SUBDIVISION COMMITTEE COMMENT
FILE NO.: Z-7758
(NOVEMBER 11, 2004)
Kristian Nelson, David Colbert and Keith Miller were present representing the
application. Staff presented the item and noted there was additional information
needed regarding building design, setbacks, building area, signage, typical days
and hours of use, site lighting, phasing and fencing. Staff asked the applicants
to locate dumpsters and screening, to provide the number of parking spaces and
to show dimensions of the spaces and driveway and to label the unidentified
elements on the plan. Staff informed the applicants that the convenience store
needed to be eliminated from the plan or the application would have to be refiled
as a rezoning. Staff told the applicants to provide written comments and
approval from the local Volunteer Fire Department which serves the area.
Public Works, Landscaping and Utility Comments were presented and
discussed.
Staff noted that the site plan submitted by the applicant was unacceptable for a
variety of reasons. Staff presented a revised sketch plan which had been
prepared by the staff of the Parks Department. Staff noted the merits of the
revised plan and suggested the applicants revise their plan to more closely follow
the plan proposed by staff. Mr. Nelson agreed and stated he had already met
with the Parks Department Staff.
The applicants were advised to continue working with neighborhood residents; to
address their concerns. The Committee directed the applicants to respond to
staff issues by November 17, 2004. The item was forwarded to the full
Commission.
STAFF ANALYSIS:
The applicant, representing the Pinnacle Valley Youth Sports Center, is
requesting approval of a conditional use permit to allow for development of a
multi -field sports complex on this R-2 zoned, 24.7± acre tract. Much of the site is
used as pasture, with the rear portion of the site being heavily wooded.
The proposed sports park includes 4 football fields, 3 baseball fields, 1 soccer
field, 2 volleyball courts and 2 open-air basketball courts. Also included is a 277
space paved parking lot, restroom and concession buildings, an open air pavilion
and an 8' wide jogging trail. The facility will focus primarily on programs for
children ages 5-12 but will also have adult flag football and softball programs.
Phase I consists of 3 little league football fields, 3 baseball fields, the concession
and restroom buildings, 177 paved parking spaces and the entry drive. Phase II
consists of an additional 100 paved parking spaces, the soccer field, basketball
February 3, 2005
ITEM NO.: H (Cont.)
FILE NO.: Z-7758
and volleyball courts and a combination little league/regulation size football field.
Each of the playing fields will also have bleachers and lighting.
The applicants did submit a revised plan based on the model prepared by City
Staff. The open air pavilion and restroom building will each be one story in
height and will have 8/12 sloped green metal roofs and stone and natural wood
exteriors. The two-story, 8,000 square foot restroom -concession -administration
building will have similar architecture. Parking lot lighting consists of 400 watt
metal halide lighting on 30 -foot poles at 90 feet spacing. The lighting will be
shielded downward, into the site. The field lighting is also to be on 30 -foot poles
with wattage and spacing as needed to light the fields. Three dumpster areas
are located on the plan, to be screened as required by Code. Fencing will
consist only of 5 -foot chainlink fencing around the baseball fields except for the
outfield fencing which will be a 6 -foot solid wood fence and the chainlink
backstops. Although not shown on the plan, staff anticipates the entry driveway
will be gated to prohibit after-hours intrusions. Landscape areas will be provided
and irrigated to comply with ordinance standards. The perimeter buffers comply
with ordinance requirements. A letter has been received from the West Pulaski
Fire Protection District voicing no opposition to the project if all required water
lines and hydrants are installed. Signage consists of a single 4'X 10' stone and
cedar ground sign at the entrance, signage on the interiors of the outfield fences
and directional signage on the site. There is no bill of assurance.
Staff is supportive of the proposed sports center. There is a need for additional
youth sports fields which has only been compounded by the recent loss of the
Highway 10 fields near the Joe T. Robinson School campus. The complex is
proposed to be located in an area which already has several parks; including
Two Rivers Park, Maumelle Corps of Engineers Park and Pinnacle Mountain
State Park. In 1994, a 233.6 acre tract located just south of this site was
rezoned from R-2 to AF in conjunction with a proposal to develop the site as a
golf course. The golf course was to include a 250 space parking lot, lighted
practice range and a club house/proshop/snack bar. That development did not
occur. This applicant proposes to retain the wooded buffers on the perimeters
where woods exist and to install trees and dense evergreen plantings where
otherwise needed. Hours of operation for the administration building are 8:00
a.m. — 5:00 p.m., Monday through Friday. Game hours, when the fields will be in
use, are 5:00 p.m. — 9:00 p.m., Monday through Friday and 10:00 a.m. — 2:00
p.m., Saturday. There will also be occasional use during the day on Sundays.
The applicant is proposing widening Pinnacle Valley Road by one lane in front of
the site to provide a turn lane.
The applicant is requesting no variances and staff's support is predicated on
each phase of the project being completely developed as per the site plan prior
to any use of the site. Programming of activities must be such that a parking
ratio of 40t parking spaces per active field is maintained. Activities are
5
February 3, 2005
ITEM NO.: H (Cont.
FILE NO.: Z-7758
scheduled to end at 9:00 p.m., Monday through Friday. Lighting of the fields
should be shut-off no later than 9:30 p.m. and parking lot lighting should be
reduced at that time to the minimum needed for security purposes.
STAFF RECOMMENDATION:
Staff recommends approval of the requested C.U.P. subject to compliance with
the following conditions:
1. Compliance with the Staff Comments and Conditions outlined in Sections
4, 5 and 6 of the staff report.
2. Compliance with the approved site plan and phasing plan.
3. There is to be no activity on the site without complete development of
each phase.
4. Existing wooded areas to be preserved on the perimeters of the site are to
be marked and protected by temporary fencing throughout the construction
project. This is to be coordinated with staff prior to any grading, clearing or
construction on the site.
5. Field lighting is to be turned off no later than 9:30 p.m. Parking lot lighting
is to be reduced by 10:00 p.m. to the minimum level required for security.
6. Programming of activities on the site is to be such that a parking ratio of
40 parking spaces per active field is maintained.
PLANNING COMMISSION ACTION:
(DECEMBER 16, 2004)
The applicant was present. There were several objectors present. Staff had
received and forwarded several letters and e-mails in opposition. Staff had
received 3-4 telephone calls in support.
Only 7 commissioners present. In line with the Commission's practice, the
applicant was offered the opportunity to defer the item. The applicant requested
the deferral and stated he would try to meet with the neighbors.
A motion was made to defer the item to the February 3, 2004 meeting. The
motion was approved by a vote of 7 ayes, 0 noes and 4 absent.
D
February 3, 2005
ITEM NO.: H(Cont.)FILE NO.: Z-7758
STAFF UPDATE:
In response to concerns raised by neighborhood residents, the applicant has
scaled-back the proposed sports center development. The project is still
proposed to be built in two phases and the phase lines remain where previously
indicated.
Phase I now consists of three (3) fields that will be used for both baseball and
football, the entry drive and 177 parking spaces, the restroom building, open air
pavilion and two-story concession/administration building. The three (3) football
fields originally shown near the entrance have been eliminated from the plan. A
horse corral that exists in that area will remain.
Phase II now consists only of the additional 100 parking spaces, 2 outdoor
basketball courts and 2 volleyball courts. The remainder of the property in the
Phase II area will remain undeveloped and undisturbed.
The jogging trail remains on the plan. It meanders through the Phase I portion
and around the developed area in Phase II.
No other changes are proposed to the site plan.
The three (3) playing fields will only be used on Tuesdays, Thursdays and
Saturdays. One game will be scheduled on each field on Tuesdays and
Thursdays. The games typically start at 5:30 p.m. Field lights will be turned off
no later than 9:30 p.m. Two games will be played on each field on Saturdays.
These games typically start at 10:00 a.m. The children playing at the park will be
between 5-12 years of age. Registration will be capped at 300 children. Staff
assumes that cap applies to each activity; baseball and football.
Staff is supportive of the revised plan and recommends approval of the C.U.P.
subject to compliance with the comments and conditions outlined in the "Staff
Recommendation" above.
PLANNING COMMISSION ACTION: (FEBRUARY 3, 2005)
The applicant, Kristian Nelson, was present. There were several persons
present; in support and in opposition. Several letters and e-mails of opposition
had been received by staff and forwarded to the Commission. Staff presented
the item and a recommendation of approval.
Kristian Nelson presented a copy of a petition signed by several area residents in
support of the proposal. He stated the ball fields were needed to replace those
lost by the closing of the Highway 10 fields. He stated he was surprised at the
neighbors' opposition but he understood their concerns. Mr. Nelson stated he
had scaled-back the development in response to those concerns. He stated,
because of the delay in this application, Deltic Timber had allowed use of the
Highway 10 facility for one more baseball season. He stated many children
7
February 3, 2005
ITEM Na.: H (Cont.) FILE NO,: Z-7758
would be able to play at this facility without having to pay any registration; that
the important thing was to provide a place for the children to play.
In response to a question from the Commission, Mr. Nelson stated much of the
upfront costs would be donated due to family and corporate support. He stated
he would establish a nonprofit organization and would seek donations.
Architect Keith Miller spoke in support. He stated he had been inspired by
Mr. Nelson's vision and had donated his work on the project. Mr. Miller stated
there was support from other engineers and contractors to see the vision
realized. He stated the park would provide uses that would be available to area
residents. Mr. Miller stated parking and traffic issues were minimal and lighting
would be aimed downward and into the site. He stated money would be raised
to build the facility but zoning approval was first needed.
Ken Brock, of 13010 County Farm Road, stated he was opposed due to traffic
concerns. He stated no one in the area supported the proposal but Mr. Nelson's
family. Mr. Brock stated proposed soccer fields were removed from Two Rivers
Park because of traffic concerns.
Stan Nowicki, of 10814 Pinnacle Valley Road, spoke in opposition and presented
a petition signed by persons in the area who were also opposed. He also voiced
concern about traffic; particularly the possibility of emergency vehicles being
hampered by ballpark traffic. He raised questions about septic tanks, the
number of people and who would be the responsible party.
Tommy Williams, of 27 River Estates Cove, spoke in opposition. He described
neighborhood meetings that had taken place and made note of what he
considered to be inaccuracies in Mr. Nelson's summary of those meetings.
Mr. Williams stated there was no widespread support among area residents for
this proposal. He also voiced traffic concerns.
Gary Aday, of 8112 Pinnacle Valley Road; spoke in opposition. He questioned
whether this was the best use of the property. He also voiced traffic and access
concerns.
In response to a question from the Commission, Mike Hood of Public Works
addressed Pulaski County's plans to make some improvements to Pinnacle
Valley Road. He stated the traffic count of Pinnacle Valley Road at Highway 10
was 2,500 vehicles per day. Mr. Hood stated the two-lane road could
accommodate up to 5,000 vehicles per day. Mr. Hood stated traffic created by
the sports complex would not be that bad on an average daily basis; that there
would be a couple of peak times that might cause some inconvenience.
E:3
February 3, 2005
ITEM NO.: H(Cont.)FILE NO.: Z-7758
In response to a question from the Commission, staff responded that compliance
with the comments from Pulaski County were a condition of the recommendation
of approval.
In response to statements concerning a septic system, Mr. Miller stated the
required engineering would be done and the site would perk.
A motion was made to approve the application with all staff comments and
conditions. The motion was approved by a vote of 6 ayes, 4 noes and 1 absent.
E
FILE NO.: Z-7758
NAME:
LOCATION:
OWNER/APPLICANT:
Pinnacle Valley Sports Center —
Conditional Use Permit
8700 Pinnacle Valley Road
Michael Nelson/Kristian Nelson
PROPOSAL: A conditional use permit is requested to allow for
development of a private recreation area containing
multiple ball fields on this R-2 zoned property.
SITE LOCATION:
The property is located on the west side of Pinnacle Valley Road; across
from Beck Road and south of the Corps of Engineers Maumelle Park.
2. COMPATIBILITY WITH NEIGHBORHO
The area is characterized by a scattering of single family homes on large
tracts and large areas of undeveloped property and pasture. There are
three parks in the overall area; including Pinnacle Mountain State Park,
the Corps of Engineers Maumelle Park and the City of Little Rock's Two
Rivers Park. Staff is supportive of this concept and believes the proposed
use could be appropriate for this area. Technical issues such as access,
parking and buffers must be resolved.
All owners of property located within 200 feet of the site, all residents within
300 feet who could be identified and the River Valley P.O.A. were notified of
this request.
3. ON SITE DRIVES AND PARKING:
The site plan shows a single, boulevard -type entry from Pinnacle Valley
Road. A 277 space paved parking lot is proposed to be developed in two
phases. 177 spaces are shown in phase I and 100 spaces in phase ll.
The plan includes 4 football fields, 3 baseball fields and 1 soccer field.
The City Parks Department estimates that 42 parking spaces should be
provided per field. The 8 fields would require a total of 336 parking
spaces. Programs on the site will need to be scheduled so that all fields
are not in use at the same time. If this is done, the proposed parking
should be sufficient for the use.
4. SCREENING AND BUFFERS:
Compliance with the City's Landscape and Buffer Ordinances is required.
FILE NO_: Z-7758 Cont.)
The overall width of the proposed land use and street buffers meet with
ordinance requirements. The width of the undisturbed part of the land
buffers is required to never be less than 9 -feet. Two small sections of the
proposed jogging trail appear to intrude into this minimum width
requirement along the northern and southern perimeter. A minimum of
seventy percent of the land use buffer area is required to remain in its
natural state.
In order to receive credit toward fulfilling the eight percent interior
landscaping requirement, interior islands must be at least 7'h feet in width
and 300 square feet in area. Additionally, interior landscaping must be
generally distributed throughout the on-site paved areas.
A six (6) foot high opaque screen, either a wooden fence with its face side
directed outward, a wall, or dense evergreen plantings, is required where
adjacent to residential properties.
An irrigation system to water landscaped areas will be required.
Prior to a building permit being issued, it will be necessary to provide
approved landscape plans stamped with the seal of a Registered
Landscape Architect.
5. PUBLIC WORKS COMMENTS:
Pinnacle Valley Road is classified on the Master Street Plan as a minor
arterial. A dedication of right-of-way 45 feet from centerline will be
required.
2. With site development, provide design of street conforming to the
Master Street Plan. Construct one -additional lane to serve as a turn
lane and a 5 -foot sidewalks with planned development.
3. This site is outside the corporate limits but within the planning
boundary. No grading permits or stormwater detention is required.
4. Driveway locations and widths do not meet the traffic access and
circulation requirements of Sections 30-43 and 31-210. For an arterial
street, driveways should be spaced 150 feet from the property
boundary and 300 feet center to center. The width of driveway must
not exceed 36 feet. Island area should be removed.
6. UTILITY. FIRE DEPT. AND CATA COMMENTS:
Wastewater: Outside service boundary, no comments.
Entergy: No Comments received.
FA
FILE NO.: Z-7758 (Cont.)_
CenterPoint Energy: No Comments received.
Southwestern Bell: No Comments received.
Water: All Central Arkansas Water requirements in effect at the time of
request for water service must be met. The facilities on-site will be
private. When meters are planned off private lines, private facilities
shall be installed to Central Arkansas Water's material and
construction specifications and installation will be inspected by an
engineer, licensed to practice in the State of Arkansas. Execution of
Customer Owned Line Agreement is required.
A Capital Investment Charge based on the size of the meter
connection(s) will apply to this project in addition to normal charges.
This fee will apply to all meter connections including any metered
connections off the private fire system.
Additional fire hydrant(s) will be required. Contact the Fire Department
having jurisdiction to obtain information regarding the required
placement of the hydrant(s) and contact Central Arkansas Water
regarding procedures for installation of the hydrant(s).
Approval of the City of Little Rock will be required prior to service to
this facility.
This development will have minor impact on the existing water
distribution system. Proposed water facilities will be sized to provide
adequate pressure and fire protection.
Fire Department: Place fire hydrants per code. Provide approval from
local Volunteer Fire Department, which serves this area.
County Planning: Not approved as submitted.
CATA: The site is not located on a CATA bus route.
SUBDIVISION COMMITTEE COMMENT: (NOVEMBER 11, 2004)
Kristian Nelson, David Colbert and Keith Miller were present representing the
application. Staff presented the item and noted there was additional information
needed regarding building design, setbacks, building area, signage, typical days
and hours of use, site lighting, phasing and fencing. Staff asked the applicants to
locate dumpsters and screening, to provide the number of parking spaces and to
show dimensions of the spaces and driveway and to label the unidentified
elements on the plan. Staff informed the applicants that the convenience store
needed to be eliminated from the plan or the application would have to be refiled
3
FILE NO.: Z-7758
as a rezoning. Staff told the applicants to provide written comments and
approval from the local Volunteer Fire Department which serves the area.
Public Works, Landscaping and Utility Comments were presented and discussed.
Staff noted that the site plan submitted by the applicant was unacceptable for a
variety of reasons. Staff presented a revised sketch plan which had been
prepared by the staff of the Parks Department. Staff noted the merits of the
revised plan and suggested the applicants revise their plan to more closely follow
the plan proposed by staff. Mr. Nelson agreed and stated he had already met
with the Parks Department Staff.
The applicants were advised to continue working with neighborhood residents; to
address their concerns. The Committee directed the applicants to respond to
staff issues by November 17, 2004. The item was forwarded to the full
Commission.
STAFF ANALYSIS:
The applicant, representing the Pinnacle Valley Youth Sports Center, is
requesting approval of a conditional use permit to allow for development of a
multi -field sports complex on this R-2 zoned, 24.7± acre tract. Much of the site is
used as pasture, with the rear portion of the site being heavily wooded.
The proposed sports park includes 4 football fields, 3 baseball fields, 1 soccer
field, 2 volleyball courts and 2 open-air basketball courts. Also included is a 277
space paved parking lot, restroom and concession buildings, an open air pavilion
and an 8' wide jogging trail. The facility will focus primarily on programs for
children ages 5-12 but will also have adult flag football and softball programs.
Phase I consists of 3 little league football fields, 3 baseball fields, the concession
and restroom buildings, 177 paved parking spaces and the entry drive. Phase II
consists of an additional 100 paved parking spaces, the soccer field, basketball
and volleyball courts and a combination little league/regulation size football field.
Each of the playing fields will also have bleachers and lighting.
The applicants did submit a revised plan based on the model prepared by City
Staff. The open air pavilion and restroom building will each be one story in
height and will have 8/12 sloped green metal roofs and stone and natural wood
exteriors. The two-story, 8,000 square foot restroom -concession -administration
building will have similar architecture. Parking lot lighting consists of 400 watt
metal halide lighting on 30 -foot poles at 90 feet spacing. The lighting will be
shielded downward, into the site. The field lighting is also to be on 30 -foot poles
with wattage and spacing as needed to light the fields. Three dumpster areas
are located on the plan, to be screened as required by Code. Fencing will
consist only of 5 -foot chainlink fencing around the baseball fields except for the
outfield fencing which will be a 6 -foot solid wood fence and the chainlink
4
FILE NO.: Z-7758 Cont.
backstops. Although not shown on the plan, staff anticipates the entry driveway
will be gated to prohibit after-hours intrusions. Landscape areas will be provided
and irrigated to comply with ordinance standards. The perimeter buffers comply
with ordinance requirements. A letter has been received from the West Pulaski
Fire Protection District voicing no opposition to the project if all required water
lines and hydrants are installed. Signage consists of a single 4' X 10' stone and
cedar ground sign at the entrance, signage on the interiors of the outfield fences
and directional signage on the site. There is no bill of assurance.
Staff is supportive of the proposed sports center. There is a need for additional
youth sports fields which has only been compounded by the recent loss of the
Highway 10 fields near the Joe T. Robinson School campus. The complex is
proposed to be located in an area which already has several parks; including
Two Rivers Park, Maumelle Corps of Engineers Park and Pinnacle Mountain
State Park. In 1994, a 233.6 acre tract located just south of this site was rezoned
from R-2 to AF in conjunction with a proposal to develop the site as a golf course.
The golf course was to include a 250 space parking lot, lighted practice range
and a club house/proshop/snack bar. That development did not occur. This
applicant proposes to retain the wooded buffers on the perimeters where woods
exist and to install trees and dense evergreen plantings where otherwise needed.
Hours of operation for the administration building are 8:00 a.m. - 5:00 p.m.,
Monday through Friday. Game hours, when the fields will be in use, are 5:00
p.m. — 9:00 p.m., Monday through Friday and 10:00 a.m. — 2:00 p.m., Saturday.
There will also be occasional use during the day on Sundays. The applicant is
proposing widening Pinnacle Valley Road by one lane in front of the site to
provide a turn lane.
The applicant is requesting no variances and staff's support is predicated on
each phase of the project being completely developed as per the site plan prior
to any use of the site. Programming of activities must be such that a parking
ratio of 40t parking spaces per active field is maintained. Activities are
scheduled to end at 9:00 p.m., Monday through Friday. Lighting of the fields
should be shut-off no later than 9:30 p.m. and parking lot lighting should be
reduced at that time to the minimum needed for security purposes.
STAFF RECOMMENDATION:
Staff recommends approval of the requested C.U.P. subject to compliance with
the following conditions:
1. Compliance with the Staff Comments and Conditions outlined in Sections
4, 5 and 6 of the staff report.
2. Compliance with the approved site plan and phasing plan.
3. There is to be no activity on the site without complete development of
5
FILE NO.: Z-7758 (Cont.
each phase.
4. Existing wooded areas to be preserved on the perimeters of the site are to
be marked and protected by temporary fencing throughout the
construction project. This is to be coordinated with staff prior to any
grading, clearing or construction on the site.
5. Field lighting is to be turned off no later than 9:30 p.m. Parking lot lighting
is to be reduced by 10:00 p.m. to the minimum level required for security.
6. Programming of activities on the site is to be such that a parking ratio of
40 parking spaces per active field is maintained.
PLANNING COMMISSION ACTION: (DECEMBER 16, 2004)
The applicant was present. There were several objectors present. Staff had
received and forwarded several letters and e-mails in opposition. Staff had
received 3-4 telephone calls in support.
Only 7 commissioners present. In line with the Commission's practice, the
applicant was offered the opportunity to defer the item. The applicant requested
the deferral and stated he would try to meet with the neighbors.
A motion was made to defer the item to the February 3, 2004 meeting. The
motion was approved by a vote of 7 ayes, 0 noes and 4 absent.
STAFF UPDATE:
In response to concerns raised by neighborhood residents, the applicant has
scaled-back the proposed sports center development. The project is still
proposed to be built in two phases and the phase lines remain where previously
indicated.
Phase I now consists of three (3) fields that will be used for both baseball and
football, the entry drive and 177 parking spaces, the restroom building, open air
pavilion and two-story concession/administration building. The three (3) football
fields originally shown near the entrance have been eliminated from the plan. A
horse corral that exists in that area will remain.
Phase II now consists only of the additional 100 parking spaces, 2 outdoor
basketball courts and 2 volleyball courts. The remainder of the property in the
Phase II area will remain undeveloped and undisturbed.
The jogging trail remains on the plan. It meanders through the Phase I portion
and around the developed area in Phase II.
No other changes are proposed to the site plan.
The three (3) playing fields will only be used on Tuesdays, Thursdays and
Saturdays. One game will be scheduled on each field on Tuesdays and
A
FILE NO.: Z-77
Thursdays. The games typically start at 6:30 p.m. Field lights will be turned off
no later than 9:30 p.m. Two games will be played on each field on Saturdays.
These games typically start at 10:00 a.m. The children playing at the park will be
between 5-12 years of age. Registration will be capped at 300 children. Staff
assumes that cap applies to each activity; baseball and football.
Staff is supportive of the revised plan and recommends approval of the C.U.P.
subject to compliance with the comments and conditions outlined in the "Staff
Recommendation" above.
PLANNING COMMISSION ACTION: (FEBRUARY 3, 2005)
The applicant, Kristian Nelson, was present. There were several persons
present; in support and in opposition. Several letters and e-mails of opposition
had been received by staff and forwarded to the Commission. Staff presented
the item and a recommendation of approval.
Kristian Nelson presented a copy of a petition signed by several area residents in
support of the proposal. He stated the ball fields were needed to replace those
lost by the closing of the Highway 10 fields. He stated he was surprised at the
neighbors' opposition but he understood their concerns. Mr. Nelson stated he
had scaled-back the development in response to those concerns. He stated,
because of the delay in this application, Deltic Timber had allowed use of the
Highway 10 facility for one more baseball season. He stated many children
would be able to play at this facility without having to pay any registration; that
the important thing was to provide a place for the children to play.
In response to a question from the Commission, Mr. Nelson stated much of the
upfront costs would be donated due to family and corporate support. He stated
he would establish a nonprofit organization and would seek donations.
Architect Keith Miller spoke in support. He stated he had been inspired by
Mr. Nelson's vision and had donated his work on the project. Mr. Miller stated
there was support from other engineers and contractors to see the vision
realized. He stated the park would provide uses that would be available to area
residents. Mr. Miller stated parking and traffic issues were minimal and lighting
would be aimed downward and into the site. He stated money would be raised to
build the facility but zoning approval was first needed.
Ken Brock, of 13010 County Farm Road, stated he was opposed due to traffic
concerns. He stated no one in the area supported the proposal but Mr. Nelson's
family. Mr. Brock stated proposed soccer fields were removed from Two Rivers
Park because of traffic concerns.
Stan Nowicki, of 10814 Pinnacle Valley Road, spoke in opposition and presented
a petition signed by persons in the area who were also opposed. He also voiced
concern about traffic; particularly the possibility of emergency vehicles being
7
FILE NO.: Z-7758 (Cont.)
hampered by ballpark traffic. He raised questions about septic tanks, the number
of people and who would be the responsible party.
Tommy Williams, of 27 River Estates Cove, spoke in opposition. He described
neighborhood meetings that had taken place and made note of what he
considered to be inaccuracies in Mr. Nelson's summary of those meetings.
Mr. Williams stated there was no widespread support among area residents for
this proposal. He also voiced traffic concerns.
Gary Aday, of 8112 Pinnacle Valley Road; spoke in opposition. He questioned
whether this was the best use of the property. He also voiced traffic and access
concerns.
In response to a question from the Commission, Mike Hood of Public Works
addressed Pulaski County's plans to make some improvements to Pinnacle
Valley Road. He stated the traffic count of Pinnacle Valley Road at Highway 10
was 2,500 vehicles per day. Mr. Hood stated the two-lane road could
accommodate up to 5,000 vehicles per day. Mr. Hood stated traffic created by
the sports complex would not be that bad on an average daily basis; that there
would be a couple of peak times that might cause some inconvenience.
In response to a question from the Commission, staff responded that compliance
with the comments from Pulaski County were a condition of the recommendation
of approval.
In response to statements concerning a septic system, Mr. Miller stated the
required engineering would be done and the site would perk.
A motion was made to approve the application with all staff comments and
conditions. The motion was approved by a vote of 6 ayes, 4 noes and 1 absent.
E:3
SUBDIVISION COMMITTEE COMMENTS KO -Al
NOVEMBER 11, 2004 \tt�, 6
& �-
ITEM NO.: 11 PINNACLE VALLEY SPORTS CENTER C.U.P. Z-7758
Planning Staff Comments:
01
1. Provide information on all proposed buildings; height and materials.
2. Label setbacks of all structures from property lines. /r
3. Provide building area (square footage) of all buildings. /
4. Provide signage plan.
5. Provide typical days and hours of use.
6. Locate and describe all site lighting; including parking lot lighting and ball field lighting.
r 7. Locate dumpster-trash areas and required screening.
8. Provide phasing plan.
9. Provide number of parking spaces and show dimensions of parking spaces and driveways.
10. Locate and describe all fencing; height and materials.
11. Eliminate convenience store.
12. Label elements shown on site plan north of Avenue of Little Champions.
13. Provide written comments and approval from local Volunteer Fire Department, which serves this area.
14. The property is not covered by a Bill of Assurance.
Variance/Waivers:
• None requested.
Public Works:
1. Pinnacle Valley Road is classified on the Master Street Plan as a minor arterial. A dedication of right-of-
way 45 feet from centerline will be required. Furnish signed and notarized dedications with final Board
approval of the rezoning request.
2. With site development, provide design of street conforming to the Master Street Plan. Construct one -
additional lane to serve as a turn lane and a 5 -foot sidewalks with planned development.
3. This site is outside the corporate limits but within the planning boundary. No grading permits or
stormwater detention is required.
4. Driveway locations and widths do not meet the traffic access and circulation requirements of Sections 30-
43 and 31-210. For an arterial street, driveways should be spaced 150 feet from the property boundary and
300 feet center to center. The width of driveway must not exceed 36 feet. Island area should be removed.
Utilities and Fire and Fire Department/Coun�Planni
Wastewater: Outside service boundary, no comments.
Entergy: No Comments received.
Reliant: No Comments received.
Southwestern Bell: No Comments received.
Water: All Central Arkansas Water requirements in effect at the time of request for water service must be met.
The facilities on-site will be private. When meters are planned off private lines, private facilities shall be
installed to Central Arkansas Water's material and construction specifications and installation will be
inspected by an engineer, licensed to practice in the State of Arkansas. Execution of Customer Owned Line
Agreement is required.
ITEM NO.: 11 PINNACLE VALLEY SPORTS CENTER C.U.P. 7-7758
A Capital Investment Charge based on the size of the meter connection(s) will apply to this project in
addition to normal charges. This fee will apply to all meter connections including any metered connections
off the private fire system.
Additional fire hydrant(s) will be required. Contact the Fire Department having jurisdiction to obtain
information regarding the required placement of the hydrant(s) and contact Central Arkansas Water
regarding procedures for installation of the hydrant(s).
Approval of the City of Little Rock will be required prior to service to this facility.
This development will have minor impact on the existing water distribution system. Proposed water
facilities will be sized to provide adequate pressure and fire protection.
Fire Department: Place fire hydrants per code. Provide approval from local Volunteer Fire Department, which
serves this area.
County Planning:
CATA: The site is not located on a CATA bus route.
Planning Division: No Comments.
Landscape: The width of the proposed buffers along the sites eastern and western perimeters is less than the forty-
four (44) foot average required by the Zoning ordinance. Additionally, the proposed width of the land use buffers
along the sites northern and southern perimeters is less than the thirty (30) foot average required by the Zoning
ordinance. A minimum of seventy percent of land use buffers are required to remain in their natural state. Land
use buffers are required to never be less than nine (9) feet in width at any given point. The on-site street buffer
width along Pinnacle Valley Road is required to never be less than twenty-two (22) feet in width at any given point.
In order to receive credit toward fulfilling the eight percent interior landscaping requirement, interior islands must
be at least 7 % feet in width and 300 square feet in area. Additionally, interior landscaping must be generally
distributed throughout the on-site paved areas.
A six (6) foot high opaque screen, either a wooden fence with its face side directed outward, a wall, or dense
evergreen plantings, is required where adjacent to residential properties.
An irrigation system to water landscaped areas will be regttired.
c�
Prior to a building permit being issued, it will be necessary to provide approved landscape plans stamped with the
seal of a Registered Landscape Architect.
Other: Submit responses to staff issues and four (4) copies by Wednesday November 11, 2004.