Loading...
HomeMy WebLinkAboutZ-7757 Map 3• ,,,4' VERTICAL FACE E..:yrD;,G DErAIL FLOW ANGLE FIRST STAKE THROUGH PREVIOUSLY WD STRAW BALE FLOW . /T STAKE 1.5' TO 2' IN GROUND STRAW BALES PLACED ALONG EQUAL CONTOUR IDI i STRAWBALE DIK BACKFILL WITH GRAVEL 0 NATIVE MATERIAL IN TREN AND ON BOTH SIDES OF FILTER FABRIC ON SURFA WIRE MESH WITH NON -REINFORCED FILTER FABRIC. � FILTER FABRIC FILTER FABRIC. USE STAPLES OR WIRE RINGS TO ATTACH FABRIC TO WIRE. -% STORM WATER DETENTION CALCULATION 1. Area of improvment: 0.055 acres (2394 sq. ft.) 2. Assume minimum time of concentration of 5.0 minutes due to size size and length of improvement. 3. Intensity: 8.5 in./hr. (25 year event) 4. Pre -developed run-off coefficient (C value): 0.30 Post -developed run-off coeffiecient (C value): 0.90 5. Pre -developed flows (Q): Q(10): (0.30)(7.4)(0.055) 0.12 c.f.s. Q(25): (0.30)(8.5)(0.055) 0.14 c.f.s. Q(50): (0.30)(9.2)(0.055) 0.15 c.f.s. 0(100): (0.30)(10.2)(0.055) 0.17 c.f.s. 6. Post -developed flows (Q): Q(10): (0.90)(7.4)(0.055) 0.37 c.f.s. 0(25): (0.90)(8.5)(0.055) 0.42 c.f.s. Q(50): (0.90)(9.2)(0.055) 0.46 c.f.s. Q(100): (0.90)(10.2)(0.055) Oso C.f.s. 7. Total allowable flow (pre -developed, 025): 0.14 c.f.s. 8. Volume of storm water increase per storm duration: Q00): (0.37-0.12)*300 = 75 cu. ft. Q(25): (0.42-0.14)*300 = 84 cu. ft. Q(50): (0.46-0.15)*300 = 93 cu. ft. Q(100): (0.50-0.17)*300 = 99 cu. ft. 9. An in -lieu contribution of $0.23 per cubic foot of storm water increase for the 25 year storm duration. Based on the 84 cubic foot increase for the 25 year storm, (84)*(0.23), $19.32 is due the City of little Rock Public Works Department prior to issuance of a building permit. SOIL LOSS CALCULATIONS SOIL TYPE: CARASAW ; K=.32 A=300(K)(LS)(C)(P) INITIAL SOIL LOSS: L=40' ® 2% ; LS = 0.151 A=300(.32)(0.151)(1)(1)=14.5 T/A/Y POST -GRADING SOIL LOSS: L=40' ® 2% ; LS = 0.151 A=300(.32)(0.151)(0.24)(1.0)=3.48 T/A/Y SO, USE LOOSE HAY OR STRAW AT 1.5 T/A ON DISTURBED AREA FOLLOWING GRADING. NOTES: 1. LAND AREA TO BE DISTURBED - 0.055 ACRES 2. ALL SITE RUNOFF IS COLLECTED AT THE SOUTHEAST CORNER OF THE SITE AND DISCHARGED INTO THE ADJACENT SITE TO THE EAST. 3. SILT FENCE WILL BE USED DURING CONSTRUCTION AROUND DISTURBED AREAS OF THE SITE TO CONTROL EROSION. GRAVEL WILL BE USED AT THE ENTRANCE TO MINIMIZE OFF-SITE TRACKING. 4. DISTURBED AREAS WILL BE SODDED AFTER CONSTRUCTION. E. TING SITE INFORMATION IS DERIVE Y FROM INFORMATION PROVIDED THE OWNER. TRACTOR TO VERIFY PROPERTY NERS, EXISTING TOPOGRAPHY SITE FEATURES PRIOR TO 4VATION TO AVOID OFF-SITE -SITE CONSTRUCTION RELATIVE THE. PROPOSED CONSTRUCTION. )E IMPROVEMENTS TO DRAIN DOSTING DRAINAGE PATHS. L1- SILT FENCE JND THE PERIMETER THE DISTURBED AREAS EROSION CONTROL b, I01 i Lq cY d• r ADDITIONAL RIGHT OF k- I I WAY DEDICATION LLJ U b ®UR f r co. pio f Nr idi Xll i 1 i I I` dC I MCS � III IlC I4 2 3 RELOCATE OR REPLACE SHRUBS AND TREES THAT ARE DISTURBED BY NEW CONSTRUCTION j SAWCUT EDGE OF� EXISTING ASPHALT -- PAVMENT AND MATCH NEW PAVEMENT TO SAWCUT EDGE. LISTING BUILDING ,30 0 C Ci ti W50'18* w 1200.7s' fes\ s GENERAL NOTES 1. THE LOCATION OF THE EXISTING WATER AND GAS UTILITIES ARE BASED ON RECORDS FROM SAID UTILITY COMPANIES AND ARE HORIZONTALLY FIELD LOCATED ONLY. THE CONTRACTORS SHALL BE RESPONSIBLE FOR DETERMINING ACTUAL LOCATION. 2. CONTRACTOR TO UNCOVER AND MARK UTILITY LINES BEFORE CONSTRUCTION. 3. CONTRACTOR SHALL BEAR ALL RESPONSIBILITY AND COST OF REPAIR OR REPLACEMENT OF EXISTING UTILITIES, DAMAGED OR INTERRUPTED AS A RESULT OF THIS CONSTRUCTION PROJECT. 4. CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER AND THE OWNER OF ANY DAMAGED OR INTERRUPTED UTILITIES IMMEDIATELY. 7. CONTRACTOR SHALL NOTIFY PROJECT ENGINEER PRIOR TO BEGINNING WORK. 8. ALL AREAS WITHIN THE PARKING LOT ARE TO RECEIVE LOOSE HAY OR STRAW TO PROVIDE EROSION CONTROL IF WORK IS NOT PROGRESSING IN AN ORDERLY MANNER. A RATE OF 2.0 TONS/ACRE IS TO BE APPLIED WITHIN TWO WEEKS OF FINAL GRADING. 9. ALL AREAS NOT WITHIN THE PARKING LOT ARE TO RECEIVE LOOSE STRAW TO PROVIDE EROSION CONTROL IF WORK IS NOT PROGRESSING IN AN ORDERLY MANNER. A RATE OF 1.5 TONS/ACRE IS TO BE APPLIED WITHIN TWO WEEKS OF FINAL GRADING. 10. AFTER NEW CURB CUTS ARE CONSTRUCTED, STRAW BALES AND GRAVEL FILTER BERMS ARE TO BE PLACED TO ALLOW FLOW THROUGH THE BERM. 11. CONTRACTOR WILL CONTROL AND PREVENT OFF-SITE TRACKING OF CONSTRUCTION RUNOFF AND SEDIMENT TO ADJACENT PROPERTY AND PUBLIC ROADS. 12. ENGINEER IS NOT LIABLE FOR ACCURACTY OF THE EXISTING SITE INFORMATION. CONTRACTOR TO VERIFY PRIOR TO CONSTRUCTION. SITE INFORMATION TOTAL LOT AREA = 21,459 SQ. FT. EXISTING IMPERVIOUS AREA = 13,354 SQ. FT. 62.2% ADDITIONAL IMPERVIOUS AREA = 2,394 SQ. FT. 1 TOTAL IMPERVIOUS AREA = 15,748 SQ. FT. 1 EXISTING GREEN AREA = 8,105 SO. FT. 37.8% PROPOSED GREEN AREA = 5,711 SQ. FT. 26.8% ,30 0 C Ci ti W50'18* w 1200.7s' fes\ s GENERAL NOTES 1. THE LOCATION OF THE EXISTING WATER AND GAS UTILITIES ARE BASED ON RECORDS FROM SAID UTILITY COMPANIES AND ARE HORIZONTALLY FIELD LOCATED ONLY. THE CONTRACTORS SHALL BE RESPONSIBLE FOR DETERMINING ACTUAL LOCATION. 2. CONTRACTOR TO UNCOVER AND MARK UTILITY LINES BEFORE CONSTRUCTION. 3. CONTRACTOR SHALL BEAR ALL RESPONSIBILITY AND COST OF REPAIR OR REPLACEMENT OF EXISTING UTILITIES, DAMAGED OR INTERRUPTED AS A RESULT OF THIS CONSTRUCTION PROJECT. 4. CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER AND THE OWNER OF ANY DAMAGED OR INTERRUPTED UTILITIES IMMEDIATELY. 7. CONTRACTOR SHALL NOTIFY PROJECT ENGINEER PRIOR TO BEGINNING WORK. 8. ALL AREAS WITHIN THE PARKING LOT ARE TO RECEIVE LOOSE HAY OR STRAW TO PROVIDE EROSION CONTROL IF WORK IS NOT PROGRESSING IN AN ORDERLY MANNER. A RATE OF 2.0 TONS/ACRE IS TO BE APPLIED WITHIN TWO WEEKS OF FINAL GRADING. 9. ALL AREAS NOT WITHIN THE PARKING LOT ARE TO RECEIVE LOOSE STRAW TO PROVIDE EROSION CONTROL IF WORK IS NOT PROGRESSING IN AN ORDERLY MANNER. A RATE OF 1.5 TONS/ACRE IS TO BE APPLIED WITHIN TWO WEEKS OF FINAL GRADING. 10. AFTER NEW CURB CUTS ARE CONSTRUCTED, STRAW BALES AND GRAVEL FILTER BERMS ARE TO BE PLACED TO ALLOW FLOW THROUGH THE BERM. 11. CONTRACTOR WILL CONTROL AND PREVENT OFF-SITE TRACKING OF CONSTRUCTION RUNOFF AND SEDIMENT TO ADJACENT PROPERTY AND PUBLIC ROADS. 12. ENGINEER IS NOT LIABLE FOR ACCURACTY OF THE EXISTING SITE INFORMATION. CONTRACTOR TO VERIFY PRIOR TO CONSTRUCTION. SITE INFORMATION TOTAL LOT AREA = 21,459 SQ. FT. EXISTING IMPERVIOUS AREA = 13,354 SQ. FT. 62.2% ADDITIONAL IMPERVIOUS AREA = 2,394 SQ. FT. 11.1% TOTAL IMPERVIOUS AREA = 15,748 SQ. FT. 73.2% EXISTING GREEN AREA = 8,105 SO. FT. 37.8% PROPOSED GREEN AREA = 5,711 SQ. FT. 26.8% BUIILDING AREA = 4,237 SO. FT. 19.7% PARKING AREA = 11,511 SQ. FT. 53.6% 0 HMAC SURFACE COURSE, TY. 2 k �6 CRUSHED AGGREGATE BASE COURSE, Cv 7 8- (MIN) COMPACTED SUBGRADE TO 95% STANDARD PROCTOR DENSITY. TYPICAL PAVING SECTION NTS LIP CONCRETE CURB CLASS 3 & 4 UPRIGHT DETAIL NTS 10 5 0 10 20 SCALE M ;Z- 7 7s-) v Q CV o cm C\j 03co v Np�� Q -3o un @) C0 v �C �E (L J (L U -Poe I SCALE 1 " = 10' RAWN BY : MER CHECKED BY PPROVED BY A� 10/21/04 1CORPORATE SEAL 71 O_ V) Q w N oV) Z a Y Z Q Y �a O O0 UW Z V) _1 H V) PROJECT N0. 04-009 c -i Z 0 W tr 71 O_ V) Q w N oV) Z a Y Z Q Y �a O O0 UW Z V) _1 H V) PROJECT N0. 04-009 c -i